Tender Type
Request for Bid(Open-Tender)
Delivery Location
Stand No. 24 - Mthombomuhle - Kwaggafontein - 0458
Organization Type
GOVERNMENT
Published
17 Jun 2026
OCDS Reference
ocds-9t57fa-159315
Thembisile hani local municipality is inviting bids for the appointment of a panel of electrical contractors to supply, deliver, and install high mast lights as and when required over a 36-month period. This is a re-measurement contract governed by the general conditions of contract for construction works, third edition (2015), with pricing adjusted using statutory indices. Bidders must comply with extensive subcontracting, health and safety, and registration requirements.
Date & Time
Friday, 10 July 2026 - 12:00
Venue
Municipal Shelter
Request for Bid(Open-Tender)
17 Jun
2026
Tender Published
Tender was published
10 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
3 High Mast Lights _Tender data - PRINT IN PINK.pdf
Thembisile Hani Local Municipality (THLM) invites tenders for the appointment of a panel of electrical contractors to supply, deliver, and install high mast lights as and when required over a 36-month period. The tender is governed by THLM's Supply Chain Management Policy and follows a 90/10 preference point system (80 points for price, 20 for specific goals). The estimated bid value is under R50 million.
Stand No. 24 - Mthombomuhle - Kwaggafontein - 0458
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: APSO Membership, Services SETA Accreditation
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 2 High Masts Contents Notice - PRINT IN WHITE.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: 13.1 Health and Safety Specification.pdfThis document is a comprehensive Health and Safety Specification for construction projects issued by Thembisile Hani Local Municipality. It outlines the client's duty to provide this specification to tenderers and details extensive requirements for Occupational Health and Safety (OH&S) management, including risk assessments, legal compliance, organisational structure, training, and operational controls. The specification forms an integral part of the contract and must be adhered to by all Principal Contractors and sub-contractors.
Evaluation Criteria
Source: 13.1 Health and Safety Specification.pdf (unknown)General
Technical
Legal
Technical Specifications
Source: 13.1 Health and Safety Specification.pdf (unknown){
"scope": [
"Appointment of a panel of contractors for the supply, delivery, and installation of high mast lights within Thembisile Hani Local Municipality as and when required over 36 months."
],
"healthAndSafety": [
"Development of a site-specific Occupational Health and Safety (OH&S) plan, including risk assessments and COVID-19 controls, before mobilisation.",
"Conduct a baseline Risk Assessment incorporating all listed risk areas (e.g., site establishment, excavations, use of plant, COVID-19) and Standard Working Procedures (SWP).",
"Compliance with Occupational Health and Safety Act, Construction Regulations 2014, Compensation for Occupational Injuries & Diseases Act (COID), and COVID-19 regulations.",
"Establish a defined OH&S structure with written appointments for: full-time Safety Officer, OH&S Officer, various supervisors (e.g., Excavation, Lifting Equipment, Construction Vehicles), and OH&S Representatives.",
"Form an OH&S Committee with designated representatives, management, and a client representative as chairman. Committee must meet monthly.",
"Provide accredited OH&S training for all relevant personnel, with records kept on the OH&S file.",
"Notify the Department of Labour of construction work within 5 working days where applicable, using the prescribed form.",
"Implement public safety measures, including a Traffic Management Plan (TCP) and COVID-19 precautions for non-employees.",
"Develop operational controls for emergencies, personal protective equipment (PPE), accident investigation, and audits.",
"Maintain a comprehensive OH&S File on site with all required documents, registers, and plans."
]
}
Quality Management
Source: 13.1 Health and Safety Specification.pdfRigorous quality control measures for health and safety are mandated:
Pricing Schedule
Source: 13.1 Health and Safety Specification.pdfThe document does not contain a pricing schedule for the main works. It references injury measurement formulas such as the Compensation Incidence Frequency Rate (CIFR): (Number of Compensation Claims x 200,000) / (220 man-hours x Number of Employees). This formula is for measuring safety performance, not for bid pricing.
Financial Requirements
Source: 13.1 Health and Safety Specification.pdf (unknown){
"ohsPaymentStructure": [
"Payment for OH&S compliance is structured into three items, with the total not less than 1% of the Tender Amount:",
"- C1.1: Lump Sum for initial obligations. Paid once after: notifying the Department of Labour, making initial appointments, client approving the Health and Safety Plan, and setting up the Health and Safety File.",
"- C1.2: Monthly amount for time-related obligations. Includes costs for staff appointments and on-site employee transport. Payment starts after C1.1 is paid.",
"- C1.3: Lump Sum for submission of the complete Health and Safety File to the client's satisfaction."
],
"note": [
"The document references injury measurement formulas (e.g., Compensation Incidence Frequency Rate - CIFR) for safety performance monitoring, not for bid pricing."
]
}
Compliance Requirements
Source: 13.1 Health and Safety Specification.pdf (unknown){
"legalCompliance": [
"Compliance with the Occupational Health and Safety Act and Regulations.",
"Compliance with Construction Regulations 2014.",
"Compliance with Government Gazette No. 43257 (29 April 2020) regarding COVID-19 workplace measures.",
"Compliance with Amended Disaster Management Act 2002: Sect 27(2).",
"Compliance with Compensation for Occupational Injuries & Diseases Act (COID). Submit proof of registration and good standing with the Compensation Insurer before contract award.",
"Where work is on mine premises, comply with the Mine Health & Safety Act and Regulations."
],
"contractualObligations": [
"Include a Section 37(2) agreement ('Agreement with Mandatory') with sub-contractors.",
"Submit written appointments for all mandatory OHS roles, including CVs, to the Municipality.",
"Maintain an updated organogram of all appointed contractors and sub-contractors, submitted weekly.",
"Appoint a Traffic Safety Officer if required by the Municipality."
],
"documentation": [
"Maintain an OH&S File on site containing: Notification of construction work, latest copy of OH&S Act, Construction Regulations 2014, Project Safety Specification, proof of COID registration, induction training manuals and registers, toolbox talk manuals and registers, PPE issue register, legal appointment forms with CVs and proof of competencies, medical fitness certificates, OH&S plan, OH&S structure/organogram, OH&S policy, evacuation/emergency procedures, emergency contact numbers, Traffic Management Plan, Fall Protection Plan, OH&S committee minutes, designs/drawings, sub-contractor agreements, and all inspection and audit registers."
]
}
Health & Safety
Source: 13.1 Health and Safety Specification.pdfCore health and safety requirements include:
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve transport, fleet, logistics, public transport, vehicles, or road operations.
Act 5 of 2009
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
13.1 Health and Safety Specification.pdf
The tender is for the appointment of a panel of contractors to supply, deliver, and install high mast lights within Thembisile Hani Local Municipality over a 36-month period. The document emphasizes strict compliance with the Occupational Health and Safety (OHS) Act, Construction Regulations, and COVID-19 safety measures. Contractors must adhere to comprehensive health, safety, and operational protocols, including risk assessments, emergency planning, PPE usage, and regular audits. Payment is structured around OHS compliance obligations, with a minimum allocation of 1% of the tender amount for OHS-related costs.
1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf
Thembisile Hani Local Municipality is seeking to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period.
7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality is seeking to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis over a 36-month period. The tender (THLM/SCM23/2025-2026/E04) requires contractors to submit a formal offer, with acceptance forming a binding contract upon mutual agreement and signing of the Form of Offer and Acceptance.
8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf
Thembisile Hani Local Municipality is appointing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over 36 months. The provided document is a pro forma performance guarantee template that must be completed by the successful contractor's guarantor (typically a bank or insurer).
2 High Masts Contents Notice - PRINT IN WHITE.pdf
Thembisile Hani Local Municipality is appointing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period. The tender uses an 80/20 preferential points system and requires CIDB grading of 5EP or higher.
8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf
This document is a safety agreement clause (C1.4) from a tender for appointing a panel of electrical contractors to supply, deliver, and install high mast lights for Thembisile Hani Local Municipality over 36 months. It outlines the contractor's legal safety obligations under the Occupational Health and Safety Act.
9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period. The tender involves detailed pricing instructions and a bill of quantities, with emphasis on monthly invoicing based on completed activities within allocated budgets.
4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period.
6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality is establishing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period.
13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf
Thembisile Hani Local Municipality seeks to establish a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis for a 36-month period. This is a framework agreement approach allowing the municipality to engage pre-qualified contractors for multiple projects without re-tendering.
8 High Masts_Contract Data - PRINT ON YELLOW.pdf
Thembisile Hani Local Municipality is appointing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis for 36 months. The contract is governed by the General Conditions of Contract for Construction Works (Third Edition, 2015) with specific amendments detailed in the Contract Data. Key aspects include a re-measurement pricing strategy, a 365-day defects liability period, strict subcontracting and local participation targets, and significant penalties for non-compliance with time, labor, and enterprise targets.
10 High Mast _Bill of Quantities.pdf
Thembisile Hani Local Municipality seeks to appoint a panel of contractors for the supply, delivery, and installation of high mast lights (both 30m conventional and 20m solar-powered) on an as-needed basis over a 36-month period. The tender includes comprehensive preliminary costs, detailed technical specifications for two types of mast lighting, and provisions for provisional sums and dayworks.
11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf
Thembisile Hani Local Municipality (THLM) seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an 'as and when required' basis over a 36-month period. The scope includes design, engineering, manufacturing, delivery, installation, testing, commissioning, and maintenance of 30-meter high mast lighting structures, including floodlights, foundations, and electrical connections. The contract is structured as an EPC (Engineering, Procurement, Construction) project with strict compliance to South African National Standards (SANS) and local regulations.
12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf
Thembisile Hani Local Municipality is seeking to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an 'as and when required' basis over a 36-month period. The scope includes design, engineering, geotechnical studies, foundation work, electrical connections, testing, commissioning, and compliance with SANS standards. The contract is structured as an EPC (Engineering, Procurement, Construction) project with stringent technical, safety, and quality requirements.
5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality invites tenders for the appointment of a panel of electrical contractors to supply, deliver, and install high mast lights on an as-and-when-required basis over 36 months. The tender closes on 10 July 2026 at 12:00 UTC.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Thembisile Hani Local MunicipalityContact Person
Siya Kalipa
Phone
013-986-9101
[email protected]
Address
Stand No. 24 - Mthombomuhle - Kwaggafontein - 0458
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
17 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Thembisile Hani Local Municipality governs KwaMhlanga and surrounds in the Nkangala District of Mpumalanga.
Key Personnel
Learn how to submit a winning bid with these related articles
Description
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdfGeneral scope:
Evaluation Criteria
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf (unknown)Eligibility and evaluation guidance from the document:
Technical Specifications
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf (unknown)Scope and deliverables:
Pricing Schedule
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdfPricing instructions and bill of quantities:
Bill of Quantities:
Key terms:
Financial Requirements
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf (unknown)Pricing and payment terms:
Key definitions:
Description
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfSubmission Guidelines
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Returnable Documents
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Evaluation Criteria
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Technical Specifications
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Experience & Qualifications
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Quality Management
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfFinancial Requirements
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Compliance Requirements
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Health & Safety
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfEnvironmental
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfContractual Terms
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfSection
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfDescription
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdfSupply, delivery, and installation of high mast lights as and when required for a period of 36 months within Thembisile Hani Local Municipality.
Evaluation Criteria
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf (unknown)Eligibility hinges on the ability to secure a substantial performance guarantee from a reputable financial institution. The contractor must be a legally registered entity capable of entering into a formal contract.
Technical Specifications
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf (unknown)Scope: Appointment of a panel of electrical contractors for the supply, delivery, and installation of high mast lights as and when required. Duration: 36 months. Location: Thembisile Hani Local Municipality.
Financial Requirements
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf (unknown)Performance Guarantee required under the General Conditions of Contract for Construction Works, 3rd Edition, 2015. Two types apply:
Payment Terms:
Contractual Terms
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdfContract aligns with the General Conditions of Contract for Construction Works, 3rd Edition, 2015. Key terms:
Description
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfImportant Dates
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Contact Information
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Submission Guidelines
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Returnable Documents
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Evaluation Criteria
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Technical Specifications
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Pricing Schedule
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfFinancial Requirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Compliance Requirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)B-BBEE Requirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Contractual Terms
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfRequirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Section
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfDescription
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdfThembisile Hani Local Municipality seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights. The panel will operate on an as-and-when-required basis for 36 months. The municipality will engage pre-qualified contractors directly from this panel for individual projects as needs arise. Project reference: THLM/SCM23/2025-2026/E04.
Submission Guidelines
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Submit the T2 Returnable Documents as part of the tender package. Ensure all required forms are completed and signed by the tenderer and witnesses. Failure to submit fully signed returnable documents may result in disqualification. Obtain the complete T2 document package to verify all submission requirements.
Evaluation Criteria
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Bidders must be registered electrical contractors. Compliance with Thembisile Hani Local Municipality’s Supply Chain Management (SCM) policies and relevant South African regulations is mandatory. Complete tender documentation, including witness-signed returnable documents, must be submitted for evaluation.
Technical Specifications
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Scope: Supply, delivery, and installation of high mast lights for Thembisile Hani Local Municipality. Duration: 36 months on an as-and-when-required basis. Panel arrangement: Pre-qualified contractors will be called upon by the municipality as needs arise. Project reference: THLM/SCM23/2025-2026/E04. Note: Detailed technical specifications, deliverables, standards, and service levels are not provided in this section. Bidders must request the full technical specifications document.
Compliance Requirements
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)No explicit compliance requirements are stated in this document section. Bidders should verify the full tender documentation for: CSD registration, valid tax clearance certificate, B-BBEE certification, CIDB grading, professional registrations (e.g., ECSA for electrical work), and any local content or municipal-specific compliance obligations.
Description
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdfContact Information
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Returnable Documents
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Evaluation Criteria
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Technical Specifications
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Description
Source: 10 High Mast _Bill of Quantities.pdfThe tender is for the appointment of a panel of contractors for the supply, delivery, and installation of high mast lights within Thembisile Hani Local Municipality over 36 months. The scope includes:
Evaluation Criteria
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Contractors must demonstrate capability to meet technical specifications, provide all required certifications (structural, galvanizing, SANS, concrete), and have capacity for a 36-month panel appointment. Key evaluation points:
Technical Specifications
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Scope: Supply, delivery, and installation of high mast lighting systems (30m and 20m solar) within Thembisile Hani Local Municipality over 36 months.
Key deliverables:
30m High Mast Lighting:
20m Solar High Mast Lighting:
Mandatory certifications and tests:
Technical submissions:
Quality Management
Source: 10 High Mast _Bill of Quantities.pdfQuality assurance and certification requirements:
Pricing Schedule
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Pricing must be submitted via the Bill of Quantities (BoQ) schedule, divided into four bills:
Financial Requirements
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Pricing must be submitted via the provided Bill of Quantities (BoQ) schedule, structured into four bills:
Bill 1: Preliminary and General Costs
Bill 2: 30m High Mast Lighting
Bill 3: 20m Solar High Mast Lighting
Bill 4: Provisional Sums and Dayworks
Final tender price must include:
Compliance Requirements
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Required compliance items:
Health & Safety
Source: 10 High Mast _Bill of Quantities.pdfSafety compliance requirements:
Contractual Terms
Source: 10 High Mast _Bill of Quantities.pdfContractual compliance is required as part of the works. The contractor must provide for:
Evaluation Criteria
Source: 8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf (unknown)Mandatory contractual condition: Bidders must be willing and legally able to assume full, sole liability for all Occupational Health and Safety Act (OHSA) compliance as per the agreement. Failure to accept these terms will disqualify the bid.
Compliance Requirements
Source: 8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf (unknown)Contractor must: Comply with all duties, obligations, and prohibitions under the Occupational Health and Safety Amendment Act, 1993 (OHSA) and its regulations. Ensure all officials and employees are acquainted with relevant OHSA provisions. Adhere to any employer-prescribed arrangements and procedures for the work. Bear sole liability for compliance and absolve the employer and consulting engineers from these obligations. Agreement is concluded under Section 37(2) of OHSA.
Contractual Terms
Source: 8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf (unknown)Agreement is governed by Section 37(2) of the Occupational Health and Safety Amendment Act, 1993. Contractor must: Accept sole liability for compliance with all OHSA duties, obligations, and prohibitions. Allow employer-authorised officials to inspect sites or premises to verify compliance. Remedy any compliance defaults at the contractor's cost if required by the employer. Report any OHSA-related investigations, complaints, or criminal charges to the employer immediately and provide full written details upon demand.
Description
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfContact Information
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Submission Guidelines
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Returnable Documents
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Evaluation Criteria
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Technical Specifications
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Quality Management
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfPricing Schedule
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfFinancial Requirements
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Compliance Requirements
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)B-BBEE Requirements
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Health & Safety
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfContractual Terms
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfDescription
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfSubmission Guidelines
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Evaluation Criteria
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Technical Specifications
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Methodology
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfQuality Management
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfPricing Schedule
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfFinancial Requirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Compliance Requirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)B-BBEE Requirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Health & Safety
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfContractual Terms
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfRequirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Description
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdfAppointment of a panel of electrical contractors for the supply, delivery and installation of high mast lights within Thembisile Hani Local Municipality as and when required for a period of 36 months. Project number: THLM/SCM23/2025-2026/E04. The panel approach means multiple contractors may be appointed to be called upon as needed during the 36-month period.
Important Dates
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Closing date: 10 July 2026 at 12:00. No briefing session date, site visit date, or clarification deadline specified in the document.
Contact Information
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Department: Supply Chain Management, Thembisile Hani Local Municipality. No specific contact person, email address, telephone number, or physical submission address provided in the document.
Submission Guidelines
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Returnable documents must be submitted as specified in the tender. Ensure all required forms are completed and signed. Disqualification may occur if submission guidelines are not followed. Bidders must comply with the Thembisile Hani Local Municipality Supply Chain Management Policy requirements.
Returnable Documents
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Additional relevant documents are required as per Part C4. These include: Thembisile Hani Local Municipality Supply Chain Management Policy, Health and Safety Specification, and Kwaggafontein B and C Geotechnical Report. These documents form part of the contract.
Evaluation Criteria
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Bidders must be registered electrical contractors. Compliance with Thembisile Hani Local Municipality Supply Chain Management Policy is required. Bidders must demonstrate ability to meet Health and Safety specifications. Bidders must show capability to perform supply, delivery, and installation of high mast lights. Bidders must be in good standing with regulatory bodies.
Technical Specifications
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Scope: Appointment of a panel of electrical contractors for the supply, delivery, and installation of high mast lights within Thembisile Hani Local Municipality as and when required. Contract duration: 36 months. Project number: THLM/SCM23/2025-2026/E04. Additional relevant documents include Health and Safety Specification and Kwaggafontein B and C Geotechnical Report which form part of the contract.
Compliance Requirements
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Required documents per Part C4 include: Thembisile Hani Local Municipality Supply Chain Management Policy, Health and Safety Specification, and Kwaggafontein B and C Geotechnical Report. Bidders must comply with Health and Safety specifications. Bidders must be registered electrical contractors in good standing with regulatory bodies.
Health & Safety
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdfHealth and Safety Specification is a required document and forms part of the contract per Part C4. Bidders must demonstrate ability to meet Health and Safety specifications. The Health and Safety Specification document must be complied with during execution of work.
Contact Information
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Submission Guidelines
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Evaluation Criteria
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Technical Specifications
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Financial Requirements
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Compliance Requirements
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Health & Safety
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdfContractual Terms
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdfSubmission Guidelines
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Submit a signed Form of Offer and Acceptance. Pricing must include sub-total (exclusive of VAT) and total (inclusive of VAT) in both words and figures. Return one copy of the signed document to the Employer before the end of the validity period. All deviations or amendments from tender documents must be recorded in the Schedule of Deviations, signed by both parties. Covering letters are not part of the final contract. Failure to provide required bonds, guarantees, or proof of insurance within two weeks of contract acceptance may result in repudiation of the agreement.
Evaluation Criteria
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)General: Must be a registered electrical contractor. Must be legally authorized to enter into a binding contract. Must have the capacity to fulfill the scope of work over 36 months. Financial: Ability to provide bonds and guarantees as required. Financial stability to handle the project scope. Legal: Compliance with South African municipal procurement regulations. No conflicts of interest or disqualifications under municipal policies.
Technical Specifications
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Scope: Supply, delivery, and installation of high mast lights as and when required. Duration: 36-month panel appointment. Contractors must be electrical specialists capable of fulfilling the scope as per the Conditions of Contract and Tender Data.
Pricing Schedule
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdfPricing structure includes: Part 1 (Agreements and Contract Data), Part 2 (Pricing Data), Part 3 (Scope of Work), Part 4 (Additional Documentation). Prices must be provided in words and figures for sub-total (exclusive of VAT) and total (inclusive of VAT).
Financial Requirements
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Pricing must be structured as follows: Part 1 (Agreements and Contract Data), Part 2 (Pricing Data), Part 3 (Scope of Work), Part 4 (Additional Documentation). Include drawings or referenced documents where applicable. Provide sub-total and total prices (exclusive and inclusive of VAT) in words and figures.
Compliance Requirements
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Compliance with all terms and conditions of the Contract Data and Conditions of Contract is mandatory. Bonds, guarantees, proof of insurance, and other documentation must be submitted within two weeks of contract acceptance. All deviations must be formally recorded in the Schedule of Deviations. Contract becomes effective upon receipt of a fully signed copy of the Form of Offer and Acceptance, including the Schedule of Deviations (if any). The Contractor must notify the Employer within five days of receipt if they cannot accept the agreement terms. No oral or implied agreements are binding.
Contractual Terms
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdfContract becomes effective upon receipt of a fully signed copy of the Form of Offer and Acceptance, including the Schedule of Deviations (if any). The Contractor must notify the Employer within five days of receipt if they cannot accept the agreement terms. Bonds, guarantees, proof of insurance, and other required documentation must be delivered within two weeks of contract acceptance. Amendments or deviations are only valid if recorded in the signed Schedule of Deviations. No oral or implied agreements are binding.
Special Conditions
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Deviations from tender documents are limited to those permitted in the Conditions of Tender. Covering letters are excluded from the final contract. Any deviations, clarifications, or changes agreed during the offer and acceptance process must be recorded in the Schedule of Deviations and incorporated into the final contract draft.
Important Dates
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Contact Information
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Technical Enquiries:
SCM Enquiries:
Municipal Manager: Mr D.J.D. Mahlangu
Physical Submission Address: Municipality’s Offices, Stand Number 24, Mthombomuhle (Kwaggafontein C).
Submission Guidelines
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Evaluation Criteria
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Technical Specifications
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Financial Requirements
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Compliance Requirements
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Description
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfImportant Dates
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Briefing Session
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Contact Information
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Submission Guidelines
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Returnable Documents
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Evaluation Criteria
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Technical Specifications
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Experience & Qualifications
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfQuality Management
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfPricing Schedule
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfFinancial Requirements
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Compliance Requirements
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Health & Safety
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfContractual Terms
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfSpecial Conditions
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Requirements
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Relevant to public transport, fleet, logistics and subsidised transport service contracts.
Relevant because this tender appears to involve transport, fleet, logistics, public transport, vehicles, or road operations.
Act 93 of 1996
Relevant to roadworthiness, vehicle compliance and operator requirements in transport contracts.
Relevant because this tender appears to involve transport, fleet, logistics, public transport, vehicles, or road operations.
Data conflicts
None detected
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 803 489
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Office administrative, office support and other business support activities. Unlock full pricing strategies, bid frequency, and historical win rates.