The road accident fund seeks a service provider to execute a comprehensive tenant installation for the state attorneys’ office at 33 waterkant street, cape town. The project includes demolition, partitioning, flooring, electrical, plumbing, HVAC, fire protection, and finishes, with strict compliance to SANS standards and mandatory certificates of compliance (coc) for plumbing and electrical works.
General:
Technical:
Material Approval:
Scope: Tenant installation for State Attorneys’ Office space at 33 Waterkant Street, Cape Town. Includes interior finishes, furniture, and accessories aligned with Road Accident Fund (RAF) Corporate Identity.
Floor Finishes:
Wall & Door Finishes:
Ceiling & Lighting:
Window Finishes:
Pause Areas:
General Notes:
Request for Information (RFI) for the appointment of a service provider to execute a tenant installation for the State Attorneys’ Office space at 33 Waterkant Street, Cape Town. The project involves interior finishes, furniture, and accessories aligned with the Road Accident Fund (RAF) Corporate Identity standards.
All proposed alternatives to specified materials must be submitted to FM Space & Projects for evaluation. Approval criteria:
Department: SUPPLY CHAIN MANAGEMENT
This is a Request for Information (RFI) for the appointment of a service provider to carry out a tenant installation for the State Attorneys’ Office space at 33 Waterkant Street, Cape Town. The process adheres to principles of transparency, accountability, impartiality, and ethics as outlined in the Constitution of South Africa and relevant legislation.
This is a Request for Information (RFI) for the appointment of a service provider to carry out a tenant installation for the State Attorneys’ Office space at 33 Waterkant Street, Cape Town. The process adheres to principles of transparency, accountability, impartiality, and ethics as outlined in the Constitution of South Africa and relevant legislation.
Submit responses via email to [email protected], addressed to SCM – Demand Management. Include the following:
Disqualification risks:
Evaluation process:
Mandatory requirements:
Outcome: Bidders failing mandatory requirements are disqualified from further evaluation.
Scope: Tenant installation for the State Attorneys’ office space at 33 Waterkant Street, Cape Town.
Objective: Ensure the building meets the business and operational requirements of the Road Accident Fund (RAF).
Details: Refer to Annexure A (Bill of Quantities) and Annexure B (Floor Drawings) for full specifications. Additional references: Annexure C (RAF Corporate Identity) and Annexure D (Standard Bidding Document SBD 4).
Pricing submission:
Mandatory compliance:
Closing date: 10 June 2026 at 11:00 AM. All enquiries must be submitted in writing prior to this date.
Enquiries and submissions: Email [email protected], addressed to SCM – Demand Management. Reference specific paragraph numbers in enquiries where applicable.
Project background: The Road Accident Fund (RAF) is a Schedule 3A public entity under the Road Accident Fund Act, 1996. Its mandate includes providing compulsory social insurance cover to all road users in South Africa, rehabilitating and compensating injured persons, and promoting road safety.
Project scope: RAF is sourcing office space for State Attorneys at 33 Waterkant Street, Cape Town. The tenant installation must ensure the building meets RAF’s business and operational needs.
Additional context: RAF’s customer base includes the South African public and foreigners within the country. Head office is in Centurion, with plans to establish Customer Experience Centres (CECs) in each province.
Evaluation process:
Outcome: Bidders failing mandatory requirements are disqualified from further evaluation.
Submit a detailed Bill of Quantities (BoQ) as per the provided structure. Include all items listed with units, quantities, rates, sub-totals, and totals. Compliance with NBR SANS 10400-Part N is mandatory for glazing. Provide allowances for preliminaries, general works, and after-hours labor where specified. Ensure all pricing is complete and follows the BoQ format.
General: Service providers must be registered and compliant with South African legal and regulatory requirements. Experience in tenant installations, office fit-outs, and compliance with SANS standards is required. Ability to provide valid Certificates of Compliance (COC) for electrical and plumbing works is mandatory. Technical: Proven track record in executing similar projects (demolition, partitioning, flooring, electrical, plumbing, HVAC, and fire protection). Access to qualified professionals (e.g., structural engineers, fire engineers, electricians, plumbers) is required. Capacity to meet deadlines, including after-hours work if required. Financial: Financial stability to handle contingencies and escalations as specified in the tender. Ability to provide contractors' all-risk insurance and other required insurances.
Scope: Tenant installation for State Attorneys’ Office at 33 Waterkant Street, Cape Town. Key deliverables: Demolition (flooring, brickwork, doors, sanitary fittings), partitioning (drywall, brickwork), doors (internal semi-solid, glass/aluminium swing and sliding), glazing (6.38mm clear laminated safety glass panels, compliant with NBR SANS 10400-Part N), flooring (vinyl, carpet tiles with 10% wastage, ceramic/porcelain tiles, sealed screed), finishes (painting, wall tiles, door decoration), ceilings (Thermatex acoustic), joinery (kitchen cupboards, reception seating), blinds (25mm aluminium venetian), plumbing (kitchenette, geyser, paraplegic bathroom with COC), electrical (lighting, plug points, data/network points, isolators, testing/commissioning, COC), HVAC (fresh air, air-conditioning, extraction, fire dampers), fire protection (detection, stopping), and professional fees (structural, fire/mechanical engineers). Furniture is excluded and must be quoted separately if required. HVAC and fire protection require designs, municipal approvals, construction drawings, site visits, and final inspection/sign-off.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies (escalation, general, fire, mechanical), and Fees/Additional General Expenses (design/admin/project management, contractors all risks insurance, disbursements, cleaning, occupational H&S safety file and risk audit). All rates must be provided for a complete submission. Payment terms and bonds/guarantees are not specified.
Plumbing Certificate of Compliance (COC) required for all plumbing works. Electrical COC, testing, commissioning, legend cards, and labelling required for electrical installations. Health and safety file required. Occupational H&S: Safety file and risk audit required. Glazing must comply with NBR SANS 10400-Part N (6.38mm clear laminated safety glass). Contractors All Risks Insurance required. After-hours labor must comply with safety protocols. Structural integrity and compliance with specifications required for partitioning works. No explicit B-BBEE, CIDB, or tax compliance requirements stated in the document.
Contact: Kayla-Nicole Moyce. Email: [email protected]. Phone: +27 73 633 2498. Address: 33 Waterkant Street, Cape Town.
Request for Information (RFI) for the appointment of a service provider to carry out tenant installation for the State Attorneys’ Office at 33 Waterkant Street, Cape Town. Scope includes demolition, partitioning, doors, glazing, flooring, finishes, ceilings, joinery, blinds, plumbing, electrical, HVAC, fire protection, and professional services. Furniture is excluded and must be quoted separately if required.
Contract includes partitioning works such as creating new door openings in existing partitions and standard drywall partitioning (DW 90 with Gyproc Rhinoboard). Reinforcement of partitions using 18mm shutterply may be required. Contractor must ensure structural integrity and compliance with specifications.
HVAC: Designs must include HVAC drawings/CAD drawings, meetings with architects, municipal approvals, quotation adjudication, construction drawings, periodic site visits, and final inspection/sign-off. Fire Protection: Rational fire design including fire protection/detection drawings, municipal approvals, quotation adjudication, construction drawings, site visits, and final inspection/sign-off. All installations must meet the intent of the design.
Categories
Request for Information
420 Witch-Hazel Road, Eco Glades 2 - Eco Park - Pretoria - 0046
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure C – RAF Corporate Identity.pdf
The Road Accident Fund (RAF) is requesting information for the appointment of a service provider to carry out a tenant installation for the State Attorneys’ Office space at 33 Waterkant Street, Cape Town. The project involves interior finishes, furniture, and accessories aligned with RAF’s brand strategy, including floor finishes, wall and door finishes, window treatments, pause area fittings, and lighting.
Annexure B - Floor Drawings.pdf
Annexure A - Bill of Quantities.pdf
The Road Accident Fund (RAF) is requesting information (RFI) for the appointment of a service provider to execute a tenant installation for the State Attorneys’ Office space at 33 Waterkant Street, Cape Town. The project involves demolition, partitioning, flooring, painting, electrical, plumbing, HVAC, fire protection, and joinery works across the third and fourth floors. The scope includes both labor and material supply, with detailed specifications provided in the Bill of Quantities. The tender closes on June 10, 2026.
Annexure D – Standard Bidding Document (SBD) 4.pdf
The Road Accident Fund (RAF) is requesting information (RFI) for the appointment of a service provider to carry out a tenant installation for the State Attorneys’ Office space at 33 Waterkant Street, Cape Town. The tender requires bidders to complete an SBD4 disclosure form to ensure transparency, accountability, and ethical compliance in the bidding process.
RFI - Cape Town State Attorneys office space Tenant Installation - Final.pdf
The Road Accident Fund (RAF) is requesting information (RFI) for the appointment of a service provider to carry out tenant installation for the State Attorneys’ office space at 33 Waterkant Street, Cape Town. The project involves setting up the office space to meet operational requirements, with submissions due by 10 June 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Wednesday, 10 June 2026 - 11:00
Venue
null
03 Jun
2026
Tender Published
Tender was published
10 Jun
2026
Closing Date
Tender closing date
Matched by category & region
Pricing requirements:
Annexures:
Enquiries and submissions: Email [email protected], addressed to SCM – Demand Management. All enquiries must be submitted in writing prior to the submission date and reference specific paragraph numbers where applicable.
Mandatory requirements:
Note: The RAF reserves the right to verify and validate CIDB registration details.
Enquiries and submissions: Email [email protected], addressed to SCM – Demand Management. All enquiries must be submitted in writing prior to the submission date and reference specific paragraph numbers where applicable.
Mandatory requirements:
Note: The RAF reserves the right to verify and validate CIDB registration details.
The RAF reserves the right to appoint more than one bidder.
Evaluation process:
Outcome: Bidders failing mandatory requirements are disqualified from further evaluation.
Mandatory requirements:
Note: The RAF reserves the right to verify and validate CIDB registration details.
Safety glass requirements: All glazed panels must use 6.38mm clear laminated safety glass in accordance with NBR SANS 10400-Part N. Plumbing COC required for all plumbing works. Electrical COC, testing, commissioning, and health and safety file required for electrical installations. Occupational H&S: Safety file and risk audit required. After-hours labor must comply with safety protocols.
Flooring: Needle-punched carpet tiles (Berberpoint, all colors) must include 10% wastage allowance. Third floor: 157 m². Fourth floor: 215 m².
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Primary contact: Kayla-Nicole Moyce. Email: [email protected]. Phone: +27 73 633 2498. Address: 33 Waterkant Street, Cape Town.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Pricing must follow the Bill of Quantities structure. Each item requires a unit, quantity, rate, sub-total, and total. Key sections: Builders Work Preliminaries and General, Demolition, Partitioning, Doors, Glazing, Flooring, Finishes, Ceilings, Joinery/Sanitary/Kitchen Fittings, Miscellaneous Builders Works, Plumbing, Electrical Installation, Blinds, HVAC, Fire Protection, Professional Fees, Contingencies, and Fees/Additional General Expenses. All rates must be provided for a complete submission.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
420 Witch-Hazel Road, Eco Glades 2 - Eco Park - Pretoria - 0046
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
03 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Median Estimate
R 538 352
Range
Based on 14 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.