Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
NELSON MANDELA DRIVE - Matimba Power Station - LEPHALALE - 0555
Organization Type
GOVERNMENT
Published
19 Jun 2026
OCDS Reference
ocds-9t57fa-159529
ESKOM invites tenders for the supply and delivery of low voltage motors to matimba power station in limpopo over a five-year period on an as-and-when-required basis. This open tender targets suppliers capable of meeting strict technical, quality, and compliance standards, including iec/sans 60034 certification and local content requirements.
Date & Time
Friday, 10 July 2026 - 10:00
Venue
Microsoft Teams
Categories
Request for Bid(Open-Tender)
NELSON MANDELA DRIVE - Matimba Power Station - LEPHALALE - 0555
19 Jun
2026
Tender Published
Tender was published
10 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
NEC3 -Supply and delivery of low voltage motors.doc
The tender is for the supply and delivery of low voltage motors to Eskom's Matimba Power Station over a period of five years on an as-and-when-required basis. The closing date for submissions is July 10, 2026.
Median Estimate
R 65 570
Range
Based on 4 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogRecommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdfEskom Matimba Power Station requires the supply and delivery of Low Voltage (LV) motors. The scope includes detailed requirements, specifications, terms, and conditions for qualifying for the tender. The document applies specifically to Matimba Power Station and outlines the User Scope of Work for LV induction motors. The purpose is to establish a supply and delivery contract between Eskom and a qualified supplier. Supplied materials must support Matimba Power Station's performance targets: EAF>85, PCLF<8, and UCLF<5.
Contact Information
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)Department: Supply Chain Management. No specific names, emails, phones, or addresses provided in the document.
Evaluation Criteria
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)General
Technical
Legal
Technical Specifications
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)Scope: Supply and delivery of Low Voltage (LV) induction motors to Matimba Power Station over five years on an as-and-when-required basis. Motors must be designed, manufactured, and tested according to Eskom Standard 240-57617975 (Rev.4), SANS IEC 60034, and SANS 1804. Motors must be direct replacements for existing units, mechanically and electrically interchangeable. Performance requirements: Matimba Power Station targets EAF>85, PCLF<8, and UCLF<5; supplied materials must support these targets. Motors range from 0.18kW to 185kW, including single-phase, three-phase, dual-speed, and geared motors. Specific models, frame sizes, enclosure ratings (e.g., IP55, IP67), insulation classes (e.g., F, H), service factors (e.g., S1, S2), and mounting types (e.g., B3, B5, Flange) are detailed in Tables 1 and 2. Motors must comply with standards such as SANS 60034, SANS 1804, ISO 9001, ISO 45001, and ISO 14001. Specialized motors include those for hazardous locations (EX-rated), high-efficiency, and actuator applications.
Methodology
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)3.4 Procedure for Submission and Acceptance of Supplier’s Design
Experience & Qualifications
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)3.3 Motor Manufacturer’s Experience
Quality Management
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdfQuality Assurance and Testing: Motors must meet Eskom Standard 240-57617975, SANS IEC 60034, and SANS 1804. On delivery, items will undergo QC by an End User to verify compliance with the order. ISO 9001 Quality Management Systems standards apply. Suppliers must ensure all spares are accompanied by their related user specifications as per URS.
Compliance Requirements
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)Motors must comply with Eskom Standard 240-57617975 New LV Induction Motor Procurement Standard (Rev.4), SANS IEC 60034, and SANS 1804. Additional compliance includes ISO 9001 (Quality Management), ISO 45001 (Occupational Health and Safety), and ISO 14001 (Environmental Management). Preferential Procurement Policy Framework Act applies. Suppliers must ensure all spares are accompanied by their related user specifications as per URS. B-BBEE minimum level: 58.
Health & Safety
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdfOccupational Health and Safety (OHS) compliance is required per ISO 45001. Motors for hazardous locations must be EX-rated and comply with HAZLOC standards. Suppliers must adhere to safety and environmental standards, including ISO 14001 for Environmental Management.
Contractual Terms
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdf (unknown)Contractual roles: Supply Manager coordinates budget, ensures compliance, and maintains records. Contractor must supply spares per Matimba Power Station procurement processes, ensure quality, and provide user specifications. Contractual meetings and correspondence will be managed as per the scope. NEC 3 Supply Contract terms apply.
Section
Source: Supply_and_delivery_of_LV_motors_SoW_Final.pdfQuality Control Plan (QCP) and Technical Evaluation Team (TET) will assess submissions. Delivered spares will be subjected to quality control (QC) by an End User at Matimba Power Station main stores to ensure compliance with the order. ISO 9001 Quality Management Systems standards will be applied during evaluation.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-68099512 Form A_Cat 3_ Rev 9 (1).docx
This tender, issued by Eskom, is for the supply and delivery of low voltage motors (less than 55kW) to Matimba Power Station in Limpopo over a five-year period on an as-and-when-required basis. The tender emphasizes compliance with Eskom Supplier Quality Requirements (Specification 240-105658000) and ISO 9001 standards, with a focus on quality assurance, performance monitoring, and adherence to technical and procedural clauses.
Supply_and_delivery_of_LV_motors_SoW_Final.pdf
Eskom is seeking a qualified supplier for the supply and delivery of low voltage (LV) induction motors to Matimba Power Station over a five-year period on an as-and-when-required basis. The motors must meet strict technical, quality, and compliance standards, including Eskom and SANS/IEC specifications. The contract aims to support Matimba Power Station's performance targets (EAF>85, PCLF<8, UCLF<5).
Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf
Eskom Holdings SOC Ltd invites tenders for the supply and delivery of low voltage (LV) motors to Matimba Power Station over a 5-year period on an as-and-when-required basis. The tender (E3028GXMPMAT) closes on 10 July 2026 at 10:00 UTC, with a validity period of 180 days. Submissions must be electronic via Eskom’s e-tendering portal, with mandatory compliance to technical, commercial, and contractual requirements, including local content, quality standards (IEC/SANS 60034), and B-BBEE regulations.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Mabuse Erick Maila
Phone
031-710-5290
[email protected]
Address
NELSON MANDELA DRIVE - Matimba Power Station - LEPHALALE - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
19 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Evaluation Criteria
Source: NEC3 -Supply and delivery of low voltage motors.doc (unknown)General
Applicants must be legally registered entities capable of supplying low voltage motors.
Technical
Must meet Eskom’s technical specifications for low voltage motors (specific details would be in the full tender document).
Logistical
Must have the capacity to deliver to Matimba Power Station as required over the five-year period.
Legal
Must comply with South African procurement laws and Eskom’s vendor requirements.
Description
Source: 240-68099512 Form A_Cat 3_ Rev 9 (1).docxSupply and delivery of low voltage motors (less than 55kW) to Matimba Power Station over five (5) years on an as-and-when required basis. Must comply with Eskom Supplier Quality Requirements (240-105658000 Specification) and ISO 9001 Standard.
Contact Information
Source: 240-68099512 Form A_Cat 3_ Rev 9 (1).docx (unknown)Eskom’s Quality Representative: Tshepo Matuludi, Quality Control Officer, signature dated 2025-04-02.
Submission Guidelines
Source: 240-68099512 Form A_Cat 3_ Rev 9 (1).docx (unknown)Returnable Documents: Tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Rev 9 (1).docx (unknown)General
Quality Assurance
Category Specific
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Rev 9 (1).docx (unknown)Supply and delivery of low voltage motors (less than 55kW) to Matimba Power Station over a period of five (5) years on an as-and-when required basis. Must comply with Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard. Applicable clauses: Pre-Contract Award Quality Requirements (Category 3), Contract Execution, Supplier Quality Performance Monitoring Phase, Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs, Special Processes.
Compliance Requirements
Source: 240-68099512 Form A_Cat 3_ Rev 9 (1).docx (unknown)Must comply with Eskom Supplier Quality Requirements (240-105658000 Specification) and ISO 9001 Standard. Quality principles to be adhered to: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, Relationship Management.
Description
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfSupply and delivery of low voltage motors to Matimba Power Station over a period of five years on an as-and-when-required basis. Scope includes adherence to Eskom’s technical, quality, and compliance standards as outlined in the tender documents.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)Closing date and time: 10 July 2026 at 10h00. Non-compulsory clarification meeting: 25 June 2026 at 14h00 via MS Teams (link: https://teams.microsoft.com/meet/3758098004542?p=zs9Zlnw40ehAftXOga). Clarification queries must be submitted at least 5 working days before the tender closing date. Tender validity period: 180 days from closing date and time.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)Eskom Representative: Mabuse Maila. Tel: 014 763 8816. Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. Submission portal: https://etendering.eskom.co.za.
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)Submit tenders electronically via Eskom E-tendering site (https://etendering.eskom.co.za) by the closing date and time. No hard copies or zipped files accepted. File limits: 50MB per file, 900MB total per submission. Price lists must be in both PDF and Excel formats. Ensure submission status is marked as 'complete'. Late submissions will not be accepted. Resubmissions will void previous versions. Mandatory returnables must be fully completed and signed where required. Failure to submit mandatory documents by the deadline will result in disqualification.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)General
Joint Ventures
Submission Rules
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)Supply and delivery of low voltage (LV) motors to Matimba Power Station over 5 years on an as-and-when-required basis. Mandatory technical returnables: Proof of manufacturer’s 5+ years of LV motor production experience (letter required). Proof of local factory capability for testing LV induction motors up to 185kW (formal letter). Manufacturer’s datasheet and dimensioned outline drawing per motor (0.18–45kW and 55kW–185kW). Confirmation that motor designs and routine test certificates comply with IEC/SANS 60034. Motors must be electrically and mechanically interchangeable with existing units. Delivery period list per motor design/type, spaced every two weeks. Cataloguing information may be required post-award; include a line item for cataloguing in the pricing schedule if applicable.
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfManufacturer must have at least 5 years of LV motor production experience (proof required via formal letter). Local factory must be capable of testing LV induction motors up to 185kW (proof required via formal letter). Tenderers must provide a track record of up to 10 past completed contracts/purchase orders for LV induction motors in the last 5 years, including client details, scope, value, dates, and reference letters on client letterhead.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfQMS must comply with ISO 9001:2015. Required documents: QMS manual (defining scope), Quality Policy (approved by top management), Quality Objectives (approved by top management), Control of documented information (Clause 7.5), Control of nonconforming outputs (Clause 8.7), Nonconformity and Corrective Action (Clause 10.2), Internal Audit (Clause 9.2). Evidence of QMS in operation: Roles/responsibilities matrix (Clause 5.3), Control of Externally Provided Processes/Products/Services (Clause 8.4). Contract Quality Plan (ISO 10005) and Quality Control Plan (QCP/ITP) required. User-defined requirements: Form A completion and additional scope-specific standards.
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfPricing schedule must be completed and submitted in both PDF and Excel formats. Include a line item for cataloguing if required (Eskom covers cost). Prices must be inclusive of VAT, corrected for arithmetic errors, and exclude contingencies. Evaluation considers Net Present Value, price adjustment factors, and exchange rate fluctuations. Unconditional discounts are factored into evaluation; conditional discounts are applied at payment. Alternative tenders are not permitted.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)Payment terms: Contracts below R50M (incl. VAT) paid within 30 days of undisputed invoice receipt. Contracts above R50M (incl. VAT) paid within 60 days. Pricing schedule must be completed and submitted in PDF and Excel. Alternative tenders are not allowed. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. Cataloguing costs will be covered by Eskom if required.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdf (RFP)Mandatory: Proof of valid CSD registration. Tax Clearance Certificate (certified copy) required for local tenderers without a SARS e-filing PIN and foreign tenderers with a South African footprint. SBD 1 (Invitation to Bid) must be completed by all tenderers. SBD 6.1 (Preference Points Claim Form) and SBD 4 (Bidders Disclosure) required. Integrity Declaration Form (Annexure D) and Supplier Integrity Pact acknowledgment mandatory. CPA Requirements for Local/Foreign Goods/Services (Annexures E/F). Local Content Declarations (Annexures G1–G4) if applicable. COIDA Certificate of Good Standing or proof of application (South African tenderers only). OHS requirements: Signed OHS legal acknowledgment (Annexure B), OHS plan, Baseline Risk Assessment (BRA), valid COIDA Letter of Good Standing, and OHS policy signed by CEO. Audited financial statements for the past 18 months (or last year if unavailable). Joint ventures must submit a valid JV agreement and designated bank account details.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfMandatory OHS returnables: Signed acknowledgment of Eskom’s OHS legal requirements (Annexure B). OHS Plan addressing project scope risks and aligned with Eskom’s HSE specifications. Baseline OHS Risk Assessment (BRA) with methodology. Valid Letter of Good Standing (COIDA or equivalent). OHS Policy signed by CEO (compliant with OHS Act Section 7). Suppliers must submit all OHS documents by tender closing. Non-compliance or missing documents will render the tender non-responsive. Suppliers have 7 working days to submit outstanding OHS documents upon request; failure results in disqualification.
Environmental
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfEnvironmental requirements: Environmental Policy, Aspects and Impact Register related to the scope of work, and Method Statement. These are contractual requirements and will be assessed post-evaluation. Failure to meet these may result in non-responsiveness.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfContract terms governed by Eskom Standard Conditions of Tender and NEC or other Contract. Payment terms: 30 days for contracts ≤ R50M, 60 days for contracts > R50M. Eskom reserves the right to negotiate with preferred bidders if prices are not market-related. Subcontracting with subsidiaries must be declared. Contract duration: 5 years. Tender validity period: 180 days from closing date. Cataloguing may be required post-award; costs covered by Eskom. Security for performance not applicable.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) LV.pdfFunctionality requirements: Must meet an 80% threshold to qualify. Qualitative technical evaluation includes Past Experience (80% of 20% weight) and Delivery Period (20% of 20% weight). Motor Interchangeability (electrical and mechanical) accounts for 80% of the technical score, split equally between electrical and mechanical compatibility. Quality Management System (QMS) scored out of 7 points (ISO 9001 compliance, manual, policy, objectives, document control, nonconforming outputs, corrective action, internal audits). Quality in operation scored out of 2 points (roles/responsibilities matrix, control of external providers). Contract Quality Plan and Quality Control Plan each scored out of 1 point. Pricing: 80 points (inclusive of VAT, corrected for errors, NPV-based). Specific Goals: 20 points (PPPFA). Final ranking uses 80/20 preference point system.
Data conflicts
None detected
Get deep intelligence on Supplies: General. Unlock full pricing strategies, bid frequency, and historical win rates.