Submissions closed on 12 June 2026. The information below is archived for reference.
Our AI analyzes thousands of tenders and finds the ones YOUR company can actually win
AI Match Scoring
Get a compatibility score for every new tender
Instant Notifications
Get alerted when 85%+ matches appear
Gap Analysis
See exactly what you need to qualify
B-BBEE Matching
Tenders matched to your certification level
Province Targeting
Only see tenders in your regions
Document Readiness
Know if you have required docs before using AI assistance
Reference
iLABS/RFQ 2026/27:29R
Organization
National Research Foundation
Province
Western Cape
Closed
12 June 2026
Categories
Don't worry! Here are similar opportunities still open for submission
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: RFQ-Air Compressor.pdf (RFQ)Date Issued: 09 June 2026 Supply and Delivery of 200L 2.2 KW (3 HP) 230 V Belt Driven Description of Services/ Goods: Mobile Air Compressor ( 1 Unit)
Important Dates
Source: RFQ-Air Compressor.pdf (RFQ){"closingDate":"12 June 2026","closingTime":"11:00 am"}
Briefing Session
Source: RFQ-Air Compressor.pdf (RFQ)Suppliersβ guide to submitting e-Submission Bids TABLE OF CONTENTS
Contact Information
Source: RFQ-Air Compressor.pdf (RFQ){"name":"Contact Tel","email":"[email protected]","phone":"021 843 1000","department":"Supply Chain Management","address":"Driven"}
Submission Guidelines
Source: RFQ-Air Compressor.pdf (RFQ)Returnable Documents: o CSD and tax complaint status PIN are the approved methods of verifying the tax, CSD Supplier Number: MAAA................................................, YesBidders Disclosure (SBD 4), signed and completed. M β, Preference Points Claimed (SBD 6.1), signed and completed with BBBEE Yes O β, Pricing Schedule
Returnable Documents
Source: RFQ-Air Compressor.pdf (RFQ)Supplier Name: .................................................................................... Request For Quotation Number: iLABS/RFQ 2026/27:29R
Evaluation Criteria
Source: RFQ-Air Compressor.pdf (RFQ)General
B-BBEE
Legal
Technical Specifications
Source: RFQ-Air Compressor.pdf (RFQ)ο Supply and Delivery of 200L 2.2 KW (3 HP) 230 V Belt Driven Mobile Air Compressor ( 1 Unit) to
include an Auto Drainer
Pricing Schedule
Source: RFQ-Air Compressor.pdfNo. Supplier Specifications include Quantity Price Per Unit Total
Model if applicable (Incl. VAT) (Incl. VAT)
1. R r
2. R r
3. R r
Delivery Charge 4. R R
Total (VAT inclusive) r
of 31
Standard bidding document (sbd) 4
Bidderβs disclosure
1. Purpose of the form
Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In line
with the principles of transparency, accountability, impartiality, and ethics as enshrined in the
Constitution of the Republic of South Africa and further expressed in various pieces of legislation,
it is required for the bidder to make this declaration in respect of the details required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted
Suppliers, that person will automatically be disqualified from the bid process.
2. Bidderβs declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any
person having a controlling interest1 in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state
employee numbers of sole proprietor/ directors / trustees / shareholders / members/ partners
or any person having a controlling interest in the enterprise, in table below.
Full Name Identity Number Name of State institution
1 the power, by one person or a group of persons holding the majority
of the equity of an enterprise, alternatively, the person/s having
the deciding vote or power to influence or to direct the course and
decisions of the enterprise.
5/4/2/1 of 31
2.2 Do you, or any person connected with the bidder, have a relationship with any person who is
employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any
person having a controlling interest in the enterprise have any interest in any other related
enterprise whether or not they are bidding for this contract? YES/NO
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
Financial Requirements
Source: RFQ-Air Compressor.pdf (RFQ)Payment Terms: Payment terms are 30 days from date of invoice received date
o As schedule 3A public entity: Payments terms are 30 days from date of
invoices (should you be awarded).
o Should your conditions differ i.e. shorter payment terms, your organisation will
be requested to submit a Payment Guarantee to mitigate all risks.
o Or shorter payment of 7/14days from deli
Compliance Requirements
Source: RFQ-Air Compressor.pdf (RFQ)tax compliance status of a bidder
Central supplier database (csd)
Central Supplier Database in order to do business with
Central Supplier Database (CSD) registered email address
Central Supplier Database (CSD) login password
CSD Supplier Number: MAAA................................................
YesBidders Disclosure (SBD 4), signed and completed. M β
Preference Points Claimed (SBD 6.1), signed and completed with BBBEE Yes O β
Pricing Schedule
Registration on the central supplier database (csd)
The bidder must be on the National Treasuryβs Central Supplier Database in order to do business with
the NRF and for the NRF to award a bid and sign the subsequent contract. Registration on the CSD
(www.csd.gov.za) is compulsory and bids from unregistered bidders are not considered.
National Treasury Contact Details: +27 (0) 12 406 9222 or email [email protected]
Points Allocation: 80 points
B-BBEE Details: the Business Unit responsible for this RFQ
iThemba LABS (Laboratory for Accelerator-Based Sciences) is a multi-disciplinary research laboratory
based at two sites in the Western Cape and Gauteng respectively, these provide facilities for:
Evaluation Process
All proposals will be evaluated by Supply Chain Management for administrative compliance,
functionality, price and B-BBEE. Based on the results of the evaluation process and upon
successful negotiations, iThemba LABS will approve the awarding of the contract to the
successful bidder.
The 80/20 preference point system will be used where 80 points will be dedicated to price and 20
points to B-BBEE status. If all bids received are more than R 1 000 000.00, this request is
automatically cancelledββ.
Subject to section 2(1)(f) of the PPPFA, the contract will be awarded to the tenderer scoring the
highest points.
No price quotations or competitive bids shall be awarded to business or persons who are not tax
complaint.
o CSD and tax complaint status PIN are the approved methods of verifying the tax
compliance status of a bidder.
of 31
Name of Supplier:
Valid Compliant Tax pin:
Address of Supplier:
Contact Person:
Contact Tel:
Email Address:
CSD Supplier Number: MAAA................................................
Lead Time for delivery
Currency: ZAR
Payment terms: 30 days from date of receipt of invoice
Administrative Compliance Returnable Documents Submitted
(M β Mandatory); (O β Optional)
YesBidders Disclosure (SBD 4), signed and completed. M β
B-BBEE Requirements
Source: RFQ-Air Compressor.pdf (RFQ)Submit your B - BBEE Certificate as accredited with SANAS or Sworn affidavit if you are claiming for specific goals.
Contractual Terms
Source: RFQ-Air Compressor.pdf (RFQ)This request for formal quotation is subject to the Preferential Procurement Policy Framework Act (PPPFA) and The Preferential Procurement Regulations, 2022, The General Conditions of Contract (GCC and, if applicable, any other special Conditions of Contract.
Special Conditions
Source: RFQ-Air Compressor.pdf (RFQ)3 DECLARATION I, the undersigned, (name)............................................................................... in submitting the accompanying bid, do hereby make the following statements that I certify to be true and complete in every respect: 3.1 I have read and I understand the contents of this disclosure; 3.2 I understand that the accompanying bid will be disqualified if this disclosure is found not to be true and complete in every respect; 3.3 The bidder has arrived at the accompanying bid independently from, and without consultation, communication, agreement or arrangement with any competitor. However, communication between partners in a joint venture or consortium will not be construed as collusive bidding. 3.4 In addition, there have been no consultations, communications, agreements or arrangements with any competitor regarding the quality, quantity, specifications, prices, including methods, factors or formulas used to calculate prices, market allocation, the intention or decision to submit or not to submit the bid, bidding with the intention not to win the bid and conditions or delivery particulars of the products or services to which this bid invitation relates. 3.4 The terms of the accompanying bid have not been, and will not be, disclosed by the bidder, directly or indirectly, to any competitor, prior to the date and time of the official bid opening or of the awarding of the contract. 3.5 There have been no consultations, communications, agreements or arrangements made by the bidder with any official of the procuring institution in relation to this procurement process prior to and during the bidding process except to provide clarification on the bid submitted where so required by the institution; and the bidder was not involved in the drafting of the specifications or terms of reference for this bid. 3.6 I am aware that, in addition and without prejudice to any other remedy provided to combat any restrictive practices related to bids and contracts, bids that are suspicious will be reported to the Competition Commission for investigation and possible imposition of administrative penalties in terms of section 59 of the Competition Act No and or may be reported to the National Prosecuting Authority (NPA) for criminal investigation and or may be restricted from conducting business with the public sector for a period not exceeding ten (10) years in terms of the Prevention and Combating of Corrupt Activities Act No or any other applicable legislation.
Requirements
Source: RFQ-Air Compressor.pdf (RFQ)Bidder / service provider / supplier that fails to provide mandatory RFQ requirements may be disqualified. Changes made by the / service provider/supplier to the RFQ template and its terms and conditions will not be considered after the closing date and time Provide CSD Summary Report (www.csd.gov.za )
Section
Source: RFQ-Air Compressor.pdfEvaluation Process
functionality, price and B-BBEE. Based on the results of the evaluation process and upon
The 80/20 preference point system will be used where 80 points will be dedicated to price and 20
points to B-BBEE status. If all bids received are more than R 1 000 000.00, this request is
Subject to section 2(1)(f) of the PPPFA, the contract will be awarded to the tenderer scoring the
highest points.
Preference Points Claimed (SBD 6.1), signed and completed with BBBEE Yes O β
Applicable is 80/20
claiming for specific goals.
o SBD 6.1 β Preference Points Claim (South African Companies Only)
Act (PPPFA) and The Preferential Procurement Regulations, 2022, The General Conditions of
a claim form for preference points for specific goals.
1.1 The following preference point systems are applicable to invitations to tender
the 80/20 system for requirements with a Rand value of up to R50 000 000 (all
The 90/10 system for requirements with a Rand value above R50 000 000 (all
1.2 The applicable preference point system for this tender is the 80/20 preference point system.
1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall be
(b) Specific Goals.
1.4 The maximum points for this tender are allocated as follows
Specific goals 20
Total points for Price and SPECIFIC GOALS 100
tender to claim points for specific goals with the tender, will be interpreted to mean that
preference points for specific goals are not claimed.
Government tenders in the Supplies: General sector represent significant opportunities for South African businesses. The South African government regularly procures goods and services through the eTender portal, making it essential for businesses to stay informed about new opportunities.
Get weekly tender digests and industry insights delivered to your inbox.
Subscribe for Free