Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Polokwane - Polokwane - Polokwane - 0700
Organization Type
GOVERNMENT
Published
03 Jul 2026
OCDS Reference
ocds-9t57fa-161274
ESKOM is tendering for the supply, delivery, construction, and erection of a 15m telecommunication tower at the paradise radio station in limpopo over a 12-month period. This project is for contractors capable of full-scope tower fabrication, foundation work, and compliance with strict technical and safety standards. The tower will support scada rtu and telephone line networks.
Date & Time
Tuesday, 28 July 2026 - 10:00
Venue
https://teams.microsoft.com/meet/31990876768653?p=PAGeslFtypCjhQ4HRl
Publish submissions on this link: https://etendering.eskom.co.za
Categories
Request for Bid(Open-Tender)
Polokwane - Polokwane - Polokwane - 0700
03 Jul
2026
Tender Published
Tender was published
28 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
0.53-2083-0-3-NEW TOWER BRACKETS B1 B2.PDF
Median Estimate
R 1 111 820
Range
Based on 22 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogTenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 0.53-2083-0-3-NEW TOWER BRACKETS B1 B2.PDF, 0.53-2914-2-0-60mm Antenna Bracket.PDF, Paradise 15m Tower Foundation.pdf and 1 more. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdfImportant Dates
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdf (unknown)Evaluation Criteria
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdf (unknown)General
Technical
Legal
Technical Specifications
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdf (unknown)Methodology
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdfQuality Management
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdfCompliance Requirements
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdf (unknown)Health & Safety
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdfEnvironmental
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdfSection
Source: 240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdfThese rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
0.53-2914-2-0-60mm Antenna Bracket.PDF
Paradise 15m Tower Foundation.pdf
Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdf
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET (Electrical/Telecommunication) Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project includes manufacturing, foundation design, tower assembly, earthing, fencing, and ancillary works, with a 12-month execution period. The tower will support SCADA RTU and telephone lines for telecommunication purposes.
Invitation to Tender (ITT) Paradise (3CE).pdf
Eskom Holdings SOC Ltd invites tenders for the Supply, Delivery, Construction, and Erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The contract duration is 12 months, with a tender validity period of 90 days post-closing. Submissions are electronic via Eskom’s e-tendering portal by 28 July 2026 at 10:00 AM UTC. The project includes mandatory technical, commercial, and compliance requirements, with evaluation based on functionality (70% threshold), price (80 points), and B-BBEE status (20 points).
Paradise SS tower (002) NEC3.pdf
Eskom Holdings SOC Ltd is inviting tenders for the supply, delivery, construction, and erection of a 15m telecommunication (ET) tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months, and the contract follows the NEC3 Engineering and Construction Short Contract (ECSC3) framework. The scope includes foundation work, tower fabrication, installation, earthing, fencing, and compliance with Eskom's technical and safety standards.
0.54-8732-0-1 Waveguide 8 Holes small dwg 1.pdf
240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf
The tender is for the supply, delivery, construction, and erection of a 15m ET (Earthing and Bonding) Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, over a 12-month period. The project involves adherence to Eskom's 'Radio Station Earthing and Bonding' standard (Ref: 240-56872313 Rev 3), which outlines technical specifications for earthing, bonding, lightning protection, and compliance for radio/microwave stations. The scope includes tower construction, earthing systems, bonding of antennas/equipment, and auxiliary supply integration, with strict compliance to Eskom’s technical and safety standards.
Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, over a 12-month period. Issued by ESKOM, it includes detailed quality control, inspection, and testing requirements.
Eskom_-_Standard_Conditions_of_Tender.pdf
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months, with a closing date of 28 July 2026. The tender process is governed by Eskom's Standard Conditions of Tender (Rev 12), emphasizing fairness, transparency, and compliance with legal and regulatory frameworks.
240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdf
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, over a 12-month period. The project is governed by Eskom's Life-Saving Rules, which mandate strict adherence to safety protocols, including electrical isolation, working at height, permit-to-work systems, and zero tolerance for violations. The tender emphasizes compliance with Eskom's Occupational Health and Safety (OHS) standards, legal frameworks (e.g., OHS Act, ISO 45001), and technical specifications for high-voltage and live-working environments.
Form A Tender & Contract Quality Requirements.docx
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, for a period of 12 months. The project is managed by ESKOM and requires adherence to strict quality, compliance, and technical standards as outlined in clauses of document 240-105658000 and ISO 9001.
Supplier Declaration of Interest.pdf
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months, with a closing date of 28 July 2026. The tender includes a mandatory Supplier Declaration of Interest to ensure transparency and avoid conflicts of interest.
eTendering Training Acknowledgement Form.pdf
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, over a 12-month period. The tender requires mandatory e-Tendering training acknowledgment.
Section 37(20 Agreement Form 2026.docx
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, over a 12-month period. The project is managed by ESKOM and requires strict adherence to the Occupational Health and Safety Act (OHSA) No. 85 of 1993, including compliance with provided SHE (Safety, Health, and Environment) specifications.
E-tendering Help Manual for supplier .docx
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months, and submissions must be made electronically via the eTendering system by the closing date of 28 July 2026 at 10:00 UTC.
LOCAL CONTENT ANNEX CDE.xls
The tender is for the supply, delivery, construction, and erection of a 15-meter ET (Electricity Transmission) Tower at Paradise Radio Station within the LimLanga Cluster in Limpopo, South Africa. The project duration is 12 months, and the issuing organization is ESKOM. The tender includes detailed financial and local content declaration requirements, as outlined in Annexes C, D, and E.
Acknowledgement Form for Eskom SHE Rules and other Requirements (2).docx
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, over a 12-month period. Issued by ESKOM, it emphasizes strict compliance with Occupational Health and Safety (OHS) legal and procedural requirements, including Eskom's standards, the OHS Act 85 of 1993, and COIDA Act 130 of 1993. The main contractor must ensure all subcontractors/suppliers adhere to these standards, with penalties for non-compliance.
15m Tower Outline.pdf
ESKOM is inviting tenders for the supply, delivery, construction, and erection of a 15m ET (Electrical Transmission) Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months.
Contract Quality Plan (CQ) Template.docx
The tender involves the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, for Eskom over a 12-month period. The project requires strict adherence to a Contract Quality Plan (QCP) aligned with SANS 466:2005 / ISO 10005:2005 standards, ensuring quality management, traceability, and compliance throughout the project lifecycle.
LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months, and the tender closes on July 28, 2026. The evaluation focuses on technical compliance with Eskom standards for telecommunication tower installations, including mandatory and qualitative criteria.
Guidelines to complete Local Content Documents.pdf
ESKOM is inviting tenders for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The contract duration is 12 months, with a closing date of July 28, 2026. The tender emphasizes strict local content compliance as per SATS 1286:2011, requiring detailed declarations (Annexures C, D, E) for imported and local content calculations.
Non-Disclosure Agreement (NDA) Vendors - Paradise tower .pdf
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station within the LimLanga Cluster, Limpopo, for a period of 12 months. The document provided is a Non-Disclosure Agreement (NDA) outlining confidentiality obligations between Eskom Holdings SOC Ltd and potential suppliers/tenderers.
240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf
The tender is for the supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo, for Eskom. The project includes installing LED aircraft warning lights on the tower, compliant with SACAA and ICAO standards, and must be completed within 12 months. The document provides detailed specifications for electrical, mechanical, and compliance requirements for the tower lights, including guarantees, maintenance strategies, and documentation submissions.
240-59967638 - New Towers- General Tower Specification for New Installations of Eskom Telecommunications Radio Towers - Rev2.pdf
Eskom is inviting tenders for the supply, delivery, construction, and erection of a 15m ET (Electrical Telecommunication) Tower at Paradise Radio Station in the LimLanga Cluster, Limpopo. The project duration is 12 months, with a closing date of 28 July 2026. The tender includes detailed technical specifications for the design, fabrication, and installation of the tower, adhering to Eskom's standards and regulatory requirements.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf
The tender is for the supply, delivery, construction, and erection of a 15m ET (Electrical Transmission) Tower at Paradise Radio Station within the LimLanga Cluster in Limpopo, South Africa. The contract duration is 12 months, and the issuing organization is ESKOM. The tender includes a detailed PAYE (Pay As You Earn) questionnaire to classify contractors for tax purposes, ensuring compliance with South African tax legislation for the 2026/2027 tax year.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Ndivhuwo Mulamuli Munyadziwa Radzilani
Phone
011-800-6223
[email protected]
Address
Polokwane - Polokwane - Polokwane - 0700
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
26
Last checked
03 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Submission Guidelines
Source: 0.53-2083-0-3-NEW TOWER BRACKETS B1 B2.PDF (unknown)Returnable Documents: Not specified in the provided text.
Submission Guidelines
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx (unknown)Returnable Documents: Not explicitly listed in the provided document. Refer to the tender notice for required submission forms and documents.
Evaluation Criteria
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx (unknown)General
Open to contractors/suppliers (subcontractors may apply where applicable)
Technical
Must demonstrate capability in tower construction, quality control, and compliance with ESKOM standards
Documentation
Must provide required QCP approvals, inspection records, and compliance certificates
Legal
Must meet ESKOM’s statutory and non-statutory requirements
Technical Specifications
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo).
Quality Control Plan (QCP) or Inspection Test Plan (ITP) Requirements:
Abbreviations:
Compliance Requirements
Source: Quality Control Plan or Inspection Test Plan (QCP or ITP) Template.docx (unknown)No specific compliance requirements explicitly stated in the provided document. Refer to the tender notice for mandatory certifications (e.g., CIDB, B-BBEE, CSD, tax clearance).
Submission Guidelines
Source: Section 37(20 Agreement Form 2026.docx (unknown)Returnable Documents: Not explicitly listed in the provided document. Refer to the tender record for submission details.
Evaluation Criteria
Source: Section 37(20 Agreement Form 2026.docx (unknown)Legal Status
The contractor/supplier must be a legally recognized entity capable of entering into a binding agreement.
Ohsa Compliance
Must demonstrate the ability to comply with OHSA and other relevant health and safety regulations.
Experience
While not explicitly stated, implied experience in similar projects (supply, delivery, construction, and erection of towers) is likely required.
She Adherence
Must agree to adhere to ESKOM’s SHE specifications and ensure employee compliance.
Authority To Sign
The representative signing the agreement must have the authority to do so on behalf of the contractor/supplier.
Compliance Requirements
Source: Section 37(20 Agreement Form 2026.docx (unknown)Compliance with the Occupational Health and Safety Act No. 85 of 1993 is mandatory. Contractor must ensure all work and machinery/plant usage adheres to the Act. Contractor must also comply with Eskom’s SHE (Safety, Health, and Environment) specifications provided for the project.
Description
Source: E-tendering Help Manual for supplier .docxThe eTendering system is a web-based platform for submitting tender documents electronically. It replaces manual/physical submissions at Eskom tender offices. Suppliers must: 1) Register with valid email and cellphone number. 2) Verify identity via OTP. 3) Upload tender documents to the electronic 'box' under the correct tender reference. The system is accessible via TenderBulletin (https://tenderbulletin.eskom.co.za) or directly at https://eTendering.eskom.co.za.
Contact Information
Source: E-tendering Help Manual for supplier .docx (unknown)For system-related issues (Tender Bulletin, eTendering, OpenText), contact the buyer responsible for the published tender. No direct contact details provided in the document.
Submission Guidelines
Source: E-tendering Help Manual for supplier .docx (unknown)Submit tender documents electronically via the eTendering system (https://eTendering.eskom.co.za). Steps: 1) Register on the portal with valid email and cellphone number. 2) Verify registration via OTP sent to both email and cellphone. 3) Log in, select the tender reference number, and click 'Create New Submission'. 4) Upload all required documents under correct categories (e.g., Technical, Commercial, Finance). 5) Ensure file names are descriptive and file types are correctly selected. 6) Individual file size must not exceed 50MB; total submission size must not exceed 900MB. 7) Verify all documents are uploaded before clicking 'Finalize Submission'. 8) Save the submission confirmation email (includes submission ID) for future reference. Note: CSD number is required to access the eTendering system.
Evaluation Criteria
Source: E-tendering Help Manual for supplier .docx (unknown)Registration
Suppliers must register on the eTendering system and have a valid CSD number.
Access
Access to the eTendering system requires verification via OTP sent to registered email and cellphone.
Technical
Ability to supply, deliver, construct, and erect a 15m ET Tower as per Eskom’s specifications (though specific technical details are not provided in the document).
Compliance
Compliance with Eskom’s procurement policies and submission guidelines, including file size limits and categorization.
Compliance Requirements
Source: E-tendering Help Manual for supplier .docx (unknown)CSD number is mandatory to access the eTendering system. No additional compliance requirements specified in the document.
Submission Guidelines
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)Returnable Documents: Not specified in the provided document.
Evaluation Criteria
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)General
Local Content
Compliance
Compliance Requirements
Source: LOCAL CONTENT ANNEX CDE.xls (unknown)No specific requirements found
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors - Paradise tower .pdf (unknown)Eskom Holdings SOC Ltd: Physical Address - Megawatt Park, Maxwell Drive, Sunninghill, Sandton. Postal Address - P O BOX 1091, Johannesburg, 2000. Telephone - +27. Contact Person - Not specified.
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors - Paradise tower .pdf (unknown)General
Technical
Legal
Technical Specifications
Source: Non-Disclosure Agreement (NDA) Vendors - Paradise tower .pdf (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station within the LimLanga Cluster, Limpopo Area. Duration: 12 months.
Contractual Terms
Source: Non-Disclosure Agreement (NDA) Vendors - Paradise tower .pdfThis is a Non-Disclosure Agreement (NDA) between Eskom Holdings SOC Ltd (Disclosing Party) and the bidder (Receiving Party). Key terms:
Section
Source: Non-Disclosure Agreement (NDA) Vendors - Paradise tower .pdf (unknown)Eskom Holdings SOC Ltd: Physical Address - Megawatt Park, Maxwell Drive, Sunninghill, Sandton. Postal Address - P O BOX 1091, Johannesburg, 2000. Telephone - +27. Domicilium notices: Hand-delivered (same day), registered post (7th business day), or fax (upon receipt). Address changes require 30 business days' written notice.
Description
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).docxProject: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) for a 12-month period. Key Focus: Compliance with Eskom OHS legal and contractual requirements, including standards, inductions, and subcontractor management.
Submission Guidelines
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).docx (unknown)Returnable Documents: Signed acknowledgement form confirming understanding of Eskom OHS requirements and consequences of non-compliance. Form must include company/supplier name, authorised signatory (CEO/Director/Managing Director), signature, date, and witness details.
Evaluation Criteria
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).docx (unknown)General
Open to suppliers/contractors capable of executing the project within the 12-month timeframe.
OHSAlignment
Must demonstrate ability to align with Eskom’s OHS requirements.
Past Experience
Preferable to have testimonials/references for similar projects (may be requested by Eskom).
Subcontractor Oversight
Must have processes to manage and audit subcontractors/suppliers for compliance.
Technical Specifications
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).docx (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) for 12 months. OHS Compliance: Must adhere to Eskom Contractor Health and Safety Requirements Standard 32-136, OHS specifications provided, Occupational Health and Safety Act 85 of 1993, and Compensation for Occupational Diseases and Illnesses Act 130 of 1993. Post-award, full alignment with Eskom’s OHS policies, procedures, and standards is mandatory.
Compliance Requirements
Source: Acknowledgement Form for Eskom SHE Rules and other Requirements (2).docx (unknown)Obligations: All employees (including contractors/suppliers) must undergo Eskom and company-specific inductions. Main contractor/supplier must: demonstrate selection criteria for subcontractors/suppliers, notify Eskom prior to their appointment, ensure subcontractors/suppliers have adequate resources/competencies, manage and audit subcontractor OHS compliance, and handle non-conformance penalties. Eskom may verify compliance and request testimonials/references for similar past work.
Important Dates
Source: eTendering Training Acknowledgement Form.pdf (unknown)Closing date for submission of the E-Tendering Training Acknowledgement Form: 27 January 2025.
Contact Information
Source: eTendering Training Acknowledgement Form.pdf (unknown)Contact details to be provided by the bidder: Business name/JV, contact person, landline, cellphone, and email address. No Eskom contact details are specified in the document.
Submission Guidelines
Source: eTendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: Fully complete and submit the E-Tendering Training Acknowledgement Form to Eskom within the prescribed period. Failure to do so will disqualify the bidder from the procurement process.
Returnable Documents
Source: eTendering Training Acknowledgement Form.pdf (unknown)Mandatory returnable: E-Tendering Training Acknowledgement Form. Bidders must: (1) Complete the form in full, including business name/JV, contact person, landline, cellphone, and email. (2) Acknowledge self-training via the E-Tendering Noddy Guide, video, or clarification meeting. (3) Sign and date the form. (4) Submit to Eskom within the prescribed period. Non-compliance results in disqualification.
Evaluation Criteria
Source: eTendering Training Acknowledgement Form.pdf (unknown)Mandatory Training
Tenderer must undergo self-training and submit the acknowledgment form
Responsiveness
Form must be fully completed and submitted within the prescribed period
Compliance
Adherence to Eskom's e-Tendering process and document control policies
Special Conditions
Source: eTendering Training Acknowledgement Form.pdf (unknown)Mandatory condition: Submission of the fully completed E-Tendering Training Acknowledgement Form to Eskom within the prescribed period. Non-submission or incomplete submission will render the bidder non-responsive and lead to disqualification.
Section
Source: eTendering Training Acknowledgement Form.pdf (unknown)Bidder must provide: Contact person name, landline number, cellphone number, and email address. No Eskom contact details are provided in the document.
Evaluation Criteria
Source: Form A Tender & Contract Quality Requirements.docx (unknown)General
Specific
Technical Specifications
Source: Form A Tender & Contract Quality Requirements.docx (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) for a 12-month period.
Quality Requirements:
Standard Conditions:
ISO 9001 Compliance:
Compliance Requirements
Source: Form A Tender & Contract Quality Requirements.docx (unknown)Quality Management System (QMS) compliance with ISO 9001 Standard is mandatory. Supplier must demonstrate adherence to all applicable clauses and principles as outlined in the tender document.
Important Dates
Source: Supplier Declaration of Interest.pdf (unknown)Effective Date: 01 February 2015
Review Date: November 2026
Submission Guidelines
Source: Supplier Declaration of Interest.pdf (unknown)Submit the completed Supplier Declaration of Interest form as a returnable with your tender. Key requirements:
Returnable Documents
Source: Supplier Declaration of Interest.pdf (unknown)The Supplier Declaration of Interest form must be submitted as a returnable with your tender/enquiry.
Evaluation Criteria
Source: Supplier Declaration of Interest.pdf (unknown)General
Specific
Compliance Requirements
Source: Supplier Declaration of Interest.pdf (unknown)Submit a signed Supplier Declaration of Interest form. Requirements include:
Special Conditions
Source: Supplier Declaration of Interest.pdf (unknown)Special conditions for suppliers:
Description
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdfProject: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Substation (SS) in Limpopo. Coordinates: 22°52'23.45"S, 30°5'29.87"E. Purpose: Provide telecommunication network for SCADA RTU and telephone lines. Duration: 12 months.
Important Dates
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdf (unknown)Closing date: 25 May 2023
Evaluation Criteria
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdf (unknown)General
Specific
Technical Specifications
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdf (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (GPS: 22°52'23.45"S, 30°5'29.87"E) in Limpopo. Purpose: Telecommunication network for SCADA RTU and telephone lines.
Phases:
Tower requirements:
Applicable standards:
As-built documents required: Engineering certificate (signed by professional engineer), earth test certificate, site drawings, and other relevant documentation.
Quality Management
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdfQuality Management System (QMS) requirements:
Pricing Schedule
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdfPricing guidance based on Bill of Materials (BOM):
Note: BOM is high-level; additional items per Eskom standard 240-59967638 may apply. Total tower steel mass: 1926 kg (for costing purposes).
Financial Requirements
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdf (unknown)Bill of Materials (BOM) highlights:
Note: BOM is high-level; additional items per Eskom standard 240-59967638 apply.
Health & Safety
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdfHealth and safety requirements:
Environmental
Source: Scope of Work for 15 m ET Tower at Paradise RS -Rev1_Signed.pdfEnvironmental considerations:
Description
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdfRevision history: February 2025 (Rev 7): Document review and alignment to organizational changes. January 2017 (Rev 6): Updated to specify applicability to contractors, revised references/definitions, and added PTW requirement to Rule 1. Previous revisions include updates to rules, definitions, and consequences.
Contact Information
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdf (unknown)For acceptance and queries, contact: Kerseri Pather (General Manager – Risk & Sustainability) or Miranda Moahlodi (Senior Manager – Risk & Sustainability – OHS). Additional support from Risk and Sustainability Management Committee, Centralised Consultative Forum, HR Policies and Procedures Committee, and OHS Steering Committee.
Evaluation Criteria
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdf (unknown)General
Safety
Technical
Legal
Technical Specifications
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdf (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) for 12 months. Mandatory adherence to Eskom Life-Saving Rules, including: RULE 1: OPEN, ISOLATE, TEST, EARTH AND CREATE AN EQUIPOTENTIAL ZONE BEFORE TOUCH; RULE 2: HOOK UP AT HEIGHT; RULE 3: BUCKLE UP; RULE 4: BE SOBER; RULE 5: ENSURE THAT YOU HAVE A PERMIT TO WORK; RULE 6: ENSURE SAFE LIVE WORKING. All work must comply with Eskom’s health, safety, and environmental standards, including pre-task risk assessments, use of PPE, and adherence to Permit to Work (PTW) requirements.
Methodology
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdfFor live work, adhere to: High Voltage Live Working Standards for the respective division; maintain minimum approach distance (MAD); never mix live and dead work on the same site; perform only authorized tasks documented in the Task Manual (TM); work on one voltage potential at a time.
Quality Management
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdfCompliance with Life-Saving Rules is monitored through annual audit and inspection plans. Supporting documents include: 240-62196227 (Life-Saving Rules – revision 6, superseded) and 240–63942960 (Life-Saving Rule Acknowledgement Form).
Compliance Requirements
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdf (unknown)Mandatory compliance with: Occupational Health and Safety Act; ISO 9001 and ISO 45001; Eskom’s Plant Safety Regulations, Operating Regulations for High Voltage Systems (ORHVS), and Low Voltage Operating Regulations; Contractor Health and Safety Requirements (32-136); Eskom Personal Protective Equipment Specifications; Substance Abuse Procedure (32-37); Environmental, Occupational Health and Safety Incident Management Procedure (32-95); Working at Heights Standard (32-418); and all other referenced Eskom standards and procedures. Contractors must ensure all employees are trained, medically fit (where applicable), and adhere to zero-tolerance policies for Life-Saving Rule violations.
Health & Safety
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdfConsequences of violations: Treated as serious misconduct. Eskom may suspend contractor activities if supervisors allow violations. Contractors must remove violating employees, investigate within 5 working days, and provide Eskom with sanction details.
Section
Source: 240-62196227 Life-Saving Rules Standard_rev7 (Final)_February 2025_signed.pdfEvaluation will assess compliance with Eskom’s Life-Saving Rules and associated standards, including ISO 9001 (Quality Management Systems) and 32-727 (Safety, Health, Environment and Quality Policy). Violations of Life-Saving Rules are treated as serious misconduct and will trigger disciplinary processes.
Evaluation Criteria
Source: 15m Tower Outline.pdf (unknown)General
Technical
Technical Specifications
Source: 15m Tower Outline.pdf (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo). Project reference: 734. Location: Paradise SS.
Description
Source: Contract Quality Plan (CQ) Template.docxPurpose: The Contract Quality Plan (CQP) template guides suppliers in planning to meet Eskom’s quality management expectations for the contract. Scope: Covers supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) over 12 months. Standards: Aligns with SANS 466:2005 / ISO 10005:2005 for quality planning and management.
Submission Guidelines
Source: Contract Quality Plan (CQ) Template.docx (unknown)Returnable Documents: Submit all required documentation as per the Contract Quality Plan (CQP) template, including QCP/ITP, method statements, inspection reports, certificates of compliance, and databooks. Ensure all records are controlled, retained, and submitted to Eskom as specified in the contract.
Evaluation Criteria
Source: Contract Quality Plan (CQ) Template.docx (unknown)Technical Capability
Applicants must demonstrate **experience in tower construction/erection** and compliance with Eskom’s technical standards.
Quality Certifications
Certification to **SANS 466:2005 / ISO 10005:2005** or equivalent QMS standards is likely required.
Financial And Operational Capacity
Proof of **financial stability and operational capacity** to execute the project within 12 months.
Sub Supplier Compliance
Sub-suppliers/subcontractors must meet **Eskom’s quality and technical requirements**.
Documentation Compliance
Ability to **generate and submit all required documentation** (QCP, ITPs, databooks, etc.) per the tender’s timeline.
Safety And Regulatory Compliance
Compliance with **South African safety regulations** (e.g., OHSA) and industry standards for tower construction.
Technical Specifications
Source: Contract Quality Plan (CQ) Template.docx (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) over 12 months. Quality Management: Must align with SANS 466:2005 / ISO 10005:2005 standards. Key Deliverables: Contract Quality Plan (CQP) covering definitions, scope of work, communication channels, organogram, interfacing documents, supplier/sub-supplier lists, monitoring processes, special controls (e.g., welding, NDT/NDE), documented information submission, records management, non-conformance handling, databook management, tool/equipment management, customer property handling, product preservation, identification/traceability, and commissioning/post-delivery activities. Method Statements: Required for all tasks, detailing safe execution, risk assessments, and control measures. Inspection & Testing: QCP/ITP must cover offsite and onsite processes, with submission of inspection reports, test reports, and certificates to Eskom. Post-Delivery: Include warranty conditions, defect correction periods, and technical support.
Compliance Requirements
Source: Contract Quality Plan (CQ) Template.docx (unknown)Quality Standards: Compliance with SANS 466:2005 / ISO 10005:2005 for quality management systems. Documented Information: All submitted documents (e.g., QCP, ITP, method statements, certificates) must be version-controlled, retrievable, and retained per contract requirements. Sub-Suppliers: Must interface with the supplier’s QMS, with evaluation, selection, and performance monitoring as per supplier procedures. Non-Conformance: Processes for concession, defect management, and inspection must be documented and implemented.
Description
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdfThis tender involves the supply, delivery, construction, and erection of a 15m Eskom Telecommunications (ET) tower at Paradise Radio Station (LimLanga Cluster, Limpopo). The project duration is 12 months. The technical evaluation strategy applies to standard new tower installations where no additional tower detailing is required from the contractor. Work must comply with Eskom standard 240-59967638 for new radio tower installations.
Contact Information
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Technical contacts for this tender:
Note: Contact details (emails/phones) are not explicitly provided in the document. Verify through official Eskom channels.
Submission Guidelines
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Submit the following returnable documents as part of your tender:
Returnable Documents
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Required returnable documents:
Supporting documents referenced:
Evaluation Criteria
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Technical
Documentation
Technical Specifications
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Scope: Supply, delivery, construction, and erection of a 15m Eskom Telecommunications (ET) tower at Paradise Radio Station (LimLanga Cluster, Limpopo).
Standards: Work must comply with Eskom standard 240-59967638 (General Tower Specification for New Installations of Eskom Telecommunication’s Radio Towers).
Definitions:
Applicability: This specification applies to Eskom Holdings Limited, its divisions, subsidiaries, and entities where Eskom has a controlling interest.
Methodology
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdfBidders must submit:
Experience & Qualifications
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdfBidders must demonstrate:
Compliance Requirements
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Mandatory compliance:
Unacceptable non-compliance: Failure to meet any of the above standards will disqualify the tender.
Requirements
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdf (unknown)Mandatory requirements:
Unacceptable risks:
Section
Source: LES1146 - Tender technical evaluation strategy for new tower installations towers - Without Detailing-signed.pdfTechnical evaluation threshold: Minimum weighted score of 70% required for a tender to pass. Evaluation is based on mandatory and qualitative criteria as outlined in the main evaluationCriteria section.
Contact Information
Source: 240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf (unknown)Information Centre and Eskom Documentation Centre at Megawatt Park. Reference: SANS 10199: 'The Design and Installation of an Earth Electrode'.
Evaluation Criteria
Source: 240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf (unknown)General
Technical
Legal
Technical Specifications
Source: 240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf (unknown)Scope: Supply, delivery, construction, and erection of a 15m ET Tower at Paradise Radio Station (LimLanga Cluster, Limpopo) for 12 months. The project must adhere to Eskom's Radio Station Earthing and Bonding Standard (Ref: 240-56872313, Rev 3).
Key Technical Requirements:
Tower and Earthing Specifications:
Equipment and Building Earthing:
Bonding Requirements:
Secondary/Tertiary Protection: Not covered. Secondary protection (e.g., circuit arrestors) is excluded; tertiary protection (internal equipment devices) is the manufacturer’s responsibility.
Geometry Variations: For stations with differing layouts, follow this standard as closely as possible.
Methodology
Source: 240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf (unknown)Execution Plan for Earthing and Bonding:
Compliance Requirements
Source: 240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf (unknown)Compliance and Inspection:
Copper Theft Prevention:
Section
Source: 240-56872313 - Tower Radio Station Earthing and Bonding Standard.pdf (unknown)For standards and specifications, contact the Information Centre and Eskom Documentation Centre at Megawatt Park. Key reference: SANS 10199 ('The Design and Installation of an Earth Electrode').
Description
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdfThis document specifies requirements for LED aircraft warning lights on Eskom telecommunication towers to comply with SACAA and ICAO regulations, ensuring aviation safety. It covers scope, purpose, applicability, technical specifications, guarantees, maintenance, and required documentation.
Contact Information
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)The responsibility to implement this document lies within the relevant engineering department within Eskom Telecommunications (ET) and Power Delivery Engineering, as well as Eskom subsidiaries installing tower lights. No specific contact details, emails, phones, or submission addresses are provided in the document.
Submission Guidelines
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)Returnable Documents: The tenderer must submit a detailed statement of compliance for each requirement in the specification using the provided SCHEDULE A: CONTRACTOR’S COMPLIANCE STATEMENT. The following documents must be provided by the aircraft warning light supplier:
Returnable Documents
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)The following documents shall be provided by the aircraft warning light supplier:
Evaluation Criteria
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)General
Compliance
Technical Specifications
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)Scope: Specification of tower lights for installation on Eskom Telecommunication towers to meet SACAA and ICAO recommendations. Key requirements:
Quality Management
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdfRequired documentation includes: SACAA certificate, proof of environmental testing, resistance to temperature/pressure/humidity/hail documentation, installation instructions/guidelines, maintenance instructions, expected life of the system, and alarm wiring diagrams. ISO 9001 Quality Management Systems is a normative reference.
Compliance Requirements
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)Bidders must comply with numerous South African National Standards (SANS) and international standards, including but not limited to: SANS 121 (hot-dip galvanizing), SANS 60598-1 (luminaires), SANS 60529 (IP ratings), SANS 61347 series (lamp control gear), EN 55015 (radio disturbance), and others listed in the normative references. ISO 9001 Quality Management Systems is required. SACAA certification is mandatory. Environmental testing results must be submitted. No explicit mention of CSD, tax, B-BBEE, CIDB, CIPC, professional registrations, or local content.
Health & Safety
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdfThe specification references multiple SANS standards related to safety, including SANS 10108 (hazardous locations), SANS 10389-1 (exterior lighting for work and safety), SANS 60529 (IP ratings for protection), and SANS 62262 (IK impact protection). Compliance with these standards is required to ensure safe installation and operation.
Contractual Terms
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdfThe document specifies technical requirements and guarantees but does not detail contract terms, conditions, duration, termination, or penalties. The tenderer must provide guarantees for luminaire housing (10 years), electrical components (50,000 hours), LED lamp (50,000 hours), and free replacement if performance is unacceptable or IP rating compromised within ten years.
Requirements
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdf (unknown)General requirements include compliance with the latest editions of referenced standards (SANS, EN, IEC, ISO). All ET towers must have aircraft warning lights fitted if protruding above ground outside an 8km radius from aerodrome reference point. Specific electrical, mechanical, and installation requirements are detailed in the technical specifications.
Section
Source: 240-138048594 -LED Aircraft Warning Light for Eskom Telecommunication Towers.pdfEvaluation includes guarantees for product longevity and performance, with free replacement required if units fail or underperform within specified periods. ISO 9001 compliance is referenced.
Description
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Supply, Delivery, Construction and Erection of a 15m ET Tower at Paradise Radio Station within LimLanga Cluster – Limpopo Area for a period of 12 months
Important Dates
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER){"closingDate":"03 July 2026","closingTime":"10h00","briefingSession":"{\"date\":\"15 July 2026\",\"time\":\"10h00am\",\"venue\":\"ion meeting will be held online via Microsoft\",\"is_compulsory\":true}"}
Briefing Session
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)A non-compulsory clarification meeting will be held online via Microsoft teams. The link for the meeting is provided below:
Date: 15 July 2026
Time: 10h00am
Meeting link: https://teams.microsoft.com/meet/31990876768653?p=PAGeslFtypCjhQ4HRl
Please note that site viewing is non-compulsory as follows:
Meeting point Siloam CNC – 16 July 2026 @ Time 13:00 p.m.
It is recommended that contractors come to site with a 4x4 vehicle due to the difficult terrain.
Note: GPS co-ordinates are as follows:
Siloam CNC -22.898360, 30.191679
Contact Information
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER){"name":null,"email":"[email protected]","phone":"0876768653","department":null,"address":"r which may be"}
Submission Guidelines
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Returnable Documents: Submission of a step by step - As per Eskom standards 240- - Construction method statement of how the 59967638, 240 -56872313 & 240- Regulations towers will be installed. This 138048594. Must submit generic method statements as must include the following: - described., Installations of foundations, Assembly of tower sections, Erection of tower sections, Climbing of towers, Tower lights, Earthing installation At this stage generic method statements will be sufficient. Detailed Safe Work Procedure (SWP) will be required from before construction, Submit completed Annex A - Fully completed Annex A from 240 – This serves as an Compliance Schedule of 240 – 59967638 initial, No sections may acknowledgement be left blank. Since Eskom is of the Eskom providing the designs, the standard supplier must simply fill “as per requirements by the Eskom design” where contractor applicable. All responsive tenders will be evaluated further for non-negotiable functionality threshold. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 62 File name: Invitation to Tender (ITT) Paradise (3CE) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Clause Number from Standard Conditions Tender Data of Tender 3.13 Functionality Stage 3: Functional Analysis (maximum marks per g (%) item = 5), Relevant structure climbing Method statement 30 competency – this must include a together with the method statement on how the tower proposed fall arrest plan. will be climbed in line with the proposed fall protection plan. Method statement & Fall arrest plan = 5 Method statement only = 4 Fall arrest plan only = 2 No submission = 0 Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 62 File name: Invitation to Tender (ITT) Paradise (3CE) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Clause Number from Standard Conditions Tender Data of Tender, List of references for similar work A list of all projects done 10 done and successfully completed in in the past 5 years clearly the past 5 years. Ongoing work MAY indicating the role(s) NOT be included on the list, see performed and below on how the marks will be completion dates. awarded (full marks = 5):- No work = 0 Foundations work only = 2 Tower Assembly work only = 1 Tower Erection work only = 1 Earthing = 0.5 Tower lights = 0.5 (work done under sub-contracting will be awarded half marks per item) The supplier must demonstrate 3. Job profiles of the team 15 their construction capability. with detailed Submit the Job profiles of the key responsibility description stakeholders responsible for the construction. If the supplier is planning to use a subcontractor for installation, the job profiles of the Subcontractors must be provided. See below how the scores will be awarded (full marks = 5), Construction/ Site manager = 2, Civil works supervisor = 1, Tower assembly and erection supervisor = 2 (must clearly indicate the proposed person together with relevant job profiles per each title provided above), Generic schedule of activities for the Detailed activity schedule 15 process to be followed when with duration per activity conducting tower installation. State if the supplier is immediately available to execute the work or they have projects to complete first. Submit an activity schedule., Project Duration 4 months Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 62 File name: Invitation to Tender (ITT) Paradise (3CE) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Clause Number from Standard Conditions Tender Data of Tender = 5 Points, Project Duration 5 months = 4 Points, Project Duration 6 months = 3 Points, Project Duration 8 months = 2 Points, Project Duration 9 months = 1 Points, Project Duration 10 months = 0 Points, Submit a detailed step by step Detailed method 30 method statement indicating how the statement(s) for: - installation will take place. See below 1. installation of how the scores will be awarded. foundations and tower earthing, Foundations and tower, Tower assembly and earthing = 2 erection, Tower erection and, Tower painting, lights assembly = 2 and mounting brackets, Tower painting, lights and installation mounting brackets installation = 1 Formula for calculating qualitative technical requirements results: A R= (M) W or R=(A/M)W Where R = Results A = Actual M = Maximum marks per item (5) W = Weight (%) 3.15 Evaluation of Stage 4 : Price and B-BBEE point system Price, 80/20 preference points system will be used to evaluate price. Price points will be calculated out of 80 for price (Evaluated price including VAT). A maximum of 20 points will be awarded to a tenderer for the specific goal. The points scored for the specific goal will be added to the points scored for price and the total will be rounded off to the nearest two decimal places. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 62 File name: Invitation to Tender (ITT) Paradise (3CE) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Clause Number from Standard Conditions Tender Data of Tender, Eskom reserves the right to negotiate market related prices with the highest ranked supplier., This evaluation will be based on the estimated value per site.
Returnable Documents
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)The following are the Commercial mandatory returnables to be submitted at tender closing.
Returnable required at Tender closing (disqualifiable):
Returnable required at Tender closing. (Non-disqualifiable):
Evaluation Criteria
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)General
Specific
Technical Specifications
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Annexure Attached (Y / N /
N/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form Annexure D Y
(refer to www.eskom.co.za for the Supplier Integrity
Pact that suppliers are required to download and read)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E N/A
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N/A
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content
(only applicable if designated materials are included
and then Tenderers will be required to complete and
submit Annexures G1 to G4 as evidence of
compliance with this requirement).
Annexure C Local Content Declaration- Summary
Schedule Annexure G2
Annexure D Imported Content Declaration – Supporting
Schedule to Annexure C Annexure G3
Annexure E Local Content Declaration- Supporting
Schedule to Annexure C Annexure G4
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA
Methodology
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Technical Mandatory:
Item 1. Submission of a step by step method statement of how the towers will be installed. This must include the following: -
Experience & Qualifications
Source: Invitation to Tender (ITT) Paradise (3CE).pdfNote: Eskom reserves the right to conduct reference checks if a need arises.
Tenderer(s) shall be disqualified if found to have misrepresented information on the
tender document.
Qualitative Technical Requirements
Item Qualitative Technical Reference to Technical Criteria
No Specification / Tender Criteria Description Weightin
Technical 100%
Total 100%
Overall minimum threshold for 70%
qualifications
Note: Eskom reserves the right to conduct reference checks if a need arises.
Tenderer(s) shall be disqualified if found to have misrepresented information on the
tender document.
Quality Management
Source: Invitation to Tender (ITT) Paradise (3CE).pdfApply =1
A.1 QMS Manual or a document that defines and describes
the QMS and its scope
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
A.4 Control of documented information (i.e. document and
record control)
A.5 Documented information for Control of nonconforming
outputs
A.6 Documented information for Nonconformity and
Corrective action
A.7 Documented information for Internal audit Clause 9.
Iso 9001:2015
Section A Score Option 2 7
SECTION B : Evidence of QMS in operation (Tender Quality
Requirements -Ref 240-105658000)
Apply =1
B.1 Documented information for defined roles, responsibilities
and authorities - Organization chart and Responsibility matrix
(must include but not limited to quality management
function/role) (Clause 5.3 of ISO 9001:2015)
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Paradise (3CE)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from
Standard Conditions Tender Data
of Tender
B.2 Documented information for Control of Externally
Provided Processes, Products and Services - Must include
criteria for evaluation, selection, monitoring of performance, 1
and re-evaluation of external providers (Clause 8.4 of ISO
9001:2015)
Section B Score 2
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000
and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in
the tender documents (Ref ISO 10005)
Apply
(Yes=1)
NB! Draft Contract/Project Quality Plan has important QA
deliverables
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or
240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref
Iso 10005)
Apply = 1
NB! Draft/ Example of an Inspection and Test Plan (ITP) or
Quality Control Plan (QCP) on similar and/ or previous work 1
done
Section D Score 1
SECTION E: User defined additional Requirements & miscellaneous (Ref
240-105658000)
Customer specific requirements & other standards and required can be
listed and evaluated here
Apply
(Yes=1)
E.1 Form A is completed and signed. 1
Section E Score 1
E) Financial Analysis
The analysis of a tenderer’s financial statements is not a criterion for the purposes
of the scoring and awarding of points or the determination of competitive ranking,
but to determine if the tenderer is financially stable enough to execute a contract /
order of the magnitude to be awarded, and if not, the risk to Eskom.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Paradise (3CE)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from
Standard Conditions Tender Data
of Tender
Due diligence may be done by the Finance Department through a review of financial
viability and risk mitigation steps. The latest and approved Annual Financial
Statements (AFS) must be submitted by the tenderer. Where the Annual Financial
Statements have not been audited, then an ITA34C tax submission will be required
and the Public Interest Score as completed by the accountant / reviewer as required
by the Companies Act, 2008.
The list of mandatory documents are as follows:
Financial analysis cannot be performed for entities who do not submit all required
documentation.
Risk mitigation factors may include:
approved by Eskom Treasury department.
financially sound enough to stand as surety for the subsidiary tendering for
the contract. The parent company’s latest and approved AFS must be
submitted for financial analysis.
In the case of an unincorporated JV or a SPV, each partner in the entity must submit
its Annual Financial Statements, which will be consolidated to determine their joint
capability to execute the contract under award. Where a new company is unable to
provide the latest and approved financial statements for the last 18 months, it may,
at Eskom’s discretion, be permitted to provide latest and approved financial
statements for the most recent twelve-month operating period.
F) sdl&i
Local Procurement Content
Local Procurement Content refers to value added in South Africa by South African
resources. This contract only involves local goods and/or services; thus, local
procurement content is 100%.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Paradise (3CE)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from
Standard Conditions Tender Data
of Tender
Jobs:
Tenderers are required to submit proposals for the type and number of jobs that
will be created and retained in South Africa as a direct result of being awarded this
contract.
Note: Communities based local to site (areas around site) should be prioritised for
employment and all unskilled labourers sourced from areas local to site.
Number of jobs to be created Number of jobs to be retained
3.24 Sign form of Not Applicable
Agreement/
Contractual
Conditions
2.28 CIDB CIDB is applicable
1.1.15 Contract Quality Plan (CQ) Template Attached Y
separately
1.1.16 Form A Tender & Contract Quality Requirements Attached Y
separately
1.1.17 Quality Control Plan or Inspection Test Plan (QCP or Attached Y
ITP) Template separately
1.1.18 Eskom Standard Conditions of Tender (Rev.12) Attached Y
separately
1.1.19 Annexure B- Acknowledgement of Eskom's SHE rules Attached Y
separately
on site will be managed, to include where disposal management
occurs
plan/strategy
D) Quality Contractual Requirement
Unique 240-
Supplier Quality Identifier 12248652
Management:List of Revision 7
Tender Returnables Effective Date 2022/01/26
Documents Specificatio 240-
n 105658000
Category 3 : Quality
Requirements Deliverables to be evaluated indicator = 1
Section A Score Option 1
SECTION A : Quality Management System Requirements ISO 9001
complies with
Iso 9001
Apply =1
A.1 QMS Manual or a document that defines and describes
the QMS and its scope
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
A.4 Control of documented information (i.e. document and
record control)
A.5 Documented information for Control of nonconforming
outputs
A.6 Documented information for Nonconformity and
A.7 Documented information for Internal audit Clause 9.
Iso 9001:2015
Section A Score Option 2 7
SECTION B : Evidence of QMS in operation (Tender Quality
Requirements -Ref 240-105658000)
Apply =1
B.1 Documented information for defined roles, responsibilities
and authorities - Organization chart and Responsibility matrix
(must include but not limited to quality management
function/role) (Clause 5.3 of ISO 9001:2015)
criteria for evaluation, selection, monitoring of performance, 1
and re-evaluation of external providers (Clause 8.4 of ISO
9001:2015)
Section B Score 2
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000
and 240-109253698).
(Yes=1)
NB! Draft Contract/Project Quality Plan has important QA
deliverables
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or
240-109253302)
QCP /Checklist/ ITP (Quality Control Plans) as per Scope of Works (Ref
Iso 10005)
Apply = 1
NB! Draft/ Example of an Inspection and Test Plan (ITP) or
Quality Control Plan (QCP) on similar and/ or previous work 1
done
Section D Score 1
SECTION E: User defined additional Requirements & miscellaneous (Ref
240-105658000)
Pricing Schedule
Source: Invitation to Tender (ITT) Paradise (3CE).pdfstating the name, position and contact details of each proposed attendee to
2.16 Seeking The tenderer will notify Eskom of any clarifications required before the closing time
clarification for clarification queries, which is 5 working days before the deadline for tender
submission.
2.22 Alternative Alternative tenders are not allowed.
tenders
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing information per
item after contract award and will need to ensure that all materials delivered to
Eskom are labelled in line with Eskom’s labelling specifications as may be stipulated
by Eskom. Where cataloguing is a requirement, the Pricing Schedule must also
include a line item for cataloguing, which tenderers are required to quote for. Eskom
will pay for the cataloguing.
tender closing.
Returnable required at Tender closing (disqualifiable)
Short Contract (ECSC). (The tenderers must submit a complete tender
with prices).
of Tender
grading designation in the class of works under consideration and
possesses the required recognition status.
the CIDB regulations is equal to or higher than a contractor grading
designation determined in accordance with the sum tendered for a 3CE or
higher
25 (1B) or 25 (7A) of the CIDB Regulations.
3.19 Ranking of Tenderers will be ranked by applying the preferential point scoring for
tenders the 80/20 system. Eskom will add the score from Pricing and Specific
Pricing schedule Completed pricing schedule within the provided NEC 3 √
Financial Requirements
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Functionality evaluation will follow the following methodology
Evaluate submissions against functional criteria
Rate each submission against each criteria
Apply weightings and calculate total functional score
Eliminate tenders below minimum Threshold Tenders which fail to meet the functionality minimum threshold will not be evaluated further. Apply the threshold evaluation (Functionality- Technical) Functionality Weightings Technical 100% Total 100% Overall minimum threshold for 70% The following contractual requirements shall apply
Commercial compliance.
Environmental;
Financial Analysis
SDL&I Tenderer/ tenderers recommended for award, including those justified on the bases of objective criteria, must still meet Contractual requirements as set out in the enquiry. Contractual requirements exclude objective criteria and Contractual requirements are not evaluation criteria. They are required to be met and assessed after the evaluation and ranking of the tenders. The tenderer will be allowed 7 working days, to resubmit the contractual requirements that were not met after the tender submission. Proof that the highest-ranked tenderer / preferred tenderer is able to meet the contractual requirements must be submitted before the contract may be awarded. If the tenderer does not meet a contractual requirement, mitigating factors, may be agreed to and be made terms and requirements of the contract. If the tenderer does not agree with the mitigating factors or if there are insufficient suitable mitigating factors or if the risk is deemed too high, the tender may be awarded to a tenderer other than the highest-ranked (the second-ranked).
Commercial Statutory compliance
B-BBEE Certificates or Sworn Affidavits
Tax Compliance Status (TCS) e-filing PIN from SARS and Tax Clearance
Valid Original certificate of letter good standing or proof of application issued by the Compensation Fund (COID)
Proof of National Treasury Central Supplier Database registration (CSD) that has a tax compliant status at award.
Proof of Registration with CIDB – 3CE (Civil Engineering) or higher for Paradise Radio Station tower Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 62 File name: Invitation to Tender (ITT) Paradise (3CE) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Clause Number from Standard Conditions Tender Data of Tender It should be noted that as per National Treasury Instruction No: /18; a tender will not be awarded to a recommended tenderer that has a tax non- compliance status. SHEQ
Safety Contractual Requirements 1 Acknowledgement of Eskom's SHE rules, Is the acknowledgement of Eskom's SHE rules, and requirements form (Annexure B). Acknowledgement form must be fully completed, i.e. MD/CEO signature and the two witnesses (compulsory) 2 Legal appointment and Training Training Certificates and appointment letters with relevant legal reference for the following appointees
Health and Safety Representative,
First aid level 2,
Fire fighters,
Fall protection planner,
Incident investigator,
Risk Assessor
Safety Officer
Construction Supervisor The signature of the Manager appointing the nominated person is required. Not compulsory for the appointee to have accepted the appointment at this stage (tender stage). 3 Occupational, Health and Safety Plan (OHS Plan)
This must be relevant to the Scope of work. 4 Baseline Risk Assessment
Risk Assessment Procedure
Baseline Risk Assessment. (The Baseline Risk Assess should address all the relevant risks and must be relevant to the Scope of work.) 5 Health and Safety Policy signed by the CEO or MD,
Company Health and safety Policy signed by CEO or MD. The Health and safety Policy statement must be actionable. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 62 File name: Invitation to Tender (ITT) Paradise (3CE) Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Clause Number from Standard Conditions Tender Data of Tender 6 Fall Protection Plan and Rescue
Fall Protection Plan should address the scope and addressing the risk of fall and rescue.
Fall Rescue Plan
B-BBEE Details: Sector Components Local Content Threshold
Steel Products and
Component for Fabricated Structural Steel 100%
Construction
Cement CEMI 100%
Cement CEMII 100%
NOTE: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-
Summary Schedule) are therefore mandatory and must be tender returnables
3.21 Reverse e- Reverse e-auction is not applicable.
auction (if
applicable) Please note: -
Reverse e-auction is an electronic price and preference point
system (aligned to PPPFA) that aims to achieve the most
competitive prices. Eskom reserves the right to utilize reverse e-auction in
certain enquiries. Where reverse e-auction is utilized in a specific enquiry
this will be indicated in the respective enquiry and the relevant reverse e-
auction supporting documents will form part of the enquiry. The Tenderers
will be required to submit a complete tender but without prices. Where a
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 62
File name: Invitation to Tender (ITT) Paradise (3CE)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from
Standard Conditions Tender Data
of Tender
supplier includes prices in their tender; these prices will not be considered
and
B-BBEE Requirements
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Specific Goals
A maximum of 20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price.
Number of points B-BBEE Status Level of Contributor (80/20 system):
1 20, 2 18, 3 14, 4 12, 5 8, 6 6, 7 4, 8 2, Non-compliant contributor 0
NB: The following documents are required to claim preference points,
Health & Safety
Source: Invitation to Tender (ITT) Paradise (3CE).pdfEffective Date 07 April 2026
Review Date April 2031
1.1.14 Occupational Health and Safety Act: Section 37(2) Attached Y
affidavits meet the following key pointers to ensure their validity:
number.
indicated in order to know that person is duly authorised to depose of an
affidavit. (Mark the applicable option).
B) Safety Contractual Requirements
reference for the following appointees:
a. Health and Safety Representative,
b. First aid level 2,
c. Fire fighters,
d. Fall protection planner,
e. Incident investigator,
f. Risk Assessor
g. Safety Officer
h. Construction Supervisor
required. Not compulsory for the appointee to have accepted the
appointment at this stage (tender stage).
3 Occupational, Health and Safety Plan (OHS Plan)
a. Risk Assessment Procedure
b. Baseline Risk Assessment. (The Baseline Risk Assess should
address all the relevant risks and must be relevant to the Scope
of work.)
numbers etc.)
11 Occupational Health programme. (Submit 11.1 or 11.2)
11.1 Medical Certificate of the workers listed below done by the
a. Health and Safety Representative,
b. First aid level 2,
c. Fire fighters,
d. Fall protection planner,
e. Incident investigator
f. Risk Assessor
g. Safety Officer
h. Construction Supervisor
11.2 Medical surveillance plan/Programme
7. preparedness environmental emergencies, with emergency
plan (EPP) contact details
Safety COIDA - Original certificate of good standing or proof √
of application issued by the Compensation Fund
(COID) or a licensed compensation insurer (South
African tenderers only)
Quality Refer to pages 22 – 23 of this invitation to tender for √
full requirements
Other safety Refer to pages 19 – 20 of this invitation to tender for √
documents as full requirements
required per scope
of works
Environmental Refer to pages 21 – 22 of this invitation to tender for √
full requirements
Due Refer to pages 23 – 24 of this invitation to tender for √
Environmental
Source: Invitation to Tender (ITT) Paradise (3CE).pdfof Tender
C) Environmental Contractual Requirement
Environmental Management System (EMS) Requirements
appointment environmental issues within the company.
letter Appointment letter to be accepted and dated.
4. Environmental Company’s communication plan / procedure on
Training Environmental Law Certificate (issued within the
Certificate past three years by Eskom) at the time of contract
signing. Failure to provide the certificate during the
evaluation stage will not result in penalisation.
viability and risk mitigation steps. The latest and approved Annual Financial
Statements (AFS) must be submitted by the tenderer. Where the Annual Financial
Statements have not been audited, then an ITA34C tax submission will be required
and the Public Interest Score as completed by the accountant / reviewer as required
by the Companies Act, 2008.
Contractual Terms
Source: Invitation to Tender (ITT) Paradise (3CE).pdfa national or is constituted, incorporated, or registered and operates in
conformity with the provisions of the laws of that country. This criterion shall
also apply to the determination of the nationality of proposed subcontractors
or suppliers for any part of the Contract including related services.
2. Tenderers submit more than one [tender/proposal] either individually or as a
partner in a joint venture (JV) or consortium, except on an E-Tendering
system where there is a limit size (The upload size per document is 500
megabytes and total submission is restricted to 4 gigabytes).
(Yes=1)
E.1 Form A is completed and signed. 1
Section E Score 1
E) Financial Analysis
The analysis of a tenderer’s financial statements is not a criterion for the purposes
of the scoring and awarding of points or the determination of competitive ranking,
but to determine if the tenderer is financially stable enough to execute a contract /
order of the magnitude to be awarded, and if not, the risk to Eskom.
approved by Eskom Treasury department.
financially sound enough to stand as surety for the subsidiary tendering for
the contract. The parent company’s latest and approved AFS must be
submitted for financial analysis.
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: Invitation to Tender (ITT) Paradise (3CE).pdf (TENDER)Tenderers (whether a single company or an incorporated or unincorporated joint venture or consortium) must meet the eligibility criteria stated in the Tender Data. The tenderer, or any of its principals, must not be under any restriction to do business with Eskom or State-Owned Companies.
Tenderers are ineligible to submit a tender if:
1. Tenderers have the nationality of a country on any international sanctions list.
2. Tenderers submit more than one [tender/proposal] either individually or as a partner in a joint venture (JV) or consortium.
3. Tenders submitted by a joint venture or consortium where the JV/consortium agreement does not explicitly state that the parties of the JV or consortium shall be jointly and severally liable for the execution of the Contract.
4. A Tenderer must not have a conflict of interest.
5. Tenders signed by non-authorised persons.
6. Any tenderer that is restricted by National Treasury.
7. Any tenderer on the Tender Defaulters list.
8. Any tenderer and/or its director/s that is restricted by Eskom.
9. A tenderer that sub-contracts 100% of the Scope of Work
Section
Source: Invitation to Tender (ITT) Paradise (3CE).pdf1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a Attached Y
1.1.15 Contract Quality Plan (CQ) Template Attached Y
1.1.16 Form A Tender & Contract Quality Requirements Attached Y
1.1.17 Quality Control Plan or Inspection Test Plan (QCP or Attached Y
All responsive tenders will be evaluated further for non-negotiable functionality
3.13 Functionality Stage 3: Functional Analysis
Functionality evaluation will follow the following methodology
Tenders which fail to meet the functionality minimum threshold will not be
Apply the threshold evaluation (Functionality- Technical)
Functionality Weightings
Overall minimum threshold for 70%
how the scores will be awarded. foundations and tower
3.15 Evaluation of Stage 4 : Price and B-BBEE point system
maximum of 20 points will be awarded to a tenderer for the specific goal.
The points scored for the specific goal will be added to the points scored for
highest points scored per site in terms of the PPR 2022 unless objective
Ps = Points scored for price of bid under consideration
status in order to obtain each tenderer’s total points scored out of 100.
Description
Source: Guidelines to complete Local Content Documents.pdfContact Information
Source: Guidelines to complete Local Content Documents.pdf (unknown)Submission Guidelines
Source: Guidelines to complete Local Content Documents.pdf (unknown)Returnable Documents
Source: Guidelines to complete Local Content Documents.pdf (unknown)Evaluation Criteria
Source: Guidelines to complete Local Content Documents.pdf (unknown)General
Local Content
Technical
Technical Specifications
Source: Guidelines to complete Local Content Documents.pdf (unknown)Pricing Schedule
Source: Guidelines to complete Local Content Documents.pdf (unknown)Financial Requirements
Source: Guidelines to complete Local Content Documents.pdf (unknown)Compliance Requirements
Source: Guidelines to complete Local Content Documents.pdf (unknown)B-BBEE Requirements
Source: Guidelines to complete Local Content Documents.pdf (unknown)Contractual Terms
Source: Guidelines to complete Local Content Documents.pdfDescription
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfThis document is a Supplier Evaluation Pack for Eskom Holdings SOC Ltd and its subsidiaries, applicable for the 2026/2027 tax year (1 March 2026 to 28 February 2027).
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Closing date for submission: 28 July 2026 at 10:00 AM (UTC).
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Submit completed pack and signed affidavits to your Eskom contractor representative.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)General
Employee Exclusion
Income Test
Independence Test
Connected Persons
Labour Brokers
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfTax withholding rules:
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Tax implications based on contractor classification:
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdf (unknown)Mandatory compliance requirements:
Section
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.pdfEvaluation is based on a structured questionnaire to classify contractors. Key steps:
Description
Source: Eskom_-_Standard_Conditions_of_Tender.pdfImportant Dates
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)General
Registration
Compliance
Submission
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender.pdfPricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender.pdfFinancial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender.pdf (TENDER)Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender.pdfContractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender.pdfSection
Source: Eskom_-_Standard_Conditions_of_Tender.pdfDescription
Source: Paradise SS tower (002) NEC3.pdf1. Production of manufacturing drawings (Eskom to provide).
2. Foundation design per drawing 0.53/2567; inform Eskom if soil conditions unfavourable.
3. Manufacturing and tower construction.
4. No dismantling of existing tower required.
Contact Information
Source: Paradise SS tower (002) NEC3.pdf (unknown)Submission Guidelines
Source: Paradise SS tower (002) NEC3.pdf (unknown)Evaluation Criteria
Source: Paradise SS tower (002) NEC3.pdf (unknown)General
Financial
Technical
Legal
Technical Specifications
Source: Paradise SS tower (002) NEC3.pdf (unknown)1. Production of manufacturing drawings (provided by Eskom).
2. Foundation design per drawing 0.53/2567; inform Eskom if soil conditions are unfavourable.
3. Manufacturing and construction.
Experience & Qualifications
Source: Paradise SS tower (002) NEC3.pdfQuality Management
Source: Paradise SS tower (002) NEC3.pdfPricing Schedule
Source: Paradise SS tower (002) NEC3.pdfFinancial Requirements
Source: Paradise SS tower (002) NEC3.pdf (unknown)Compliance Requirements
Source: Paradise SS tower (002) NEC3.pdf (unknown)Health & Safety
Source: Paradise SS tower (002) NEC3.pdfEnvironmental
Source: Paradise SS tower (002) NEC3.pdfContractual Terms
Source: Paradise SS tower (002) NEC3.pdfSection
Source: Paradise SS tower (002) NEC3.pdfRelevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.