Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Grootvlei Power Station - Grootvlei - Grootvlei - 2024
Organization Type
GOVERNMENT
Published
03 Jul 2026
OCDS Reference
ocds-9t57fa-161090
This tender invites bids for the provision of specialized cleaning services for eskom’s awr dams, pollution control dams, ash dam decanting systems, oil skimmers, terminal reservoirs at grootvlei power station, and clarifiers and sludge dams at vaal dam over a 60-month period. The contract is structured under the nec3 term service contract (tsc3) framework and is open to suppliers capable of meeting strict sheq, compliance, and operational requirements.
Date & Time
Friday, 31 July 2026 - 10:00
Venue
https://teams.microsoft.com/meet/350613151656556?p=Hwyoo38c8c1O7YkhZT
Categories
Request for Bid(Open-Tender)
Grootvlei Power Station - Grootvlei - Grootvlei - 2024
03 Jul
2026
Tender Published
Tender was published
31 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
High Risk OHS Specification Dam Cleaning.docx
This tender, issued by Eskom, seeks the provision of cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and Sludge Dams at Vaal Dam on an 'as and when required' basis. The contract emphasizes strict compliance with Occupational Health and Safety (OHS) standards, legal requirements, and Eskom-specific procedures. The scope includes cleaning, maintenance, and operational tasks, with a strong focus on safety, environmental management, and regulatory adherence.
Median Estimate
R 1 482 426
Range
Based on 22 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
Comprehensive step-by-step guide to Engineering Council of South Africa (ECSA) registration. Learn the requirements, costs, timeline, CPD obligations, and how ECSA registration unlocks access to government infrastructure tenders and public sector engineering contracts.
Stop bidding blindly. Learn how to build a tender intelligence system using procurement data, historical award analysis, and competitor insights to make data-driven bid-no-bid decisions that win more contracts.
In 2026, General contractors operating in the Eastern Cape must prioritize compliance with COIDA (Compensation for Occupational Injuries and Diseases Act) registration and Letters of Good Standing. With the Department of Employment and Labour intensifying enforcement, and government tenders increasingly scrutinizing workforce-related compliance, failure to maintain valid documentation can disqualify bids before evaluation even begins. As public sector procurement in the province continues to demand higher standards of legal and financial integrity, suppliers must treat these requirements as non-negotiable gateways to participation.
💡 Want more tendering tips and strategies?
Explore Our BlogTenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: High Risk OHS Specification Dam Cleaning.docxScope: Provision of cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and Sludge Dams at Vaal Dam on an as-needed basis. Work must comply with Eskom’s OHS specifications, SHEQ Policy, and all applicable South African legislation.
Contact Information
Source: High Risk OHS Specification Dam Cleaning.docx (unknown)Eskom Contract’s Manager/End User: Thandi Sibiya. Eskom’s OHS/SHE Manager: Martin Mawasha. Eskom’s Procurement Manager/Officer: Silindile Mncube. Eskom’s OHS/SHE Officer: Maki Mofokeng.
Evaluation Criteria
Source: High Risk OHS Specification Dam Cleaning.docx (unknown)General
Technical
Safety And Compliance
Technical Specifications
Source: High Risk OHS Specification Dam Cleaning.docx (unknown)Scope: Cleaning of AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation & cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and Sludge Dams at Vaal Dam as required. OHS Requirements: Contractor must develop and implement an OHS plan compliant with Eskom’s SHEQ Policy, OHS Act 85 of 1993, and other applicable legislation. Key OHS obligations include: Section 37(2) legal agreement signing, hazard identification and risk assessments, statutory appointments (e.g., Health and Safety Representative, First Aider), PPE provision, COVID-19 compliance, substance abuse policy, emergency preparedness, and incident reporting. Specific technical requirements: Fall protection plans for work at heights, confined space protocols, fire safety equipment maintenance, first aid provisions, vehicle and equipment safety, and housekeeping standards.
Compliance Requirements
Source: High Risk OHS Specification Dam Cleaning.docx (unknown)Legal Compliance: OHS Act 85 of 1993 and regulations, National Environmental Management Act 107 of 1998, Basic Conditions of Employment Act 75 of 1997, Compensation for Occupational Injuries and Diseases Act (COID), and National Road Traffic Act 93 of 1996. Eskom-Specific Compliance: SHEQ Policy, Eskom Life-Saving Rules (e.g., zero alcohol tolerance, permit-to-work), Eskom COVID-19 policy, and Eskom Substance Abuse Procedure (32-37). Certifications: Valid Letter of Good Standing (LoG) from Compensation Commissioner, SANS standards compliance (e.g., SANS 1186 for safety signs, SANS 10085 for scaffolding), ISO 45001 alignment. Appointments: Statutory roles (e.g., Incident Investigator, Health and Safety Committee Member, First Aider) and non-statutory roles (e.g., Emergency Planning Coordinator, Safety Officer). Documentation: OHS file maintenance, risk assessments, method statements, and training records.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
High Risk OHS Specification Dam Cleaning.pdf
This tender, issued by Eskom, seeks the provision of cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation & cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and Sludge Dams at Vaal Dam on an as-needed basis. The contract emphasizes strict adherence to Occupational Health and Safety (OHS) standards, legal compliance, and Eskom-specific requirements, including COVID-19 protocols, statutory appointments, and life-saving rules. The tender closes on July 31, 2026.
Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf
The tender is for the provision of cleaning services for various dams, pollution control systems, ash dam decanting systems, oil skimmers, terminal reservoirs, clarifiers, and sludge dams at Eskom's Grootvlei Power Station and Vaal Dam. The scope is 'as and when required,' and the tender emphasizes strict Occupational Health and Safety (OHS) compliance due to the high-risk nature of the work.
NEC TSC Document- Ash dam cleaning.pdf
Eskom is seeking a contractor to provide cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers/Sludge Dams at Vaal Dam on an 'as and when required' basis for a 60-month period under an NEC3 Term Service Contract (TSC3). The contract includes strict compliance with safety, environmental, and operational standards, with pricing based on a detailed price list and task orders.
BoQ - Dam Cleaning.xlsx
The tender is for the provision of cleaning services for various dams, reservoirs, clarifiers, and related systems at Grootvlei Power Station and Vaal Dam. This includes site establishment/de-establishment, labor, equipment, safety compliance, and operational tasks like oil skimmer cleaning and ash dam decanting. The contract spans multiple years with specific durations for each task.
240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf
Eskom is seeking tenders for the provision of cleaning services for various dams, reservoirs, and related systems at Grootvlei Power Station and Vaal Dam. The scope includes cleaning AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs, Clarifiers, and sludge Dams on an as-needed basis. The tender emphasizes strict Quality Management System (QMS) compliance, either through ISO 9001 certification or documented evidence of an equivalent QMS.
240-109253698 CQP Template.docx
This tender document outlines ESKOM's requirements for a comprehensive cleaning and maintenance contract at Grootvlei Power Station and Vaal Dam, focusing on water and pollution control infrastructure. The document is primarily a detailed template for a Contract Quality Plan (CQP) that tenderers must complete, emphasizing strict quality management, documentation, and compliance with standards like SANS 466/ISO 10005.
CIDB ViewTenderNoticePdf.pdf
Eskom Holdings SOC Limited (Gauteng) invites tenders for the provision of cleaning services for various dams, reservoirs, and systems at Grootvlei Power Station and Vaal Dam, including AWR dams, Pollution Control Dams, Ash Dam Decanting systems, oil skimmer operations, Terminal Reservoirs, Clarifiers, and sludge Dams. The services are required on an 'as and when' basis.
240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdf
Eskom tender for cleaning services at Grootvlei Power Station and Vaal Dam facilities. The scope includes cleaning AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs, Clarifiers, and sludge Dams. Services are required on an 'as and when required' basis. This is a Category 2 quality requirements tender under ISO 9001 standards with post-contract quality monitoring.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
ESKOM tender for the provision of cleaning services at Grootvlei Power Station and Vaal dam facilities. Services include cleaning AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs, Clarifiers, and sludge Dams on an 'as and when required' basis. The contract includes Quality Control Plan (QCP) requirements with various inspection and test methods.
GVL Dams Dredging Contract TES.pdf
This tender, issued by Eskom, seeks the provision of cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and Sludge Dams at Vaal Dam on an as-needed basis. The tender evaluation focuses on technical criteria, including method statements, past project experience, organizational structure, and risk assessments, with a weighted scoring system.
Environmental Requirements Dams, Drains and Channel Cleaning.pdf
The tender is for the provision of cleaning services for various dams, ash dam decanting systems, oil skimmers, terminal reservoirs, clarifiers, and sludge dams at Eskom's Grootvlei Power Station and Vaal Dam. The services are required on an as-needed basis, with a focus on compliance with Eskom's environmental policies, legal requirements, and incident management procedures.
240-105658000 Supplier Quality Management Specification.pdf
This tender, issued by Eskom, is for the provision of cleaning services for various dams, reservoirs, and decanting systems at Grootvlei Power Station and Vaal Dam, including AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs, Clarifiers, and sludge Dams. The tender emphasizes strict adherence to Eskom's Supplier Quality Management (SQM) specifications, which are aligned with ISO 9001 standards. The scope requires suppliers to demonstrate a robust Quality Management System (QMS), compliance with technical and quality control plans, and the ability to manage sub-suppliers effectively. The closing date is July 31, 2026.
Safety - Annexure B.pdf
Eskom tender for cleaning services at Grootvlei Power Station and Vaal Dam facilities, including AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs, Clarifiers, and sludge Dams. This is an 'as and when required' service contract. The document provided is specifically the OHS (Occupational Health and Safety) Acknowledgement Form that all bidders must complete.
Invitation to tender-Dam Raging.pdf
Eskom Holdings SOC Ltd invites tenders for the provision of cleaning services for various dams, ash dam decanting systems, oil skimmer operations, terminal reservoirs at Grootvlei Power Station, and clarifiers/sludge dams at Vaal Dam. The contract duration is 5 years, with a tender validity period of 26 weeks. Submissions are electronic via Eskom’s e-tendering portal by 31 July 2026, 10:00 UTC. A clarification meeting is scheduled for 16 July 2026 via Microsoft Teams.
Environmental Requirements Dams, Drains and Channel Cleaning.docx
The tender is for the provision of cleaning services for various dams, reservoirs, and sludge systems at Eskom's Grootvlei Power Station and Vaal Dam. The scope includes cleaning AWR dams, Pollution Control Dams, Ash Dam Decanting systems, oil skimmer operations, Terminal Reservoirs, Clarifiers, and sludge Dams on an as-needed basis. The contract emphasizes strict adherence to environmental policies, legal compliance, waste management, and incident reporting.
Financial Analysis Information List Rev 6 13 September 2019.pdf
Eskom is seeking tenders for the provision of cleaning services for various dams, reservoirs, and systems at Grootvlei Power Station and Vaal Dam, including AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operations, Terminal Reservoirs, Clarifiers, and Sludge Dams. The tender is open nationally and closes on July 31, 2026.
GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf
Eskom seeks a contractor for on-demand cleaning and maintenance of water management infrastructure at Grootvlei Power Station and Vaal Dam. The scope includes desilting/dredging of pollution control dams, ash water return dams, raw water reservoirs, clarifiers, sludge dams, and cleaning of penstocks, filter drains, trenches, and the oil skimmer plant. The contract also requires the provision of eight oil skimmer plant operators for a 60-month period. Work is to be performed 'as and when required' based on Eskom inspections.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Nsukuzonke Buthelezi
Phone
016-457-5541
[email protected]
Address
Grootvlei Power Station - Grootvlei - Grootvlei - 2024
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
03 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Subcontracting
Description
Source: Environmental Requirements Dams, Drains and Channel Cleaning.docxScope: Cleaning of AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and sludge Dams at Vaal Dam. Work is required on an as-needed basis. Environmental compliance is a core requirement for all activities.
Evaluation Criteria
Source: Environmental Requirements Dams, Drains and Channel Cleaning.docx (unknown)General
Technical
Legal
Technical Specifications
Source: Environmental Requirements Dams, Drains and Channel Cleaning.docx (unknown)Scope: Cleaning of AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and sludge Dams at Vaal Dam on an as-needed basis. Environmental compliance is mandatory for all activities.
Compliance Requirements
Source: Environmental Requirements Dams, Drains and Channel Cleaning.docx (unknown)Environmental Compliance:
Submission Guidelines
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf (unknown)Submit the following returnable documents as part of your tender:
Returnable Documents
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf (unknown)Additional OHS tender returnables applicable to the scope of work must be submitted and evaluated prior to contract award.
Evaluation Criteria
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf (unknown)Legal
Technical
Administrative
Technical Specifications
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf (unknown)Scope of work includes:
Financial Requirements
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf (unknown)Submit detailed costing for OHS management:
Compliance Requirements
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdf (unknown)Mandatory compliance requirements:
Health & Safety
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdfThe submitted OHS policy must comply with OHS Act Section 7.
Section
Source: Annexure C 1 SHE Tender Evaluation Template (High risk).pdf Cleaning Dam.pdfEvaluation will be conducted using Annexure C 1: OHS Tender Evaluation Template (High Risk, Document Identifier 240-77471651 Rev 3).
Description
Source: BoQ - Dam Cleaning.xlsxThe tender involves the provision of cleaning services for various dams, reservoirs, and systems at Grootvlei Power Station and Vaal Dam. Key tasks include: Site establishment and de-establishment for multiple locations (East Terrace, Coal Stockyard, South Terrace, AWR dams, Clear Water Reservoir, Terminal Reservoirs, Sludger Dam, Vaal Dam Clarifiers). Cleaning of Oil Skimmer Plant components (Primary & Secondary Chambers, Penstocks, Filter Drains). Supply of medicals, safety files, PPE, site containers, diesel storage, generators, and transport. Labour provision for supervisors, safety officers, labourers, and oil skimmer operators.
Submission Guidelines
Source: BoQ - Dam Cleaning.xlsx (unknown)Returnable Documents: Not explicitly listed in the provided content. Ensure all required forms, certifications, and supporting documents are submitted as per standard tender practices.
Evaluation Criteria
Source: BoQ - Dam Cleaning.xlsx (unknown)General
Legal
Financial
Technical Specifications
Source: BoQ - Dam Cleaning.xlsx (unknown)Scope includes: Site establishment and de-establishment for multiple dams and reservoirs (East Terrace, Coal Stockyard, South Terrace, AWR 13 million 1 & 2, AWR 6 million, Clear Water Reservoir, Terminal Reservoirs 1 & 2, Sludger Dam, Vaal Dam Clarifiers 1-4). Cleaning of Oil Skimmer Plant (Primary & Secondary Chambers, Penstocks, Filter Drains). Provision of medicals, safety files, PPE (branded overalls, SABS-approved safety boots, reflector vests, gumboots), site containers, diesel storage, generators, and transport. Labour requirements: Supervisors, Safety Officers, Labourers, and Oil Skimmer Plant Operators. Duration for each task varies (1-60 months/days).
Financial Requirements
Source: BoQ - Dam Cleaning.xlsx (unknown)Pricing must be provided per item in the Bill of Quantities (BoQ). Include rates, quantities, and total amounts for each task. Contract Skills Development Goal (CSDG) applies at a rate of 0.0025%. Sub-total and total inclusive of CSDG must be provided.
Compliance Requirements
Source: BoQ - Dam Cleaning.xlsx (unknown)CIDB registration is required. Contract Skills Development Goal (CSDG) compliance is mandatory. Safety and PPE standards must meet SABS approvals.
Important Dates
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Document issued: 10 July 2025.
Contact Information
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Eskom representative: Mmaphuti Moloto.
Submission Guidelines
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Submit the following returnable documents: Form A (completed and signed).
Returnable Documents
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Form A (completed and signed).
Evaluation Criteria
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Qms Compliance
Must meet either Option 1 (ISO 9001 certified) or Option 2 (documented QMS aligning with ISO 9001:2015).
Documentation
All required documents (e.g., certificates, manuals, plans) must be submitted as per the tender specifications.
Technical Compliance
Materials, equipment, and processes must comply with Eskom and national/international standards.
Experience
Applicants must demonstrate competence and prior experience in similar projects (implied by QCP/ITP examples).
Technical Specifications
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Scope: Cleaning of AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and sludge Dams at Vaal Dam (as and when required).
Quality requirements for materials/equipment:
Compliance Requirements
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdf (unknown)Quality Management System (QMS) compliance:
Section
Source: 240-12248652 (Rev 7) List of Tender Returnables - Dams Cleaning.pdfEvaluation is based on Quality Management System (QMS) requirements and operational evidence. Scoring breakdown:
Submission Guidelines
Source: Safety - Annexure B.pdf (unknown)Submit a signed Acknowledgement Form (Annexure B) confirming understanding of Eskom OHS requirements. The form must include: Company/Supplier Name, Name of Authorised Person (CEO/Director/Managing Director), Signature, Date, and Witness Signatures (2).
Evaluation Criteria
Source: Safety - Annexure B.pdf (unknown)Must demonstrate ability to comply with all Eskom and statutory OHS requirements. Must have processes for managing subcontractors. Must be willing to undergo Eskom verification of compliance. Must provide testimonials/references and contact details of previous clients upon request. Contractor's employees must be available for Eskom induction.
Compliance Requirements
Source: Safety - Annexure B.pdf (unknown)Compliance with the following is mandatory for all suppliers/contractors/tenderers:
Post-award, the supplier must fully align their company’s processes with Eskom’s OHS policies, procedures, and standards.
Penalties will be enforced for non-conformance with Eskom or statutory OHS requirements, applicable to the main supplier, its contractors, or suppliers.
All employees (including contractors/suppliers) must undergo Eskom’s relevant induction and the company’s own induction.
Health & Safety
Source: Safety - Annexure B.pdfMandatory OHS compliance requirements for suppliers/contractors/tenderers:
Post-award, align all company processes with Eskom’s OHS policies, procedures, and standards.
Penalties apply for non-conformance with Eskom or statutory OHS requirements (applicable to the main supplier, its contractors, or suppliers).
All employees (including contractors/suppliers) must complete Eskom’s relevant induction and the company’s own induction.
Contractual Terms
Source: Safety - Annexure B.pdfThe main contractor/supplier must:
Eskom reserves the right to verify compliance and may request copies of testimonials/references and client contact details (including Eskom) for similar past work.
Description
Source: 240-109253698 CQP Template.docxScope: Cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation & cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers/sludge Dams at Vaal Dam (as-and-when required).
Purpose: The Contract Quality Plan (CQP) template guides suppliers in identifying and planning to meet Eskom’s quality management expectations. It references SANS 466:2005 / ISO 10005:2005 standards.
Submission Guidelines
Source: 240-109253698 CQP Template.docx (unknown)Returnable Documents: Submit all required documentation as per the Contract Quality Plan (CQP) template, including QCP/ITP forms, method statements, inspection reports, and technical records.
Evaluation Criteria
Source: 240-109253698 CQP Template.docx (unknown)While explicit eligibility criteria aren't listed, tenderers must demonstrate: capability to execute the specialized cleaning scope; robust Quality Management System (QMS); experience managing sub-suppliers; compliance with ISO 9001 requirements; ability to provide all required documentation; and resources for 'as and when required' service delivery. Financial and technical qualifications are implied but not specified in this excerpt.
Technical Specifications
Source: 240-109253698 CQP Template.docx (unknown)Scope: Provision of cleaning services for AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation & cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers/sludge Dams at Vaal Dam (as-and-when required).
Quality Management: Must align with SANS 466:2005 / ISO 10005:2005 standards. Suppliers must submit a Contract Quality Plan (CQP) outlining:
Important Dates
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)Clarification meeting: 16 July 2026 at 14h00 via Microsoft Teams (link: https://teams.microsoft.com/meet/350613151656556?p=Hwyoo38c8c1O7YkhZTDraft).
Closing date for tenders: 31 July 2026 at 10h00.
Contact Information
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)Submission Guidelines
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)Tenders must be submitted using the official tender documentation issued by Eskom. Emailed and late tenders will not be accepted. Requirements for sealing, addressing, delivering, opening, and assessment of tenders are detailed in the Tender Data.
Returnable Documents
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)Tenders must be submitted on the official tender documentation issued. Closing time: 31 July 2026 at 10h00. Emailed and late tenders will not be accepted.
Evaluation Criteria
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)Cidb Grade
Registration
Must be CIDB-registered
Documentation
Tenders must be submitted on the official tender documentation issued by Eskom.
Compliance Requirements
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)Bidders must have a CIDB contractor grading of 8CE or higher. 7CE Potentially Emerging Enterprises may submit tenders if they satisfy the criteria stated in the Tender Data. Only tenderers with Grade 8CE, 7CE, or higher are eligible to submit.
Requirements
Source: CIDB ViewTenderNoticePdf.pdf (TENDER)CIDB contractor grading requirement: 8CE or higher. 7CE Potentially Emerging Enterprises may submit tenders if they meet the criteria in the Tender Data. Only Grade 8CE, 7CE, or higher are eligible.
Contact Information
Source: Financial Analysis Information List Rev 6 13 September 2019.pdf (unknown)Contact the Financial Analysis Team for queries or clarity on the document.
Evaluation Criteria
Source: Financial Analysis Information List Rev 6 13 September 2019.pdf (unknown)Financial
Must provide valid, audited/reviewed financial statements meeting all specified criteria (e.g., signed, in English, with comparatives).
Compliance
Must pass technical, SHE, and financial evaluations as part of the tender process.
Legal
Must be a registered entity capable of fulfilling the scope of work (cleaning services for industrial/dam systems).
Experience
Implied need for experience in industrial cleaning, pollution control, or similar services (though not explicitly stated).
Financial Requirements
Source: Financial Analysis Information List Rev 6 13 September 2019.pdf (unknown)Mandatory financial documentation:
Pricing and payment:
Compliance Requirements
Source: Financial Analysis Information List Rev 6 13 September 2019.pdf (unknown)Mandatory financial compliance requirements:
Additional rules:
SHE (Safety, Health, Environment) compliance is a gatekeeper requirement.
Health & Safety
Source: Financial Analysis Information List Rev 6 13 September 2019.pdfSHE (Safety, Health, Environment) is a mandatory gatekeeper requirement for evaluation.
Requirements
Source: Financial Analysis Information List Rev 6 13 September 2019.pdf (unknown)Tender acceptance threshold: Applies to tenders below R300 million.
Contact Information
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdf (unknown)Eskom Quality Representative: Mmaphuti Moloto (QA Officer).
Evaluation Criteria
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdf (unknown)Category 2 quality requirements selected - requires Main Supplier and Sub-supplier Capability and Capacity Assessment. Only one quality category may be selected per tender. Site assessment applicability must be indicated. Tenderer must have capacity to execute contract with quality performance monitoring. Must comply with all post-contract award conditions including quality audits, nonconformity management, and Eskom access rights.
Technical Specifications
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdf (unknown)Scope: Cleaning of AWR dams, Pollution Control Dams, Ash Dam Decanting systems, Oil skimmer operation and cleaning, Terminal Reservoirs at Grootvlei Power Station, and Clarifiers and Sludge Dams at Vaal Dam (as and when required).
Quality Requirements:
Methodology
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdfBidder must demonstrate alignment with ISO 9001 principles:
Quality Management
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdfPost-contract award requirements:
Compliance Requirements
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdf (unknown)ISO 9001 certification is required. Compliance with the following clauses is mandatory:
Section
Source: 240-68099512 (Rev 9) Form A Tender & Contract - Dams Cleaning.pdfEvaluation is based on ISO 9001 quality management system compliance. Key criteria include:
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)The provided document excerpt does not contain explicit eligibility criteria. Standard ESKOM tender requirements typically include: valid tax clearance certificate, proof of registration with relevant authorities, financial stability, relevant experience in similar cleaning operations, and compliance with SHE (Safety, Health, and Environment) requirements. Bidders should consult the full tender documentation for complete eligibility requirements.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)This document is a Quality Control Plan (QCP) / Inspection Test Plan (ITP) template for the cleaning contract. Key quality control requirements defined:
Description
Source: GVL Dams Dredging Contract TES.pdfDocument authorization: Accepted by Mpho Taje (Civil Engineer), Menelisi Mkhabela (Auxiliary Engineering Manager), Thabo Montja (Middle Manager Engineering), Thandi Sibiya (Senior Technician), Nondumiso Buthelezi (Document Controller).
Revisions:
Development Team: Mpho Taje.
Acknowledgements: Menelisi Mkhabela, Thandi Sibiya.
Evaluation Criteria
Source: GVL Dams Dredging Contract TES.pdf (unknown)Cidb Grading
Minimum cidb contractor grading designation of **8CE or 7CE PE or higher**.
Technical Compliance
Must meet all mandatory technical requirements (no explicit mandatory criteria listed, but qualitative criteria are strictly evaluated).
Documentation
Failure to provide required documentation (e.g., method statements, CVs, risk assessments) results in 0 points for that section.
Non Compliance Penalties
Exclusions of scope, unclear organograms, or lack of project schedules are unacceptable and may disqualify the tender.
Technical Specifications
Source: GVL Dams Dredging Contract TES.pdf (unknown)Scope: Cleaning and silt-removal of water storage and pollution control dams at Grootvlei Power Station, including:
Method Statements must detail:
Equipment requirements:
Standards/References:
Methodology
Source: GVL Dams Dredging Contract TES.pdfContractor must provide method statements (40% weight) for:
Method statements must include:
Scoring:
Compliance Requirements
Source: GVL Dams Dredging Contract TES.pdf (unknown)CIDB contractor grading designation of 8CE or 7CE PE or higher required.
Personnel qualifications:
Proof of relevant experience: Completion certificates for similar projects, with verifiable references (Project Name, Description, Contact Details, Start/End Dates, Project Value).
Health & Safety
Source: GVL Dams Dredging Contract TES.pdfSafety requirements:
Risk Assessment: Required for Pollution Control Dams, Filter Drain High-Pressure Cleaning, and Ash Water Return Dam. Must include:
Scoring: 5 (full coverage), 4 (missing 1 element), 2 (missing 2 elements), 0 (none).
Environmental
Source: GVL Dams Dredging Contract TES.pdfEquipment requirements for environmental compliance:
Section
Source: GVL Dams Dredging Contract TES.pdfTo qualify, tenderers must meet all mandatory requirements and achieve a minimum 70% score. Evaluation is 100% technical, focusing on Dams, Drains, and Channel Cleaning for Grootvlei Power Station. CIDB grading of 8CE or 7CE PE or higher is required.
Description
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown)Title: Grootvlei Power Station: Dams, Drains and Channel Cleaning SoW
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Engineering
Revision: 1
Total Pages: 19
Next Review Date: AS REQUIRED
Contact Information
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s with a capacity of 200 MW each and the total installed capacity is 1200","address":null}
Returnable Documents
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown)4.18 Deliverables
(minimum of 3 projects) must be provided for works completed within the last 5 years.
indicating the roles that the resources will fulfil in the project.
work. The equipment list is to be provided with serial numbers for verification by the
letter of intent listing the required equipment signed by him and his supplier.
5. CIDB Registration of 8CE
Evaluation Criteria
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown)Mandatory CIDB registration of 8CE. Demonstrated relevant experience with a minimum of three verifiable reference projects completed in the last five years. Key personnel must have a minimum of five years of relevant experience. The contractor must have the financial and operational capacity to provide all necessary plant, equipment, and skilled labor (including eight oil skimmer operators) for a long-term, on-call contract.
Technical Specifications
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown)Grootvlei Power Station is situated close to the town of Balfour in Mpumalanga province. The Power
Station consists of six units with a capacity of 200 MW each and the total installed capacity is 1200
MW. The first of six units was commissioned in 1969. Three of the units were mothballed in 1989
and the rest in 1990. Grootvlei was one of the power stations being recommissioned. The return to
service of the first unit occurred during 2007 and all six units were recommissioned during 2010. The
power station is currently 51 years old.
The Power Station is provided with pollution control dams, drains, and channels which are critical for
water conveyance and management during the operating life cycle of the power plant. It is critical
that through the operating life cycle, the above-mentioned infrastructure remains serviceable and
performs according to the stipulated design requirements.
Due to the nature of operations and the medium conveyed, silting and scaling up occurs which
compromises the design baseline. For this reason, it is required that the infrastructure be cleaned to
remove the silt accumulation on an as and when required basis.
2. Supporting Clauses
2.1 Scope
This document covers the scope of works relating to the cleaning of the dams and waterway
infrastructure as listed below, where the works are to be performed by the Contractor.
2.1.1 Purpose
The purpose of this document is to outline the minimum requirements and the scope of activities
required from the Contractor for the execution of the works.
2.1.2 Applicability
This document applies to Grootvlei Power Station and all other stakeholders involved in the project.
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] Eskom Health, Environment and Quality (SHEQ) Policy 32-727
[2] ISO 9001 Quality Management Systems
[3] National Environmental Management Act (NEMA)
[4] Construction Regulations, 2014
[5] Occupational Health and Safety Act No.
[6] 240-99527377: Inspection Manual for Civil Works at Eskom’s Power Station
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
2.2.2 Informative
None
2.3 Definitions
N/a
2.3.1 Disclosure Classification:
Controlled Disclosure: controlled disclosure to external parties (either enforced by law, or
discretionary).
2.4 Abbreviations
Abbreviation Explanation
AWR Ash Water Return
CSY Coal Stockyard
ET East Terrace
ISO International Organization for Standardization
ST South Terrace
2.5 Roles and Responsibilities
appointing an appropriate Contractor to perform the activities as indicated in this document.
conducted in liaison with the Coal Management department.
2.6 Process for Monitoring
The Contractor submits a quality control plan for approval by Employer.
2.7 Related/Supporting Documents
Drawings (to be issued as and when required).
3. Employers Objectives and Purpose of the Works
The objective and purpose of the works is to:
level.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
4.1 Description of the Works
The Contractor shall adhere to the South African Environment Protection Act, the Waste
Management code of practice and the South African Occupational Health and Safety Act No. 85
(OHS Act), the regulations promulgated thereunder and Eskom Health, Environment and Quality
(SHEQ) Policy 32-727 for removal, separation and disposal of scrap, waste and hazardous
materials.
The Contractor provides a service to the Employer for the desilting/desludging/dredging and cleaning
and/or high-pressure cleaning of the below infrastructure on an “As and When Required” basis:
1. East Terrace Dam (Pollution Control Dam)
2. Coal Stockyard Dam (Pollution Control Dam)
3. South Terrace Dam (Pollution Control Dam)
4. Lower Ash Water Return Dams
5. Upper Ash Water Return Dams
6. Ash Dam Penstocks
7. Ash Dam Filter Drains
8. Vaal Dam Clarifiers
9. Trenches and Channels
10. Sludge Dams at Vaal Dam
11. Oil Skimmer Plant
4.2 Cleaning of the East Terrace Dam
Inspections shall be carried out by the Employer on the ET dam checking the extent of weeds, shrubs
and sludge that has accumulated in the ET dam. Upon completion of the inspection, if the amount
of sludge, shrubs and weeds significantly affects the capacity and status of the ET overall, a
recommendation shall then be made to clean the ET dam.
The following work shall be carried out:
effectively.
which will clearly indicate the sludge mass and water volume).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
piping and bends to site.
the ash dam from the ET dam.
by the Employer.
(housekeeping).
pumped, a suitable method to be used to haul the material from point east terrace to ash dams.
4.3 Cleaning of the Coal Stockyard Dam
Inspections shall be carried out by the Employer on the COAL STOCKYARD dam checking the
extent of weeds, shrubs and sludge that has accumulated in the COAL STOCKYARD dam. Upon
completion of the inspection, if the amount of sludge, shrubs and weeds significantly affect the
capacity and status of the COAL STOCKYARD overall, a recommendation shall then be made to
clean the COAL STOCKYARD dam
The following work shall be carried out:
effectively.
which will clearly indicate the sludge mass and water volume).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
piping and bends to site.
the ash dam from the CSY dam.
Employer.
(housekeeping).
pumped, a suitable method to be used to haul the material from point Coal Stockyard dam to
ash dams.
4.4 Cleaning of the South Terrace Dam
Inspections shall be carried out by the Employer on the ST Dam checking the extent of weeds,
shrubs and sludge that has accumulated in the ST Dam. Upon completion of the inspection, if the
amount of sludge, shrubs and weeds significantly affect the capacity and status of the ST overall, a
recommendation shall then be made to clean the ST Dam.
The following work shall be carried out:
work effectively
surveys which will clearly indicate the sludge mass and water volume).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
piping and bends to site.
to the ash dam from the ST dam.
Employer.
(housekeeping).
pumped, a suitable method to be used to haul the material from South Terrace dam to ash
dams.
4.5 Cleaning of AWR (13 Million East and West) Dams
Inspections shall be carried out by the Employer to determine the extent of sludge accumulation in
the AWR dams. Should the dam capacity highly compromised, a decision shall then be made
to clean the AWR dams by removing the solid material to a designated site for dumping indicated by
Employer.
The following work shall be carried out:
necessary on site.
damaged during the cleaning.
narrowing of the existing walls during cleaning to ensure stability is maintained).
dam from both the AWR dam (Method statement of the Contractor will be accepted).
Employer.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
(housekeeping).
4.6 Cleaning of AWR (6 Million East and West) Dams
Inspections shall be carried out by the Employer to determine the extent of sludge accumulation in
the AWR dams. Should the dam capacity be highly compromised, then a decision shall be made to
clean the AWR dams by removing the solid material to a designated site for dumping indicated by
Employer
The following work shall be carried out:
necessary on site.
damaged during the cleaning.
narrowing of the existing walls during cleaning to ensure stability is maintained).
both the AWR dam (Method statement of the Contractor will be accepted).
Employer.
(housekeeping).
4.7 Cleaning of Ash Dam Filter Drains
Due to the water carrying silt particles during the draining process, scale forms in the drainage pipes
and this reduces the flow through the pipes. If not cleaned the scale increases so much such that
the drainage pipes block thus rendering the drainage pipe useless. It is therefore necessary to
periodically clean the drainage pipes to ensure that the flow through the pipes is as per design
(diameter of pipe not reduced by scale).
The following work shall be carried out:
when required’.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
that all blocked drains are unblocked.
Inspect the filter drains outlets after the cleaning to verify that the outlet flow has improved.
4.8 Cleaning of Ash Dam Penstock
Due to the water carrying silt particles during the draining process, scale forms in the drainage pipes
and this reduces the flow through the pipes. If not cleaned the scale increases so much such that
the drainage pipes block thus render the drainage pipe useless. It is therefore necessary to
periodically clean the drainage pipes to ensure that the flow through the pipes is as per design
(diameter of pipe not reduced by scale).
The following work shall be carried out:
line prior to cleaning.
the line as evident from the video footage taken.
‘as and when required’.
the decanting line once cleaning is completed.
4.9 Cleaning of Raw Water Reservoirs
The Employer shall carry out inspections on the reservoirs checking the extent of weeds, shrubs and
sludge that has accumulated in the reservoirs. Upon completion of the inspection, if the amount of
sludge, shrubs and weeds significantly affect the capacity and operability of the reservoirs overall,
an instruction shall then be issued to clean the reservoirs.
The following minimum actions shall be carried out by the Contractor for the execution of the works:
surveys which will clearly indicate the sludge mass and water volume).
Contractors Method Statement.
damaged during the cleaning.
all other components are not damaged during the cleaning. The Contractor shall be liable for
any damage caused to this infrastructure because of the cleaning activities.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
4.10 Cleaning of the Sludge Dams (Dry Beds) at Vaal Dam
The Employer shall carry out inspections to determine the extent of sludge accumulation in the
sludge dams. If the capacity of the sludge dams is identified to be compromised, then a decision
shall be made by the Employer to clean the sludge dams by removing the solid material (may be
dried sludge) to a designated site for dumping as instructed by the Employer.
The following shall be read as the scope by the Contractor:
dam.
the Contractor to the Employer.
damaged during the cleaning. The Contractor shall be liable for any damage caused to this
infrastructure because of the cleaning activities.
narrowing of the existing walls during cleaning to ensure stability is maintained)
acceptance by the Employer.
4.11 Cleaning of Clarifiers
The Employer shall carry out inspections to determine the extent of sludge in the clarifiers. A decision
will then be taken, when required, to clean the clarifiers by removing the sludge that has
accumulated. All removed sludge shall be deposited into the provided sludge dams.
The following shall be read as the scope by the Contractor for the works:
as identified in the method statement
the contractor’s method statement.
of the clarifiers.
damaged during the cleaning process.
4.12 Cleaning of the Primary and Secondary Chamber at the Oil Skimmer Plant
The Employer shall carry out inspections to determine the extent of silt in the primary and secondary
chambers. A decision will then be taken, when required, to clean the chambers by removing the silt
that has accumulated. All removed and uncontaminated silt shall be deposited into the ash dam.
Should the ash be contaminated, it must be deposited into a designated certified disposal site.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623 Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
The following shall be read as the scope by the Contractor for the works:
as identified in the method statement.
depicted in the contractor’s method statement.
of the chambers.
within the site is not damaged during the cleaning process.
4.13 Cleaning of the Surrounding Trenches around the Ash Dam Site
The following shall be read as the scope by the Contractor for the works:
as identified in the method statement.
damaged during the cleaning process.
4.14 Oil Skimmer Operators
The hiring of oil skimmer plant operators to operate and maintain the oil skimmer plant for a period
of 60 months. X8 operators are required in total. X2 operators will be working per 12Hours shift cycle
(day and night).
to the East Terrace Dam.
and vegetation) to be disposed at designated skips and disposal sites.
4.15 Employer’s Design/Specification
Below are the specifications detailing the dam type and capacities for each of the dams to be
cleaned:
Area Type Dimensions and Capacity
East Terrace Dam Earth Wall HDPE Lined (Clay Base) 43 000 m3
Coal Stockyard Dam Earth Wall HDPE Lined (Clay Base) 18 000 m3
South Terrace Dam Earth Wall HDPE Lined (Clay Base) 11600 m3
AWR 13 Million Dam Earth Wall with Clay Base 190 000m3
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623 Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
AWR 6 Million Dam Earth Wall 27 180m3
Penstocks Steel Pipeline 750mm Diameter
Filter Drains HDPE/Irrigation Earthenware 150mm Diameter
Capacity: 11 160m3, 6.1m
Clear Water reservoir Earth Dam, Unlined
high
Capacity: 160 000m3 each,
Terminal Reservoir Earth Dam, unlined 5.2m high
Sludge Dams Earth Ponds Unknown
Dimensions: 40 x 9 x 7m deep
Clarifiers Concrete Structures
Capacity: 2 520m3, 4 off
Ash Dam Trenches Concrete Lined Channels Total length: approx. 6100m
Dimensions:
Primary Chamber = 28 x 7.89
x 2.5m deep (Capacity: 553
Oil Skimmer Plant Concrete Structures m3)
Secondary Chambers = 40 x
23.34 x 2.5m deep (Capacity:
2334 m3)
4.16 Contractor’s Requirements
4.16.1 General
1. The Contractor takes full accountability and liability for the works as described in the scope
of works.
2. The Contractor is required to confirm and verify all information supplied by the Employer prior
to being used in the works.
3. The Contractor adheres to all design requirements, codes of standards and regulations
stated in this scope of works and those not stated but are applicable.
4. Any discrepancy or ambiguity between the Employer’s Specifications or requirements is to
be immediately brought to the attention of the Contracts Manager for clarification.
5. Where the Contractor requires additional information, the Contractor notifies the Contracts
Manager of the Contractor’s requirements a minimum of one (1) week before continuing with
the works.
6. Any damages to existing infrastructure and services resulting from the works is repaired/
made good by the Contractor at his own expense. This is subject to the Contractor supplying
a method statement for the repair works to the Project Manager for review and acceptance
prior to conducting the repair works.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
7. The Contractor quantifies the limitations and risks in the form of a detailed risk assessment,
which is reviewed and accepted by the Project Manager prior to commencing with
construction work.
4.17 Works Execution Requirements
4.17.1 General
The Contractor:
1. Adheres to the South African Environment Protection Act, the waste management code of
practice and the South African Occupational Health and Safety Act No. , the
regulations promulgated thereunder and Eskom Safety, Health, Environment and Quality
(SHEQ) Policy 32- 727 and Waste Management Procedure, as well as the National Building
Regulations and SANS 10400 for all works.
2. Submits a comprehensive method statement (including a comprehensive risk assessment)
detailing the proposed methods for the entire works to the Contracts Manager for acceptance
prior to the start of the works. Refer to Section 4.4.5 for method statement requirements.
3. Submits a project specific safety file to the Contracts Manager for comments / acceptance.
4. Submits a detailed level 3 schedule for the works to the Project Manager for acceptance after
contract award.
5. Takes all necessary precautions to ensure that none of the existing structures / facilities is
damaged during construction. The Contractor is liable for all damages that may occur and
repairs are to be done at no additional cost to the Employer.
6. The Contractor disposes of all waste material at a waste disposal site to be approved by the
Contract Manager. The waste disposal site is selected to suit the classification of the
materials to be disposed of. Certificates of disposal are required to be submitted to the
Contract Manager.
7. Continuously monitors the conditions within the working and surrounding areas for any
hazardous substances or situations, and in such case, the Contractor is required to take
necessary precautionary measures.
8. Manages access to the working areas and the Site.
9. Manages activities on Site to ensure that no interference takes place between the works and
that of others.
10. The Contractor is responsible for the design and erection of all the temporary supports
require for the works. In addition to the aforementioned, the Contractor adheres to the
following:
applicable regulations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
works execution
materials
control, until completion of the works
permission from the Project Manager. Modification in this sense includes, but is not limited
to the following:
➢ Welding onto existing plant,
➢ Drilling into structural steel or concrete,
➢ Cutting or removing
➢ Loading adjacent structures
➢ Excavating the Employers property
11. The Contractor ensures that a complete QCP, risk assessment, method statement and ITP’s,
where applicable are submitted to the Project Manager for review and acceptance before the
works can commence for each activity to be carried out. During reviews of the ITP’s, the
Project Manager provides the necessary intervention points.
4.17.2 Plant and Material Supply
1. The Contractor provides all plant, tools, and equipment for the handling of material and the
proper execution of the works.
2. The Contractor takes reasonable care to ensure that equipment used does not cause
damage to any existing infrastructure. In the event that such damages do occur to the
surrounding infrastructures, the Contractor is responsible for repairing such damages and is
liable for all costs associated with the repairs.
3. The Contractor is to supply, deliver, offload, and temporarily store (as may be required) all
materials needed to carry out the works.
4.17.3 Storage Facilities
1. The Contractor is to make his own arrangements regarding storage facilities and laydown
areas that are required to complete the works. All laydown areas on Site are as per
agreement with the Contract Manager.
2. All storage facilities (Plant, Material and Equipment) will be within the boundaries of the Site
in order not to affect the operations of Others.
4.17.4 Method Statement
1. As a tender returnable, the Contractor submits a Method Statement taking into consideration
the various requirements for the different plant areas as per the above listed areas.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
2. This Method Statement clearly illustrates how the Contractor accounts for the risks of the
activities and is tailored to address the specified project objectives and requirements.
3. The Method Statement includes, as a minimum and where applicable, the following:
completed by Others and accommodates for the completion of such work in his methodology.
access restrictions and safety requirements.
associated proposed mitigations.
types.
works, including (where applicable) his Project Manager, Site Quality Manager, Health and
Safety Officer, Supervisor, Environmental Officer, Transporter, and other personnel required
for the works.
operations, where applicable.
4. All Method Statements are reviewed and accepted by Contract Manager prior to commencing
any work.
4.18 Deliverables
The Contractor provides the following document deliverables as part of the works.
4.18.1 Tender Phase
The tenderer submits the following as a minimum in the tender submission:
1. Method Statement (including Programme, QCP and Risk Assessment) for the entire works
clearly demonstrating understanding of and compliance with the full scope as detailed in the
Scope of Works.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
2. Relevant experience in completion of similar projects. List of verifiable relevant references
(minimum of 3 projects) must be provided for works completed within the last 5 years.
References to include contact numbers and name of client, description of scope in the project
and the cost of the project as a minimum.
3. CV’s of the proposed key resources each having a minimum of 5 years’ relevant experience.
Copy of valid certificate to be provided. Organogram of site team to also be provided clearly
indicating the roles that the resources will fulfil in the project.
4. List of equipment the Contractor aims to utilise for each of the activities listed in the Scope of
work. The equipment list is to be provided with serial numbers for verification by the
Employer. Where the Contractor intends to hire such equipment, the Contractor provides a
letter of intent listing the required equipment signed by him and his supplier.
5. CIDB Registration of 8CE
4.18.2 Planning Phase for Each Activity
1. A Level 3 schedule (schedule with defined activities) for the design scope clearly highlighting
all activities involved, major milestones and provision.
2. Detailed Method Statement for the execution of the works.
3. Risk Assessment
4. Project Quality Control Plan.
4.18.3 Pre-Task Completion
1. A Bathymetry Survey is to be completed on each of the dams to determine the amount of silt
accumulated.
2. Detailed method statements for the execution of the identified works
3. Inspection and Test Plans (ITP's) indicating all intervention points
4. Quality Control Plans (QCP's)
5. Programme detailing works execution
6. Task Specific Safety File (updated)
7. Any temporary works required as part of construction signed by a qualified person
8. Detailed Risk Assessments (updated)
9. Visual Assessment Report which forms part of the package
4.18.4 Post Task Completion
1. For dam cleaning, a Bathymetry Survey shall be completed verifying that the dam has been
cleaned to the satisfaction of the Employer.
2. A CCTV inspection showing that the Penstock and filter drains have been cleaned to the
Employers Satisfaction.
5. Acceptance
This document has been seen and accepted by:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains and
Channel Cleaning SoW Revision: 1
Page:
Full Name and Surname Designation
Mpho Taje Civil Engineer
Menelisi Mkhabela Auxiliary Engineering Line Manager
Thabo Montja Engineering Manager
Sibongile Nkosi Coal Management Manager
Nondumiso Buthelezi Document Controller
6. Revisions
Date Rev. Compiler Remarks
Feb 2025 1 Mpho Taje Final document
7. Development Team
The following people were involved in the development of this document:
8. Acknowledgements (if applicable)
N/a
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Methodology
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdfLimited, Reg No 2002/015527/30.
Unique Identifier: GVL/0623Grootvlei Power Station: Dams, Drains
And Channel Cleaning Revision: 1
Page:
Content . Introduction ............................................................................................................................... 4
2. Supporting Clauses ................................................................................................................... 4
2.1 Scope ............................................................................................................................... 4
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ............................................................................................................ 4
2.2 Normative/Informative References .................................................................................... 4
2.2.1 Normative .............................................................................................................. 4
2.2.2 Informative ............................................................................................................. 5
2.3 Definitions ......................................................................................................................... 5
2.3.1 Disclosure Classification: ....................................................................................... 5
2.4 Abbreviations .................................................................................................................... 5
2.5 Roles and Responsibilities ................................................................................................ 5
2.6 Process for Monitoring ...................................................................................................... 5
2.7 Related/Supporting Documents ........................................................................................ 5
3. Employers Objectives and Purpose of the Works ...................................................................... 5
4. Scope of Works ........................................................................................................................ 6
4.1 Description of the Works ................................................................................................... 6
4.2 Cleaning of the East Terrace Dam .................................................................................... 6
4.3 Cleaning of the Coal Stockyard Dam ................................................................................ 7
4.4 Cleaning of the South Terrace Dam .................................................................................. 8
4.5 Cleaning of AWR (13 Million East and West) Dams .......................................................... 9
4.6 Cleaning of AWR (6 Million East and West) Dams .......................................................... 10
4.7 Cleaning of Ash Dam Filter Drains .................................................................................. 10
4.8 Cleaning of Ash Dam Penstock....................................................................................... 11
4.9 Cleaning of Raw Water Reservoirs ................................................................................. 11
4.10 Cleaning of the Sludge Dams (Dry Beds) at Vaal Dam .................................................... 12
4.11 Cleaning of Clarifiers ....................................................................................................... 12
4.12 Cleaning of the Primary and Secondary Chamber at the Oil Skimmer Plant .................... 12
4.13 Cleaning of the Surrounding Trenches around the Ash Dam Site .................................... 13
4.14 Oil Skimmer Operators ................................................................................................... 13
4.15 Employer’s Design/Specification ................................................................................................ 13
4.16 Contractor’s Requirements .......................................................................................................... 14
4.16.1 General ................................................................................................................ 14
4.17 Works Execution Requirements ...................................................................................... 15
4.17.1 General ................................................................................................................ 15
4.17.2 Plant and Material Supply .................................................................................... 16
4.17.3 Storage Facilities ................................................................................................. 16
4.17.4 Method Statement................................................................................................ 16
4.18 Deliverables .................................................................................................................... 17
4.18.1 Tender Phase ...................................................................................................... 17
necessary on site.
damaged during the cleaning.
narrowing of the existing walls during cleaning to ensure stability is maintained).
dam from both the AWR dam (Method statement of the Contractor will be accepted).
necessary on site.
damaged during the cleaning.
narrowing of the existing walls during cleaning to ensure stability is maintained).
both the AWR dam (Method statement of the Contractor will be accepted).
dam.
the Contractor to the Employer.
damaged during the cleaning. The Contractor shall be liable for any damage caused to this
infrastructure because of the cleaning activities.
narrowing of the existing walls during cleaning to ensure stability is maintained)
acceptance by the Employer.
4.11 Cleaning of Clarifiers
as identified in the method statement
the contractor’s method statement.
of the clarifiers.
damaged during the cleaning process.
4.12 Cleaning of the Primary and Secondary Chamber at the Oil Skimmer Plant
as identified in the method statement.
depicted in the contractor’s method statement.
of the chambers.
within the site is not damaged during the cleaning process.
4.13 Cleaning of the Surrounding Trenches around the Ash Dam Site
made good by the Contractor at his own expense. This is subject to the Contractor supplying
a method statement for the repair works to the Project Manager for review and acceptance
prior to conducting the repair works.
areas that are required to complete the works. All laydown areas on Site are as per
agreement with the Contract Manager.
2. All storage facilities (Plant, Material and Equipment) will be within the boundaries of the Site
in order not to affect the operations of Others.
4.17.4 Method Statement
Compliance Requirements
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown)No specific requirements found
B-BBEE Minimum Level: 3
Health & Safety
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdffollowing paragraphs.
2.2.1 Normative
[1] Eskom Health, Environment and Quality (SHEQ) Policy 32-727
[2] ISO 9001 Quality Management Systems
[3] National Environmental Management Act (NEMA)
[4] Construction Regulations, 2014
[5] Occupational Health and Safety Act No.
[6] 240-99527377: Inspection Manual for Civil Works at Eskom’s Power Station
Management code of practice and the South African Occupational Health and Safety Act No. 85
(OHS Act), the regulations promulgated thereunder and Eskom Health, Environment and Quality
(SHEQ) Policy 32-727 for removal, separation and disposal of scrap, waste and hazardous
materials.
practice and the South African Occupational Health and Safety Act No. , the
regulations promulgated thereunder and Eskom Safety, Health, Environment and Quality
(SHEQ) Policy 32- 727 and Waste Management Procedure, as well as the National Building
Regulations and SANS 10400 for all works.
2. Submits a comprehensive method statement (including a comprehensive risk assessment)
detailing the proposed methods for the entire works to the Contracts Manager for acceptance
prior to the start of the works. Refer to Section 4.4.5 for method statement requirements.
hazardous substances or situations, and in such case, the Contractor is required to take
necessary precautionary measures.
6. Task Specific Safety File (updated)
8. Detailed Risk Assessments (updated)
Requirements
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf (unknown)East Terrace Dam Earth Wall HDPE Lined (Clay Base) 43 000 m3
Coal Stockyard Dam Earth Wall HDPE Lined (Clay Base) 18 000 m3
South Terrace Dam Earth Wall HDPE Lined (Clay Base) 11600 m3
AWR 13 Million Dam Earth Wall with Clay Base 190 000m3
AWR 6 Million Dam Earth Wall 27 180m3
Penstocks Steel Pipeline 750mm Diameter
Filter Drains HDPE/Irrigation Earthenware 150mm Diameter
Capacity: 11 160m3, 6.1m high
Capacity: 160 000m3 each, Terminal Reservoir Earth Dam, unlined 5.2m high
Dimensions: 40 x 9 x 7m deep
Capacity: 2 520m3, 4 off
Ash Dam Trenches Concrete Lined Channels Total length: approx. 6100m
Primary Chamber = 28 x 7.89 x 2.5m deep (Capacity: 553 m3)
Oil Skimmer Plant Concrete Structures
Secondary Chambers = 40 x 23.34 x 2.5m deep (Capacity: 2334 m3)
Section
Source: GVL 0623 Revised_Dams Cleaning Scope of Work 2025.._.pdf[1] Eskom Health, Environment and Quality (SHEQ) Policy 32-727
[2] ISO 9001 Quality Management Systems
The Contractor submits a quality control plan for approval by Employer.
Description
Source: Environmental Requirements Dams, Drains and Channel Cleaning.pdfEnvironmental Requirements: Dams, Drains and Channel Cleaning
Evaluation Criteria
Source: Environmental Requirements Dams, Drains and Channel Cleaning.pdf (unknown)Environmental Knowledge
Contractor must have personnel with basic environmental knowledge.
Legal Compliance
Must demonstrate ability to comply with NEMA and other environmental laws.
Waste Management Plan
Must provide a sludge and dredged material management plan.
Incident Response
Must have a system in place for environmental incident reporting and management.
Audit Participation
Must be willing to participate in Eskom’s environmental audits and corrective actions.
Technical Specifications
Source: Environmental Requirements Dams, Drains and Channel Cleaning.pdf (unknown)Quality Management
Source: Environmental Requirements Dams, Drains and Channel Cleaning.pdfCompliance Requirements
Source: Environmental Requirements Dams, Drains and Channel Cleaning.pdf (unknown)Description
Source: 240-105658000 Supplier Quality Management Specification.pdfImportant Dates
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Contact Information
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Returnable Documents
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Certification
Suppliers must hold a valid ISO 9001 certification (or equivalent QMS standard) unless excluded by the tender category.
Experience
Evidence of prior experience in similar cleaning services for industrial or power station environments may be required.
Capacity
Demonstrated capability and capacity to handle the scope of work, including resources, personnel, and equipment.
Compliance
Compliance with Eskom’s SHEQ (Safety, Health, Environment, and Quality) policies and relevant South African regulations.
Sub Supplier Management
Ability to manage and monitor sub-suppliers to ensure their compliance with Eskom’s quality and technical requirements.
Legal And Financial
Suppliers must meet Eskom’s legal and financial eligibility criteria, including registration on the Eskom supplier database.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Methodology
Source: 240-105658000 Supplier Quality Management Specification.pdfExperience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification.pdfQuality Management
Source: 240-105658000 Supplier Quality Management Specification.pdfCompliance Requirements
Source: 240-105658000 Supplier Quality Management Specification.pdf (unknown)Health & Safety
Source: 240-105658000 Supplier Quality Management Specification.pdfContractual Terms
Source: 240-105658000 Supplier Quality Management Specification.pdfSection
Source: 240-105658000 Supplier Quality Management Specification.pdfDescription
Source: Invitation to tender-Dam Raging.pdfImportant Dates
Source: Invitation to tender-Dam Raging.pdf (RFP)Contact Information
Source: Invitation to tender-Dam Raging.pdf (RFP)Submission Guidelines
Source: Invitation to tender-Dam Raging.pdf (RFP)Evaluation Criteria
Source: Invitation to tender-Dam Raging.pdf (RFP)General
Specific
Technical Specifications
Source: Invitation to tender-Dam Raging.pdf (RFP)Methodology
Source: Invitation to tender-Dam Raging.pdfQuality Management
Source: Invitation to tender-Dam Raging.pdfPricing Schedule
Source: Invitation to tender-Dam Raging.pdfFinancial Requirements
Source: Invitation to tender-Dam Raging.pdf (RFP)Compliance Requirements
Source: Invitation to tender-Dam Raging.pdf (RFP)Health & Safety
Source: Invitation to tender-Dam Raging.pdfEnvironmental
Source: Invitation to tender-Dam Raging.pdfContractual Terms
Source: Invitation to tender-Dam Raging.pdfSection
Source: Invitation to tender-Dam Raging.pdfDescription
Source: High Risk OHS Specification Dam Cleaning.pdfEvaluation Criteria
Source: High Risk OHS Specification Dam Cleaning.pdf (unknown)General
Compliance
Certifications
Technical Specifications
Source: High Risk OHS Specification Dam Cleaning.pdf (unknown)Experience & Qualifications
Source: High Risk OHS Specification Dam Cleaning.pdfQuality Management
Source: High Risk OHS Specification Dam Cleaning.pdfPricing Schedule
Source: High Risk OHS Specification Dam Cleaning.pdfFinancial Requirements
Source: High Risk OHS Specification Dam Cleaning.pdf (unknown)Compliance Requirements
Source: High Risk OHS Specification Dam Cleaning.pdf (unknown)Health & Safety
Source: High Risk OHS Specification Dam Cleaning.pdfEnvironmental
Source: High Risk OHS Specification Dam Cleaning.pdfContractual Terms
Source: High Risk OHS Specification Dam Cleaning.pdfRequirements
Source: High Risk OHS Specification Dam Cleaning.pdf (unknown)2.2 NORMATIVE/INFORMATIVE REFERENCES paragraphs.
Description
Source: NEC TSC Document- Ash dam cleaning.pdfImportant Dates
Source: NEC TSC Document- Ash dam cleaning.pdf (unknown)Contact Information
Source: NEC TSC Document- Ash dam cleaning.pdf (unknown)Evaluation Criteria
Source: NEC TSC Document- Ash dam cleaning.pdf (unknown)Legal
Financial
Technical
B-BBEE
Technical Specifications
Source: NEC TSC Document- Ash dam cleaning.pdf (unknown)Methodology
Source: NEC TSC Document- Ash dam cleaning.pdfExperience & Qualifications
Source: NEC TSC Document- Ash dam cleaning.pdfQuality Management
Source: NEC TSC Document- Ash dam cleaning.pdfPricing Schedule
Source: NEC TSC Document- Ash dam cleaning.pdfFinancial Requirements
Source: NEC TSC Document- Ash dam cleaning.pdf (unknown)Compliance Requirements
Source: NEC TSC Document- Ash dam cleaning.pdf (unknown)Health & Safety
Source: NEC TSC Document- Ash dam cleaning.pdfEnvironmental
Source: NEC TSC Document- Ash dam cleaning.pdfContractual Terms
Source: NEC TSC Document- Ash dam cleaning.pdfSection
Source: NEC TSC Document- Ash dam cleaning.pdfData conflicts
None detected