Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
No 1 dale road midrand - Johannesburg - Johannesburg - 1685
Organization Type
GOVERNMENT
Published
09 Jun 2026
OCDS Reference
ocds-9t57fa-158560
AI Document Analysis Stages
Description
Source: Tender documents.zipCategories
Request for Quotation
No 1 dale road midrand - Johannesburg - Johannesburg - 1685
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Tender documents.zip
Analysis completed but response format was invalid
Date & Time
Monday, 06 July 2026 - 10:00
Venue
MS Team
09 Jun
2026
Tender Published
Tender was published
06 Jul
2026
Closing Date
Tender closing date
Median Estimate
R 71 911
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd and bbbee compliance for general sector suppliers in south africa (2026) — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd & bbbee compliance for general sector tenders in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
1. Open your web browser
2. Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
3. eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
*
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
4. Once the email is verified, login using your registered email address and password then the
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5. OTP sent to the registered cellphone number and email address
6. Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7. Landing page once OTP is verified
8. Select the preferred “Ref No”
9. A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
10. Click on “Create New Submission” button to submit required Tender documents
11. Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
12. To submit tender documents, click on “Add file” button
13. Upload required tender documents by:
1. Giving the file a name
2. Select the listed file type e.g.: Technical, commercial, finance and etc
3. Choose the file you need to upload
4. Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
14. Once clicked on “Upload” button, this page will be displayed with the submitted document(s).
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
15. Click on “Finalize Submission” button. A file size cannot exceed 50MB and a total size of
all uploaded files should not exceed 900MB.
16. Once “Finalize Submission” button is clicked the pop-up message confirming the submission
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
17. Click on “Finalise and Close Submission” button to finalize the submission of documents.
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
18. Once the submission is finalised the page with all submitted documents will display with the
submission and closed time and date timestamp at the bottom.
19. To view submitted tenders, click on “My Submissions” menu option. All your individually
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
20. Once the submission process is complete an email with be sent to the submitter with all
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
From:Eskom E-Tender Document Submission 28 <[email protected]>
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Cell D1: GAUTENG OPERATING UNIT: ENVIRONMENTAL SCOPE OF WORKS FOR SPECIFICATION
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Business evaluation and analysis services
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N/A
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
on an as when required for period of three years. SECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Clause 3 pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
CLAUSE 4 Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) X
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000)
-
Post-contract award (ESKOM)
Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2. Supporting Clauses .................................................................................................................. 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3. Pre-Contract Award: Quality Requirements .............................................................................. 7
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
4. Acceptance ............................................................................................................................. 27
5. Revisions ................................................................................................................................ 27
6. Development Team ................................................................................................................ 27
7. Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2. Supporting Clauses
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3. Pre-Contract Award: Quality Requirements
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
4. Acceptance
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
5. Revisions
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
6. Development Team
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
7. Acknowledgements
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
appointment of contractors or suppliers for the commencement
of work
Construction Managers
(8.1)
229994)
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with
its Safety, Health, Environmental and Quality Policy, along with legislative obligations.
This SHE specification is Eskom the minimum requirements which are required to be met for
the specific contract and for the duration of the contract period by contractors and where
required, the delivery organisation.
The contractor is expected to develop a SHE plan, which meets these requirements as
well as all the relevant applicable legislation they conform to.
Eskom in no way assumes the contractor’s legal responsibilities. The contractor is and
remains accountable for the quality and the execution of his/her health and safety
programme for his/her employees and appointed contractor employees.
This SHE specification reflects minimum requirements and should not be construed as all
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements.
Where requirements listed are already in place, then the organisational requirements must be
taken cognisance of and listed in the respective SHE plans. If there are any additional Eskom
and or legislative requirements listed in the SHE specification, then these must be addressed.
2. Supporting Clauses
2.1 Scope
This SHE specification lists the legislative and Eskom requirements and where applicable, any
requirements pertaining to Local Authorities / Municipal by-laws / Environmental legislation
that must be met by the contractor.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.1.1 Purpose
This document will provide a standardised approach to the compilation of SHE specifications
throughout Eskom for contracts, standards and NEC 3 contracts.
2.1.2 Applicability
This SHE specification is applicable to any contracting organisation who intends tendering for
the contract.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] Compensation for Occupational Injuries and Diseases Act
[6] 32-37 Eskom Substance Abuse Procedure.
[7] 32-726 Contract and Contractor OHS Management
[8] 240-62196227 Life- saving Rules
[9] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[10] 32-727 SHEQ Policy
[11] 32- 418 Working at Heights Procedure
[12] 240-62946386 Vehicle and Driver Safety Management Procedure
[13] 32-520 Risk Assessment Procedure
[14] Asbestos Regulation 2021 (Gov. Gazette Vol. 440 Pretoria 10 February 2002 No. 23108)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] National Environmental Management Waste Act, 2008 (Act No. )
[15] Asbestos Abate Regulation, 2020
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Appointed contractor Means a contractor appointed by the principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes principal contractors
Construction work Any work in connection with
a. the construction, erection, alteration, renovation, repair, demolition or
dismantling of or addition to a building or any similar structure.
b. the construction, erection, maintenance, demolition or dismantling of any
bridge, dam, canal, road, railway, runway, sewer or water reticulation
system or the moving of earth, clearing of land, the making of excavation,
piling or any similar civil engineering structure or type of work.
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships among
and between them, and the physical, chemical, aesthetic, and cultural
properties and conditions of the foregoing that influence human health
and well-being
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing negative
environmental impacts are implemented during the life-cycle of a project.
This Environmental Management Plan should preferable form part of
Eskom’s Environmental Management System
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Health and safety file (OHS Act) means a file or other record in permanent form, containing the
information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Health and safety means comprehensive health and safety requirements for a contract, project,
requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Principal contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, principal contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
Asbestos means any mixture containing these fibrous silicates - Asbestos actinolite,
CAS No. 77536-66-4; asbestos grunerite (amosite), CAS No. 12172-73-5;
(c) asbestos anthophyllite, CAS No. 77536-67-5;(d) chrysotile, CAS No.
12001-29-5 or CAS No. 132207-32-0;(e) crocidolite, CAS No. 12001-28-4;
(f) asbestos tremolite, CAS No. 77536-68-6
Approve plan of work means a written site-specific methodology as contemplated in regulation 15
that is at least co-signed by the asbestos client, registered asbestos
contractor and approved inspection authority.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
CE Chief Executive
CNC (Eskom) Customer Network Centre
CR Construction Regulations of the OHS Act
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DoL Department of Labour ( Inspection and Enforcement services – Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
MSDS Material Safety Data Sheets
NEMA National Environmental Management Act
OHS Act Occupational Health and Safety Act and Regulations,
SACPCMP South African Council for the Project & Construction Management Professions
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/Supporting Documents
Eskom Gauteng Cluster’s OHS Act section 37(2) agreement to be signed at procurement
during the signing of the NEC contract, it is the responsibility of the project manager to ensure
that the 37(2) agreement is signed and a copy be kept in the contractor file at procurement.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.6 Roles and Responsibilities
2.6.1 Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved
in the day to day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
2.6.2 Principal contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both principal contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
1. Carry out all duties as listed in section 8, 9 and 10, the various other regulations that
form part of the OHS Act and Regulation 7 of the Construction Regulations.
2. The principal contractor must notify the provincial director of the Department of Labour
in writing of all construction work if it falls within the scope of Regulation 4 of the
Construction Regulations (if this has not been arranged and or done by the
client/agent);
3. Carry accountability and responsibility for the safety and health of their employees and
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act;
4. Shall keep a record of all employees including the appointed contractor employees,
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
5. Ensure that all their appointees are made aware of their accountabilities and
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
6. Ensure that the minimum legislative, regulatory and Eskom SHE requirements are
complied with on all work sites.
7. Give the Eskom project managers and line managers / responsible managers their full
participation and cooperation.
8. Compile a SHE (health and safety) file where all relevant health and safety records
must be kept for each work site.
9. The principal contractor must hand over a consolidated (to include any appointed
contractors files) health and safety file to the Eskom project manager on completion of
the project. This is to include all drawings, designs, lists of materials used and other
applicable information about the completed project, as well as the list of appointed
contractors, the agreement, and the type of work completed.
10. Contractors must hand over a consolidated (to include any appointed contractors files)
health and safety file to the principal contractor on completion of the project. This is to
include all drawings, designs, lists of materials used and other applicable information
about the completed project, as well as the list of appointed contractors, the
agreement, and the type of work completed.
11. The principal contractor must provide the project manager with a certified copy of
his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company. Similarly, the principal contractor must provide the Eskom
project manager with all the valid letters of good standing from their appointed
contractors.
12. Contractors must provide the principal contractor with a certified copy of his/her
Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
13. Appoint competent staff to perform the project work and ensure that all employees are
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
14. Ensure that all employees are conversant with all relevant work procedures and that
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
15. Co-ordinate the activities of all the appointed contractors in the interests of safety and
health;
16. Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
17. Stop his /her employees and any appointed contractors, if project work is not in
accordance with the health and safety plan or if such work poses a threat to the health
and safety of persons or a risk of degradation to the environment.
18. Take reasonable steps to ensure cooperation between all their appointed contractors.
19. Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
20. Appoint full-time competent employees in writing to supervise the performance of all
specified work throughout the contract period.
Note 2: No work may commence and or continue without the presence of the appointed project
manager or project supervisor during performance of the contracted work.
21. Ensure that the supervisor or manager do not supervise work on any site other than
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: Construction supervisor may not supervise any other site other than the one appointed to.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
22. Appoint a full or part time safety officer or construction safety officer (registered with
SACPCMP) in writing.
23. Not victimise or dismiss employees, by virtue of the employees divulging health and
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements;
24. Follow a process of disciplinary action if any of their employees or their appointed
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
25. Ensure that all appropriate precautions are taken to protect persons (visitors, members
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
26. Before the commencement of any work, conduct risk assessments which shall include
public safety. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
27. Ensure that pre-task risk assessments are conducted and documented daily and prior
to the starting of any new task, irrespective of whether it is a repetitive task or not.
28. Take prime responsibility for all aspects of environmental management associated with
the project activity for which they are responsible.
29. Provide any appointed contractor who is making a bid or is appointed to perform work
on Eskom’s behalf, with the relevant sections of the documented Eskom’s SHE
Specification.
30. Principal contractors are required to approve appointed contractor’s health and safety
plans if they meet all the requirements.
31. Must ensure that an organisation medical surveillance programme for the duration of
the contract is in place and maintained.
32. Prior to having pre-employment and periodic medicals fitness examinations
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
33. Ensure that pre-employment, periodic and exit medicals are carried out on their
employees. Medical assessments must be conducted by a registered Occupational
Health Practitioner. During the pre-employment medical, where employees will be
required to work at heights, they will also be required to undergo the required employee
physical and psychological fitness examinations.
34. Ensure, prior to the commencement of construction work, that all persons involved in
the project work, as well as the appointed contractors, have received a health and
safety induction training session. Similarly, ensure that all visitors to site undergo the
site’s induction training.
35. Ensure, prior to the commencement of construction work or contracted work, that all
their employees involved in the project work, as well as the appointed contractors,
have received task-specific training.
36. Issue risk-based personal protective equipment (PPE) as a measure of last resort to
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the principal contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
37. Erect their own site huts, temporary buildings, storage areas, toilets, fencing, and any
other structure as may be required. Any such structures shall be positioned and
erected in compliance with any instructions from the Eskom project manager and the
relevant site safety and fire prevention requirements;
38. On completion of the work remove all structures erected by them, and where required
by law rehabilitate the environment.
39. Where performing work with the environment, ensure that minimal damage is done
and that where an Environment Management Plan is in place, then adhere to the plan.
40. Respect the rights of land owners/lessors and the preservation of their registered
activities;
41. Must have a substance abuse program which must be in line with the requirements of
the OHS Act.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
42. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
43. Ensure that all equipment and tools used comply with OHS Act requirements with
respect to condition, use, care, storage, maintenance, and the management of these;
44. Ensure that all incidents are reported and investigated timeously by competent incident
investigators.
45. Be involved in all of their appointed contractor’s investigations.
46. Establish health and safety committees, hold such committee meetings on all sites,
and ensure that appointed contractors participate in their health and safety meetings.
47. Chair their own health and safety committee meetings and record such meetings.
48. Appoint sufficient number of health and safety representatives in terms of legislative
requirements and ensure that the appointed contractors appoint health and safety
representatives for their work sites.
49. When appointing contractors, advise the project manager in writing timeously and
obtain his/her approval prior to them commencing work.
50. Shall keep a record of all employees including the appointed contractor’s employees,
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
2.6.3 Construction Managers/ Contract Managers
Note 1: No work may commence and or continue without the appointed supervisor or manager during
the performance of the contracted work.
1. Not supervise construction work on any construction site other than the site they have
been appointed to supervise;
2. Assist the contractor and/or the appointed safety officer in conducting site induction
training for new staff and site visitors;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
3. Instruct and train all employees under their control on any hazardous and related work
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
4. Ensure that the minimum legislative and Eskom SHE requirements are complied with
on all work sites;
5. Stop any construction work that is not in accordance with the safety and health plan or
if such work poses a threat to the safety and health of persons or a risk of degradation
to the environment;
6. Ensure that risk-based personal protective equipment (PPE) has been issued and
employees wear/use the PPE as instructed.
7. Inspect such PPE on a regular basis and record the inspections;
8. Ensure that all incidents are reported to the client and are investigated.
9. Be involved in all investigations that occur within their area of responsibility.
10. Carry out audits and or inspections on their contractors at least monthly and any
appointed contractors on instructions of their contractor.
11. Ensure that employees under their control are conversant with all relevant work
procedures and that they adhere to such procedures;
12. Before the commencement of any work, where possible, assist in the conducting of
risk assessments and ensure that appropriate mitigating measures have been
considered and implemented.;
13. Ensure that daily or pre-task risk assessments are conducted and documented daily
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
14. Hold tool box talks at the start of each day/ task to discuss health and safety issues as
well as confirming the requirements of the daily risk assessments;
15. Ensure that all appropriate precautions are taken to protect persons (visitors, members
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
16. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
17. Ensure that all equipment and tools used on site comply with OHS Act requirements
with respect to condition, use, care, storage, maintenance, and the management of
these.
18. Ensure that they and their contractor managers give clear and unambiguous
instructions for the project work, to the employees for whom they are responsible for.
19. Not victimise their employees by virtue of their employees divulging health and safety
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
20. Where any work is performed which involves the environment, ensure that minimal
damage is done to the environment and that where an Environment Management Plan
is in place, then the plan adhere to the plan.
21. Stop any employee or contractor from performing construction work which is not in
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
22. Appointed construction manager must be registered with SACPCMP.
2.6.4 Contractor Site Supervisor or Contract Supervisor
Must:
1. Be competent to perform the required supervisory tasks;
2. Ensure their employees and all appointed contractors comply with the required
statutory and Eskom project requirements;
3. Inspect all work done by the Contractors to ensure adherence to Eskom’s standards
and specifications
4. Conduct follow-up inspections to ensure findings are closed out and preventative
action is in place.
5. Monitor contractors for adhere to statutory requirements and safety standards.
6. Monitor contractors overall SHE performance on site in order to achieve excellent
results
7. Ensuring a Safe working environment is established and maintained by the contractor
for the elimination of unsafe acts by all people whilst on the project site.
8. Discuss all SHE related problems with the relevant contractor management timeously
in the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformance’s identified, corrective actions,
audits and inspection schedules.
9. Ensuring that quality records are maintained in accordance with legislative and Eskom
requirements;
10. Continual liaison between the principal contractor, appointed contractors and
employees.
11. Ensures that employees and appointed contractors are aware of latest standards,
procedures, work instructions and safety regulations issued by Eskom:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
12. Conduct site Inspections for compliance to SHE requirements and compiles the
relevant inspection reports.
13. Submit the observation reports to the relevant management.
14. Have meaningful participation in the project statutory health and safety committee
meetings.
15. Participate in all appointed contractor incident investigations.
16. Participate in the principal contractors emergency preparedness planning.
17. Ensure that their own employees and those of any appointed contractor are competent
to perform the tasks assigned.
18. Issue site instructions on behalf of the principal contractor where and when the
appointed contractors deviate from safety requirements.
19. Assist the principal contractor with the handing over process, in particular the SHE file
and relevant documentation.
2.6.5 Employees
Must:
1. Be responsible for their own safety and health and that of their co-workers;
2. Co-operate with their employer to meet all of the employer’s as well as legislative and
Eskom requirements;
3. Familiarise themselves with their responsibilities during induction and awareness
training sessions, some of which are:
a. familiarising themselves with their workplaces and safety and health procedures;
b. working in a manner that does not endanger them or cause harm to others;
c. ensuring that the work area is kept tidy;
d. reporting all incidents and near misses;
e. protecting fellow workers against injury by performing job observations;
f. reporting unsafe acts and unsafe conditions;
g. reporting any situation that may become dangerous; and
h. carrying out lawful orders and obeying safety and health rules;
4. Who become aware of any person disregarding a safety notice, instruction, or
regulation, immediately report this to the person concerned. If the person persists,
stop that person from working, and report the matter to contractor management and/or
Eskom’s project manager or supervisor immediately.
5. Not damage, alter, remove, render ineffective, or interfere with anything that has been
provided for the protection of the site or for the health and safety of persons this
includes any guarding of machinery or equipment.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
6. Obey any safety signs and adhere to any site demarcation at all times.
7. When entering or leaving the site, do so via the official designated access/departure
routes. Where reflective jackets/bibs are required to be worn, wear them.
8. Be subjected to any disciplinary action, if having transgressed any of the requirements
of the health and safety site rules, Eskom requirements, company requirements, or
legislative requirements.
9. Avoid any act that may endanger their own health and safety or that of fellow
employees, members of the public, or visitors who may be affected by their acts and/or
omissions at work.
10. Have the right to obtain proper information from their employer regarding health and
safety risks and measures related to the work processes.
11. Use facilities placed at their disposal and not misuse anything provided for their own
protection or that of others.
12. Have the right to remove themselves from danger when they have good reason to
believe that there is an imminent and serious danger to their health and safety and
have the duty to inform their supervisor immediately of such danger.
13. Report to their supervisor (in the first instance), the principal contractor (in the second
instance), and/or the Eskom project manager, any substandard acts and/or conditions
that have come to their attention and that have not been rectified or acted on by their
contractor management timeously.
14. Have the right and the duty at any workplace to participate in ensuring healthy and
safe working conditions, to the extent of their control, over the equipment and methods
of work adopted.
15. Maintain the surrounding area of the work site in a neat and tidy condition.
16. Have meaningful participation in regular health and safety meetings.
17. Have the right to refuse to perform or continue to perform any task/job on the grounds
of health, safety, and environmental concerns.
18. When given instructions, understand the instructions and be permitted to clarify those
instructions.
2.6.6 Contractor Health and Safety officer
1. Promote a SHE culture within the organisations involved in the project / contract.
2. The contractor’s safety and health officer shall assist in the control of all health and
safety-related matters on the sites.
3. Be involved in the developing the project SHE plan and SHE policy.
4. Be in constant liaison and cooperate with Eskom’s SHE professionals responsible for
providing them with a health and safety service.
5. Ensure that this SHE specification is adhered to by his/her principal contractor and is
submitted to any appointed contractors.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
6. Conduct audits and inspections of all work sites for the duration of the project.
7. Be involved in the organisations incident investigations when required.
8. Participate in the organisation’s statutory and non-statutory health and safety
committees meetings.
9. Conduct organisational, site and visitor induction training.
10. Stop any employee or contractor from performing construction work which is not in
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
11. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management.
12. Make themselves available and ensure co-operation of employees under their control
to undergo breathalyser and drug testing while entering and/or being on any Eskom
work site by Eskom.
13. Carry out audits and or inspections on their contractors at least monthly and any
appointed contractors on instructions of their contractor;
14. Carry out frequent behaviour observations of employees under their control at least
monthly and any appointed contractors on instructions of their contractor.
15. Appointed full or part time safety officer or construction safety officer must be
registered with SACPCMP).
3.1 Scope of work
Asbestos containing material removal, transportation and disposal:
The Provision of Supervision, Labour, Equipment, monitoring, transport, removal and disposal
of asbestos containing material for the Gauteng Cluster for on as and required basis:
Contractors to be registered to perform type 2 or type 3 asbestos work, have a valid track
record, have licence to transport hazardous waste and have the necessary equipment in order
to remove asbestos containing material from different sites with different scopes.
1) P&Gs and Pre-construction planning related activities. (Specialised barricading,
Specialised PPE, equipment and vehicles.)
2) Obtaining the correct authorisations for removal of asbestos containing
material.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
3) Building, decommissioning/ removal of asbestos containing material in
buildings such as roofing sheets, fascia boards, barge boards, gutters, ceilings,
partitioning walls or any asbestos containing material linked to buildings.
4) Safe transportation permits and transportation in sealed skips or bags.
Asbestos and ACM must be transported in accordance with the minimum
requirements of 32-303 Asbestos Management Standard and in accordance with
SANS 10228 and SANS 10229.
5) Disposal at registered Hazardous landfill sites in Gauteng Province. Asbestos
or Asbestos containing material must be disposed of in accordance with the
minimum requirements according to the Asbestos Abatement Regulations –
Regulation 20 and the applicable environmental requirements, that is, the
Environment Conservation Act and the National Environmental
Management Act .
6) Providing Eskom with safe disposal certificates.
7) Any removal and safe storage of asbestos containing material (ACM) shall be
performed after normal working hours, or under controlled conditions, to limit
the number of persons who might be exposed.
8) Air monitoring performed by an approved inspection authority (AIA) is required
during and after removal of the asbestos containing material for clearance
purposes.
A copy of the scope of works must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “principal contractor” and
any contractor appointed by the principal contractor will be known as the “appointed contractor.
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the principal contractor at the
time of awarding the contract. The principal contractor must ensure that a section 37(2)
agreement is compiled between the principal contractor and all their appointed contractors for
the contract.
The original copy of the section 37(2) Agreement must be retained by the contractor and a
copy retained by the responsible project manager.
A copy of all the agreements must form part of the respective contractor’s SHE file.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
3.2.2 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
1. being protected from exploitative labour practices;
2. not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
ii. place at risk the child’s well-being, education, physical or mental health or spiritual,
moral or social development;
and the Basic Conditions of Employment Act, Chapter six Section 43 “Prohibition of
employment of children”.
Before resorting to the use of child labour, due consideration must be given to the rights of the
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
Purpose and Interpretation. Eskom does not condone the use of child labour and therefore all
effort must be exercised and child labour should not be used.
3.2.3 OHS Act
The principal contractor and appointed contractors shall have an up to date copy of the OHS
Act and regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The principal contractor and all appointed contractors will comply with all the legislation
pertaining to this project being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of
Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
SANS Standards –Contractor shall use the relative standards applicable to the project.
3.3 Eskom Requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom SHE documentation that is applicable to contract services.
3.4 Construction Professional Registration
The principal contractor and all his/her appointed contractors shall be registered in their
respective levels as professionals in terms of the requirements of the SACPCMP.
The SACPCMP web address is http://www.sacpcmp.org.za
SHE professionals (which include Construction Safety Officers) are required to register
as professionals with the SACPCMP.
Construction Managers are required to register as professionals with the SACPCMP.
Construction agents are required to register as a professional with the SACPCMP.
3.5 Notification of Construction Work
Unless otherwise contractually agreed upon, the principal contractor must notify the relevant
provincial director of the Department of Labour of the intention of carrying out any construction
work as defined in Construction Regulation 4 of the Act. The notification form of construction
work is listed as an annexure to the construction regulations of the OHS Act. A copy of the
notification letter sent to the DoL shall be forwarded to the Project Manager on the same day
as sent to the DoL. A copy of the letter and their approval must be kept in the SHE file. When
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
the DoL provide a letter of approval, a copy of the approval must be sent to the Eskom Project
Manager and a copy filed in the SHE file.
3.6 SHE Policy
SHE policy is a statement of intent and a commitment by the organisation’s CE and senior
management in relation to the relevant SHE roles and responsibilities, the achievement of
their strategic objectives, values of integrity, customer satisfaction, excellence, and innovation.
The principal contractor and all appointed contractors, if already not in place, will be required
to compile an organisational SHE policy in line with their SHE responsibilities. The policy must
be signed by the organisation’s CE or the appointed assistant to the CE OHS Act Section
16(2). The policy must be displayed in a prominent place within the workplace. A copy of the
policy must be filed in the contractor SHE files and attached as an annexure in the SHE Plan.
3.7 Coid
The principal contractor and all his/her appointed contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor SHE files.
3.8 Occupational Health, Hygiene and Rehabilitation
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation
program. The program is intended to ensure that the risks to health are identified and
controlled.
3.8.1 Medicals
Note: Eskom Gauteng Cluster will only accept medical surveillances conducted by an Occupational
Health Practitioner who holds a qualification in occupational health.
1. Principle contractors must ensure that their employees and their appointed contractor
employees have a medical surveillance program whereby their employees under go
entry, periodic and exit medical fitness examinations.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2. In order for the appropriate medical examinations to be conducted, each employee
must have a man job specification, which must indicate the description of work, list of
hazards and potential occupational exposure limits, physical hazards and required
physical attributes.
3. Medical fitness certificates shall be renewed annually for employees who are working
on site. This shall be maintained until completion of the contract.
4. The Principal Contractor must ensure that his / her employees and appointed
contractor employees have undergone pre-entry medical examination before starting
work on the contract.
5. The principal contractor shall provide a documented process for managing those
employees who are issued with a conditional certificate of fitness.
3.9 Incident Investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations
8 and 9, using Eskom Procedure 32-95 as a reference, and where injuries as contemplated
in sections 24 and 25 have been sustained, be reported to the Department of Labour.
Contractors shall use the standard General Administrative Regulation Annexure 1
“Recording of an Incident” form for all incident investigation reports. The objective of
incident investigation, should not only be a legal requirement, but should establish why
and how the incident occurred and find out the real root cause of the incident and to decide
on precautionary measures that are required to address the root cause to prevent any
further recurrences of the same or similar incidents.
3.10 Emergency Management
The art of emergency preparedness and response is to minimise the effects of any
emergency and to restore normal activities as soon as practical. Periodic emergency drills
must be undertaken to test the effectiveness of the plan. This must be recorded and
provided on request.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
There is a need to remove and dispose of all asbestos from Eskom properties, within
Distribution (DX) Gauteng Cluster (GC) to ensure compliance with Eskom Asbestos Standard
32-303 and Occupational Health and Safety Act, 1993 (Act No. )
and with specific reference to the Asbestos Abatement Regulations.
2.1 Purpose
The purpose of the Contract is to provide a scope requirement for the safe removal and
disposal of asbestos and asbestos containing material in Gauteng Cluster Building/s.
2.2 Scope requirement
The scope of work includes:
The Provision of Supervision, Labour, Equipment, monitoring, transport, removal and
disposal of asbestos containing material for the Gauteng Cluster for on as and required
basis.
Contractors to be registered to perform type 2 or type 3 asbestos work, have a valid track
record, have licence to transport hazardous waste and have the necessary equipment in
order to remove asbestos containing material from different sites with different scopes.
1.) P&Gs and Pre-construction planning related activities. (Specialised barricading,
Specialised PPE, equipment and vehicles.)
2.) Obtaining the correct authorisations for removal of asbestos containing material.
3.) Building, decommissioning/ removal of asbestos containing material in buildings such as
roofing sheets, fascia boards, barge boards, gutters, ceilings, partitioning walls or any
asbestos containing material linked to buildings.
4.) Safe transportation permits and transportation in sealed skips or bags. Asbestos and
ACM must be transported in accordance with the minimum requirements of 32-303 Asbestos
Management Standard and in accordance with SANS 10228 and SANS 10229.
5) Disposal at registered Hazardous landfill sites in Gauteng Province. Asbestos or Asbestos
containing material must be disposed of in accordance with the minimum requirements
according to the Asbestos Abatement Regulations Regulation 20 and the applicable
environmental requirements, that is, the Environment Conservation Act and the
National Environmental Management Act .
6) Providing Eskom with safe disposal certificates.
7) Any removal and safe storage of asbestos containing material (ACM) shall be performed
after normal working hours, or under controlled conditions, to limit the number of persons
who might be exposed.
8) Air monitoring performed by an approved inspection authority (AIA) is required during and
after removal of the asbestos containing material for clearance purposes.
Controlled Disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
Unique Identifier: 331-131Asbestos disposal and removal within Gauteng Cluster
Properties Revision: 3
of 13
Find below list of sites that have asbestos:
Temba CNC
Ga- rankuwa, Mothuhlung, Mapobane & Winterveldt CNC.s
Cullinan CNC
Cullinan HUB
Bronkhorstspruit CNC
Germiston CNC
Vlakfontein MEW, ( Tsakane, Dannuttor) CNC's
Vlakfontein Ekurhuleni Live Work
Etwatwa CNC
Petit CNC
Vosterskroon CNC's
Stepdown CNC
RDC Warehouse
Rosherville Buidings
Meyerton CNC
Mnandi CNC
Sebokeng CNC & Hub
Braamfisher CNC
Carletonville CNC
Libanon Livework
Magalies CNC
Taunus CNC
Klipspruit & Zola CNC
Zola Hub
Mapetla Hub
Morningside Hub
President Building
Princess CNC
Randfontein Hub
Rigi North CNC
West Wits Houses
2.3 General Requirements
The Contractor shall carry out scope requirements in compliance with Eskom Asbestos
Standards 32-303 requirements and the Occupational Health and Safety Act,
and Asbestos Abatement Regulations Requirement.
Controlled Disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
Unique Identifier: 331-131Asbestos disposal and removal within Gauteng Cluster
Properties Revision: 3
of 13
Declaration certificate for local production and content
The tenderer will initial each page and submit as a form of accepting the SDL&I Undertaking agreement at Tender.
appointments Organogram, legal
identity number of and Ten appointments and
(10) CV's Ten (10) CV – 3,3% asbestos work
Important Dates
Source: Tender documents.zip (TENDER){"closingDate":"09 June 2026","closingTime":"10h00am","briefingSession":"{\"date\":\"17 June 2026\",\"time\":\"11:00am\",\"venue\":\"ion A non-compulsory clarification meeting/site visit with representatives\",\"is_compulsory\":true}"}
Contact Information
Source: Tender documents.zip (TENDER){"name":null,"email":"[email protected]","phone":"0380813919","department":null,"address":"r which may be"}
Submission Guidelines
Source: Tender documents.zip (TENDER)Returnable Documents: C1.1 Form of Offer and Acceptance [2], C1.1 Form of Offer & Acceptance, By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer and
Evaluation Criteria
Source: Tender documents.zip (TENDER)Unable to extract eligibility criteria
Technical Specifications
Source: Tender documents.zip (TENDER)eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to “upload” their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be “dropped” or “uploaded”. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 What’s New
A new functionality to “add closed tenders”. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
1. Open your web browser
2. Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
3. eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on “Resend Verification Email”
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
*
Fig1.1
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
4. Once the email is verified, login using your registered email address and password then the
OTP page will be displayed
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5. OTP sent to the registered cellphone number and email address
6. Insert the otp number then click “Verify OTP” button, to resend OTP click on “Resend OTP”
button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7. Landing page once OTP is verified
8. Select the preferred “Ref No”
9. A page with the preferred Tender information is displayed before tender documentation can
be submitted.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
10. Click on “Create New Submission” button to submit required Tender documents
11. Landing page once clicked on “Create New Submission” button. Take note of the
mentioned disclaimers.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
12. To submit tender documents, click on “Add file” button
13. Upload required tender documents by:
1. Giving the file a name
2. Select the listed file type e.g.: Technical, commercial, finance and etc
3. Choose the file you need to upload
4. Then click on “Upload” button, Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
14. Once clicked on “Upload” button, this page will be displayed with the submitted document(s).
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making ‘Final Submission’ by clicking on ‘Finalize
Submission’ button.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
15. Click on “Finalize Submission” button. A file size cannot exceed 50MB and a total size of
all uploaded files should not exceed 900MB.
16. Once “Finalize Submission” button is clicked the pop-up message confirming the submission
will pop-up
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
17. Click on “Finalise and Close Submission” button to finalize the submission of documents.
If not all documents were submitted or still wish to add or submit more documents, click on
“No, continue adding files” button.
18. Once the submission is finalised the page with all submitted documents will display with the
submission and closed time and date timestamp at the bottom.
19. To view submitted tenders, click on “My Submissions” menu option. All your individually
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on “View Submission” button
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
20. Once the submission process is complete an email with be sent to the submitter with all
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
From:Eskom E-Tender Document Submission 28 <[email protected]>
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select “Edit Registration” on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on “Update” button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click “Log out” on the dropdown next to your name
Fig1.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click “Forgot your password” Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or “Reset Password” button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on “Reset Password” button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
© 2023 Eskom of 19
Cell D1: GAUTENG OPERATING UNIT: ENVIRONMENTAL SCOPE OF WORKS FOR SPECIFICATION
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Business evaluation and analysis services
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N/A
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2 Y
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
on an as when required for period of three years. SECTION (TENDERER)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Clause 3 pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
CLAUSE 4 Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) X
Category 4 (refer to clause 3.5.-105658000) -
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000)
-
Post-contract award (ESKOM)
Title: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2. Supporting Clauses .................................................................................................................. 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3. Pre-Contract Award: Quality Requirements .............................................................................. 7
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
4. Acceptance ............................................................................................................................. 27
5. Revisions ................................................................................................................................ 27
6. Development Team ................................................................................................................ 27
7. Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskom’s
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2. Supporting Clauses
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
develop,
implement,
maintain, and
continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems – Requirements
[2] ISO 10005 Quality Management Systems – Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems – Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems – Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management – Quality of an Organisation – Guidance to Achieve Sustained
Success
[7] 32-1033: Eskom’s Procurement and Supply Chain Management Policy
[8] 32-1034: Eskom’s Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplier’s process for delivering the level of quality
required by the contract. It is a framework for the contractor’s process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CT’s, VT’s and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welder’s Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3. Pre-Contract Award: Quality Requirements
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplier’s scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplier’s scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
Verification of the QMS
Audits and surveillances
Regular assessment of the CQPs and reviews of QCPs.
NC and Defect Management
Inspection and test plans
Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplier’s quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplier’s scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplier’s and/ or sub-suppliers’ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welder’s qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the company’s internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
company’s training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplier’s
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
Outline the resources, the communication channels, applicable documents and records to be
generated.
Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
List of documents and records that will be used and submitted during the execution of the
project.
Communications channels should include contact person and contact details
Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplier’s QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agency’s agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplier’s involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskom’s discretion based on its assessment of the supplier’s performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
Eskom contract number and title
The supplier’s order number
Identification of the area of works/contract
Description of the work, with components, item number, and activity date
QCP/ITP unique number
A list of the sequence of operations, including inspection and tests
The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
The inspection and test activities that the supplier has nominated for its intervention points
Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
Identification of quality verification activity and stage
The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Definition of acceptance criteria
Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
Listing of all proposed test procedures
Acceptance criteria for each inspection or test in alignment with specified tolerances
A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen days’ advance notice of meetings shall be given to Eskom.
Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplier’s
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplier’s and sub-supplier’s representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplier’s or sub-supplier’s premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
Quality Policy, aligned with the supplier’s strategic direction (documented information)
Quality Objectives (documented information)
Control of documented information (both maintain and retain documented information )
Internal audit procedure (documented information)
Control of nonconforming outputs (documented information)
Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplier’s strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplier’s business management processes to ensure that all of
Eskom’s requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
The quality method statement should address all the supplier’s business management
processes to ensure that all of Eskom’s requirements are fully met on a consistent basis.
The supplier shall submit a signed/ approved quality policy (aligned with the supplier’s strategic
direction). (documented information)
The supplier shall submit a copy of quality objectives. (documented information)
The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
provide products and services with high risk to operational sustainability
work on critical plant and equipment
supply of critical plant items or components
provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
Generation Level 1 & 2 plant
Transmission and Distribution Power Plant & Control Plant
Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskom’s requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
CQP and QCP /ITP
Delivery
Design
Cost
Management system
Subsequent key performance indicators associated with these areas will include the following:
Nonconformity monitoring
Audit and assessment evaluation scoring
Management system compliance and accreditation
Achievement of delivery targets as per contractual agreements
Process improvements
Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskom’s effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskom’s suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplier’s information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplier’s audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplier’s audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplier’s QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplier’s
or sub-supplier’s premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplier’s testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplier’s designers and those of Eskom’s service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term “physical assets” should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplier’s preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplier’s preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplier’s preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
requirements for electrical grounding or isolation;
requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplier’s preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplier’s preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplier’s preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplier’s quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplier’s
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplier’s premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplier’s and sub-suppliers’ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplier’s qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplier’s QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
4. Acceptance
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
5. Revisions
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
6. Development Team
The following people were involved in the development of this document:
Andrew Else
Bongi Tshabalala
Feziwe Mogamisi
Lesego Garegae
Patrick Thwane
Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
7. Acknowledgements
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
appointment of contractors or suppliers for the commencement
of work
Construction Managers
(8.1)
229994)
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with
its Safety, Health, Environmental and Quality Policy, along with legislative obligations.
This SHE specification is Eskom the minimum requirements which are required to be met for
the specific contract and for the duration of the contract period by contractors and where
required, the delivery organisation.
The contractor is expected to develop a SHE plan, which meets these requirements as
well as all the relevant applicable legislation they conform to.
Eskom in no way assumes the contractor’s legal responsibilities. The contractor is and
remains accountable for the quality and the execution of his/her health and safety
programme for his/her employees and appointed contractor employees.
This SHE specification reflects minimum requirements and should not be construed as all
encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not
supersede or replace any organizational SHE requirements.
Where requirements listed are already in place, then the organisational requirements must be
taken cognisance of and listed in the respective SHE plans. If there are any additional Eskom
and or legislative requirements listed in the SHE specification, then these must be addressed.
2. Supporting Clauses
2.1 Scope
This SHE specification lists the legislative and Eskom requirements and where applicable, any
requirements pertaining to Local Authorities / Municipal by-laws / Environmental legislation
that must be met by the contractor.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.1.1 Purpose
This document will provide a standardised approach to the compilation of SHE specifications
throughout Eskom for contracts, standards and NEC 3 contracts.
2.1.2 Applicability
This SHE specification is applicable to any contracting organisation who intends tendering for
the contract.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Basic Conditions of Employment Act No .
[2] Occupational Health and Safety Act and Regulations No .
[3] National Environmental Management Act .
[4] National Road Traffic Act .
[5] Compensation for Occupational Injuries and Diseases Act
[6] 32-37 Eskom Substance Abuse Procedure.
[7] 32-726 Contract and Contractor OHS Management
[8] 240-62196227 Life- saving Rules
[9] 32-95 Environmental, Occupational Health and Safety Incident Management Procedure
[10] 32-727 SHEQ Policy
[11] 32- 418 Working at Heights Procedure
[12] 240-62946386 Vehicle and Driver Safety Management Procedure
[13] 32-520 Risk Assessment Procedure
[14] Asbestos Regulation 2021 (Gov. Gazette Vol. 440 Pretoria 10 February 2002 No. 23108)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.2.2 Informative
[1] Tobacco Products Control Act (Updated 2011.05.19)
[2] SANS 1186 Symbolic Safety Signs
[3] Constitution of the Republic of South Africa No
[4] National Environmental Management Waste Act, 2008 (Act No. )
[15] Asbestos Abate Regulation, 2020
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.3 Definitions
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Appointed contractor Means a contractor appointed by the principal contractor
Baseline risk (32-520) baseline operational risks refer to the health and safety risks
assessment associated with all standard processes and routine activities in the business
Business unit (BU) (32-296) means any defined unit within the Eskom environment, operating as
a business under a particular cost-centre number. In the context of this
document and in terms of health and safety, any reference to a BU includes a
defined unit within any Eskom division and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also referred to as
the contract administrator/custodian or agent or project manager (as defined
in the contract). He/she is the person responsible for ensuring that the works
or services are executed in terms of the contract, as well as adherence to
legislation pertaining to the contract.
Competent person (OHS Act) means any person having the knowledge, training, experience,
and qualifications, specific to the work or task being performed, provided that,
where appropriate, qualifications and training are registered in terms of the
South African Qualifications Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes principal contractors
Construction work Any work in connection with
a. the construction, erection, alteration, renovation, repair, demolition or
dismantling of or addition to a building or any similar structure.
b. the construction, erection, maintenance, demolition or dismantling of any
bridge, dam, canal, road, railway, runway, sewer or water reticulation
system or the moving of earth, clearing of land, the making of excavation,
piling or any similar civil engineering structure or type of work.
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable measures
to prevent such pollution or degradation from occurring, continuing, or
recurring. If such harm to the environment is authorised by law or cannot
reasonably be avoided or stopped, such person must minimise and rectify
such pollution or degradation of the environment
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Employee (OHS Act) means, subject to the provisions of subsection (2), any person
who is employed by or works for an employer and who receives or is entitled
to receive any remuneration or who works under the direction or supervision
of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any person
who employs or provides work for any person and remunerates that person
or expressly or tacitly undertakes to remunerate him/her, but excludes a TES
(ex labour broker) as defined in section 1(1) of the Labour Relations Act 1956
(Act No. )
Environment (32-94) means:
a. the land, water, and atmosphere of the earth;
b. micro-organisms and plant and animal life; and
c. any part or combination of (a) and (b) and the interrelationships among
and between them, and the physical, chemical, aesthetic, and cultural
properties and conditions of the foregoing that influence human health
and well-being
Environmental A detailed plan of action prepared to ensure that recommendations for
Management plan enhancing or ensuring positive impacts and limiting or preventing negative
environmental impacts are implemented during the life-cycle of a project.
This Environmental Management Plan should preferable form part of
Eskom’s Environmental Management System
Eskom requirements Eskom requirements flowing from directives, policies, standards, procedures,
specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working from an
elevated position, considering the nature of work undertaken, and setting out
the procedures and methods to be applied in order to eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated
with the type of construction work being executed or to be executed
Health and safety file (OHS Act) means a file or other record in permanent form, containing the
information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified and
includes safe work procedures to mitigate, reduce, or control hazards
identified
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Health and safety (OHS Act) means a document specification of all health and safety
specification requirements pertaining to associated to a contract, so as to ensure the
health and safety of persons.
Health and safety means comprehensive health and safety requirements for a contract, project,
requirements site, and scope of work. This specification is intended to ensure the health
and safety of persons, both workers and the public, and the duty of care to
the environment. The health and safety requirements must be specific to
each contract, project, site, and scope of work
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to cause
serious harm to people
Medical Certificate of (OHS Act) means a certificate valid for one year, issued by an occupational
fitness health practitioner, issued in terms of the regulations, whom shall be
registered with the Health Professions Council of South Africa
Medical surveillance (OHS Act) means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by
an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards
identified in any risk assessment
Organisation may be defined as a group of individuals (large of small) that is cooperating
under the direction of executive leadership in accomplishment of certain
common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of the
day’s work and that is attended by all the relevant employees associated with
the work task
Principal contractor (In the text of this document) Means an employer, as defined in section 1 of
the OHS Act, who intends to tender for or has signed a contract with Eskom
for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of the
General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who has
been appointed as part of the Eskom delegation of authority process with the
aim to assist the applicable 16(2) assigned person in executing his/her duties
in terms of the Occupational Health and Safety Act
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
Definition Explanation
Risk assessment (OHS Act) means a programme to determine any risk associated with any
hazard at a construction site in order to identify the steps needed to be taken
to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building, specific
project, work site, or the site where agents, clients, principal contractors,
contractors, suppliers, vendors, and service providers provide a service to
Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to Eskom for
compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and may
include the following current or potential supplier vendor, contractor,
consultant
Task (34-227) a segment of work that requires a set of specific and distinct actions
for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning, shares
all the tasks at hand and discusses task allocation, the identified risks, and
the control measures with all his/her team members on site before
commencing a specific task and documenting the agreed strategy. (This
shall be done to ensure common understanding of the tasks, risks, and
control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as
amended, and the Regulations thereto
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
Asbestos means any mixture containing these fibrous silicates - Asbestos actinolite,
CAS No. 77536-66-4; asbestos grunerite (amosite), CAS No. 12172-73-5;
(c) asbestos anthophyllite, CAS No. 77536-67-5;(d) chrysotile, CAS No.
12001-29-5 or CAS No. 132207-32-0;(e) crocidolite, CAS No. 12001-28-4;
(f) asbestos tremolite, CAS No. 77536-68-6
Approve plan of work means a written site-specific methodology as contemplated in regulation 15
that is at least co-signed by the asbestos client, registered asbestos
contractor and approved inspection authority.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.4 Abbreviations
Abbreviation Description
AIA Approved Inspection Authority
BU Business Unit
CE Chief Executive
CNC (Eskom) Customer Network Centre
CR Construction Regulations of the OHS Act
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DoL Department of Labour ( Inspection and Enforcement services – Provincial office)
EAP Employee Assistance Program
EP Emergency Preparedness
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
LoG (COID) Letter of Good Standing
MSDS Material Safety Data Sheets
NEMA National Environmental Management Act
OHS Act Occupational Health and Safety Act and Regulations,
SACPCMP South African Council for the Project & Construction Management Professions
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/Supporting Documents
Eskom Gauteng Cluster’s OHS Act section 37(2) agreement to be signed at procurement
during the signing of the NEC contract, it is the responsibility of the project manager to ensure
that the 37(2) agreement is signed and a copy be kept in the contractor file at procurement.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2.6 Roles and Responsibilities
2.6.1 Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved
in the day to day operations, in particular the Occupational Health and Safety aspects of any
project / contract. Legislation requires that each employee must take reasonable care of
themselves and their fellow workers, from management level down to the lowest employee
level.
2.6.2 Principal contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both principal contractors and any
appointed contractors. Where some of the listed do not apply to both, then the specific
responsibilities will be listed and titled. The contractors shall:
1. Carry out all duties as listed in section 8, 9 and 10, the various other regulations that
form part of the OHS Act and Regulation 7 of the Construction Regulations.
2. The principal contractor must notify the provincial director of the Department of Labour
in writing of all construction work if it falls within the scope of Regulation 4 of the
Construction Regulations (if this has not been arranged and or done by the
client/agent);
3. Carry accountability and responsibility for the safety and health of their employees and
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act;
4. Shall keep a record of all employees including the appointed contractor employees,
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
5. Ensure that all their appointees are made aware of their accountabilities and
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
6. Ensure that the minimum legislative, regulatory and Eskom SHE requirements are
complied with on all work sites.
7. Give the Eskom project managers and line managers / responsible managers their full
participation and cooperation.
8. Compile a SHE (health and safety) file where all relevant health and safety records
must be kept for each work site.
9. The principal contractor must hand over a consolidated (to include any appointed
contractors files) health and safety file to the Eskom project manager on completion of
the project. This is to include all drawings, designs, lists of materials used and other
applicable information about the completed project, as well as the list of appointed
contractors, the agreement, and the type of work completed.
10. Contractors must hand over a consolidated (to include any appointed contractors files)
health and safety file to the principal contractor on completion of the project. This is to
include all drawings, designs, lists of materials used and other applicable information
about the completed project, as well as the list of appointed contractors, the
agreement, and the type of work completed.
11. The principal contractor must provide the project manager with a certified copy of
his/her Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company. Similarly, the principal contractor must provide the Eskom
project manager with all the valid letters of good standing from their appointed
contractors.
12. Contractors must provide the principal contractor with a certified copy of his/her
Compensation Commissioner’s valid letter of good standing before the
commencement of work and any future renewal letters obtained during the project for
record-keeping purposes. The letter of good standing shall reflect the name of the
contractor’s company.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
13. Appoint competent staff to perform the project work and ensure that all employees are
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
14. Ensure that all employees are conversant with all relevant work procedures and that
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
15. Co-ordinate the activities of all the appointed contractors in the interests of safety and
health;
16. Ensure that potential contractors (whom they intend appointing) submitting tenders
have made detailed provision for the cost of safety and health measures throughout
the project.
17. Stop his /her employees and any appointed contractors, if project work is not in
accordance with the health and safety plan or if such work poses a threat to the health
and safety of persons or a risk of degradation to the environment.
18. Take reasonable steps to ensure cooperation between all their appointed contractors.
19. Only appoint contractors to do work, if satisfied that the contractor has the necessary
competencies and resources to perform the work safely.
20. Appoint full-time competent employees in writing to supervise the performance of all
specified work throughout the contract period.
Note 2: No work may commence and or continue without the presence of the appointed project
manager or project supervisor during performance of the contracted work.
21. Ensure that the supervisor or manager do not supervise work on any site other than
the site for which such supervisor has been appointed for.
Note 3: In determining the number of appointed competent supervisors, the nature and scope of work
being performed, shall be taken into consideration.
Note 4: Construction supervisor may not supervise any other site other than the one appointed to.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
22. Appoint a full or part time safety officer or construction safety officer (registered with
SACPCMP) in writing.
23. Not victimise or dismiss employees, by virtue of the employees divulging health and
safety information or suspecting such information has been divulged, in the interests
of health and safety requirements;
24. Follow a process of disciplinary action if any of their employees or their appointed
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
25. Ensure that all appropriate precautions are taken to protect persons (visitors, members
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
26. Before the commencement of any work, conduct risk assessments which shall include
public safety. This should be done by a competent person appointed in writing with a
view to identify hazardous and potentially hazardous work operations.
27. Ensure that pre-task risk assessments are conducted and documented daily and prior
to the starting of any new task, irrespective of whether it is a repetitive task or not.
28. Take prime responsibility for all aspects of environmental management associated with
the project activity for which they are responsible.
29. Provide any appointed contractor who is making a bid or is appointed to perform work
on Eskom’s behalf, with the relevant sections of the documented Eskom’s SHE
Specification.
30. Principal contractors are required to approve appointed contractor’s health and safety
plans if they meet all the requirements.
31. Must ensure that an organisation medical surveillance programme for the duration of
the contract is in place and maintained.
32. Prior to having pre-employment and periodic medicals fitness examinations
conducted, person/man job specifications must be compiled and handed to the
occupational health practitioner.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
33. Ensure that pre-employment, periodic and exit medicals are carried out on their
employees. Medical assessments must be conducted by a registered Occupational
Health Practitioner. During the pre-employment medical, where employees will be
required to work at heights, they will also be required to undergo the required employee
physical and psychological fitness examinations.
34. Ensure, prior to the commencement of construction work, that all persons involved in
the project work, as well as the appointed contractors, have received a health and
safety induction training session. Similarly, ensure that all visitors to site undergo the
site’s induction training.
35. Ensure, prior to the commencement of construction work or contracted work, that all
their employees involved in the project work, as well as the appointed contractors,
have received task-specific training.
36. Issue risk-based personal protective equipment (PPE) as a measure of last resort to
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
Note 5: should the principal contractor or his/her appointed contractors entertain visitors on site, they
will be held responsible for the provision and wearing PPE.
37. Erect their own site huts, temporary buildings, storage areas, toilets, fencing, and any
other structure as may be required. Any such structures shall be positioned and
erected in compliance with any instructions from the Eskom project manager and the
relevant site safety and fire prevention requirements;
38. On completion of the work remove all structures erected by them, and where required
by law rehabilitate the environment.
39. Where performing work with the environment, ensure that minimal damage is done
and that where an Environment Management Plan is in place, then adhere to the plan.
40. Respect the rights of land owners/lessors and the preservation of their registered
activities;
41. Must have a substance abuse program which must be in line with the requirements of
the OHS Act.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
42. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on the work sites.
Note 6: Eskom will not tolerate the presence of anyone who is or who appears to be under the influence
of alcohol or any other intoxicating substance whilst performing work for them or on any work site.
43. Ensure that all equipment and tools used comply with OHS Act requirements with
respect to condition, use, care, storage, maintenance, and the management of these;
44. Ensure that all incidents are reported and investigated timeously by competent incident
investigators.
45. Be involved in all of their appointed contractor’s investigations.
46. Establish health and safety committees, hold such committee meetings on all sites,
and ensure that appointed contractors participate in their health and safety meetings.
47. Chair their own health and safety committee meetings and record such meetings.
48. Appoint sufficient number of health and safety representatives in terms of legislative
requirements and ensure that the appointed contractors appoint health and safety
representatives for their work sites.
49. When appointing contractors, advise the project manager in writing timeously and
obtain his/her approval prior to them commencing work.
50. Shall keep a record of all employees including the appointed contractor’s employees,
including date of induction, relevant skills and licenses and be able to produce this list
at the request of the Eskom Project Manager.
2.6.3 Construction Managers/ Contract Managers
Note 1: No work may commence and or continue without the appointed supervisor or manager during
the performance of the contracted work.
1. Not supervise construction work on any construction site other than the site they have
been appointed to supervise;
2. Assist the contractor and/or the appointed safety officer in conducting site induction
training for new staff and site visitors;
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
3. Instruct and train all employees under their control on any hazardous and related work
procedures, before any work commences and thereafter, at such times as may be
determined by a risk assessment;
4. Ensure that the minimum legislative and Eskom SHE requirements are complied with
on all work sites;
5. Stop any construction work that is not in accordance with the safety and health plan or
if such work poses a threat to the safety and health of persons or a risk of degradation
to the environment;
6. Ensure that risk-based personal protective equipment (PPE) has been issued and
employees wear/use the PPE as instructed.
7. Inspect such PPE on a regular basis and record the inspections;
8. Ensure that all incidents are reported to the client and are investigated.
9. Be involved in all investigations that occur within their area of responsibility.
10. Carry out audits and or inspections on their contractors at least monthly and any
appointed contractors on instructions of their contractor.
11. Ensure that employees under their control are conversant with all relevant work
procedures and that they adhere to such procedures;
12. Before the commencement of any work, where possible, assist in the conducting of
risk assessments and ensure that appropriate mitigating measures have been
considered and implemented.;
13. Ensure that daily or pre-task risk assessments are conducted and documented daily
and prior to the starting of any new task, irrespective of whether it is a repetitive task.
Ensure that the team are involved in the abovementioned risk assessments;
14. Hold tool box talks at the start of each day/ task to discuss health and safety issues as
well as confirming the requirements of the daily risk assessments;
15. Ensure that all appropriate precautions are taken to protect persons (visitors, members
of the public, and other contractors) present at work or in the vicinity of a construction
site against all risks that may arise from such site.
16. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management;
17. Ensure that all equipment and tools used on site comply with OHS Act requirements
with respect to condition, use, care, storage, maintenance, and the management of
these.
18. Ensure that they and their contractor managers give clear and unambiguous
instructions for the project work, to the employees for whom they are responsible for.
19. Not victimise their employees by virtue of their employees divulging health and safety
information or suspecting such information has been divulged, in the interests of health
and safety requirements (reference – section 26 of the OHS Act).
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
20. Where any work is performed which involves the environment, ensure that minimal
damage is done to the environment and that where an Environment Management Plan
is in place, then the plan adhere to the plan.
21. Stop any employee or contractor from performing construction work which is not in
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
22. Appointed construction manager must be registered with SACPCMP.
2.6.4 Contractor Site Supervisor or Contract Supervisor
Must:
1. Be competent to perform the required supervisory tasks;
2. Ensure their employees and all appointed contractors comply with the required
statutory and Eskom project requirements;
3. Inspect all work done by the Contractors to ensure adherence to Eskom’s standards
and specifications
4. Conduct follow-up inspections to ensure findings are closed out and preventative
action is in place.
5. Monitor contractors for adhere to statutory requirements and safety standards.
6. Monitor contractors overall SHE performance on site in order to achieve excellent
results
7. Ensuring a Safe working environment is established and maintained by the contractor
for the elimination of unsafe acts by all people whilst on the project site.
8. Discuss all SHE related problems with the relevant contractor management timeously
in the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformance’s identified, corrective actions,
audits and inspection schedules.
9. Ensuring that quality records are maintained in accordance with legislative and Eskom
requirements;
10. Continual liaison between the principal contractor, appointed contractors and
employees.
11. Ensures that employees and appointed contractors are aware of latest standards,
procedures, work instructions and safety regulations issued by Eskom:
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
12. Conduct site Inspections for compliance to SHE requirements and compiles the
relevant inspection reports.
13. Submit the observation reports to the relevant management.
14. Have meaningful participation in the project statutory health and safety committee
meetings.
15. Participate in all appointed contractor incident investigations.
16. Participate in the principal contractors emergency preparedness planning.
17. Ensure that their own employees and those of any appointed contractor are competent
to perform the tasks assigned.
18. Issue site instructions on behalf of the principal contractor where and when the
appointed contractors deviate from safety requirements.
19. Assist the principal contractor with the handing over process, in particular the SHE file
and relevant documentation.
2.6.5 Employees
Must:
1. Be responsible for their own safety and health and that of their co-workers;
2. Co-operate with their employer to meet all of the employer’s as well as legislative and
Eskom requirements;
3. Familiarise themselves with their responsibilities during induction and awareness
training sessions, some of which are:
a. familiarising themselves with their workplaces and safety and health procedures;
b. working in a manner that does not endanger them or cause harm to others;
c. ensuring that the work area is kept tidy;
d. reporting all incidents and near misses;
e. protecting fellow workers against injury by performing job observations;
f. reporting unsafe acts and unsafe conditions;
g. reporting any situation that may become dangerous; and
h. carrying out lawful orders and obeying safety and health rules;
4. Who become aware of any person disregarding a safety notice, instruction, or
regulation, immediately report this to the person concerned. If the person persists,
stop that person from working, and report the matter to contractor management and/or
Eskom’s project manager or supervisor immediately.
5. Not damage, alter, remove, render ineffective, or interfere with anything that has been
provided for the protection of the site or for the health and safety of persons this
includes any guarding of machinery or equipment.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
6. Obey any safety signs and adhere to any site demarcation at all times.
7. When entering or leaving the site, do so via the official designated access/departure
routes. Where reflective jackets/bibs are required to be worn, wear them.
8. Be subjected to any disciplinary action, if having transgressed any of the requirements
of the health and safety site rules, Eskom requirements, company requirements, or
legislative requirements.
9. Avoid any act that may endanger their own health and safety or that of fellow
employees, members of the public, or visitors who may be affected by their acts and/or
omissions at work.
10. Have the right to obtain proper information from their employer regarding health and
safety risks and measures related to the work processes.
11. Use facilities placed at their disposal and not misuse anything provided for their own
protection or that of others.
12. Have the right to remove themselves from danger when they have good reason to
believe that there is an imminent and serious danger to their health and safety and
have the duty to inform their supervisor immediately of such danger.
13. Report to their supervisor (in the first instance), the principal contractor (in the second
instance), and/or the Eskom project manager, any substandard acts and/or conditions
that have come to their attention and that have not been rectified or acted on by their
contractor management timeously.
14. Have the right and the duty at any workplace to participate in ensuring healthy and
safe working conditions, to the extent of their control, over the equipment and methods
of work adopted.
15. Maintain the surrounding area of the work site in a neat and tidy condition.
16. Have meaningful participation in regular health and safety meetings.
17. Have the right to refuse to perform or continue to perform any task/job on the grounds
of health, safety, and environmental concerns.
18. When given instructions, understand the instructions and be permitted to clarify those
instructions.
2.6.6 Contractor Health and Safety officer
1. Promote a SHE culture within the organisations involved in the project / contract.
2. The contractor’s safety and health officer shall assist in the control of all health and
safety-related matters on the sites.
3. Be involved in the developing the project SHE plan and SHE policy.
4. Be in constant liaison and cooperate with Eskom’s SHE professionals responsible for
providing them with a health and safety service.
5. Ensure that this SHE specification is adhered to by his/her principal contractor and is
submitted to any appointed contractors.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
6. Conduct audits and inspections of all work sites for the duration of the project.
7. Be involved in the organisations incident investigations when required.
8. Participate in the organisation’s statutory and non-statutory health and safety
committees meetings.
9. Conduct organisational, site and visitor induction training.
10. Stop any employee or contractor from performing construction work which is not in
accordance with the principal contractor’s and or appointed contractors health and
safety plan which poses a threat to the health and safety of persons.
11. Ensure that no alcohol or other intoxicating substances are brought on to, or remains
on, the premises / work sites and that no employee remains on site if he/she is under
the influence. Furthermore, report such instances to contract management.
12. Make themselves available and ensure co-operation of employees under their control
to undergo breathalyser and drug testing while entering and/or being on any Eskom
work site by Eskom.
13. Carry out audits and or inspections on their contractors at least monthly and any
appointed contractors on instructions of their contractor;
14. Carry out frequent behaviour observations of employees under their control at least
monthly and any appointed contractors on instructions of their contractor.
15. Appointed full or part time safety officer or construction safety officer must be
registered with SACPCMP).
3.1 Scope of work
Asbestos containing material removal, transportation and disposal:
The Provision of Supervision, Labour, Equipment, monitoring, transport, removal and disposal
of asbestos containing material for the Gauteng Cluster for on as and required basis:
Contractors to be registered to perform type 2 or type 3 asbestos work, have a valid track
record, have licence to transport hazardous waste and have the necessary equipment in order
to remove asbestos containing material from different sites with different scopes.
1) P&Gs and Pre-construction planning related activities. (Specialised barricading,
Specialised PPE, equipment and vehicles.)
2) Obtaining the correct authorisations for removal of asbestos containing
material.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
3) Building, decommissioning/ removal of asbestos containing material in
buildings such as roofing sheets, fascia boards, barge boards, gutters, ceilings,
partitioning walls or any asbestos containing material linked to buildings.
4) Safe transportation permits and transportation in sealed skips or bags.
Asbestos and ACM must be transported in accordance with the minimum
requirements of 32-303 Asbestos Management Standard and in accordance with
SANS 10228 and SANS 10229.
5) Disposal at registered Hazardous landfill sites in Gauteng Province. Asbestos
or Asbestos containing material must be disposed of in accordance with the
minimum requirements according to the Asbestos Abatement Regulations –
Regulation 20 and the applicable environmental requirements, that is, the
Environment Conservation Act and the National Environmental
Management Act .
6) Providing Eskom with safe disposal certificates.
7) Any removal and safe storage of asbestos containing material (ACM) shall be
performed after normal working hours, or under controlled conditions, to limit
the number of persons who might be exposed.
8) Air monitoring performed by an approved inspection authority (AIA) is required
during and after removal of the asbestos containing material for clearance
purposes.
A copy of the scope of works must be retained by the contractor.
Note: The contractor who will be awarded this contract will be known as the “principal contractor” and
any contractor appointed by the principal contractor will be known as the “appointed contractor.
3.2 Legal Compliance
3.2.1 Section 37(2) (Legal) Agreement
A section 37(2) agreement must be signed between Eskom and the principal contractor at the
time of awarding the contract. The principal contractor must ensure that a section 37(2)
agreement is compiled between the principal contractor and all their appointed contractors for
the contract.
The original copy of the section 37(2) Agreement must be retained by the contractor and a
copy retained by the responsible project manager.
A copy of all the agreements must form part of the respective contractor’s SHE file.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
3.2.2 Hazardous work by children (Child Labour)
The constitution of the Republic of South Africa, in the “Bill of Rights” is clear on the rights of
children, especially when it comes to:
1. being protected from exploitative labour practices;
2. not to be required or permitted to perform work or provide services that
i. are inappropriate for a person of that child’s age; or
ii. place at risk the child’s well-being, education, physical or mental health or spiritual,
moral or social development;
and the Basic Conditions of Employment Act, Chapter six Section 43 “Prohibition of
employment of children”.
Before resorting to the use of child labour, due consideration must be given to the rights of the
child in terms of the constitution. Where work is being performed which is not prohibited in
terms of the constitution, then such work must be conducted in terms of the OHS Act
“Regulations on Hazardous Work by Children in South Africa” with emphasis on paragraph 2
Purpose and Interpretation. Eskom does not condone the use of child labour and therefore all
effort must be exercised and child labour should not be used.
3.2.3 OHS Act
The principal contractor and appointed contractors shall have an up to date copy of the OHS
Act and regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The principal contractor and all appointed contractors will comply with all the legislation
pertaining to this project being:
The Constitution of the Republic of South Africa (particularly Section 24 of the Bill of
Rights).
Occupational Health and Safety Act 1993 (Act ) and its Regulations.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
National Environmental Management Act 1998 (Act ).
Environment Conservation Act 1989 (Act ).
National Water Act 1998 (Act ).
National Road Traffic Act .
Compensation for Occupational Injures and Diseases Act.
SANS Standards –Contractor shall use the relative standards applicable to the project.
3.3 Eskom Requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom SHE documentation that is applicable to contract services.
3.4 Construction Professional Registration
The principal contractor and all his/her appointed contractors shall be registered in their
respective levels as professionals in terms of the requirements of the SACPCMP.
The SACPCMP web address is http://www.sacpcmp.org.za
SHE professionals (which include Construction Safety Officers) are required to register
as professionals with the SACPCMP.
Construction Managers are required to register as professionals with the SACPCMP.
Construction agents are required to register as a professional with the SACPCMP.
3.5 Notification of Construction Work
Unless otherwise contractually agreed upon, the principal contractor must notify the relevant
provincial director of the Department of Labour of the intention of carrying out any construction
work as defined in Construction Regulation 4 of the Act. The notification form of construction
work is listed as an annexure to the construction regulations of the OHS Act. A copy of the
notification letter sent to the DoL shall be forwarded to the Project Manager on the same day
as sent to the DoL. A copy of the letter and their approval must be kept in the SHE file. When
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
the DoL provide a letter of approval, a copy of the approval must be sent to the Eskom Project
Manager and a copy filed in the SHE file.
3.6 SHE Policy
SHE policy is a statement of intent and a commitment by the organisation’s CE and senior
management in relation to the relevant SHE roles and responsibilities, the achievement of
their strategic objectives, values of integrity, customer satisfaction, excellence, and innovation.
The principal contractor and all appointed contractors, if already not in place, will be required
to compile an organisational SHE policy in line with their SHE responsibilities. The policy must
be signed by the organisation’s CE or the appointed assistant to the CE OHS Act Section
16(2). The policy must be displayed in a prominent place within the workplace. A copy of the
policy must be filed in the contractor SHE files and attached as an annexure in the SHE Plan.
3.7 Coid
The principal contractor and all his/her appointed contractors shall be registered with an
appropriate employment compensation commissioner and have available a valid letter of good
standing (LoG) from such commissioner. The obligation lies with the contractors to ensure that
the LoG remain valid throughout the contract period. A copy of the LoG must be filed in the
contractor SHE files.
3.8 Occupational Health, Hygiene and Rehabilitation
All contractors are required to develop an Occupational Health, Hygiene and Rehabilitation
program. The program is intended to ensure that the risks to health are identified and
controlled.
3.8.1 Medicals
Note: Eskom Gauteng Cluster will only accept medical surveillances conducted by an Occupational
Health Practitioner who holds a qualification in occupational health.
1. Principle contractors must ensure that their employees and their appointed contractor
employees have a medical surveillance program whereby their employees under go
entry, periodic and exit medical fitness examinations.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
Template
240-73416879 Rev 1
SHE SPECIFICATION Identifier
Document
Gauteng Removal, Rev 2
Identifier
Transportation and disposal of Effective Date 20 February 2021
Asbestos Containing Material
Review Date February 2026
2. In order for the appropriate medical examinations to be conducted, each employee
must have a man job specification, which must indicate the description of work, list of
hazards and potential occupational exposure limits, physical hazards and required
physical attributes.
3. Medical fitness certificates shall be renewed annually for employees who are working
on site. This shall be maintained until completion of the contract.
4. The Principal Contractor must ensure that his / her employees and appointed
contractor employees have undergone pre-entry medical examination before starting
work on the contract.
5. The principal contractor shall provide a documented process for managing those
employees who are issued with a conditional certificate of fitness.
3.9 Incident Investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations
8 and 9, using Eskom Procedure 32-95 as a reference, and where injuries as contemplated
in sections 24 and 25 have been sustained, be reported to the Department of Labour.
Contractors shall use the standard General Administrative Regulation Annexure 1
“Recording of an Incident” form for all incident investigation reports. The objective of
incident investigation, should not only be a legal requirement, but should establish why
and how the incident occurred and find out the real root cause of the incident and to decide
on precautionary measures that are required to address the root cause to prevent any
further recurrences of the same or similar incidents.
3.10 Emergency Management
The art of emergency preparedness and response is to minimise the effects of any
emergency and to restore normal activities as soon as practical. Periodic emergency drills
must be undertaken to test the effectiveness of the plan. This must be recorded and
provided on request.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 56
There is a need to remove and dispose of all asbestos from Eskom properties, within
Distribution (DX) Gauteng Cluster (GC) to ensure compliance with Eskom Asbestos Standard
32-303 and Occupational Health and Safety Act, 1993 (Act No. )
and with specific reference to the Asbestos Abatement Regulations.
2.1 Purpose
The purpose of the Contract is to provide a scope requirement for the safe removal and
disposal of asbestos and asbestos containing material in Gauteng Cluster Building/s.
2.2 Scope requirement
The scope of work includes:
The Provision of Supervision, Labour, Equipment, monitoring, transport, removal and
disposal of asbestos containing material for the Gauteng Cluster for on as and required
basis.
Contractors to be registered to perform type 2 or type 3 asbestos work, have a valid track
record, have licence to transport hazardous waste and have the necessary equipment in
order to remove asbestos containing material from different sites with different scopes.
1.) P&Gs and Pre-construction planning related activities. (Specialised barricading,
Specialised PPE, equipment and vehicles.)
2.) Obtaining the correct authorisations for removal of asbestos containing material.
3.) Building, decommissioning/ removal of asbestos containing material in buildings such as
roofing sheets, fascia boards, barge boards, gutters, ceilings, partitioning walls or any
asbestos containing material linked to buildings.
4.) Safe transportation permits and transportation in sealed skips or bags. Asbestos and
ACM must be transported in accordance with the minimum requirements of 32-303 Asbestos
Management Standard and in accordance with SANS 10228 and SANS 10229.
5) Disposal at registered Hazardous landfill sites in Gauteng Province. Asbestos or Asbestos
containing material must be disposed of in accordance with the minimum requirements
according to the Asbestos Abatement Regulations Regulation 20 and the applicable
environmental requirements, that is, the Environment Conservation Act and the
National Environmental Management Act .
6) Providing Eskom with safe disposal certificates.
7) Any removal and safe storage of asbestos containing material (ACM) shall be performed
after normal working hours, or under controlled conditions, to limit the number of persons
who might be exposed.
8) Air monitoring performed by an approved inspection authority (AIA) is required during and
after removal of the asbestos containing material for clearance purposes.
Controlled Disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
Unique Identifier: 331-131Asbestos disposal and removal within Gauteng Cluster
Properties Revision: 3
of 13
Find below list of sites that have asbestos:
Temba CNC
Ga- rankuwa, Mothuhlung, Mapobane & Winterveldt CNC.s
Cullinan CNC
Cullinan HUB
Bronkhorstspruit CNC
Germiston CNC
Vlakfontein MEW, ( Tsakane, Dannuttor) CNC's
Vlakfontein Ekurhuleni Live Work
Etwatwa CNC
Petit CNC
Vosterskroon CNC's
Stepdown CNC
RDC Warehouse
Rosherville Buidings
Meyerton CNC
Mnandi CNC
Sebokeng CNC & Hub
Braamfisher CNC
Carletonville CNC
Libanon Livework
Magalies CNC
Taunus CNC
Klipspruit & Zola CNC
Zola Hub
Mapetla Hub
Morningside Hub
President Building
Princess CNC
Randfontein Hub
Rigi North CNC
West Wits Houses
2.3 General Requirements
The Contractor shall carry out scope requirements in compliance with Eskom Asbestos
Standards 32-303 requirements and the Occupational Health and Safety Act,
and Asbestos Abatement Regulations Requirement.
Controlled Disclosure
When downloaded from the EDS database, this document is uncontrolled and the responsibility rests with the user to ensure it
is in line with the authorised version on the database.
Unique Identifier: 331-131Asbestos disposal and removal within Gauteng Cluster
Properties Revision: 3
of 13
Declaration certificate for local production and content
The tenderer will initial each page and submit as a form of accepting the SDL&I Undertaking agreement at Tender.
appointments Organogram, legal
identity number of and Ten appointments and
(10) CV's Ten (10) CV – 3,3% asbestos work
Financial Requirements
Source: Tender documents.zip (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Section
Source: Tender documents.zipCriteria Weight
Technical Criteria 100%
Minimum Threshold 80%
Tenderers who do not meet the threshold for functionality scoring will
be disqualified
3.15 Evaluation of Price Prices will be evaluated as follows:
1. Inclusive of VAT.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
2. Corrected for arithmetical errors.
3. Excluding contingencies in any bill of quantities or activity
schedule’
4. Adjusted for any other acceptable variations, deviations, or
alternative tenders submitted; and
5. Making a comparison of the Net Present Value of each adjusted
tender based on the tendered programme (if provided) and
prices, on the estimated effect of Price Adjustment Factors and
rate of exchange fluctuations (if applicable) and on other
evaluation parameters relating to uncertainty and risk, where
applicable.
6. Unconditional discounts will be taken into account for evaluation
purposes.
7. Conditional discounts will not be taken into account for
evaluation purposes but will be implemented when payment is
effected.
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
PPPFA.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
Goals together and rank the suppliers from the highest to the lowest.
The outcome will result in the award of multiple contracts to multiple
suppliers with a minimum of 1 to a maximum of 4 suppliers.
Should we not obtain 4 suppliers, Eskom reserve the right to top up
the number of suppliers to achieve the 4 desired number.
Alternatively, Eskom will reassess the achieved number at the time
and make a determination whether to top up or not to top up.
Suppliers will be ranked by applying the Preferential Point scoring
based on the 80/20 methodology to technically acceptable suppliers.
Eskom aspires to standardized rates of the successful tenderers
during negotiations.
The scope of work and approved budget will be allocated equally.
3.20 Objective Criteria Objective criteria are applicable.
Please see attached SDL&I bidder’s template
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
Please note that Eskom may award the contract to a tenderer
other than the highest scoring if objective criteria justify the
award.
As per SDL&I bidders’ template
3.21 Reverse e-auction Not applicable
(if applicable)
Contractual Requirements Mandatory Contractual Requirements that must be included in all
tenders is the following: -
Additional Contractual Requirements that may be included if
applicable:
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Proof that the tenderer recommended for award has met the
stipulated contractual requirements must be submitted prior to
contract award.
Failure to meet stipulated Contractual Requirements by the
stipulated deadlines may result in the tenderer being regarded
as non-responsive and ineligible for contract award.
3.24 Sign form of Agreement/ The conditions of the contract will be the NEC3 Term Service
Contractual Conditions Contract (TSC3)
2.28 CIDB Requirements (where Not applicable
applicable for Engineering and
Construction Works Contracts)
2.29 Contract Skills Development Not applicable
Goals (CSDG)
2.30 Contract Participation Goals Not applicable
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Please note:
Tenderers are requested to bear in mind Eskom's standard payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Eskom reserves the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary companies as this
may be interpreted as subcontracting with themselves and / or using their subsidiaries for fronting.
Where a main contractor subcontracts with a subsidiary, this must be declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following link:
www.csd.gov.za
“proof of B-BBEE status level of contributor” means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic Empowerment Act
1.3 Tender returnables
The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Note the following: -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
the tender at Tender closing date and time. If not completed, signed (if required on the returnable) and/or
submitted by tender closing, the tenderer will be disqualified.
These returnables are required to be completed, signed (if required on the returnable) and submitted with
Tender at Tender closing date and time; however, if not submitted by Tender closing, or submitted with
incomplete information or without a required signature, the Procurement Practitioner will, in writing,
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
request the tenderer to submit the returnable within 5 working days. If the returnable is not completed,
signed if required and/or received by the Procurement Practitioner within 5 working days of the request,
the tenderer will be disqualified.
The 5 working days period does not apply to CIDB proof of grading. Refer to the returnable table the
prescribed period for CIDB proof of grading.
# Returnables required at Tender Closing date and time for evaluation: -
These returnables are required to be submitted at tender closing date and time. These returnables will
not be requested by the Procurement Practitioner. A tenderer that does not submit the required returnable
at stipulated deadline or submits an incomplete returnable; will not be disqualified but will score zero.
Returnable required prior to Contract Award.
Returnables that are mandatory for contract award must be submitted prior to award, completed if
completion is a requirement and signed if signature is a requirement.
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Basic Compliance Electronic copy of the tender in a PDF format. The √
price list needs to be submitted in PDF and a copy in
excel format (The upload size per document is 500
megabytes and total submission is restricted to 4
gigabytes)
Annexure A Authorisation Form √
Annexure B Acknowledgement Form √
Annexure C Tenderers Particulars √
Annexure D Integrity Pact Declaration form √
Annexure E CPA for local goods/services (if applicable) √
Annexure F CPA(IG) for imported goods/services (if applicable) N/A
Annexure G1-G4 SBD 6.2 -Declaration certificate for local production √
and content and Annexures G2,G3,G4
Annexure H SBD 1- to be completed and submitted by all √
tenderers.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
(applicable for all
suppliers including
Foreign suppliers)
# Annexure I SBD 6.1- Preference Points Claim Form in terms of √
PPPFA 2022 regulations
Annexure J SBD 4 – Bidders Disclosure √
Reverse e-auction N/A
training
acknowledgement
form (if applicable)
E-tendering Help √
Manual
acknowledgement
form (If applicable)
Additional Letter of intent to form a JV/consortium or Valid joint √
Documents required venture agreement confirming the rights and
in the event of JV: - obligations of each of the joint venture partners and
their profit-sharing ratios.
Separate written confirmation that the joint venture will √
operate as a single business entity (incorporated) for
the duration of the contract or this may be included as
an obligation within the JV agreement.
Details and confirmation of a single designated bank √
account in the name of the JV and independent of the
individual JV partners, as set out in the joint venture
agreement.
# Specific Goals A tenderer’s failure to submit proof that it meets the √
specific goals will not result in its disqualification.
The tenderer will, however, be scored zero for
Specific Goals for purposes of PPPFA scoring and
ranking.
Tax Clearance A certified copy of a tax clearance certificate is √
Certificates required from foreign tenderers (with a footprint in
South Africa but that are not registered on CSD and
have not provided a SARS pin number) and local
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
tenderers (that have not provided their SARS e-filing
PIN number for verification by Eskom and/or their
CSD profile / CSD number).
Foreign suppliers with no footprint in South Africa
must complete the SBD1 document; however, no
proof of tax compliance is required.
Tax Evaluation Evaluation questionnaire to determine whether a √
Questionnaire (if company, close corporation (CC) or Trust is a
services contract personal service provider for purposes of PAYE
and was included as
annexure)
Compliance with To the extent that the tenderer falls within the √
Employment Equity definition of a “designated Employer” as contemplated
Act in the Employment Equity Act , the tenderer
is required to furnish the Employer with proof of
compliance with the Employment Equity Act, including
proof of submission of the Employment Equity report
to the Department of Labour. (South African tenderers
only)
CIDB (where Valid proof of the required CIDB grading designation N/A
applicable) for the main contractor; JV and /or sub-contractor as
may be required in the tender data at tender closing
deadline or within 21 working days from the closing
date of submission of tenders if this is agreed with the
Employer
NEC Completed NEC Contract with pricing schedule √
Pricing schedule Fully completed pricing schedule (if not already √
submitted in the NEC or other Contract).
For e-tendering price schedule needs to be submitted
in PDF
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 58
File name: Invitation to Tender (ITT) (0)
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Additional √
documents required
(Ecsa/
SACPCMP/CVs/
permits/licenses/
specific registration
documents
(if applicable to
scope of work)
Mandatory contractual requirements
Supporting evidence
Mandatory CSD Registration (CSD number/CSD Report) √
Contractual
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Xolane Ngubane
Phone
017-827-8591
[email protected]
Address
No 1 dale road midrand - Johannesburg - Johannesburg - 1685
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
09 Jun 2026
AI status
Not enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Data conflicts
None detected