• Root Cause Analysis
• Failure mode effective analysis
• Knowledge of supplier audits
CONTROLLED DISCLOSURE
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
The provision of Quality Assurance Activities and Unique Identifier: 14RISK GEN-2415
Performance of Physical Inspections on Outages (Planned
and Unplanned), Maintenance and Projects activities at Revision: 1
Tutuka Power Station for a period of 5 years. Page:
• Knowledge of deviation control through
NCR procedures.
• Data book inspection and reviews
Contractor to adhere to the following:
The Contractor will also provide: -
• Documentation that verifies that the work performed meets the minimum standards established by the
specifications.
• Weekly and Monthly activity reports to indicate their involvements in the daily running of the Power
station and interface with the relevant department.
• Monthly presentation of quality risks, issues, actions, solutions, and improvement actions.
• Report reworks and cost saving methods.
• Conduct and Provide report on Supplier/Contractor quality internal Audits.
• Offer on the job and awareness training.
• Submit monthly reports for plant failure mode effective analysis
Special Requirements
• Risk assessments must be completed before each task.
• The contractor shall comply to Eskom Lifesaving rules.
• Eskom safety, quality and outage meetings to be adhered to – teams or in person
• The Contractor will comply within Eskom Quality Standard’s.
• Site conditions will be according to the Eskom and Safety regulations standards.
• Tools, site, cabins and equipment shall be inspected by Contractor and check sheet must be filled and
ensure to maintain good housekeeping.
• Audits on Contractor will be done on a frequent basis.
• 4 x BSO evaluations to be done each month
• All Eskom Safety Regulations must be adhered to.
• Review Quality Control Plans and Contract Quality Plans as per requirement of QM58
• Eskom Transport procedures to be always adhered to
• The Contractor to have and comply to the following documents: -
− Quality Management System Requirements ISO 9001: 2015 version
− Valid Certification of Quality Management System by an ISO accredited body
− The Contractor to be ISO 9001: 2015 certified
CONTROLLED DISCLOSURE
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
The provision of Quality Assurance Activities and Unique Identifier: 14RISK GEN-2415
Performance of Physical Inspections on Outages (Planned
and Unplanned), Maintenance and Projects activities at Revision: 1
Tutuka Power Station for a period of 5 years. Page:
General
• Perform Quality Assurance activities on Outages, Projects and Maintenance activities as-and-when
requested.
• Working hours is Eskom working time and overtime might be required depending on the workload.
• A request for absence from the workplace must be negotiated with Eskom. In periods of absence a
negotiated substitute will replace the absentee.
• If the Contractor were like to bring in extra people under its control, it must be negotiated with the
Employer.
• In case of a Contractor’s employee (Quality Inspector) leaving work or terminating His/her contract for
any reason, The Contractor shall ensure replace the absent employee within 2 weeks
• All records will be seen as Eskom property and may not be used for other companies.
• Any deviations to the program / plan to be communicated within eight hours.
• The Contractor will be working along with other Contractors
• Contractor to supply own consumables
• Private calls and internet connection will be on the account of the Contractor
• The Contractor to provide proof of experience and qualifications for approval by Service Manager.
• The Contractor will report directly to the Service Manager.
• Audit on Contractor will be done on a frequent basis as per Employer’s Audit Plan.
• Contractor to make use of own facilities and provide own tea, coffee, sugar, etc.
• Quality control plan and contract Quality plan approval process standards as per QM 58 to be adhered
to.
• The Contractor will make use of the LAR system.
• Workers register and Risk Assessment Form must be completed before each task.
• Eskom required and relevant training for the services will be provided by Employer.
• All communications must be done electronically or printed and filed in Service Manager’s file.
• Contractor personnel to attend meetings as requested by the Service Manager
• Timesheets to be logged and signed by Service Manager and Contractor.
• All PPE to be provided by Contractor at own cost and must be SABS approved.
• Yearly induction for all personnel.
• All work to be issued via the SAP Plant Maintenance system (Work Order & Purchase Order).
• All defected equipment / material to be reported to the Employer via SAP System.
CONTROLLED DISCLOSURE
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
The provision of Quality Assurance Activities and Unique Identifier: 14RISK GEN-2415
Performance of Physical Inspections on Outages (Planned
and Unplanned), Maintenance and Projects activities at Revision: 1
Tutuka Power Station for a period of 5 years. Page:
5. Manpower and Site Establishment Requirements
Manpower plan
The contractor will provide the following resources:
• 1x Quality Supervisor
• 4x Welding Quality Inspectors (2x Level 1 Inspectors & 2x Level 2 Inspectors)
• 2x Electrical Quality Inspectors
• 2x C&I Quality Inspector
• 5x Mechanical Inspectors (extensive experience)
• 1x Civil Quality Inspector as and when required
Resources are required to conduct onsite and offsite inspections when required.
Site Establishment
• The contractor is to establish their own site (Park home) at the start of the contract and to de-
establish it at the end of the contract. Site conditions will be according to the Eskom and
Safety regulations standards.
• Tools, site, cabins and equipment shall be inspected by Contractor and check sheet must be
filled and ensure to maintain good housekeeping.
6. Acceptance
This document has been seen and accepted by:
Name Designation
Armando Mathebula Maintenance Manager, Boiler and Turbine Valves
Elvis Maremene Manager, Maintenance
Mxolisi Ntanzi Manager, Projects
Terry Maseko Manager, Outages (Acting)
Mikateko Matlole Maintenance Manager, Mechanical
Nathi Mabaso Auxiliary Engineering Manager
Sello Kgantsi Maintenance Manager, Mechanical
Ryan Hector Manager, Electrical Plant
Rhulani Lowani Maintenance Manager, Mechanical
Takalani Mabirimisa Maintenance Manager, Turbine
Geoff Ledwaba Manager, C&I Plant
Nomkhosi Ramonotsi Maintenance Manager, C&I
Bennie Naude Senior Advisor, C&I
Sanelisiwe Radebe Maintenance Manager, Works Management
Jerry Dlamini Maintenance Manager, Mechanical
Lele Masote Manager, Engineering
Phathamandla Sithole Civil Engineering Manager
Aneske Jurie Design and Specification Manager
Pikela Chauke Boiler Engineering Manager, (Acting)
Lebogang Ramphago Turbine Engineering Manager
CONTROLLED DISCLOSURE
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
The provision of Quality Assurance Activities and Unique Identifier: 14RISK GEN-2415
Performance of Physical Inspections on Outages (Planned
and Unplanned), Maintenance and Projects activities at Revision: 1
Tutuka Power Station for a period of 5 years. Page:
Name Designation
Ditsoanelo Nkosi Outage Manager
Lucas Nyembe Contracts Manager
7. Revisions
Date Rev. Compiler Remarks
July 2025 1 Marius Prinsloo Document development
8. Development Team
The following people were involved in the development of this document:
• Marius Prinsloo
• Boitumelo Kotu
• Mosiuoa Mona
• Keamogetse Merementsi
9. Acknowledgements
N/A
CONTROLLED DISCLOSURE
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30