Skip to main content
ToolsForensic Analysismaziya generalbamboo rock jv

maziya generalbamboo rock jv

Supplier Forensic Analysis · Scanned: 2026/05/23

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
2
Total Value
R 40M

Recent Awards

2 awards · Total: R 40 279 050

Showing 5 of 2
PACKAGE 1 - THE RECONSTRUCTION OF THE 3 KV DC TRACTION SUBSTATIONS, AND AC DISTRIBUTION SUBSTATIONS BETWEEN LANGLAAGTE TRAIN STATION AND MARAISBURG TRACTION SUBSTATION
Passenger Rail Agency of South Africa
Ref: HO/PT/ENG/(E)/220/12/2022
R 0
01 Jun 2023
REQUEST FOR TENDER (RFT) FOR THE APPOINTMENT OF A CONTRACTOR FOR THE REINSTATEMENT OF CHRIS HANI 3KV DC AND 11KV AC SUBSTATIONS ON THE CENTRAL RAIL CORRIDOR IN WESTERN CAPE
Passenger Rail Agency of South Africa
Ref: HO/PT/ENG/(E)/193/08/2021
R 40 279 050
07 May 2023

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →