Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Passenger Rail Agency of South Africa (PRASA)Location
Gauteng
Closing Date
24 Jun 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Cnr Leyds and Simmonds street - Braamfontein - Johannesburg - 2001
Organization Type
GOVERNMENT
Published
17 Jun 2026
OCDS Reference
ocds-9t57fa-159298
The passenger rail agency of south africa (PRASA) invites bids for the calibration and repair of speed monitoring machines used in train operations. This RFQ targets suppliers capable of meeting strict technical, safety, and compliance standards for railway environments.
Date & Time
Wednesday, 24 June 2026 - 10:00
Venue
null
Categories
Request for Quotation
Cnr Leyds and Simmonds street - Braamfontein - Johannesburg - 2001
17 Jun
2026
Tender Published
Tender was published
24 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf
The Passenger Rail Agency of South Africa (PRASA) has issued a Request for Quotation (RFQ) for the calibration and repair of speed monitoring machines. The tender (RFQ NUMBER: 04/117/26/GAU-TO) closes on 24 June 2026 at 10:00 AM CAT. Bids must be hand-delivered to Ground Floor Shosholoza Meyl Junction, Braamfontein. The scope includes technical calibration (e.g., speed accuracy ±2 km/h, ISO/IEC 17050-1 certification) and repairs (OEM parts, firmware updates, tamper-proofing) for equipment operating in rail environments with strict safety standards (e.g., IP67 rating, Class 1 FDA Eye-Safe). Evaluation is based on compliance (Stage 1), technical/functional requirements (60% threshold, Stage 2), and price/specific goals (80/20 weighting, Stage 3). Preference points are awarded for B-BBEE compliance (e.g., Black Woman Owned, EME/QSE 51% Black Owned).
Median Estimate
R 462 369
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogTenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdfTrain operation speed monitoring
Calibrations and repair
The Calibration and maintenance specifications
include:
1. Technical Performance Specifications
environments
2. Routine Calibration Protocol
with theinfrared Lidar laser beam at all
distances.
typically checked using a standard
timing/distance generator.
intervals and issued a traceable ISO/IEC
17050-1 or similar SANAS/NIST calibration
certificate.
12 Months.
2. Repair Requirements
Accreditation:
All hardware repairs must be handled by OEM-
certified or legally accredited metrology
laboratories.
Request For Quotation SCM_2024
Component Replacement:
Damaged batteries, cracked lenses, or degraded
laser diodes must be replaced with OEM parts.
Firmware/Software:
Microcontroller units must be updated to the latest
manufacturer firmware.
Tamper-proofing: Following internal diagnostics
and repairs, anti-tamper seals must be applied
before deployment in the field.
4. Rail Environment Constraints
Operating speed enforcement and condition
monitoring equipment near railway (PRASA
networks) means suppliers must comply with
specialized safety standards:
tests protecting against electromagnetic
interference from catenaries and signaling
systems.
Eye & Safety Constraints: Work procedures must
adhere to strict environmental and human-safety
Transnet Freight Rail (TFR) Specifications
Request For Quotation SCM_2024
Section 10
Boq/ pricing schedule
Ite uom qty total
Description unit price
M amount
NO r c r c
Speed Monitoring Machines Each
1 06 calibration
Each
2 Speed Monitoring Repairs 06
Total
VAT 15%
Grand total
Request For Quotation SCM_2024
Important Dates
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)Briefing Session
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)and has / have acquainted himself / themselves with the Contract, Project Specification / Special carrying out of the proposed WORKS to which the enquiry relates THUS, DONE and SIGNED at ________________________________________________ on this _________________ day of ___________________________ DULY AUTHORISED SIGNATORY(IES) WITNESSES 1. ___________________________________ 1. __________________________ 2. ___________________________________ 2. __________________________ 3. ___________________________________ 3. __________________________
Contact Information
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)Submission Guidelines
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)Returnable Documents
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)BID RESPONSE DOCUMENTS MAY BE DEPOSITED IN THE BID BOX SITUATED AT (STREET ADDRESS): on or before closing date and time. No late RFQ will be accepted. No email or Fax will be accepted.
Evaluation Criteria
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)General
Compliance
Technical Specifications
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)Experience & Qualifications
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdfdate, project end date, 100
4: 3 Similar projects= 60 points
extension of time where
applicable, and contract value 5: 4 Similar projects = 80 points
inclusive of VAT. 6: 5 and above Similar projects=100
Furthermore, attach a points
completion certificate signed
by the client or a letter from
the client confirming the
successful completion of the
project.)
3 Stage 3- Price and Specific Goals Evaluation.
1. Price and Specific Goals
The following formula shall be used to allocate scores to the interested bidders:
The maximum points for this tender are as follows:
Details points
Price 80
Specific goals 20
Total points for price and 100
The score will be based on successfully (N.B. Provide for each
successfully completed executed and completed similar
project/s in the following projects.
sequence: Copy of an
1: Zero (0) Similar Projects/non- appointment letter/s (on
company letterhead), submission/incomplete submission=
description of the project/ 0
office number), Project start 3: 2 Similar projects =40 points
Experience
date, project end date, 100
4: 3 Similar projects= 60 points
extension of time where
applicable, and contract value 5: 4 Similar projects = 80 points
inclusive of VAT. 6: 5 and above Similar projects=100
4.1 Section 2(1)(f) of the PPPFA empowers an organ of state to award a tender to the highest
scoring bidder unless there is an objective criterion that justifies the award to another tender.
4.2 PRASA reserves the right to apply the objective criteria for this bid.
4.3 PRASA may award a bid to a bidder that did not score the highest points under the following
circumstances:
a) A negative track record of the bidder in other related projects.
Request For Quotation SCM_2024
b) spreading the award to bidders that have not been previously appointed.
c) the need to avoid concentrating on awards to the previously appointed bidders. Prasa shall
consider the following:
i. the number of bid(s) awarded to the highest scoring bidder(s) in the preceding financial
years.
ii. the capacity of the highest scoring bidder(s) despite the previous appointments.
iii. the value and scope of the bid(s) already awarded to the highest scoring bidder(s).
iv. the materiality of the price difference between the highest scoring bidder and other bidders;
and
v. whether the goods, services or works are of a specialized nature.
Quality Management
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)SECTION 09 SCOPE OF WORK certified or legally accredited metrology laboratories.
Pricing Schedule
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)(Failure to completed and provide these Mandatory Returnable forms at the Closing Date and time of this RFQ will result in a bidder ’s disqualification) may not award the contract to the Bidder. PRASA may: the second highest points. market-related price with the Bidder scoring the third highest points. cancel the RFQ.
Financial Requirements
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)Compliance Requirements
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)B-BBEE Requirements
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)SECTION 7 SBD 6.1 as a claim form for preference points for specific goals. NB: BEFORE COMPLETING THIS FORM, TENDERERS MUST STUDY THE GENERAL AND PREFERENTIAL PROCUREMENT REGULATIONS, 2022 1.1 The following preference point systems are applicable to invitations to tender: - the 80/20 system for requirements with a Rand value of up to R50 000 000 (all applicable taxes included); and - the 90/10 system for requirements with a Rand value above R50 000 000 (all applicable taxes included). 1.2 To be completed by the organ of state a) The applicable preference point system for this tender is the 80/20 preference point system. b) The 80/20 preference point system will be applicable in this tender. The lowest/ highest acceptable tender will be used to determine the accurate system once tenders are received. 1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall be awarded for: (a) Price; and (b) Specific Goals. 1.4 To be completed by the organ of state: PRICE 80 SPECIFIC GOALS 20 Total points for Price and Specific Goals 100 1.5 Failure on the part of a tenderer to submit proof or documentation required in terms of this tender to claim points for specific goals with the tender, will be interpreted to mean that preference points for specific goals are not claimed. 1.6 The organ of state reserves the right to require of a tenderer, either before a tender is adjudicated or at any time subsequently, to substantiate any claim in regard to preferences, in any manner required by the organ of state.
Health & Safety
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdfrequested to do so, PRASA reserves the right to award the business to the next highest ranked bidder
provided that he/she/it is still prepared to provide the required goods at the quoted price.
or rejection by PRASA’s Legal Counsel, prior to consideration for an award of business.
10 national treasury’s central supplier database
Bidders are required to self-register on National Treasury’s Central Supplier Database (CSD) which has
been established to centrally administer supplier information for all organs of state and facilitate the
verification of certain key supplier information. PRASA is required to ensure that price quotations are invited
and accepted from prospective bidders listed on the CSD. Business may not be awarded to a bidder who
has failed to register on the CSD. Only foreign suppliers with no local registered entity need not register on
the CSD. The CSD can be accessed at https://secure.csd.gov.za/.
the Exposure/Influence Exposure/Influence
3.4 Declaration:
I/We the undersigned ____________________________________________________ (Name) hereby
certify that the PEP/PIP information furnished in this bid document is true and correct. We further certify that
we understand that where it is found that we have made a false declaration or statement in this bid, PRASA
2 Both foreign and domestic politically exposed person as specified in Schedule 3A and 3B of the Financial
Intelligence Centre Act No. as amended. (refer to Annexure 2 of the PRASA Code of Conduct for
dealing with Politically Exposed Persons, Prominent Influential Persons and Related Parties).
3 As reflected in Schedule 3C of the Financial Intelligence Centre Act No. (refer to Annexure 2.1.2 of
the PRASA Code of Conduct for dealing with Politically Exposed Persons, Prominent Influential Persons and Related
Parties).
4 Clause 4.5 of the PRASA Code of Conduct for dealing with Politically Exposed Persons, Prominent Influential
property, capital, efforts, skill and knowledge in an activity for the execution of a contract.
Request For Quotation SCM_2024
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2, 3 and 4 ABOVE IS
environments
with theinfrared Lidar laser beam at all
distances.
typically checked using a standard
timing/distance generator.
intervals and issued a traceable ISO/IEC
17050-1 or similar SANAS/NIST calibration
certificate.
monitoring equipment near railway (PRASA
networks) means suppliers must comply with
specialized safety standards:
tests protecting against electromagnetic
interference from catenaries and signaling
systems.
Eye & Safety Constraints: Work procedures must
adhere to strict environmental and human-safety
Transnet Freight Rail (TFR) Specifications
Request For Quotation SCM_2024
Section 10
Contractual Terms
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdfWithout prejudice to any other rights of PRASA under these conditions, the Supplier warrants that the items
are in accordance with PRASA’s requirements and fit for the purpose for which they are intended and will
remain free from defects for a period of one year (unless another period is stated in the Order) from
acceptance of the items by PRASA.
The Supplier indemnifies PRASA against all actions, suits, claims, demands, costs, charges and expenses
arising in connection therewith arising from the negligence, infringement of intellectual or legal rights or
breach of statutory duty of the Supplier, his subcontractors, agents or servants, or from the Supplier’s
defective design, materials or workmanship.
The Supplier indemnifies PRASA against claims, proceedings, compensation and costs payable out of
infringement by the Supplier of the rights of others, except an infringement which arose out of the use by
the Supplier of things provided by PRASA.
Assignment and sub-contracting
The successful Bidder awarded the contract may only enter a subcontracting arrangement with PRASA’s
prior approval. The contract will be concluded between the successful Bidder and PRASA, therefore, the
successful Bidder and not the sub-contractor will be held liable for performance in terms of its contractual
obligations.
Governing law
The order/contract is governed by the law of the Republic of South Africa and the parties hereby submit to
the non-exclusive jurisdiction of the South African courts.
Request For Quotation SCM_2024
Section 6
Sbd4
Bidder’s disclosure
1. Purpose of the form
Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In line with the
principles of transparency, accountability, impartiality, and ethics as enshrined in the Constitution of the
Republic of South Africa and further expressed in various pieces of legislation, it is required for the bidder
to make this declaration in respect of the details required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted Suppliers,
that person will automatically be disqualified from the bid process.
2. Bidder’s declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any person
having a controlling interest1 in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state employee
numbers of sole proprietor/ directors / trustees / shareholders / members/ partners or any person
having a controlling interest in the enterprise, in table below.
Full Name Identity Number Name of State
institution
2.2 Do you, or any person connected with the bidder, have a relationship with any person who is
employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any person
having a controlling interest in the enterprise have any interest in any other related enterprise
whether they are bidding for this contract? YES/NO
2.3.1 If so, furnish particulars:
1 the power, by one person or a group of persons holding the majority of the equity of an enterprise, alternatively,
the person/s having the deciding vote or power to influence or to direct the course and decisions of the enterprise.
Request For Quotation SCM_2024
........................................................................................
........................................................................................
3 Bidder’s declaration regarding PEPs/PIPs
PRASA requires bidders to disclose if they have Politically Exposed Persons (“PEP”)2 or Prominent
Influential Persons (“PIP”)3 and related individuals in their organization and/or beneficial owners /
shareholders who are PEP/PIP.
PRASA reserves the right not to enter a business relationship with such a person, official or entity,
provided there are objective factors that justify the conclusion of such business relationship, and the
decision is based on achieving the best interest of PRASA.4
3.1 Is the bidder a PEP/PIP? YES/NO
3.2 Does the bidder have an existing relationship with a PEP/PIP? YES/NO
3.3 Where a relationship with a PEP/PIP exists, the bidder is required to furnish particulars of the
nature of the exposure, terms of the office and description of activities relating to exposure, in table
below.
Name of PEP/PIP & Nature of Term of the office Description of activities relating to
the Exposure/Influence Exposure/Influence
3.4 Declaration:
I/We the undersigned ____________________________________________________ (Name) hereby
certify that the PEP/PIP information furnished in this bid document is true and correct. We further certify that
we understand that where it is found that we have made a false declaration or statement in this bid, PRASA
2 Both foreign and domestic politically exposed person as specified in Schedule 3A and 3B of the Financial
Intelligence Centre Act No. as amended. (refer to Annexure 2 of the PRASA Code of Conduct for
dealing with Politically Exposed Persons, Prominent Influential Persons and Related Parties).
3 As reflected in Schedule 3C of the Financial Intelligence Centre Act No. (refer to Annexure 2.1.2 of
the PRASA Code of Conduct for dealing with Politically Exposed Persons, Prominent Influential Persons and Related
Parties).
4 Clause 4.5 of the PRASA Code of Conduct for dealing with Politically Exposed Persons, Prominent Influential
Persons and Related Parties.
Request For Quotation SCM_2024
may disqualify our bid or terminate a contract we may have with PRASA where we are successful in this
tender.
___________________________________________________________________
Signature Date
____________________________________________________________________
Position Name of Bidder
6.1 PRASA may appoint a bidder other than the successful bidder under the following instances:
(i) When a successful bidder, after having been informed of the acceptance of its Bid,
fails to sign a contract within a prescribed period e.g. 14 (fourteen) days after being
called upon to do so.
(ii) When a successful bidder has failed to provide the necessary security, bonds or
guarantees within the time required to do so by PRASA.
(iii) When a successful bidder fails to meet a condition precedent for the award of
business (e.g. to obtain the necessary funding); and
(iv) When final contract negotiations with a preferred bidder fail and a contract is not
agreed upon.
6.2 PRASA will only award a bid to a bid other than the highest scoring bidder provided that
such bid is still within the bid validity period.
6.3 Only if the second ranked bidder is also unable/unwilling, PRASA may proceed to the third
ranked bidder.
Request For Quotation SCM_2024
Section 4
arising in connection therewith arising from the negligence, infringement of intellectual or legal rights or
breach of statutory duty of the Supplier, his subcontractors, agents or servants, or from the Supplier’s
defective design, materials or workmanship.
4.3 Name of company/firm...............................................................................
4.4 Company registration number: .....................................................................
4.5 Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6 I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that the
points claimed, based on the specific goals as advised in the tender, qualifies the company/ firm
for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct.
ii) The preference points claimed are in accordance with the General Conditions as indicated in
paragraph 1 of this form.
iii) In the event of a contract being awarded as a result of points claimed as shown in paragraphs
1.4 and 4.2, the contractor may be required to furnish documentary proof to the satisfaction of
the organ of state that the claims are correct.
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any other
remedy it may have –
(a) disqualify the person from the tendering process.
(b) recover costs, losses or damages it has incurred or suffered because of that
person’s conduct.
(c) cancel the contract and claim any damages which it has suffered because of
having to make less favourable arrangements due to such cancellation.
(d) recommend that the tenderer or contractor, its shareholders and directors, or
only the shareholders and directors who acted on a fraudulent basis, be
restricted from obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other side) rule has
been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
Request For Quotation SCM_2024
Section 8
Certificate of attendance of compulsory RFQ briefing (n/a)
Request number: N/A
Special Conditions
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)directly or indirectly to canvass any SCM Officer(s) or PRASA employee in respect of this RFQ between the closing date and the date of the award of the business.
Requirements
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf (RFQ)SYSTEM PIN: OR CENTRAL SUPPLIER DATABASE No: MAAA................. 2.1 ARE YOU THE Yes No ACCREDITED Yes No 2.2 ARE YOU A FOREIGN BASED AFRICA FOR THE GOODS /WORKS OFFERED? [IF YES, ANSWER THE /SERVICES /WORKS [IF YES ENCLOSE PROOF] QUESTIONNAIRE BELOW] OFFERED? IS THE ENTITY A RESIDENT OF THE REPUBLIC OF SOUTH AFRICA (RSA)? YES NO DOES THE ENTITY HAVE A BRANCH IN THE RSA? YES NO DOES THE ENTITY HAVE A PERMANENT ESTABLISHMENT IN THE RSA? YES NO DOES THE ENTITY HAVE ANY SOURCE OF INCOME IN THE RSA? YES NO IS THE ENTITY LIABLE IN THE RSA FOR ANY FORM OF TAXATION? YES NO IF THE ANSWER IS “NO” TO ALL OF THE ABOVE, THEN IT IS NOT A REQUIREMENT TO REGISTER FOR A TAX COMPLIANCE STATUS SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT REGISTER AS PER 2.3 BELOW.
Section
Source: RFQ SPEED MONITORING CALIBRATION AND REPAIRS.pdf1 Stage 1 Compliance Evaluation
Bidders are to comply with the following requirements and failure to comply may lead to disqualification.
1.1 Stage 1A – Mandatory Requirements
If you do not submit the following mandatory documents/requirements, your bid will be automatically
disqualified. Bidders are further required to confirm submission of these documents by so indicating [Yes or
No] in the table below:
Only bidders who comply with stage 1A will be evaluated further.
Submitted
No. Description of requirement (Yes or No)
a) Completed Pricing and Delivery Schedule Form – Section 4 of this RFQ.
Completed BOQ / Pricing Schedule - Section 10 of this RFQ
b) NB: Prasa will notify the bidders of any arithmetic errors or omission
identified on BOQ to obtain clarity.
1.2 Stage 1B –Other Mandatory Requirements
If you do not submit the following other mandatory documents/requirements, PRASA may request the bidder
to submit the information within three (3) working days. Should this information not be provided, your bid
proposal will be disqualified. Bidders are further required to confirm submission of these documents by so
indicating [Yes or No] in the table below:
No. Description of requirement SUBMITTED
(Yes or No)
a) Submission of Signed and Completed RFQ Document and Standard Bid
Documents (SBD) Forms
b) Letter of Good Standing: COIDA.
c) Supply of valid SARS Pin
d) Completion of ALL RFP documentation (includes ALL declarations)
e) Joint Venture, Consortium Agreement or Partnering Agreement/ Subcontract
Agreement signed by all parties. The agreement should indicate the leading
bidder where applicable.
f CSD supplier registration number
2 Stage 2 Technical / Functionality Requirements
Scoring of Functionality:
The minimum threshold for the Technical/functionality criteria is (60%) and bidders who score below this
minimum will not be considered for further evaluation in terms of price and Specific Goals.
Request For Quotation SCM_2024
Criteria indicator weight scores
The score will be based on successfully (N.B. Provide for each
successfully completed executed and completed similar
project/s in the following projects.
sequence: Copy of an
1: Zero (0) Similar Projects/non- appointment letter/s (on
company letterhead), submission/incomplete submission=
description of the project/ 0
Purchase order, Client name,
2: 1 Similar project = 20 points Client. Contact (i.e., email and
Organizational
office number), Project start 3: 2 Similar projects =40 points
PS = 80 (1 − Pt−Pmin)
Pmin
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
3. Points awarded for specific goals
3.1. In terms of Regulation 4(2); 5(2); 6(2) and 7(2) of the Preferential Procurement Regulations,
preference points must be awarded for specific goals stated in the tender. For the purposes
of this tender the tender will be allocated points based on the goals stated in table 1 below
as may be supported by proof/ documentation stated in the conditions of this tender:
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
Note to tenderers: The tenderer must indicate how they claim points for each preference
point system.)
Number of points
Supporting evidence claimed (80/20
for meeting preferential Number of points system)
The specific goals procurement targets allocated (To be completed
allocated points in (Bidder to provider the (80/20 system) by the tenderer)
terms of this tender below supporting (To be completed by
evidence to claim the organ of state)
allocated points for
each specific goal)
Black Woman owned Certified copy of ID 10
Documents of the Owners /
directors
or
Company Registration
Certification (CIPC)
Or
CSD report / CSD
registration number (MAAA
number)
EME or QSE 51% Audited Annual Financial/ 10
Black Owned B-BBEE Certificate/
Affidavit
4. Objective criteria
4.1 Section 2(1)(f) of the PPPFA empowers an organ of state to award a tender to the highest
scoring bidder unless there is an objective criterion that justifies the award to another tender.
4.2 PRASA reserves the right to apply the objective criteria for this bid.
4.3 PRASA may award a bid to a bidder that did not score the highest points under the following
circumstances:
a) A negative track record of the bidder in other related projects.
Request For Quotation SCM_2024
b) spreading the award to bidders that have not been previously appointed.
c) the need to avoid concentrating on awards to the previously appointed bidders. Prasa shall
consider the following:
i. the number of bid(s) awarded to the highest scoring bidder(s) in the preceding financial
years.
ii. the capacity of the highest scoring bidder(s) despite the previous appointments.
iii. the value and scope of the bid(s) already awarded to the highest scoring bidder(s).
iv. the materiality of the price difference between the highest scoring bidder and other bidders;
and
v. whether the goods, services or works are of a specialized nature.
5. Splitting of awards
5.1 PRASA reserves the right to split the award of this bid to more than one service provider,
provided that the nature of the services or goods or works to be provided are capable of
being split to more than one service provider.
6. Appointments other than the successful bidder
6.1 PRASA may appoint a bidder other than the successful bidder under the following instances:
(i) When a successful bidder, after having been informed of the acceptance of its Bid,
fails to sign a contract within a prescribed period e.g. 14 (fourteen) days after being
called upon to do so.
(ii) When a successful bidder has failed to provide the necessary security, bonds or
guarantees within the time required to do so by PRASA.
(iii) When a successful bidder fails to meet a condition precedent for the award of
business (e.g. to obtain the necessary funding); and
(iv) When final contract negotiations with a preferred bidder fail and a contract is not
agreed upon.
6.2 PRASA will only award a bid to a bid other than the highest scoring bidder provided that
such bid is still within the bid validity period.
6.3 Only if the second ranked bidder is also unable/unwilling, PRASA may proceed to the third
ranked bidder.
Request For Quotation SCM_2024
Section 4
Pricing and delivery schedule
(Failure to completed and provide these Mandatory Returnable forms at the Closing Date and time of this RFQ will result in a bidder ’s
disqualification)
Bidders are required to complete the attached Pricing Schedule
1 Prices must be quoted in South African Rand, inclusive of all applicable taxes.
2 The price range is firm and clearly indicates the basis thereof.
3 Pricing Bill of Quantity is completed in line with schedule if applicable (delete if not applicable).
4 Cost breakdown must be indicated.
5 The price escalation basis and formula must be indicated.
6 To facilitate like-for like comparison bidders must submit pricing strictly in accordance with this price
schedule and not utilize a different format. Deviation from this pricing schedule could result in a bid
being declared non-responsive.
7 Please note that should you have offered a discounted price(s), PRASA will only consider such price
discount(s) in the final evaluation stage on an unconditional basis.
8 Bidders are to note that if the price offered by the highest scoring bidder is not market related, PRASA
may not award the contract to the Bidder. PRASA may:
9 Negotiate a market-related price with the Bidder scoring the highest points.
10 If that Bidder does not agree to a market-related price, negotiate a market-related price with the Bidder scoring
the second highest points.
11 If the Bidder scoring the second highest points does not agree to a market-related price, negotiate a
market-related price with the Bidder scoring the third highest points.
12 If a market-related price is not agreed with the Bidder scoring the third highest points, PRASA must
cancel the RFQ.
I / We ______________________________________________________________ (Insert Name of
Bidding Entity) of __________________________________________________________________
____________________________________________________ code __________ (Full address)
conducting business under the style or title of: _____________________________ represented by:
_____________________________ in my capacity as:____________________________________
being duly authorized, hereby offer to undertake and complete the above-mentioned work/services at the
prices quoted in the bills of quantities / schedule of quantities or, where these do not form part of the
contract, at a lumpsum, of R _____________________________________ (amount in numbers);
____________________________________________________________________________________
_________________________________________________________(amount in words) Incl. VAT.
DELIVERY PERIOD: Suppliers are requested to offer their earliest delivery period possible.
Delivery will be affected within ............. working days from date of order. (To be completed by Service
provider)
Request For Quotation SCM_2024
Section 5
PRASA general conditions of purchase
General
PRASA and the Supplier enter an order/contract on these conditions to supply the items
(goods/services/works) as described in the order/contract.
Conditions
These conditions form the basis of the contract between PRASA and the Supplier. Notwithstanding anything
to the contrary in any document issued or sent by the Supplier, these conditions apply except as expressly
agreed in writing by PRASA.
No servant or agent of PRASA has authority to vary these conditions orally. These general conditions of
purchase are subject to such special conditions as may be prescribed in writing by PRASA in the
order/contract.
Price and payment
The price or rates for the items stated in the order/contract may include an amount for price adjustment,
which is calculated in accordance with the formula stated in the order/contract.
The Supplier may be paid in one currency other than South African Rand. Only one exchange rate is used
to convert from this currency to South African Rand. Payment to the Supplier in this currency other than
South African Rand, does not exceed the amounts stated in the order/contract. PRASA pays for the item
within 30 days of receipt of the Suppliers correct tax invoice.
Delivery and documents
The Supplier’s obligation is to deliver the items on or before the date stated in the order/contract. Late
deliveries or late completion of the items may be subject to a penalty if this is imposed in the order/contract.
No payment is made if the Supplier does not provide the item as stated in order/contract.
Where items are to be delivered the Supplier:
Clearly marks the outside of each consignment or package with the Supplier’s name and full details of the
destination in accordance with the order and includes a packing note stating the contents thereof; On
dispatch of each consignment, sends to PRASA at the address for delivery of the items, an advice note
specifying the means of transport, weight, number of volume as appropriate and the point and date of
dispatch; Sends to PRASA a detailed priced invoice as soon as is reasonably practical after dispatch of the
items, and states on all communications in respect of the order the order number and code number (if any).
Containers / packing material
Unless otherwise stated in the order/contract, no payment is made for containers or packing materials or
return to the Supplier.
Request For Quotation SCM_2024
Title and risk
Without prejudice to rights of rejection under these conditions, title and risk in the items passes to PRASA
when accepted by PRASA.
Rejection
If the Supplier fails to comply with his obligations under the order/contract, PRASA may reject any part of
the items by giving written notice to the Supplier specifying the reason for rejection and whether and within
what period replacement of items or re-work are required.
In the case of items delivered, PRASA may return the rejected items to the Supplier at the Supplier’s risk
and expense. Any money paid to the Supplier in respect of the items not replaced within the time required,
together with the costs of returning rejected items to the Supplier and obtaining replacement items from a
third party, are paid by the Supplier to PRASA.
In the case of service, the Supplier corrects non-conformances as indicated by PRASA.
Pt−Pmin
Ps= 80(1− )
Pmin
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
3.2 Formulae for disposal or leasing of state assets and income generating
Procurement
Points awarded for price
A maximum of 80 points is allocated for price on the following basis:
Pt−Pmax
Ps= 80(1+ )
Pmax
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmax = Price of highest acceptable tender
Request For Quotation SCM_2024
4. Points awarded for specific goals
4.1 In terms of Regulation 4(2); 5(2); 6(2) and 7(2) of the Preferential Procurement Regulations,
preference points must be awarded for specific goals stated in the tender. For the purposes of this
tender the tender will be allocated points based on the goals stated in table 1 below as may be
supported by proof/ documentation stated in the conditions of this tender:
4.2 In cases where organs of state intend to use Regulation 3(2) of the Regulations, which states that,
if it is unclear whether the 80/20 or 90/10 preference point system applies, an organ of state must,
in the tender documents, stipulate in the case of—
(a) an invitation for tender for income-generating contracts, that either the 80/20 or 90/10
preference point system will apply and that the highest acceptable tender will be used to
determine the applicable preference point system: or
(b) any other invitation for tender, that either the 80/20 or 90/10 preference point system will apply
and that the lowest acceptable tender will be used to determine the applicable preference point
system,
then the organ of state must indicate the points allocated for specific goals for both the 90/10 and
80/20 preference point system.
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
(Note to organs of state: Where either the 90/10 or 80/20 preference point system is applicable,
corresponding points must also be indicated as such.
Note to tenderers: The tenderer must indicate how they claim points for each preference point
system.)
Supporting evidence Number of points
for meeting preferential claimed (80/20
Number of points
procurement targets system)
The specific goals allocated
(bidder to provider the (To be completed
allocated points in (80/20 system)
below supporting by the tenderer)
terms of this tender (To be completed by
evidence to claim
the organ of state)
allocated points for
each specific goal)
Black women owned Certified copy of ID 10
Documents of the Owners /
directors or Company
Registration Certification
(CIPC) Or CSD report /
CSD registration number
(MAAA number)
EME or QSE 51% Audited Annual Financial/ 10
Black Owned B-BBEE Certificate/
Affidavit. Certified copy of
ID Documents of the
Owners / directors or
Company Registration
Certification (CIPC) Or
CSD report / CSD
registration number (MAAA
number)
Request For Quotation SCM_2024
Declaration with regard to company/firm
4.3 Name of company/firm...............................................................................
4.4 Company registration number: .....................................................................
4.5 Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6 I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that the
points claimed, based on the specific goals as advised in the tender, qualifies the company/ firm
for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct.
ii) The preference points claimed are in accordance with the General Conditions as indicated in
paragraph 1 of this form.
iii) In the event of a contract being awarded as a result of points claimed as shown in paragraphs
1.4 and 4.2, the contractor may be required to furnish documentary proof to the satisfaction of
the organ of state that the claims are correct.
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any other
remedy it may have –
(a) disqualify the person from the tendering process.
(b) recover costs, losses or damages it has incurred or suffered because of that
person’s conduct.
(c) cancel the contract and claim any damages which it has suffered because of
having to make less favourable arrangements due to such cancellation.
(d) recommend that the tenderer or contractor, its shareholders and directors, or
only the shareholders and directors who acted on a fraudulent basis, be
restricted from obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other side) rule has
been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
Request For Quotation SCM_2024
Section 8
Certificate of attendance of compulsory RFQ briefing (n/a)
Request number: N/A
Request for
N/a
Proposal:
Attendance
This is to certify that _____________________________________ has / have today attended the site
inspection / RFQ briefing session to which this enquiry relates.
THUS, DONE and SIGNED at ________________________________________________ on this
_________________ day of ___________________________
___________________________ ___________________________
for / on behalf of PRASA Designation
Acknowledgement
This is to certify that the Bidder attended the above mentioned briefing session/ site inspection
and has / have acquainted himself / themselves with the Contract, Project Specification / Special
Conditions, Specifications and / or Bills of Quantities / Schedule of Quantities / Schedule of
Prices, together with the drawings enumerated therein, as laid down by the PRASA for the
carrying out of the proposed WORKS to which the enquiry relates
THUS, DONE and SIGNED at ________________________________________________
on this _________________ day of ___________________________
Duly authorised signatory(ies) witnesses
1. ___________________________________ 1. __________________________
2. ___________________________________ 2. __________________________
3. ___________________________________ 3. __________________________
Request For Quotation SCM_2024
Section 09
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Passenger Rail Agency of South Africa (PRASA)Contact Person
cry monene
Phone
021-837-7937
[email protected]
Address
Cnr Leyds and Simmonds street - Braamfontein - Johannesburg - 2001
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
17 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
PRASA manages and operates South Africa's passenger rail and long-distance bus services.
Key Personnel
Technical
Data conflicts
None detected
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.