Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
4
Total Value
R 33M
Recent Awards
4 awards · Total: R 33 210 098
Establishment of a Panel of CIDB Level (CE 6-9) CIVIL Engineering Contractors for a Period of 3 years
Gauteng - Roads and Transport
Ref: DRT 17/07/2019R 1
20 Dec 2024
APPOINTMENT OF A CONTRACTOR FOR THE REFURBISHMENT, ALTERATIONS, AND ADDITIONS AT EAST LONDON CORRIDOR- PANMURE STATION IN THE EASTERN CAPE REGION TO BE DONE OVER 8 MONTHS CONSTRUCTION PERIOD WITH A CIDB GRADING OF 6GB OR HIGHER
Passenger Rail Agency of South Africa
Ref: ECR/CRES/01/09/PAN/2022R 11 485 515
21 Dec 2023
APPOINTMENT OF A CONTRACTOR FOR THE REFURBISHMENT, ALTERATIONS, AND ADDITIONS AT EAST LONDON CORRIDOR- WILSONIA STATION IN THE EASTERN CAPE REGION TO BE DONE OVER 8 MONTHS CONSTRUCTION PERIOD WITH A CIDB GRADING OF 6GB OR HIGHER
Passenger Rail Agency of South Africa
Ref: ECR/CRES/02/09/WIL/2022R 10 675 531
04 Dec 2023
APPOINTMENT OF A CONTRACTOR FOR THE REFURBISHMENT, ALTERATIONS, AND ADDITIONS AT EAST LONDON CORRIDOR- ARNOLDTON STATION IN THE EASTERN CAPE REGION TO BE DONE OVER 8 MONTHS CONSTRUCTION PERIOD WITH A CIDB GRADING OF 6GB OR HIGHER
Passenger Rail Agency of South Africa
Ref: ECR/CRES/03/10/ARN/2022R 11 049 051
04 Dec 2023
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Risk Assessment
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →