This tender has been awarded to Rentokil Initial for Undisclosed Amount.
Issuing Organization
ESKOM
Location
Western Cape
Award Date
1 January 1900
Rentokil Initial
Award Date
1 January 1900
Status
Active / AwardedScoring
eTenders ID
1913
GOVERNMENT
Get a full report on Rentokil Initial including tender win history, total contract values, and bidding patterns.
Tender for Substation protection testing and maintenance within the George Municipal areas as and when required, from date of appointment until 30 June 2029
Appointment of a Service Provider for the Printing and Delivery of Water Saving Awareness Flyers
Appointment of a Panel of Service Providers for the Maintenance and Repair Services for Water Pumps, Swimming Pool Pumps, and Electrical Systems at Garden Route District Municipality -owned Properties for a Period of Three Years.
Appointment of a Service Provider for the Supply and Delivery of Fuel
Service: Procurement for the Supply and Delivery of 40 X Laptops
Learn how to submit a winning bid with these related articles
Gauteng’s 2026 infrastructure pipeline exceeds R65 billion, yet 42% of General-category bids fail at compliance screening. With National Treasury’s April 2026 Preferential Procurement Policy Framework Act (PPPFA) amendments now in force, every supplier engaged in provincial construction, maintenance, and facilities-management work must recalibrate their documentation matrix. Misinterpreting the revised 80/20 and 90/10 preference point thresholds, or submitting outdated BBBEE affidavits, triggers automatic disqualification—costing contractors both tender costs and opportunity value in the country’s most competitive procurement marketplace.
CIDB grading is no longer a “nice-to-have” in Gauteng—every tender from the Department of Infrastructure, City of Johannesburg, Ekurhuleni and Tshwane explicitly calls for the CIDB grade on page 1 of the SBD 1 form. In 2026 the provincial audit units run automated checks against the CIDB iEnabler database; if the grade on your submission does not match the CIDB record, the bid is culled before technical evaluation even opens. One keystroke error—an “8” instead of a “7”—and your envelope is shredded. That is why this guide exists.
Compulsory briefing sessions have become the single most lethal filter in Gauteng’s 2026 procurement cycle. With National Treasury’s 2025 directive requiring organs of state to verify physical attendance through digital attendance certificates, non-attendance now triggers an immediate disqualification—no exceptions, no late submissions, no “technical oversight” appeals. For General contractors bidding in Gauteng’s R12.8 billion infrastructure pipeline this year, understanding the exact legal requirements is not a formality; it is the difference between compliant submission and automatic exclusion.
From AI matching to competitive intelligence — here's how every part of Tenders-SA works together to give South African businesses a real edge in procurement.
💡 Want more tendering tips and strategies?
Explore Our BlogThe provision of dry cleaning and laundry services at Eskom Transmission, Simmerpan, Victoria Lake Inn on, as and when required basis.
Onsite Machining and line boring at Drakensberg Pumped Storage Scheme for a period of 5 years
The Supply and Delivery of Fluorescent Sulphur Dioxide (so2), Chemiluminescence Nitrogen Oxide (nox) and Ozone (o3) Analyser for Research, Testing & Development Rt&d.
Supply and Delivery of 7x Fine Particulate Dust Samplers/monitors Capable of Both Measuring Pm2.5 and Pm10 Simultaneously for Air Quality Monitoring Network for a Period of Six (6) Months
Tender Validity Extension - The panel appointment of thirty-seven (37) consultants for the provision of Environmental Management Services (EMS) within Central East Cluster (Kwa-Zulu Natal and Free State Operating Units), on an “as and when” required basis for a period of five (5) years.
Request for Quotations (rfq) for the Supply, Delivery and Maintenance of Office Plants to Ensure That the Facilities Are Maintained in a Clean, Healthy, and Safe Pleasing Appearance From 1 January 2025 Until 31 December 2027 (36 Months)