Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
matimba Power Station - Lephalale - Lephalale - 0555
Organization Type
GOVERNMENT
Published
18 Jun 2026
OCDS Reference
ocds-9t57fa-159467
ESKOM seeks a contractor to upgrade the outer perimeter fence at matimba power station (a national key point) in limpopo, replacing 8036 meters of existing fencing with a high-security, anti-climbing system. The project includes removal of old fencing, design and installation of a new 3m-high fence with razor coil topping, and compliance with nkp regulations and SANS standards.
Date & Time
Friday, 10 July 2026 - 11:00
Venue
https://teams.microsoft.com/meet/329893641854320?p=4QYA27vOi1FYQxDZRB
Categories
Request for Quotation
matimba Power Station - Lephalale - Lephalale - 0555
18 Jun
2026
Tender Published
Tender was published
10 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
SAFETY REQUIREMENT - Annexture B SHE Rules.docx
The tender (E2752GXMPMATR) is for the upgrading of a security fence over a 12-month period, issued by ESKOM in Limpopo. It mandates strict compliance with Eskom's Safety, Health, Environmental (SHE), and Quality policies, including Life Saving Rules, incident management, waste management, and contractor safety standards. Non-compliance may result in financial penalties or work stoppages without compensation.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
A strategic guide to getting listed on government consultancy, legal, and engineering panels. Learn why panels are the gateway to steady public sector work.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
💡 Want more tendering tips and strategies?
Explore Our BlogNot enough data available to generate an estimate for this tender type.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Tender Technical Evaluation Stratergy_NKP Secuirty Fence Upgrade__ REV4.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: NEC ECC Upgrade of Security Fence Phase 2.docImportant Dates
Source: NEC ECC Upgrade of Security Fence Phase 2.doc (unknown)Evaluation Criteria
Source: NEC ECC Upgrade of Security Fence Phase 2.doc (unknown)General
Technical
Financial
B-BBEE
Technical Specifications
Source: NEC ECC Upgrade of Security Fence Phase 2.doc (unknown)Compliance Requirements
Source: NEC ECC Upgrade of Security Fence Phase 2.doc (unknown)These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender Technical Evaluation Stratergy_NKP Secuirty Fence Upgrade__ REV4.pdf
Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdf
Eskom is seeking bids for the upgrading of the outer perimeter security fence at Matimba Power Station in Limpopo. The project involves the removal of the existing 8,036-meter outer mesh fence and barbed wire coils, followed by the design, supply, and installation of a new high-security fence with enhanced anti-climbing and anti-cutting features. The new fence must comply with National Key Point (NKP) regulations and include components like mesh panels, razor coil topping, reinforced posts, gates, signage, and earthing. The project duration is 12 months, with a closing date of July 10, 2026.
LOCAL CONTENT ANNEX C,D,E.xlsx
The tender (E2752GXMPMATR) issued by ESKOM in Limpopo, South Africa, involves the upgrading of a security fence over a 12-month period. The closing date is July 10, 2026. The tender requires detailed declarations of local content, imported content, and foreign currency payments, with VAT excluded from all calculations. Compliance with SATS 1286.2011 standards is mandatory.
PAYE Questionnaire for Service Contracts 2025_2026.doc
The tender document (E2752GXMPMATR) pertains to the upgrading of a security fence for a 12-month period, issued by ESKOM in the Limpopo Province. The closing date for submissions is July 10, 2026. The document primarily includes a PAYE (Pay As You Earn) Questionnaire for Service Contracts to the Eskom Group, designed to classify contractors as Independent Contractors, Personal Service Providers, Labour Brokers, or Dependent Contractors for tax purposes. It outlines evaluation criteria, affidavits, and declarations to determine tax obligations and compliance with South African tax legislation (Income Tax Act No. 58 of 1962).
eTendering System Training manual.docx
This document is primarily a Supplier Help Manual for Eskom's eTendering system rather than the actual tender specification for the security fence upgrade. The tender E2752GXMPMATR relates to upgrading of security fence for 12 months in Limpopo province with a closing date of July 10, 2026. The document provides guidance on system registration, document submission, and technical requirements for using the eTendering portal. Specific technical specifications for the fence upgrading work are not included in this document.
E-Tenderers’ E-Tendering Training Acknowledgement Form.docx
The tender (E2752GXMPMATR) is for the upgrading of a security fence over a 12-month period, issued by ESKOM in Limpopo. It requires mandatory e-tendering training acknowledgment prior to participation.
NEC ECC Upgrade of Security Fence Phase 2.doc
The tender E2752GXMPMATR, issued by ESKOM Holdings SOC Ltd, is for the upgrading of the security fence at Matimba Power Station in Limpopo, South Africa. The project involves the removal of the old outer perimeter fence, removal of barbed wire coils, design and installation of a new outer fence, and associated works over a 12-month period. The contract is governed by the NEC3 Engineering & Construction Contract (ECC3) with specific options and additional conditions (Z clauses). The closing date for submissions is July 10, 2026.
E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf
Eskom Holdings SOC Ltd invites tenders for the **Upgrading of Security Fence for 18 months at Matimba Power Station** (Tender No: E2752GXMPMATR). The project involves enhancing perimeter security infrastructure, with a focus on compliance with local content, safety, and quality standards. Submissions are electronic via Eskom’s e-tendering portal, with a closing date of **10 July 2026 at 10:00 UTC**. A compulsory clarification meeting is scheduled for **1 July 2026 via Microsoft Teams**.
Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx
The tender (E2752GXMPMATR) issued by ESKOM in Limpopo, South Africa, involves the upgrading of a security fence over a 12-month period. The document emphasizes high-risk environmental compliance requirements, with a focus on environmental management, waste handling, emergency preparedness, and hazardous substance control. The evaluation is based on a weighted scoring system (minimum threshold: 80%).
240-77471499 (2) Annexure B.docx
The tender E2752GXMPMATR, issued by ESKOM in Limpopo, involves the upgrading of a security fence over a 12-month period. The document emphasizes strict compliance with Occupational Health and Safety (OHS) requirements, including Eskom's standards, the OHS Act 85 of 1993, and other statutory regulations. The contractor must ensure all employees and subcontractors adhere to these standards, with penalties for non-compliance. The main contractor is responsible for managing subcontractors, ensuring their compliance, and providing documentation of past work upon request.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx
Eskom is inviting tenders for the upgrading of a security fence over a 12-month period in Limpopo. The tender emphasizes a structured Quality Management System (QMS) aligned with ISO 9001:2015, requiring documented evidence of processes, roles, and quality control measures. Applicants must submit a provisional Contract Quality Plan (CQP) and Quality Control Plan (QCP) to demonstrate compliance with engineering and project management standards.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Azwifaneli Thagwana
Phone
031-710-5290
[email protected]
Address
matimba Power Station - Lephalale - Lephalale - 0555
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
12
Last checked
18 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
ASGI-SA
Description
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfImportant Dates
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)Contact Information
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)Submission Guidelines
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)Evaluation Criteria
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)General
Joint Ventures
Submissions
Technical Specifications
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)Methodology
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfExperience & Qualifications
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfQuality Management
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfPricing Schedule
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfFinancial Requirements
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)Compliance Requirements
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdf (RFP)Health & Safety
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfEnvironmental
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfContractual Terms
Source: E2752GXMPMATR Invitation to Tender (ITT) - upgrading of Parimeter Security fence at Matimba PS.pdfDescription
Source: 240-77471499 (2) Annexure B.docxProject: Upgrading of security fence for 12 months. Key Focus: Compliance with Eskom OHS and other requirements as outlined in Annexure B.
Submission Guidelines
Source: 240-77471499 (2) Annexure B.docx (unknown)Returnable Documents: Signed acknowledgement form (Annexure B) confirming understanding of Eskom OHS and other requirements.
Evaluation Criteria
Source: 240-77471499 (2) Annexure B.docx (unknown)General
Open to suppliers/contractors capable of upgrading security fences and complying with Eskom’s OHS and statutory requirements.
Compliance
Must demonstrate ability to comply with Eskom’s OHS standards and South African OHS/COID Acts.
Subcontractor Oversight
Must have processes in place to manage, audit, and ensure compliance of subcontractors/suppliers.
Past Work
Must provide evidence (testimonials/references) of similar past work if requested by Eskom.
Technical Specifications
Source: 240-77471499 (2) Annexure B.docx (unknown)Scope: Upgrading of security fence for 12 months. Key OHS Requirements: Compliance with Eskom Contractor Health and Safety Requirements Standard 32-136, OHS specifications provided, Occupational Health and Safety Act 85 of 1993, and Compensation for Occupational Diseases and Illnesses Act 130 of 1993. Post-award: Full alignment of company processes with Eskom’s SHE policies, procedures, and standards.
Compliance Requirements
Source: 240-77471499 (2) Annexure B.docx (unknown)OHS Compliance: Mandatory adherence to Eskom and statutory OHS requirements. Penalties apply for non-conformance. Contractor/Supplier Management: Main supplier must demonstrate selection criteria for subcontractors, notify Eskom prior to their appointment, ensure their competence, and monitor their OHS compliance via audits. Non-compliance by subcontractors is the main supplier’s responsibility. Eskom may verify compliance and request testimonials/references for similar past work.
Description
Source: SAFETY REQUIREMENT - Annexture B SHE Rules.docxThis annexure is an Acknowledgement Form for Eskom's Safety, Health, Environmental (SHE) Rules and other requirements that the tenderer must sign and submit.
Submission Guidelines
Source: SAFETY REQUIREMENT - Annexture B SHE Rules.docx (unknown)Returnable Documents: The tenderer must submit a signed Acknowledgement Form for Eskom SHE Rules and Other Requirements (Annexure B).
Evaluation Criteria
Source: SAFETY REQUIREMENT - Annexture B SHE Rules.docx (unknown)General
Compliance
Legal
Technical Specifications
Source: SAFETY REQUIREMENT - Annexture B SHE Rules.docx (unknown)The tenderer must acknowledge and comply with Eskom's Safety, Health, Environmental and Quality (SHE) requirements. The mandatory documents and rules include:
Financial Requirements
Source: SAFETY REQUIREMENT - Annexture B SHE Rules.docx (unknown)Financial penalties will be enforced on the main supplier for non-conformance with Eskom or statutory SHE requirements, including those of its subcontractors. Work stoppages due to SHE issues will not warrant financial compensation claims against Eskom.
Compliance Requirements
Source: SAFETY REQUIREMENT - Annexture B SHE Rules.docx (unknown)The main supplier must:
Description
Source: LOCAL CONTENT ANNEX C,D,E.xlsxTender involves the upgrading of a security fence for a 12-month period. Local content and imported content declarations are required as part of the submission.
Submission Guidelines
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Returnable Documents: None explicitly listed in the provided document extracts.
Evaluation Criteria
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)General
Local Content
Compliance
Financial Requirements
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Pricing must exclude VAT for all calculations. Local content and imported content values must be declared separately, with detailed breakdowns for exempted, direct, and third-party imports. Foreign currency payments must be converted using the tender exchange rate.
Compliance Requirements
Source: LOCAL CONTENT ANNEX C,D,E.xlsx (unknown)Local Content Declaration (Annex C, D, E) required, including: Summary Schedule (Annex C), Imported Content Declaration (Annex D), and Local Content Declaration Supporting Schedule (Annex E). All calculations must align across annexes.
Description
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docxThis document contains only the E-Tenderers' E-Tendering Training Acknowledgement Form template (Template ID: 240-9722574 Rev 1). It does not contain the actual tender description or scope of work for the security fence upgrading project. The tender reference is E2752GXMPMATR for upgrading of security fence for 12 months at Eskom in Limpopo Province.
Submission Guidelines
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)This document is the E-Tenderers' E-Tendering Training Acknowledgement Form - a mandatory returnable document. Bidders must complete this form in full and submit it to Eskom within the prescribed period. The form requires: business name/JV details, contact person information (landline, cellphone, email), and the tenderer's signature acknowledging they have undergone self-training via the e-Tendering Noddy Guide, video, or clarification meeting. Failure to fully complete and submit this form will render the tenderer non-responsive and result in disqualification from the procurement process.
Evaluation Criteria
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)All tenderers must undergo self-training on the E-Tendering Solution and submit the fully completed acknowledgment form to be considered responsive.
Technical Specifications
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)No technical specifications for the security fence upgrading work are contained in this document. This document is only the mandatory E-Tendering Training Acknowledgement Form template, not the actual tender specification. Bidders must obtain the full tender documentation to access technical requirements for the security fence upgrading project.
Compliance Requirements
Source: E-Tenderers’ E-Tendering Training Acknowledgement Form.docx (unknown)E-Tendering Training Completion: Bidders must acknowledge they have undergone e-Tendering self-training (via Noddy Guide, video, or clarification meeting) and confirm they can operate the E-Tendering Solution. This is a mandatory compliance requirement - failure to submit the completed acknowledgement form will result in disqualification.
Evaluation Criteria
Source: Copy of F240042 REV4 ENVIRONMENTAL EVALUATION HIGH RISK ACTIVITY.xlsx (unknown)Mandatory
Desirable
Important Dates
Source: Tender Technical Evaluation Stratergy_NKP Secuirty Fence Upgrade__ REV4.pdf (unknown)Closing Date: 10 July 2026 at 11:00 AM (South African Time). All other dates (briefings, site visits, clarification deadlines) could not be extracted from the available document text.
Submission Guidelines
Source: Tender Technical Evaluation Stratergy_NKP Secuirty Fence Upgrade__ REV4.pdf (unknown)Returnable Documents: The document indicates this is a Request for Quotation. Submission requirements could not be fully extracted from the available text. Bidders should ensure all standard Eskom RFQ returnable documents are completed and submitted before the closing date.
Technical Specifications
Source: Tender Technical Evaluation Stratergy_NKP Secuirty Fence Upgrade__ REV4.pdf (unknown)Scope: Upgrading of security fence for a 12-month period. Location: Nkondlo area (inferred from file name 'NKP Security Fence Upgrade'). This is an Eskom infrastructure project in Limpopo province. Specific technical requirements, standards, and deliverables could not be extracted from the available document text.
Compliance Requirements
Source: Tender Technical Evaluation Stratergy_NKP Secuirty Fence Upgrade__ REV4.pdf (unknown)Insufficient searchable text - AI extraction recommended. Standard Eskom supplier compliance requirements would typically include: CSD registration, valid tax clearance, B-BBEE certification, and compliance with Eskom's supplier development criteria.
Description
Source: PAYE Questionnaire for Service Contracts 2025_2026.docThis is a PAYE (Pay-As-You-Earn) Questionnaire for Service Contracts to Eskom Group of Companies. The document determines whether an Individual, Close Corporation, Company, or Trust should be classified as an Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor, and the tax consequences of such classification. The Pack applies only to Contractors who supply Eskom Holdings SOC Ltd and its subsidiaries with services or Individual Contractors providing Eskom with labour.
Important Dates
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)This questionnaire applies from 1 March 2025 to 28 February 2026. Note: This is not the tender closing date - refer to the tender record for the actual RFQ closing date.
Contact Information
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)Group Tax Department: [email protected]. For queries, contact your contractor representative in Eskom. Group Tax Department is located at Megawatt Park.
Submission Guidelines
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)This document is a PAYE Questionnaire for Service Contracts, not the tender submission document. Returnable documents include: completed and signed summary sheet, signed affidavits (Appendices 1-5 as applicable), signed declarations (Appendices 6-9 as applicable). Submit completed Pack to your Eskom contractor representative. Copy Group Tax at [email protected]. If classified as a Personal Service Provider or Dependent Contractor, PAYE will be withheld from all payments.
Evaluation Criteria
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)Residency
Contractors must confirm if they are residents of South Africa (as per the Income Tax Act). Non-residents must sign Appendix 9.
Employee Threshold
Companies/CCs/Trusts must employ 3+ full-time, non-connected employees engaged in their business to avoid PAYE withholding (Appendix 1).
Income Test
No more than 80% of income should come from Eskom or an associated institution (Appendix 4).
Independence
Contractors must demonstrate independence from Eskom’s control/supervision (Appendix 3) and not be integrated into Eskom’s organizational structure (Dominant Impression Test).
Connected Persons
No connected persons (e.g., shareholders, family members) may render services to Eskom on behalf of the contractor (Appendix 2).
Labour Brokers
Labour Brokers must provide a valid IRP30 exemption certificate to avoid PAYE withholding (Appendix 6).
Compliance Requirements
Source: PAYE Questionnaire for Service Contracts 2025_2026.doc (unknown)This questionnaire determines contractor tax classification under the Fourth Schedule to the Income Tax Act 58 of 1962. Contractor types assessed: Independent Contractor, Personal Service Provider (PSP), Labour Broker, or Dependent Contractor. Key tests include: Residence test (must be SA resident), Number of Employees exclusion (3+ full-time employees not connected to shareholders/members), 80% Income test (no more than 80% from one client), Place/Control/Supervision test (services not mainly at Eskom premises or controlled by Eskom), Dominant Impression test (11 questions assessing employment-like characteristics). If classified as PSP or Dependent Contractor, PAYE will be withheld at code 3601 or 3616 on IRP5. If classified as Independent Contractor, no PAYE withheld and no IRP5 issued.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)This document is a Category 3 Returnables list (Ref 240-12248652_List of Tender Returnables_Cat 3_ Rev 7). It does not contain submission instructions, deadline details, or returnable checklists. Refer to the main tender document for submission requirements.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)Qms Compliance
Applicants must have a documented QMS that complies with ISO 9001:2015 (certification not required but alignment is mandatory)
Documentation
All required QMS documents, CQP, QCP, and Form A must be submitted as part of the tender
Experience
Evidence of similar or previous work (e.g., example ITP or QCP) may be required to demonstrate capability
Project Specific Plans
Provisional CQP and QCP must be tailored to the scope of upgrading the security fence
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)This document specifies quality requirements for upgrading of security fence. Bidders must demonstrate:
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx (unknown)No specific compliance requirements stated in this document. The quality requirements reference Eskom Tender Quality Requirements documents (240-105658000, 240-109253698, 240-109253302) for additional guidance.
Description
Source: eTendering System Training manual.docxThe tender involves the use of Eskom's eTendering system, a web-based platform for electronic submission of tender documents. Key points: 1) Replaces physical submissions at Eskom tender offices. 2) Suppliers must register and verify via OTP (sent to cellphone and email). 3) CSD number is mandatory for access. 4) Documents are uploaded under specific categories (e.g., Technical, Commercial). 5) System is accessible via https://eTendering.eskom.co.za or Tender Bulletin (https://tenderbulletin.eskom.co.za).
Contact Information
Source: eTendering System Training manual.docx (unknown)For system-related issues (Tender Bulletin, eTendering, OpenText), contact the buyer responsible for the published tender. No direct contact details provided in the document.
Submission Guidelines
Source: eTendering System Training manual.docx (unknown)Submit all tender documents electronically via the eTendering system (https://eTendering.eskom.co.za). Steps: 1) Register on the eTendering portal with a valid CSD number. 2) Verify email and OTP sent to registered cellphone and email. 3) Select the tender reference number (e.g., E2752GXMPMATR). 4) Click 'Create New Submission' and upload documents under correct categories (e.g., Technical, Commercial, Finance). 5) Ensure file names are descriptive and file types match the category. 6) Individual file size must not exceed 50MB; total submission size must not exceed 900MB. 7) Click 'Finalize Submission' to complete. 8) Save the confirmation email with submission ID for future reference. Physical submissions are not accepted.
Evaluation Criteria
Source: eTendering System Training manual.docx (unknown)Suppliers must have a valid CSD number and must be registered on the Eskom eTendering system. The document does not specify additional eligibility criteria for the security fence tender itself - applicants should refer to the actual tender documentation for evaluation criteria and pre-qualification requirements.
Technical Specifications
Source: eTendering System Training manual.docx (unknown)The eTendering system is a web-based platform for electronic submission of tender documents. Key features: 1) Replaces manual/physical submissions at Eskom tender offices. 2) Requires supplier registration with CSD number. 3) Uses OTP verification (sent to cellphone and email) for access. 4) Compatible with most web browsers; Microsoft Edge recommended. 5) Supports upload of multiple document types (Technical, Commercial, Finance, etc.).
Compliance Requirements
Source: eTendering System Training manual.docx (unknown)Suppliers must have a valid CSD number to access the eTendering system. No additional compliance requirements explicitly stated in the document.
Description
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdfReturnable Documents
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdf (unknown)Documents and Records. The contractor shall be responsible for keeping documents and records generated during execution of the work described in this SOW document. Creating and obtaining employer's approval of Design and Workshop Drawings, As-built drawings, program, certificates of guarantees, document registers and any other relevant documents. Documenting all relevant activities throughout the design, manufacturing and installation activities within the scope defined in this document. All documents generated shall be filed appropriately into relevant record data books. Ensuring that the final records and documents are complete and contain all relevant documents which are up to date and signed off where applicable. The final records shall be filed into final handover pack, reviewed, and accepted by the employer prior to final handover. On completion of the fences, the Contractor shall furnish the Employer with 'As built' layout and detail drawings of the new outer perimeter fence and all its components.
Evaluation Criteria
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdf (unknown)General
Legal
Safety
Technical Specifications
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdf (unknown)1. Site preparation and clearance, including vegetation removal and maintaining a 3m clearance zone.
2. Demolition, removal, and disposal of the old outer mesh fence and barbed wire coils from the old energized fence.
3. Design, manufacturing, supply, delivery, and installation of a new high-security fence.
4. Installation of earthing for the new fence.
Methodology
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdf (unknown)Quality Management
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdfCompliance Requirements
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdf (unknown)Health & Safety
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdfEnvironmental
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdfContractual Terms
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdfSection
Source: Scope of Work - Upgrade of outer perimeter fence (SIGNED) updated.pdfData conflicts
None detected
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.