Skip to main content
ToolsForensic Analysisimpi instillations

impi instillations

Supplier Forensic Analysis · Scanned: 2026/05/10

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
2
Total Value
R 101

Recent Awards

2 awards · Total: R 101

Showing 5 of 2
The establishment of an enabling agreement for a panel of 30 Contractors to cater for the provision of electrical works performed within the breakdown portfolio on an “As and When required basis, for a period of thirty – six (36) months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN142
R 100
07 Nov 2025
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
ESKOM
Ref: KZN157
R 1
13 Oct 2025

Risk Assessment

0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →