This tender, issued by TRANSNET soc ltd, requires the supply, delivery, removal of existing UPS systems, and installation, testing, and commissioning of three new UPS units at the port of east london. The project aims to replace outdated UPS systems in critical server rooms to ensure uninterrupted power during outages and protect sensitive equipment.
Date & Time
Monday, 06 July 2026 - 16:00
Venue
A Non-Compulsory Tender Clarification Meeting will be conducted via MS Teams please click here to ac
Categories
Request for Quotation
Hely Hutchinson road - Quigney - East London - 5201
19 Jun
2026
Tender Published
Tender was published
06 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf
Transnet SOC Ltd seeks a contractor to supply, deliver, install, test, and commission three new UPS systems at the Port of East London, including removal of existing UPS systems, over a six-month period. The tender includes a technical functionality evaluation with five weighted criteria and a minimum threshold score of 60 out of 100.
Median Estimate
R 680 000
Range
Based on Industry avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Evaluation Criteria
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf (unknown)Bidders must meet all technical functionality criteria with supporting documentation. Minimum requirements: company experience in UPS supply/installation (proven via references), qualified trade-tested electrical artisan with N2+ qualification and 3+ years UPS experience, method statement covering minimum aspects, and SHE documentation. Failure to meet minimum threshold score of 60 disqualifies bid.
Technical Specifications
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdf (unknown)Scope: Supply, delivery, removal of existing UPS systems, and installation, testing, and commissioning of three (3) new UPS systems at the Port of East London. Duration: 6 months.
Key deliverables:
Methodology
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdfSubmit a comprehensive method statement detailing the execution plan for:
Minimum 3 of 5 aspects required for scoring. Points increase with the number of aspects covered (20 to 100).
Experience & Qualifications
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdfCompany Experience (30% weight):
Key Personnel Qualification (15% weight):
Key Personnel Experience (15% weight):
Health & Safety
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdfSubmit a SHE Management Plan addressing at least 3 of 4 required documents:
Points awarded based on completeness and depth: 20 (1 document), 40 (2), 60 (3), 80 (4 with detail), 100 (4 with exceptional detail/innovation).
Environmental
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdfEnvironmental requirements include:
Section
Source: 2. Technical Functionality Evaluation Criteria for Supply and Installation of UPS.pdfTechnical functionality evaluation with a minimum threshold of 60%. Categories: Company Experience (30%), Key Personnel Qualification (15%), Key Personnel Experience (15%), Method Statement (20%), SHE Management Plan (20%). Scoring is point-based per category, with higher points for more comprehensive submissions.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
3. Contract for Supply and Installation of UPS System at POEL.pdf
Transnet SOC Ltd (TNPA) is inviting tenders for the supply, delivery, removal of existing UPS systems, and installation, testing, and commissioning of three new UPS systems (30KVA, 20KVA, and 10KVA) at the Port of East London. The contract duration is six months, with a closing date of July 6, 2026. The project aims to replace aging UPS units to ensure uninterrupted power supply to critical server rooms during outages or load shedding, working in conjunction with existing standby generators.
1. Request for Quotation for Supply and Installation of UPS System.pdf
Transnet National Ports Authority is seeking a contractor for the supply, delivery, removal of existing UPS systems, and installation, testing, and commissioning of three (3) new UPS systems at the Port of East London over a six-month period. The tender follows a multi-stage evaluation process including functionality assessment (minimum 60 points threshold) and 80/20 preference point system.
4. Part C3 Works Information for Supply and Installation of UPSs.pdf
Transnet SOC Ltd seeks a contractor to replace three aging UPS systems at the Port of East London. The scope includes removing existing units, and supplying, delivering, installing, testing, and commissioning three new double-conversion online UPS systems (30kVA, 20kVA, 10kVA) with external battery systems. The project must be completed within a six-month period, with a strong emphasis on technical compliance, safety, and environmental responsibility.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
TransnetContact Person
Xolelwa Gwele
Phone
031-361-8589
[email protected]
Website
www.transnet.net/
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
19 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Transnet is South Africa's state-owned freight transport and logistics company.
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB grading, electrification projects (INEP), and maintenance of substations and mini-subs.
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
In 2026, Western Cape’s security procurement landscape remains one of the most active in South Africa, with 176 live security tenders signaling strong demand for compliant service providers. For security contractors, PSIRA compliance is non-negotiable—failing to verify company and guard registrations before submission can lead to immediate disqualification. With government buyers prioritizing regulatory adherence, suppliers must adopt a proactive approach to ensure all certifications are current, accurate, and aligned with tender requirements.
In 2026, Construction contractors in the Western Cape operate in an increasingly stringent compliance environment. With 180 active construction tenders in the province and a growing emphasis on regulatory adherence, securing a CIDB grading certificate is not just a formality—it’s a gateway to participation. The Western Cape’s procurement landscape demands precision, and even minor documentation errors can disqualify bids. Understanding the legislative framework, required registrations, and common pitfalls is critical for SMEs aiming to compete in this space.
💡 Want more tendering tips and strategies?
Explore Our BlogImportant Dates
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Contact Information
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Submission Guidelines
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Evaluation Criteria
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Eligibility requires: (1) CIDB registration at 3EB level or higher for construction work; (2) For JVs: every member must be CIDB registered, lead partner must be one level below required grade, and combined grading must meet 3EB requirement; (3) Submit certified copy of signed joint venture agreement if applicable; (4) No directors/shareholders listed on Register of Tender Defaulters; (5) Not under restrictions from Transnet or National Treasury; (6) Tax compliance status must be in order; (7) Minimum functionality score of 60 points required to proceed to price evaluation; (8) B-BBEE Level 1 or 2 status for preference points.
Technical Specifications
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Financial Requirements
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Compliance Requirements
Source: 1. Request for Quotation for Supply and Installation of UPS System.pdf (RFQ)Description
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdfImportant Dates
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Contact Information
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Submission Guidelines
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Returnable Documents
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Evaluation Criteria
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)General
Legal
Financial
Technical
Technical Specifications
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Experience & Qualifications
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdfQuality Management
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdfPricing Schedule
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdfFinancial Requirements
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Compliance Requirements
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Health & Safety
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdfContractual Terms
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdfSection
Source: 3. Contract for Supply and Installation of UPS System at POEL.pdf (RFQ)Description
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdfEvaluation Criteria
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdf (unknown)While explicit pre-qualification criteria are not detailed in the provided excerpt, eligibility will be strongly determined by the ability to meet all technical specifications, provide a 36-month guarantee, demonstrate compliance with all listed South African standards and safety regulations, and show capability to handle the removal, installation, and commissioning within the 6-month timeframe. Proof of proper waste disposal and adherence to environmental responsibilities is also required.
Technical Specifications
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdf (unknown)Methodology
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdf (unknown)Quality Management
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdfCompliance Requirements
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdf (unknown)Health & Safety
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdfContractual Terms
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdfRequirements
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdf (unknown)Section
Source: 4. Part C3 Works Information for Supply and Installation of UPSs.pdf (unknown)Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Data conflicts
None detected
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.