Issuing Organization
Eskom
Location
Gauteng
Closing Date
16 Apr 2026
Tender Type
Request for Bid(Open-Tender)
Delivery Location
MWP, ERIC, EAL - Gauteng - Johannesburg - 2000
Organization Type
GOVERNMENT
Published
26 Mar 2026
OCDS Reference
ocds-9t57fa-152078
ESKOM invites open bids to design, manufacture, supply and install executive office furniture at megawatt park, eal and eric sites in gauteng over a seven-month contract.
Categories
Request for Bid(Open-Tender)
MWP, ERIC, EAL - Gauteng - Johannesburg - 2000
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: , ,
Date & Time
Thursday, 16 April 2026 - 10:00
Venue
https://teams.microsoft.com/meet/39941828077769?p=9lOqOW1aKXNU81e1zv
Tenders are to be submitted on e-tendering system. Download tender documents on ESKOM tender bulletin.
26 Mar
2026
Tender Published
Tender was published
16 Apr
2026
Closing Date
Tender closing date
Technical Evaluation Criteria for Executive Furniture.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Matched by category & region
Ask questions, share insights, or request clarifications about this tender. Official responses will be marked clearly.
Join the discussion for this tender
Guidelines
Please keep discussions professional and relevant to this tender. For formal queries that require an official response, please use the "Request Clarification" button.
No messages yet. Be the first to start the discussion!
Analyze your competition's historical pricing and win-rates for Manufacture of furniture.
moretssy@ntcsa.co.za
Address
Maxwell Dr, Sunninghill, Sandton, 2157, South Africa
Contact
011-800-4850moretssy@ntcsa.co.zawww.eskom.co.zaMaxwell Dr, Sunninghill, Sandton, 2157, South Africa
Key Personnel
Median Estimate
RÂ 1Â 150Â 000
Range
Based on General government tender averages. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A technical guide for manufacturers and suppliers to provide bulk school furniture—from desks to science labs—to Gauteng's growing school network.
Gauteng’s construction pipeline is worth R94 billion over the next three MTEF cycles, yet 38% of bids still crash at compliance. The March 2026 CIDB gazette tightened the *Construction Procurement Regulations*—effective 1 April—making a misaligned CIDB grade an automatic SBD 4 disqualification. If your CIDB certificate does not mirror the tender value band, your envelope is not even opened. This guide strips out the theory and tells you exactly what must be on the front page of your submission to stay alive in the Gauteng adjudication room.
Security contractors in Gauteng are entering 2026 under heightened scrutiny: every cloud or hosting service that stores, processes or transmits any state data must now prove full data-sovereignty, localisation and residency compliance before a security guarding or electronic security tender can even reach adjudication. National Treasury’s Instruction 2025-11 (effective 1 April 2026) makes SITA’s Cloud Framework Agreement 2.0 mandatory for national and provincial departments, while the Information Regulator’s 2025 enforcement guidance treats non-compliant hosting as an automatic POPIA breach. For security firms, the risk is immediate—if the CCTV archive, access-control database or guarding-management platform is not demonstrably hosted inside South Africa with verified local data custodians, your bid is rejected at box-tick.
Gauteng’s 2026 infrastructure pipeline exceeds R65 billion, yet 42% of General-category bids fail at compliance screening. With National Treasury’s April 2026 Preferential Procurement Policy Framework Act (PPPFA) amendments now in force, every supplier engaged in provincial construction, maintenance, and facilities-management work must recalibrate their documentation matrix. Misinterpreting the revised 80/20 and 90/10 preference point thresholds, or submitting outdated BBBEE affidavits, triggers automatic disqualification—costing contractors both tender costs and opportunity value in the country’s most competitive procurement marketplace.
đź’ˇ Want more tendering tips and strategies?
Explore Our Blog