Skip to main content
ToolsForensic Analysiskopanang power technologies

kopanang power technologies

Supplier Forensic Analysis · Scanned: 2026/05/24

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
3
Total Value
R 14M

Recent Awards

3 awards · Total: R 14 203 737

Showing 5 of 3
THE PROVISION OF VEGETATION MANAGEMENT AND BUSH CLEARING SERVICES IN THE TRANSMISSION NORTH EAST GRID FOR A PERIOD OF FIVE (05) YEARS ON AN AS AND WHEN REQUIRED BASIS
ESKOM
Ref: MWP2461TX
R 8 688 965
02 Jun 2025
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.
ESKOM
Ref: LPOO125NK
R 5 514 773
06 Sept 2024
The construction of MV and LV Feeder lines including designated material to be supplied by the contractor for various zones within the Limlanga Cluster (Limpopo & Mpumalanga) on an “as and when” required basis for a period of 36 months.
ESKOM
Ref: LP0083SM
R 0
01 Jan 1900

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →