Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
8
Total Value
R 8,4M
Recent Awards
8 awards · Total: R 8 417 237
Panel appointment of 75 contractors for the provision of Dead Work Services (maintenance and repairs) on the Low Voltage (LV) and Medium Voltage (MV)
networks (up to and including 33kV) and associated projects; in Limpopo Area on an “as and when required” basis over period of 60 months.
ESKOM
Ref: LP00183ASR 406 049
12 Dec 2025
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
ESKOM
Ref: KZN157R 1
13 Oct 2025
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN103R 2 496 413
01 Apr 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
ESKOM
Ref: KZN132R 1
16 Jan 2025
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.
ESKOM
Ref: LPOO125NKR 5 514 773
06 Sept 2024
3 More Awards
View complete award history with full tender details.
Paid access from R499/mo
or upgrade to Pro Subscription
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Risk Assessment
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →