Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
3
Total Value
R 8M
Recent Awards
3 awards · Total: R 8 011 186,73
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
Eskom
Ref: KZN103R 2 496 412,97
01 Apr 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Eskom
Ref: KZN132R 1,00
16 Jan 2025
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.
Eskom
Ref: LPOO125NKR 5 514 772,76
06 Sept 2024
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Risk Assessment
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →