Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
1 Maxwell Drive - Sunninghill - Sandton - 2157
Organization Type
GOVERNMENT
Published
02 Jun 2026
OCDS Reference
ocds-9t57fa-157892
ESKOM invites bids for the supply and delivery of stationery to its group capital division on an as-and-when-required basis over a three-year period. Suppliers must submit bids electronically via eskomβs etendering portal with mandatory csd registration.
Returnable Documents:
Method statement Title (Title as per tender/RFQ title) Full Name (Supplier Representative Details) Originated by Reviewed by
(if applicable) Approved by:
(if applicable) Approved by:
(if applicable)
Method statement Title (Title as per tender/RFQ title) Designation (of the compiler)
Method statement Title (Title as per tender/RFQ title) Contact No (of the compiler)
Method statement Title (Title as per tender/RFQ title) Date
Client (Division/Cluster/ Operating/ Business Unit as per tender RFQ) Tender /RFQ Number/ Contract Number- choose the appropriate selection
Activity Detailed Description (type in the information required) Detailed Description (type in the information required) Detailed Description (type in the information required) Reference Document/ Procedure Area / Dept./ Discipline
Scope of work as described in the contract document/ order/ tender Outline the scope of work as detailed in the Works Information of the NEC document for this tender/ RFQ Outline the scope of work as detailed in the Works Information of the NEC document for this tender/ RFQ Outline the scope of work as detailed in the Works Information of the NEC document for this tender/ RFQ Note the relevant document ref number (if available) Relevant discipline (if any)
Scope of work Objectives/ Outputs / contract objectives List 2-3 objectives (Specific. Measurable; Achievable; Realistic & Time bound) in relation to the SOW outputs List 2-3 objectives (Specific. Measurable; Achievable; Realistic & Time bound) in relation to the SOW outputs List 2-3 objectives (Specific. Measurable; Achievable; Realistic & Time bound) in relation to the SOW outputs
Leadership- How is the organizationβs mission, vision, strategy, policies and processes communicated throughout the organization; What are the shared values of this organisation? The mission; vision; values of the organisation. The mission; vision; values of the organisation. The mission; vision; values of the organisation.
Customer Focus - The primary focus of quality management is to meet customer requirements and to strive to exceed customer expectations. How are customer needs identified, and effectively communicated to affected personnel? How are customer needs identified, and effectively communicated to affected stakeholders in and outside the organisation? How are customer needs identified, and effectively communicated to affected stakeholders in and outside the organisation? How are customer needs identified, and effectively communicated to affected stakeholders in and outside the organisation?
Communication- customer satisfaction How does the organisation communicates with clients for determining the requirement for the SOW services or products? Through meetings/websites/ telephone contacts and representative/ or email address/ or any other means.
How does the organisation acquire information from the customer related to questions; complaints; concerns; feedback β provide details for direct email/phone calls/ online surveys; customer support channels; face to face or virtual meetings
How are issues relating to delivery of service/product are handled, elaborate where applicable β transportation; user training; on-site installation; warranties; repairs and customer support. How does the organisation communicates with clients for determining the requirement for the SOW services or products? Through meetings/websites/ telephone contacts and representative/ or email address/ or any other means.
How does the organisation acquire information from the customer related to questions; complaints; concerns; feedback β provide details for direct email/phone calls/ online surveys; customer support channels; face to face or virtual meetings
How are issues relating to delivery of service/product are handled, elaborate where applicable β transportation; user training; on-site installation; warranties; repairs and customer support. How does the organisation communicates with clients for determining the requirement for the SOW services or products? Through meetings/websites/ telephone contacts and representative/ or email address/ or any other means.
How does the organisation acquire information from the customer related to questions; complaints; concerns; feedback β provide details for direct email/phone calls/ online surveys; customer support channels; face to face or virtual meetings
How are issues relating to delivery of service/product are handled, elaborate where applicable β transportation; user training; on-site installation; warranties; repairs and customer support.
Competency, empowering and engaging people throughout the organization to enhance its capability to create value. What Human Resources, training and authority are required for delivering this SOW? Provide details of skills/ competencies and training required to deliver the tender/order Scope of work?
Any accreditation required for the services/products required?
Any industry requirements governing the supply of products/services Provide details of skills/ competencies and training required to deliver the tender/order Scope of work?
Any accreditation required for the services/products required?
Any industry requirements governing the supply of products/services Provide details of skills/ competencies and training required to deliver the tender/order Scope of work?
Any accreditation required for the services/products required?
Any industry requirements governing the supply of products/services
Infrastructure: PPE required
Dealing with client or external providers Property (material/tools/premises/IP/personal data) Infrastructure required to deliver on SOW; PPE that is required in executing the scope of work?
How is the organisation going to protect customer/external provider property (material/tools/premises/IP/personal data)?
How does the organisation limit access to intellectual property or confidential/ personal data especially after the completion of the contract (If applicable) Infrastructure required to deliver on SOW; PPE that is required in executing the scope of work?
How is the organisation going to protect customer/external provider property (material/tools/premises/IP/personal data)?
How does the organisation limit access to intellectual property or confidential/ personal data especially after the completion of the contract (If applicable) Infrastructure required to deliver on SOW; PPE that is required in executing the scope of work?
How is the organisation going to protect customer/external provider property (material/tools/premises/IP/personal data)?
How does the organisation limit access to intellectual property or confidential/ personal data especially after the completion of the contract (If applicable)
List the tools/equipment/infrastructure (including testing/ measurements to be done- if any) required to deliver the scope of work?
Are there any statutory and or regulatory requirements relevant to the sow outputs, please enlist them and highlight mitigation measures. List the tools/equipment/infrastructure (including testing/ measurements to be done- if any) required to deliver the scope of work?
Are there any statutory and or regulatory requirements relevant to the sow outputs, please enlist them and highlight mitigation measures. List the tools/equipment/infrastructure (including testing/ measurements to be done- if any) required to deliver the scope of work?
Are there any statutory and or regulatory requirements relevant to the sow outputs, please enlist them and highlight mitigation measures.
Risk Management -identification and management to mitigate impact List all Risks associated with delivering the scope of work, what actions will be taken to minimise and mitigate the identified risks.
Dealing with non-conformances or substandard work during sow delivery or execution (to add) List all Risks associated with delivering the scope of work, what actions will be taken to minimise and mitigate the identified risks.
Dealing with non-conformances or substandard work during sow delivery or execution (to add) List all Risks associated with delivering the scope of work, what actions will be taken to minimise and mitigate the identified risks.
Dealing with non-conformances or substandard work during sow delivery or execution (to add)
What actions will be undertaken for improving efficiency and effectiveness of the business processes? Explain how the organisation identifies gaps for improvement in business processes to meet or exceed customer/regulatory requirements;
Is there a risk and opportunity register, how often is it populated and reviewed by top management?
How are the identified risks managed to minimise or eliminate impact? Explain how the organisation identifies gaps for improvement in business processes to meet or exceed customer/regulatory requirements;
Is there a risk and opportunity register, how often is it populated and reviewed by top management?
How are the identified risks managed to minimise or eliminate impact? Explain how the organisation identifies gaps for improvement in business processes to meet or exceed customer/regulatory requirements;
Is there a risk and opportunity register, how often is it populated and reviewed by top management?
How are the identified risks managed to minimise or eliminate impact?
Data and Analysis βwhat data will be collected from this contract and what analysis will be carried out to assist with decision making in the future. How does your organisation analyse data to evaluate the degree of customer satisfaction?
How does your organisation monitor data to evaluate conformity of products and services offered by your organisation?
How does your organisation monitor performance of external providers?
How does your organisation deal with resolving issues that requires rework or scrapping? How does your organisation analyse data to evaluate the degree of customer satisfaction?
How does your organisation monitor data to evaluate conformity of products and services offered by your organisation?
How does your organisation monitor performance of external providers?
How does your organisation deal with resolving issues that requires rework or scrapping? How does your organisation analyse data to evaluate the degree of customer satisfaction?
How does your organisation monitor data to evaluate conformity of products and services offered by your organisation?
How does your organisation monitor performance of external providers?
How does your organisation deal with resolving issues that requires rework or scrapping?
Relationship Management. For sustained success, organizations manage their relationships with interested parties, such as suppliers. Purchasing/Procurement done including supplier selection criteria and monitoring if any. Does your organisation source externally for services /products for executing the scope of work?
If yes, do have a process outlined to ensure supplier selection criteria; evaluation and performance monitoring is followed in outsourcing activities? Does your organisation source externally for services /products for executing the scope of work?
If yes, do have a process outlined to ensure supplier selection criteria; evaluation and performance monitoring is followed in outsourcing activities? Does your organisation source externally for services /products for executing the scope of work?
If yes, do have a process outlined to ensure supplier selection criteria; evaluation and performance monitoring is followed in outsourcing activities?
Returnable Documents:
Cell B35: Polypropylene Carry File Folder (blue, red, black, green)
No specific requirements found
Returnable Documents:
Business name/JV: _______________________________________________________
No specific requirements found
Returnable Documents:
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
No specific requirements found
Returnable Documents:
are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tendererβs
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskomβs requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Returnable Documents:
2. Poor quality of items delivered
Supply Manager is (name): Simon McMillan
Address Eskom Megawatt Park, 1 Maxwell Drive,
Sunninghill, Sandton
Tel Provided later
e-mail Provided later
11.2(13) The goods
Payment Terms: payment certificate from the Supply Manager in terms of core
clause 51.1, the Supplier provides the Purchaser with a tax invoice in accordance with the
Purchaser's procedures stated in the Goods Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Supplier does not provide a tax invoice in the form and by t
Returnable Documents:
Cell D3: Type 1 in the block to select the applicable type of Category
No specific requirements found
Returnable Documents:
Supply
Manager and Others to work
No specific requirements found
{"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"ull, according to Options chosen, is essential to create a complete contract."}
Returnable Documents:
[1] 32-727: Safety, Health, Environment and Quality Policy
[24] ISO 9001: 2015 Quality Management Systems - Requirements
Eskom Group Capital Division is committed to achieving and demonstrating sound Safety, health
and Environmental (SHE) management by controlling SHE risks/impacts consistent with its SHEQ
policy and objectives.
Zero harm is one of ESKOM values. The aim of Eskomβs adoption of Zero Harm as one of its values
is to strive to, and achieve world class safety, health and environmental performance, where all
Guardians (employees and contractors) return home safely every day and without harm done to the
environment we operate in.
The aim of the Safety Health and Environmental (SHE) requirements is to provide potential bidders
or suppliers with:
compliance with certain high-level requirements for SHE.
contract, and
needs to adhere or align to & demonstrate commitment towards zero harm
the tenderer is timeously made aware of:
indirectly.
The appointed Supply and Delivery of Stationery Service Provider and its contractors/service
providers must develop an OHS plan or manual that meets these requirements as well as the
relevant applicable legislation.
This document may not thoroughly address all hazards and aspects associated with any specialised
activity or operation. In such situations, contractors shall be responsible for developing their own
health and safety plans/procedures/manuals/work instructions to adequately address their
specialised activities and scope of operation.
2. Supporting Clauses
2.1 Scope
This document sets out the minimum legislative and organisational requirements for work that is
specific to the scope of work, site, and type of project.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
2.2 Purpose
To provide the tenderer/s with Eskomβs minimum requirements to respond to and provide relevant
OHS bidding documents which will be assessed by the Client (Eskom) to determine if the tenderer
is competent in respect to OHS management for the contract.
2.3 Applicability
This document is applicable to the potential Stationery Services Provider as a service provider, and
its suppliers, and or contractors and all the activities carried out for and on behalf of Group Capital
to support its mandate.
2.4 Effective date
This document shall be implemented from date of approval.
3. Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed below.
Note: Where the date for revision of a document on the Eskom Document Centre website has passed,
the document is still current, irrespective of its revision date having passed.
3.1 Normative
[1] 32-727: Safety, Health, Environment and Quality Policy
[2] 32-520 OHS Risk Assessment Procedure
[3] Basic Conditions of Employment Act No .
[4] Occupational Health and Safety Act and Regulations No .
[5] Pressure Equipment Regulations 2009 under OHS ACT
[6] National Road Traffic Act .
[7] Disaster Management Act and Regulations promulgated thereunder
[8] 32-37 Eskom Substance Abuse Procedure
[9] 240-62196227: Life-saving Rules Standard
[10] 240-155373927: Eskom COVID-19 Health and Safety Policy Statement
[11] All Directives issued by the Department of Employment and Labour in respect of
COVID-19
[12] Compensation for Occupational Injuries and Diseases Act
[13] 32-345 Eskom Vehicle Safety Specifications,
[14] 32-124 Eskom Fire Risk Management,
[15] 32-1126 Smoking Policy,
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
[16] 240-62946386 Eskom Vehicle and Driver Safety Management Procedure
[17] 240-43848327- Employeesβ right of refusal to work in an unsafe condition
[18] 32-123 Emergency planning standard,
[19] 32-95 OHS Incident Management Procedure
3.2 Informative
Note: The following is a list of documents that can be used as a guide to meet legal and
Eskom requirements
[20] Tobacco Products Control Act (Updated 2011.05.19)
[21] SANS 1186 Symbolic Safety Signs
[22] SANS 10232-3: Emergency Information Systems β Part 3: Emergency Response Guide
[23] Constitution Of the Republic Of South Africa No
[24] ISO 9001: 2015 Quality Management Systems - Requirements
[25] ISO 14001:2015, Environmental Management Systems
[26] ISO 45001: 2018 Occupational Health and Safety (OH&S) Management Systems
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
3.3 Definitions
3.3.1 Aspect: An activity, product or service of the organisation which can/or has potential to
interact with the environment.
3.3.2 Baseline risk assessment: (32-520) baseline operational risks refer to the health and
safety risks associated with all standard processes and routine activities in the business.
3.3.3 Client: any person for whom construction work is being performed.
3.3.4 Competent Person: means a person who has in respect of the work or task to be performed
the required knowledge, training and experience and, where applicable, qualifications,
specific to that work or task: Provided that where appropriate qualifications and training are
registered in terms of the provisions of the National Qualification Framework Act, 2000 (Act
No.), those qualifications and that training must be regarded as the required
qualifications and training; and is familiar with the Act and with the applicable regulations
made under the Act;
3.3.5 Contractor: means an employer as defined in section 1 of the Act who performs construction
work and includes principal contractors. In relation to this document, where the word
βcontractorβ is used, it will mean all or some of the following: principal contractors, appointed
contractors, suppliers, vendors, service providers and consultants
3.3.6 Environmental risk assessment means a systematic process of evaluating the potential
risks that may be involved in a projected activity or undertaking.
3.3.7 Eskom Requirements: Eskom requirements which evolve from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals
3.3.8 Hazard: means a source of, or exposure to danger.
3.3.9 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
3.3.10 Impacts: Any change to the environment whether adverse or beneficial, wholly or partial
resulting from environmental aspects.
3.3.11 Medical surveillance: means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of employees by an
occupational health practitioner or, in prescribed cases, by an occupational medicine
practitioner.
3.3.12 Method Statement: is a written document detailing work procedures and sequences of
operations.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
3.3.13 On Site/Site: Any workplace where the contractor or his employees performs contract
related work.
3.3.14 Planned Task Observation: is an independent observation made during the planned
period in which the task is being executed.
3.3.15 Risk: the probability that injury or damage will occur.
3.3.16 Risk Assessment: means a programme to determine any risk associated with any hazard
at a construction site to identify the steps needed to be taken to remove, reduce, or control
such hazard.
3.3.17 Safety Health and Environmental file: means a file or other record in permanent form,
containing the information on the SHE management system to be implemented during course
of the contract
3.3.18 Safety, Health and Environmental Plan: means a written plan that addresses hazards
identified during the risk assessment process as well as the identified impacts in the SHE
specification. This would typically include safe work procedures to mitigate, reduce or control
the hazards identified.
3.3.19 Safety, Health and Environmental (SHE) Specification: a record detailing health and
safety requirements the client provides to the potential bidders to guide them of the relevant
contract specific health and safety requirements. This is to ensure the health and safety of
employees and the direct and indirect communities, as well as duty of care for the
environment.
3.3.20 Safe Work Procedures: Safe work procedures are a series of specific steps that guide a
worker through a task from start to finish in a chronological order. Safe work procedures are
designed to reduce the risk by minimizing potential exposure.
4. Abbreviations
Abbreviation Explanation
COID Act Compensation for Occupational Injuries and Diseases Act
DEL Department of Employment and Labour
EMS Environmental Management System
GC Group Capital
GSR General Safety Regulations
HCA Hazardous Chemical Agents
HIRA Hazard identification and risk assessment
ISO International Organisation for Standards
LTIR Lost Time Incident Rate
OHS Act Occupational Health and Safety Act No.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
Abbreviation Explanation
OHS Occupational Health and Safety
PPE Personal Protective Equipment
SANS South African National Standards
SAQA South African Qualifications Authority.
SAQCC South African Qualification and Certification Committee
SHE Safety, health, and environment
5. Roles and Responsibilities
5.1 Commitment to SHE
Visible and felt leadership commitment is essential in providing a healthy and safe work environment.
Management, employees and contractors at all levels must demonstrate their commitment by being
proactively involved in the day-to-day operations, in particular SHE aspects of any project / contract.
Legislation and the Eskom values require that each employee must take reasonable care of
themselves and their fellow workers. Senior Management must provide strategic direction and
demonstrate commitment in terms of SHE issues both on strategic level and operational level.
5.2 The Supply and Delivery of Stationary Services Providerβs accountabilities to their
Contractors
contractor, it is imperative for the Client to be informed. Such contractors must, in every respect,
meet the Clientβs SHE requirements.
Supply and Delivery Stationary Services Provider would then have the same role and
responsibility in relation to the contractors, in a similar way as the Client has in relation to the
Supply and Delivery Stationary Services Provider.
his contractors. The Supply and Delivery Stationary Services Provider will also be responsible
for initiating any remedial action (recovery plan) that may be necessary to ensure that the
contractor complies with all requirements.
appointed have the necessary competencies and resources to perform the work safely.
organisational structured procedure to deal with employees who have transgressed
organisational and legal requirements.
including the contractor employees, including date of induction, relevant skills, and licenses, and
be able to produce this list at the request of the relevant officials. These records shall be filed in
the SHE File.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
disregarding a health & safety notice, instruction or regulation shall immediately report this to the
person concerned. If the person persists, stop the person from working and report the matter to
the relevant Supervisor immediately.
6. Process for Monitoring
This document is valid for the duration of the contract and will be amended, as and when necessary,
and therefore it will be required for the Supply and Delivery Stationary Services Providerβs plan or
manual to be amended accordingly.
Conformance to this document shall be verified based on agreed reviews.
6.1 Related/Supporting Documents
Eskom OHS Act section 37 (2) agreement (to be completed by the Project Manager) (24077037682)
Annexure A β Client non-negotiable OHS requirements
Annexure B - Acknowledgement Form for Eskom SHE Rules and other requirements (32-726)
Annexure C -SHEQ Policy 32-727
Annexure D- Form 75 Contractor Monthly Statistical Report
Annexure E- HIRA Template
7. Document Content
7.1 Note to prospective Supply and Delivery of Stationary Services Provider
The Supply and Delivery of Stationary Services Provider is expected to establish an OHS plan or
manual which meets these requirements as well as all the relevant applicable legislation. Eskom in
no way assumes the Delivery and Supply of Stationary Services Providerβs legal responsibilities.
The Supply and Delivery of Stationary Services Provider as a legal entity, therefore an employer is
and remains accountable for the quality and the execution of the health and safety program for their
employees and contractor employees. This document reflects minimum requirements and should
not be construed as all encompassing.
The Supply and Delivery of Stationary Services Provider is expected to have a OHS Management
system that will incorporate these requirements as well as all the relevant applicable legislation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
8. SHE Requirements
8.1 Project and Scope of Work Details
Location: Address and identification of specific structures - refer to the contracts/other contractual
documentation (works information) where the exact detail is contained.
Project description/detailed scope of work: The Supplier is required to supply stationery items to GCD.
The Supplier is expected to deliver as per specification. Delivery to be on an as and when requested basis.
(Refer to the Scope of Work Document for the comprehensive details)
Program details:
Section 16(1) creates a legal presumption, and therefore no appointment is required. The Contractor
shall provide the full names, contact telephone number and business address of the Chief Executive
Officer.
9. SHE/Q Policy
The Supply and Delivery of Stationary Services Provider and the contractor companies shall each
have a SHE/Q Policy authorised by their Chief Executive (OHS Act Section 16(1) appointee) that
clearly states overall SHE/Q objectives and commitment to improving Safety, Health, Environment
and Quality performance and must be displayed and shared with all stakeholders.
Eskom has a SHEQ Policy that clearly states the policy principles by which Eskom operates and the
commitment to SHEQ excellence and is authorised by the Eskom Group Chief Executive. (See
Annexure C)
10. OHS Requirements
The Client expects the Supply and Delivery of Stationary Services Provider and Contractor to engage
in safety culture initiatives in line with the Eskom SHEQ Policy and value, Zero Harm.
It is required that the Supply and Delivery of Stationary Services Provider and Contactor comply with
the relevant applicable legislation, specifications, and standards in accordance with the scope of the
project.
This Contract will abide by applicable legislative requirements and be aligned to Eskom SHEQ
Policies, standards, and procedures.
A section 37(2) agreement must be signed between the Client and the Supply and Delivery of
Stationary Services Provider before contract award. A signed copy of this agreement is submitted to
the Client prior to commencement of any activities on site.
The Supply and Delivery of Stationary Services Provider must ensure that a section 37(2) agreement
is signed between them and all their appointed contractors/suppliers for the contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
The Supply and Delivery of Stationary Services Provider, always, considers itself to be the
βEmployerβ for the purposes of the OHS Act, and shall not consider itself under the supervision or
management of the Client regarding compliance with the SHE Requirements.
The Supply and Delivery of Stationary Services Provider and its Contractors shall ensure that all
their employees, contractors and agents undergo the relevant Eskom SHEQ induction and
companyβs induction prior to starting the works.
The Client, or any person appointed by the Client, may, at any stage during the execution of this
contract refuse any Employee or Contractor access to the premises if such person has been found
to commit an unsafe act or any unsafe working practice or is found not to be qualified or authorised
in terms of the SHE Requirements.
10.1 Legal and Other Requirements
It is required that all Contractors comply with the relevant applicable legislation, specifications, and
standards in accordance with the scope of the project.
It is the duty of the Supply and Delivery of Stationary Services Provider and contractor to ensure that
they are familiar with the necessary SHE legislation required.
11. Enforcement of SHE Requirements and Non-compliance
The Supply and Delivery of Stationary Services Provider shall submit their procedure on how they
would deal with enforcement and non-compliance to SHE requirements.
12. Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the βBill of Rightsβ is clear on the rights of children,
especially when it comes to:
a) being protected from exploitative labour practices.
b) not to be required or permitted to perform work or provide services that
social development; and the Basic Conditions of Employment Act, Chapter six Section 43
βProhibition of employment of childrenβ.
child in terms of the constitution.
Where work is being performed which is not prohibited in terms of the constitution, then such work
must be conducted in terms of the OHS Act βRegulations on Hazardous Work by Children in South
Africaβ with emphasis on paragraph 2 Purpose and Interpretation.
Eskom does not condone the use of child labour and therefore all efforts must be exercised to avoid
it.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
13. OHS Act
All contractors shall have an up-to-date copy of the OHS Act and Regulations at all work sites which
will be available to all employees. (Reference GAR 4).
14. Cost allocation for SHE Compliance
The Supply and Delivery of Stationary Services Provider shall ensure that the submitted tender
adequately made provision for the cost of Occupational Health and Safety measures.
Note: the costing for OHS must be detailed, itemised based on the overall contracted scope of the
project (i.e.) Medical surveillance (Medicals), provision of PPE, safety equipment purchases,
resources and SHE training etc.
15. Training
The Supply and Delivery of Stationary Services Provider and its Contractor need to ensure that the
resources to work on the contract have the required related training, knowledge, and experience
specific to the scope of work/services.
16. Site Induction
The Supply and Delivery of Stationary Service Provider shall ensure that all his employees and
contractor employees undergo their company induction and Eskom Induction with regard to the
approved OHS plan, general hazards prevalent on the Eskom site, risk assessment, rules and
regulations, and other related aspects.
All visitors must remain in the care and custody of a person (host) who has been properly inducted.
17. Access and Security Control
Access and Security control shall be done according to the Eskom Access Control Policies.
Employees, contractors, and visitors shall be subjected to induction training and substance abuse
tests when entering Eskom sites, or as and when required whilst on Eskom sites.
It may be required that prior to access being granted that person(s) complete the required training
e.g., employee training, occupational health and safety training or any other prescribed training.
The following are prohibited items and shall not be allowed on Eskom sites unless the necessary
authorisation for possession has been obtained:
ammunition issued to the South African Security Forces)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
18. Site Rules (Zero Harm to People and the Environment)
The objective of this section is to define the rules that are over and above the internal regulations
and procedures of Eskom and relevant legislation which will ensure zero harm to persons and the
environment. These rules will be specific to the project and site.
Eskom Life Saving Rules
Six Life Saving rules have been developed that will apply to all Eskom Employees, agents,
consultants, contractors and visitors. Failure to adhere to these rules will be considered a serious
transgression. These rules are being implemented to prevent serious injury or death of any
employee, labour broker or contractor working in any area within Eskom.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
(That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required permit to
work.
Ensure safe live working
Rule 6
Eskom will take a stance of zero tolerance on these rules
Any non-compliance to any health and safety requirement is subject to discipline/removal of person
from the project site.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to serious
disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits an Eskom work site returns home safely
to their family
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
No person shall damage, alter, remove, render ineffective, or interfere with anything that has been
provided for the protection of the site, or for the health and safety of persons.
No person under the influence of alcohol, drugs or medication (in a state of intoxication) or any other
condition that may render him incapable of controlling himself or of other persons under his charge
shall be allowed to enter the site.
All safety and warning signs shall be always obeyed.
Entering or leaving the Site will only take place at official access control points and may only be done
via the official designated walkways.
All employees shall adhere to the SHE and other site-specific rules.
The Supply and Delivery of Stationary Service Provider must have a process in place to address
employees that have contravened Health and Safety Requirements.
Smoking is only permitted at designated areas in accordance with the requirements of the smoking
policy (32-1126: Eskom Smoking Policy).
Do not use Cellular phones in areas where cell phone usage is prohibited.
All fire extinguishers brought to site during supply and delivery shall be:
Ensure that all drivers and passengers wear seatbelts, where fitted, while travelling in a motor
vehicle. Vehicles not fitted with seatbelts must be retrofitted according to the vehicle manufacturerβs
specifications.
Ensure that no employees, including contractor employees, when performing work for Eskom, are
transported at the back of bakkies / vans and trucks.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
The Supply and Delivery of Stationary Services Provider shall provide a Substance Abuse
management policy which is in line with the Eskom Procedure (Eskom Substance Abuse Procedure
32-37)
19. Hazard Identification and Risk Assessment
The supplier shall prepare and provide a Baseline Risk Assessment as per the Scope of work for
the contract.
The Supply and Delivery of Stationary Services Provider shall develop a Risk Assessment in line
with Section 8(2)(d) for the OHS Act and where applicable Construction Regulation 9 (1)
(a-e), in alignment to Eskom 32-520 procedure.
Emerging risks and hazards must be managed as the execution of work progresses. This means
that if there are significant changes to a process or activity, or any new process, then these should
also be subjected to risk assessment.
All risks must be rated.
Attendance registers must be kept of all the employees involved in compiling the risk assessment
Please refer to Annexure F (Risk assessment Template); it may be used as a minimum guideline.
19.1 Emergency Care
The Supply and Delivery of Stationary Services Provider shall ensure that his employees and
contractor employees are familiar with the emergency numbers and are provided with stickers, with
the emergency numbers printed on.
Emergency numbers will also be part of the SHE induction.
Eskom has established a contract with ER24 for all employees and its contractor employees for
emergency medical assistance incurred whilst on duty anywhere in South Africa. The telephone
number is 086 123 7566 (08612 Eskom).
The Supply and Delivery of Stationary Services Provider and contractor shall ensure that alternative
arrangements shall be made for possible incidents occurring while on ESKOM site for supply and
delivery.
19.2 Compensation of Occupational Injuries and Diseases Act (COIDA)
The Supply and Delivery of Stationary Services Provider shall submit proof of registration and letter
of good standing with the compensation fund or with a licensed compensation insurer for his
company and each of his contractors based on South African legislative requirements. This must
remain valid for the duration of the contract. The Letter of Good Standing shall reflect the name of
the Supply and Delivery of Stationary Services Provider and/or Contractor Company.
20. Vehicle Safety Management
All vehicles and equipment shall meet the legislative requirements pertaining to the OHS Act, the
National Road Traffic Act, National Environmental Act and Eskom Vehicle Safety Specification
Procedure 240-62946386.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
21. Housekeeping
Where applicable the Supply and Delivery of Stationary Services Provider and his contractor
resources shall participate in housekeeping programme.
22. Personal Protective Equipment (PPE)
In terms of Section 8 of the OHS Act, the duty of the employer is to take steps to eliminate or mitigate
(hierarchy of control measures) any hazard or potential hazard to the safety or health of employees
before resorting to PPE.
Where applicable the Supply and Delivery of Stationary Services Provider employees and contractor
employees including visitors, shall always use the relevant internationally recognised approved riskbased PPE, as a minimum:
This specification applies to all activities where PPE is required. It sets out Eskomβs minimum
PPE requirement to be met by contractors with the exclusion of the requirements stipulated
about the Eskom Corporate Identity.
The Supply and Delivery of Stationary Services Provider shall ensure that his employees understand
why the personal protective equipment is necessary and that they use them correctly.
Strict non-compliance measures must be administered to any employee not complying with the use
of PPE and that employee shall be removed from the Site.
23. Incident Investigation
The Supply and Delivery of Stationary Services Provider and Contactors shall report all
incidents/accidents as required in terms of the legislation.
All SHE incident reporting, classification and investigation will be done according to the requirements
set out in the Eskom documents 32-95 (Occupational Health and Safety Incident Management
Procedure) and 240-13307117 (Environmental Incident Management Procedure) (latest version)
the 2nd of every month. The reporting format is indicated on Form 75 :( Refer to Annexure D)
24. Omissions of this SHE Requirements
By drawing up these SHE requirements Eskom has endeavoured to address the most critical aspects
relating to SHE issues to assist the Supply and Delivery of Stationary Services Provider to
adequately addressing the health and safety management of persons.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
Should Eskom not have addressed all aspects pertaining to the work that is tendered for, the Supply
and Delivery of Stationary Services Provider need to ensure that all applicable SHE requirements
are identified and included in their management system.
Returnable Documents:
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N/A
3.13 Functionality requirements Functionality requirements are not applicable.
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
6. Unconditional discounts will be taken into account for evaluation
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points.
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
A maximum of 20 points may be awarded to a tenderer for the specific
goal specified for the tender. The points scored for the specific goal
must be added to the points scored for price and the total must be
contract must be awarded to the tenderer scoring the highest points.
B-BBEE Status Level of Number of points
Contributor (80/20 system)
Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Quality Requirements
(Enquiry/Contract/Quality Requirements for Supplier Quality
2. The supplier shall submit a quality method statement based on
ISO 9001 and specific to the scope of work. The quality method
3. The supplier shall submit a signed/ approved quality policy
Returnable Documents:
construction
Environmental Management.
Submit the CV of designated person/s
6. Medium to High Risk: N/A
Aspects and Impacts register related to the scope of
work
No specific requirements found
Returnable Documents:
Supply and delivery of stationery to group capital division
C1.3 Forms of Securities
Pro formas for Bonds & Guarantees
For use with the NEC3 Supply Contract (SC3)
The conditions of contract stated in the Contract Data Part 1 may include the following Options:
Option X14 Advanced payment to the Supplier
These Options require a bond or guarantee βin the form set out in the Goods
No specific requirements found
Returnable Documents:
Supply and delivery of stationery to group capital division
C1.1 Form of Offer & Acceptance
Offer
The Purchaser, identified in the Acceptance signature block, has solicited offers to enter into a contract for
the procurement of:
Supply and Delivery of Stationery to Group Capital Division
The tenderer, identified in the Offer signature block, has
eit
No specific requirements found
Returnable Documents:
used for calculation of the estimated contract value. The evaluation of prices will be based on rates
3.2 To supply requested stationery items on an as and when basis at the right quality, quantity and time.
3.3 The Goods will conform with the quality, description and other particulars of the goods stated in the
3.4 The Goods will be of satisfactory quality and fit for any intended use expressly or impliedly made
3.6 The Goods will conform with all quality standards.
Limitation in accordance with Preferential Procurement Policy Framework Act (PPPFA) No. .
Section 1: Preference Point Scoring System
In accordance with Section 2(1)(d)(i) of PPPFA, that requires contracting with persons, or categories of
scorecard applicable is the 80/20 as stated below
Contributor Number of points (80/20 system)
ce points as specific goals, a tenderer must submit the following documentation
on points.
A tenderer failing to documentation for the allocation of preference points will not be disqualified, butmay only score points out of 90/80 for price
scores zero points out of 10/20 for specific goals.
accordance with the requirements of the PPPFA [clause 2(1)(f)]
Section 3: Contractual Requirements - Contractual requirements are not evaluation criteria. They are
required to be met and assessed after the evaluation and ranking of the tenders.
4.8 Quality .......................................................................................................................................... 6
Returnable Documents: C1.1 Form of Offer and Acceptance [3], C2 Bill of Quantities [4]
Supply Contract (SC3)
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________ )
for Supply and Delivery of Stationery to Group Capital
Division
Contents: No of
pages
Part C1 Agreements & Contract Data [β]
Part C2 Pricing Data [β]
Part C3 Scope of Work
C1.1 Form of Offer and Acceptance [3]
C2 Bill of Quantities [4]
Submit via Eskomβs eTendering portal (https://eTendering.eskom.co.za). Steps: 1) Register on the portal with a valid CSD number, email, and +27-formatted phone number. 2) Verify email via sent link. 3) Log in, then enter OTP sent to email/phone. 4) Select the tender reference number. 5) Click 'Create New Submission' and upload files under correct categories (Technical, Commercial, Finance). 6) Ensure each file is named, typed, and under 50MB (total max 900MB). 7) Click 'Finalize Submission' then 'Finalise and Close Submission'. 8) Save the confirmation email with submission ID for records. Disqualification risk: Incomplete or incorrectly categorized uploads.
Scope: Supply and delivery of stationery on an as-and-when-required basis for 3 years to Eskomβs Group Capital Division (GCD). Submission is fully electronic via eTendering portal. No physical submissions accepted.
Categories
Request for Bid(Open-Tender)
1 Maxwell Drive - Sunninghill - Sandton - 2157
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
20260128_C1 2b SC3 Data by Supplier.pdf
Date & Time
Thursday, 25 June 2026 - 11:00
Venue
https://teams.microsoft.com/meet/351293727750732?p=p5vgtDPyKyJ2dzyexU
02 Jun
2026
Tender Published
Tender was published
25 Jun
2026
Closing Date
Tender closing date
Median Estimate
RΒ 418Β 171
Range
Based on 8 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
No specific requirements found
Cell B35: Polypropylene Carry File Folder (blue, red, black, green)
Business name/JV: _______________________________________________________
NB: The tenderer must complete and sign this form to acknowledge and accept Eskom Supplier Quality Requirements as per 240-105658000 Specification and ISO 9001 Standard.
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskomβs requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
{"closingTime":"2.2","briefingSession":"{\"date\":null,\"time\":null,\"venue\":\"tend a site visit and/or clarification meeting that is stipulated as being\",\"is_compulsory\":true}"}
{"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tendererβs
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskomβs requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
including the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskomβs right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskomβs approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tendererβs 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractorsβ B-BBEE
status and the sub-contractorsβ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
of a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
tenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskomβs requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tendererβs B-BBEE certificate/affidavit, or evidence of βfrontingβ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskomβs responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderersβ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderersβ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
ο· Addenda issued during the tender period;
ο· inclusion of returnables stipulated in the Invitation to Tender;
ο· inclusion of changes agreed in contract negotiations; and
ο· Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
reasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writingβ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as βdouble dippingβ.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tendererβs
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tenderβs context. However,
should suitable mitigating factors not exist in the tenderβs context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tendererβs addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
2000. If Eskom intends to apply Objective Criteria envisaged in section 2(1)(f), Eskom
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
No specific requirements found
B-BBEE Details: deemed to be jointly
and severally liable to the Purchaser for the performance of this contract.
Z2.2 Unless already notified to the Purchaser, the persons or organisations notify the Supply
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Supplier on their behalf.
Z2.3 The Supplier does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Purchaser having
been given to the Supplier in writing.
Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status
Z3.1 Where a change in the Supplierβs legal status, ownership or any other change to his business
composition or business dealings results in a change to the Supplierβs B-BBEE status, the
Supplier notifies the Purchaser within seven days of the change.
Z3.2 The Supplier is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Supply Manager within thirty
days of the notification or as otherwise instructed by the Supply Manager.
Z3.3 Where, as a result, the Supplierβs B-BBEE status has decreased since the Contract Date the
Purchaser may either re-negotiate this contract or alternatively, terminate the Supplierβs
obligation to Provide the Goods and Services.
Z3.4 Failure by the Supplier to notify the Purchaser of a change in its B-BBEE status may constitute
a reason for termination. If the Purchaser terminates in terms of this clause, the procedures on
termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Z4 Confidentiality
Z4.1 The Supplier does not disclose or make any information arising from or in conn
{"name":null,"email":null,"phone":"011 800 8000","department":null,"address":"C Ltd (reg no"}
Supply Manager is (name): Simon McMillan
Address Eskom Megawatt Park, 1 Maxwell Drive,
Sunninghill, Sandton
Tel Provided later
e-mail Provided later
11.2(13) The goods
2. Poor quality of items delivered
insurance
Part c1: agreements and contract data c1.2A Sc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
88.1 The Supplierβs liability to the Purchaser for
indirect or consequential loss, including
loss of profit, revenue and goodwill is
limited to R0.0 (zero Rand)
88.2 For any one event, the Supplierβs liability The amount of damage caused
to the Purchaser for loss of or damage to
the Purchaserβs property is limited to
88.4 The Supplierβs total liability to the The total of the Prices.
in connection with this contract, other than
the excluded matters, is limited to
88.5 The end of liability date is The applicable warrantee or guarantee per item
ordered
dispute to him. (see www.ice-sa.org.za). If the
Z3.2 The Supplier is required to submit an updated verification certificate and necessary supporting
documentation confirming the change in his B-BBEE status to the Supply Manager within thirty
days of the notification or as otherwise instructed by the Supply Manager.
Z3.3 Where, as a result, the Supplierβs B-BBEE status has decreased since the Contract Date the
Purchaser may either re-negotiate this contract or alternatively, terminate the Supplierβs
obligation to Provide the Goods and Services.
Z3.4 Failure by the Supplier to notify the Purchaser of a change in its B-BBEE status may constitute
a reason for termination. If the Purchaser terminates in terms of this clause, the procedures on
termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1 and A3 as
stated in clause 93.
Z4 Confidentiality
Z4.1 The Supplier does not disclose or make any information arising from or in connection with this
contract available to Others. This undertaking does not, however, apply to information which at
the time of disclosure or thereafter, without default on the part of the Supplier, enters the public
domain or to information which was already in the possession of the Supplier at the time of
disclosure (evidenced by written records in existence at that time). Should the Supplier
disclose information to Others in terms of clause 23.1, the Supplier ensures that the provisions
of this clause are complied with by the recipient.
Part c1: agreements and contract data c1.2A Sc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
assumptionβ.
Z9 Purchaserβs limitation of liability
Z9.1 The Purchaserβs liability to the Supplier for the Supplierβs indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Supplierβs entitlement under the indemnity in 83.1 is provided for in 60.1(12) and the
Purchaserβs liability under the indemnity is limited.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z10.1 or had a business rescue order granted against it.
Z11 Addition to secondary Option X7 Delay damages (if applicable in this contract)
Z11.1 If the amount due for the Supplierβs payment of delay damages reaches the limits stated in this
Contract Data for Option X7, the Purchaser may terminate the Supplierβs obligation to Provide
the Goods and Services using the same procedures and payment on termination as those
applied for reasons R1 to R15 or R18 stated in the Termination Table.
Z12 Ethics
court or in any other similar process, of such Prohibited Action before the Purchaser can
terminate the Supplierβs obligation to Provide the Services for this reason.
Z12.3 If the Purchaser terminates the Supplierβs obligation to Provide the Services for this reason,
the amounts due on termination are those intended in core clauses 92.1 and 92.2.
Z12.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited
Z13 Insurance
Z __13.1 Replace core clause 84 with the following:
Insurance cover 84
84.1 When requested by a Party, the other Party provides certificates from
his insurer or broker stating that the insurances required by this
contract are in force.
84.2 The Supplier provides the insurances stated in the Insurance Table A
for events which are at the Supplierβs risk from the starting date until
the last defects date or a termination certificate has been issued.
Part c1: agreements and contract data c1.2A Sc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
goods, plant and materials Purchaserβs insurance.
The Purchaserβs policy deductible as at
Purchaserβs insurance.
damage to property Purchaserβs property
(except the goods, plant The replacement cost where not covered by the
and materials and Purchaserβs insurance.
equipment) and liability for
bodily injury to or death of The Purchaserβs policy deductible as at
a person (not an employee Contract Date, where covered by the
of the Supplier) caused by Purchaserβs insurance.
activity in connection with
this contract Other property
bodily injury to employees
of the Supplier arising out
of and in the course of
their employment in
connection with this
contract
Z _13.2 Replace core clause 87 with the following:
Insurance by 87
the Purchaser
87.1 The Purchaser provides the insurances stated in the Insurance Table B
Transportation (Marine) Per the insurance policy document
Z14 Nuclear Liability
Z14.1 The Purchaser is the operator of the Koeberg Nuclear Power Station (KNPS), a nuclear
installation, as designated by the National Nuclear Regulator of the Republic of South Africa,
and is the holder of a nuclear licence in respect of the KNPS.
Z14.2 The Purchaser is solely responsible for and indemnifies the Supplier or any other person
against any and all liabilities which the Supplier or any person may incur arising out of or
resulting from nuclear damage, as defined in Act , save to the extent that any
liabilities are incurred due to the unlawful intent of the Supplier or any other person or the
presence of the Supplier or that person or any property of the Supplier or such person at or in
the KNPS or on the KNPS site, without the permission of the Purchaser or of a person acting
on behalf of the Purchaser.
Z14.3 Subject to clause Z14.4 below, the Purchaser waives all rights of recourse, arising from the
aforesaid, save to the extent that any claims arise or liability is incurred due or attributable to
the unlawful intent of the Supplier or any other person, or the presence of the Supplier or that
person or any property of the Supplier or such person at or in the KNPS or on the KNPS site,
without the permission of the Purchaser or of a person acting on behalf of the Purchaser.
Z14.4 The Purchaser does not waive its rights provided for in section 30 (7) of Act , or any
replacement section dealing with the same subject matter.
Z14.5 The protection afforded by the provisions hereof shall be in effect until the KNPS is
decommissioned.
Z15 Asbestos
50.1 The assessment interval is To be determined by date of delivery
51.1 The currency of this contract is the South African Rand
51.2 The period within which payments are
made is 30 days from invoice
51.4 The interest rate is i) For South African Rand (ZAR), it is the
publicly quoted South African Rand Overnight
Index Average (ZARONIA) rate published by
the South African Reserve Bank.
X1 Price adjustment for inflation
X1.1 The base date for indices is The month before the closing date of the
tender.
The proportions used to calculate the Average of the CPI (Headline) index Table B2
Price Adjustment Factor are: for the previous 12 month period as published
Part c1: agreements and contract data c1.2A Sc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
Z4.2 If the Supplier is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Supply Manager.
Z4.3 In the event that the Supplier is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Supplier, to the extent permitted by law prior to
disclosure, notifies the Purchaser so that an appropriate protection order and/or any other
action can be taken if possible, prior to any disclosure. In the event that such protective order is
not, or cannot, be obtained, then the Supplier may disclose that portion of the information which
it is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the goods or any
portion thereof, in the course of Providing the Goods and Services and after Delivery, requires
the prior written consent of the Supply Manager. All rights in and to all such images vests
exclusively in the Purchaser.
Z4.5 The Supplier ensures that all his subcontractors abide by the undertakings in this clause.
Z5 Waiver and estoppel: Add to core clause 12.3:
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
not give rise to an estoppel unless the Parties agree otherwise and confirm such agreement in
writing.
Z6 Health, safety and the environment: Add to core clause 25.4
Z6.1 The Supplier undertakes to take all reasonable precautions to maintain the health and safety of
persons in and about the provision of the goods and execution of the services.
proper compliance with all applicable health & safety laws and regulations and the health
and safety rules, guidelines and procedures provided for in this contract and generally for
the proper maintenance of health & safety in and about the execution of supply and
safety laws and regulations and rules, guidelines and procedures otherwise provided for
under this contract and ensures that his Subcontractors, employees and others under the
Supplierβs direction and control, likewise observe and comply with the foregoing.
Z6.2 The Supplier, in and about the execution of the supply, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Supplierβs direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Supply Manager in terms of core
clause 51.1, the Supplier provides the Purchaser with a tax invoice in accordance with the
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (βAsbestos Regulationsβ). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z15.2 Upon written request by the Supplier, the Purchaser certifies that these conditions prevail. All
measurements and reporting are effected by an independent, competent, and certified
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
and related control measures at the Supplierβs expense. For the purposes of compliance the
results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z15.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z15.3 The Purchaser manages asbestos and ACM according to the Standard.
Z15.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z15.5 The Supplierβs personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z15.6 The Supplier continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
Z15.7 Any removal and disposal of asbestos, asbestos containing materials and waste, is done by a
registered asbestos contractor, instructed by the Purchaser at the Purchaserβs expense, and
conducted in line with South African legislation.
Part c1: agreements and contract data c1.2A Sc3 contract data part 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
The conditions of contract are the core B: Priced contract with bill of quantities
clauses and the clauses for Options
X1: Price adjustment for inflation
X2 Changes in the law
X14: Advanced payment to the Supplier
Z: Additional conditions of contract
of the NEC3 Supply Contract (April 2013) 1 (If the December 2009 edition is to be used delete April 2013
and replace by December 2013)
10.1 The Purchaser is (name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state owned company
incorporated in terms of the company laws of
the Republic of South Africa
Cell D3: Type 1 in the block to select the applicable type of Category
Supply
Manager and Others to work
statement however other clauses may also use the same data
3. Where a form field like this [ ] appears, data is required to be inserted relevant to the option
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
11.2(8) The Goods Information for the Supplierβs
design is in:
11.2(11) The tendered total of the Prices is R ,
(in words)
11.2(12) The price schedule is in: C2 SC3 Pricing Data
11.2(14) The following matters will be included in
the Risk Register
25.2 The restrictions to access for the Supply
The following Minimum OHS -related requirements that bidders must address and respond to when submitting their tender returnable are as follows: Please complete the following form, and where required, submit copies of the appropriate documentation.
Provide Signed, Acknowledgement form for Eskom SHE Rules and other legislative requirements.
Hazard Identification and Riska Assessment
SHEQ Policy
(COID) Letter of Good Standing CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689 Delivery of Stationary to Group Capital Division Revision: 1 Page
Annexures: B, C, D & E Annexure B 240-77471499 Annexure B.pdf Annexure C 240-157835076_SHE Q_Policy_Poster.pdf Annexure D Contractor Monthly stats.doc Annexure E
{"name":null,"email":null,"phone":null,"department":null,"address":"n OHS plan or manual that meets these requirements as well as the"}
Eskom Group Capital Division is committed to achieving and demonstrating sound Safety, health
and Environmental (SHE) management by controlling SHE risks/impacts consistent with its SHEQ
policy and objectives.
Zero harm is one of ESKOM values. The aim of Eskomβs adoption of Zero Harm as one of its values
is to strive to, and achieve world class safety, health and environmental performance, where all
Guardians (employees and contractors) return home safely every day and without harm done to the
environment we operate in.
The aim of the Safety Health and Environmental (SHE) requirements is to provide potential bidders
or suppliers with:
compliance with certain high-level requirements for SHE.
contract, and
needs to adhere or align to & demonstrate commitment towards zero harm
the tenderer is timeously made aware of:
indirectly.
The appointed Supply and Delivery of Stationery Service Provider and its contractors/service
providers must develop an OHS plan or manual that meets these requirements as well as the
relevant applicable legislation.
This document may not thoroughly address all hazards and aspects associated with any specialised
activity or operation. In such situations, contractors shall be responsible for developing their own
health and safety plans/procedures/manuals/work instructions to adequately address their
specialised activities and scope of operation.
2. Supporting Clauses
2.1 Scope
This document sets out the minimum legislative and organisational requirements for work that is
specific to the scope of work, site, and type of project.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
2.2 Purpose
To provide the tenderer/s with Eskomβs minimum requirements to respond to and provide relevant
OHS bidding documents which will be assessed by the Client (Eskom) to determine if the tenderer
is competent in respect to OHS management for the contract.
2.3 Applicability
This document is applicable to the potential Stationery Services Provider as a service provider, and
its suppliers, and or contractors and all the activities carried out for and on behalf of Group Capital
to support its mandate.
2.4 Effective date
This document shall be implemented from date of approval.
3. Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed below.
Note: Where the date for revision of a document on the Eskom Document Centre website has passed,
the document is still current, irrespective of its revision date having passed.
3.1 Normative
[1] 32-727: Safety, Health, Environment and Quality Policy
[2] 32-520 OHS Risk Assessment Procedure
[3] Basic Conditions of Employment Act No .
[4] Occupational Health and Safety Act and Regulations No .
[5] Pressure Equipment Regulations 2009 under OHS ACT
[6] National Road Traffic Act .
[7] Disaster Management Act and Regulations promulgated thereunder
[8] 32-37 Eskom Substance Abuse Procedure
[9] 240-62196227: Life-saving Rules Standard
[10] 240-155373927: Eskom COVID-19 Health and Safety Policy Statement
[11] All Directives issued by the Department of Employment and Labour in respect of
COVID-19
[12] Compensation for Occupational Injuries and Diseases Act
[13] 32-345 Eskom Vehicle Safety Specifications,
[14] 32-124 Eskom Fire Risk Management,
[15] 32-1126 Smoking Policy,
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
[16] 240-62946386 Eskom Vehicle and Driver Safety Management Procedure
[17] 240-43848327- Employeesβ right of refusal to work in an unsafe condition
[18] 32-123 Emergency planning standard,
[19] 32-95 OHS Incident Management Procedure
3.2 Informative
Note: The following is a list of documents that can be used as a guide to meet legal and
Eskom requirements
[20] Tobacco Products Control Act (Updated 2011.05.19)
[21] SANS 1186 Symbolic Safety Signs
[22] SANS 10232-3: Emergency Information Systems β Part 3: Emergency Response Guide
[23] Constitution Of the Republic Of South Africa No
[24] ISO 9001: 2015 Quality Management Systems - Requirements
[25] ISO 14001:2015, Environmental Management Systems
[26] ISO 45001: 2018 Occupational Health and Safety (OH&S) Management Systems
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
3.3 Definitions
3.3.1 Aspect: An activity, product or service of the organisation which can/or has potential to
interact with the environment.
3.3.2 Baseline risk assessment: (32-520) baseline operational risks refer to the health and
safety risks associated with all standard processes and routine activities in the business.
3.3.3 Client: any person for whom construction work is being performed.
3.3.4 Competent Person: means a person who has in respect of the work or task to be performed
the required knowledge, training and experience and, where applicable, qualifications,
specific to that work or task: Provided that where appropriate qualifications and training are
registered in terms of the provisions of the National Qualification Framework Act, 2000 (Act
No.), those qualifications and that training must be regarded as the required
qualifications and training; and is familiar with the Act and with the applicable regulations
made under the Act;
3.3.5 Contractor: means an employer as defined in section 1 of the Act who performs construction
work and includes principal contractors. In relation to this document, where the word
βcontractorβ is used, it will mean all or some of the following: principal contractors, appointed
contractors, suppliers, vendors, service providers and consultants
3.3.6 Environmental risk assessment means a systematic process of evaluating the potential
risks that may be involved in a projected activity or undertaking.
3.3.7 Eskom Requirements: Eskom requirements which evolve from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals
3.3.8 Hazard: means a source of, or exposure to danger.
3.3.9 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
3.3.10 Impacts: Any change to the environment whether adverse or beneficial, wholly or partial
resulting from environmental aspects.
3.3.11 Medical surveillance: means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of employees by an
occupational health practitioner or, in prescribed cases, by an occupational medicine
practitioner.
3.3.12 Method Statement: is a written document detailing work procedures and sequences of
operations.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
3.3.13 On Site/Site: Any workplace where the contractor or his employees performs contract
related work.
3.3.14 Planned Task Observation: is an independent observation made during the planned
period in which the task is being executed.
3.3.15 Risk: the probability that injury or damage will occur.
3.3.16 Risk Assessment: means a programme to determine any risk associated with any hazard
at a construction site to identify the steps needed to be taken to remove, reduce, or control
such hazard.
3.3.17 Safety Health and Environmental file: means a file or other record in permanent form,
containing the information on the SHE management system to be implemented during course
of the contract
3.3.18 Safety, Health and Environmental Plan: means a written plan that addresses hazards
identified during the risk assessment process as well as the identified impacts in the SHE
specification. This would typically include safe work procedures to mitigate, reduce or control
the hazards identified.
3.3.19 Safety, Health and Environmental (SHE) Specification: a record detailing health and
safety requirements the client provides to the potential bidders to guide them of the relevant
contract specific health and safety requirements. This is to ensure the health and safety of
employees and the direct and indirect communities, as well as duty of care for the
environment.
3.3.20 Safe Work Procedures: Safe work procedures are a series of specific steps that guide a
worker through a task from start to finish in a chronological order. Safe work procedures are
designed to reduce the risk by minimizing potential exposure.
4. Abbreviations
Abbreviation Explanation
COID Act Compensation for Occupational Injuries and Diseases Act
DEL Department of Employment and Labour
EMS Environmental Management System
GC Group Capital
GSR General Safety Regulations
HCA Hazardous Chemical Agents
HIRA Hazard identification and risk assessment
ISO International Organisation for Standards
LTIR Lost Time Incident Rate
OHS Act Occupational Health and Safety Act No.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
Abbreviation Explanation
OHS Occupational Health and Safety
PPE Personal Protective Equipment
SANS South African National Standards
SAQA South African Qualifications Authority.
SAQCC South African Qualification and Certification Committee
SHE Safety, health, and environment
5. Roles and Responsibilities
5.1 Commitment to SHE
Visible and felt leadership commitment is essential in providing a healthy and safe work environment.
Management, employees and contractors at all levels must demonstrate their commitment by being
proactively involved in the day-to-day operations, in particular SHE aspects of any project / contract.
Legislation and the Eskom values require that each employee must take reasonable care of
themselves and their fellow workers. Senior Management must provide strategic direction and
demonstrate commitment in terms of SHE issues both on strategic level and operational level.
5.2 The Supply and Delivery of Stationary Services Providerβs accountabilities to their
Contractors
contractor, it is imperative for the Client to be informed. Such contractors must, in every respect,
meet the Clientβs SHE requirements.
Supply and Delivery Stationary Services Provider would then have the same role and
responsibility in relation to the contractors, in a similar way as the Client has in relation to the
Supply and Delivery Stationary Services Provider.
his contractors. The Supply and Delivery Stationary Services Provider will also be responsible
for initiating any remedial action (recovery plan) that may be necessary to ensure that the
contractor complies with all requirements.
appointed have the necessary competencies and resources to perform the work safely.
organisational structured procedure to deal with employees who have transgressed
organisational and legal requirements.
including the contractor employees, including date of induction, relevant skills, and licenses, and
be able to produce this list at the request of the relevant officials. These records shall be filed in
the SHE File.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
disregarding a health & safety notice, instruction or regulation shall immediately report this to the
person concerned. If the person persists, stop the person from working and report the matter to
the relevant Supervisor immediately.
6. Process for Monitoring
This document is valid for the duration of the contract and will be amended, as and when necessary,
and therefore it will be required for the Supply and Delivery Stationary Services Providerβs plan or
manual to be amended accordingly.
Conformance to this document shall be verified based on agreed reviews.
6.1 Related/Supporting Documents
Eskom OHS Act section 37 (2) agreement (to be completed by the Project Manager) (24077037682)
Annexure A β Client non-negotiable OHS requirements
Annexure B - Acknowledgement Form for Eskom SHE Rules and other requirements (32-726)
Annexure C -SHEQ Policy 32-727
Annexure D- Form 75 Contractor Monthly Statistical Report
Annexure E- HIRA Template
7. Document Content
7.1 Note to prospective Supply and Delivery of Stationary Services Provider
The Supply and Delivery of Stationary Services Provider is expected to establish an OHS plan or
manual which meets these requirements as well as all the relevant applicable legislation. Eskom in
no way assumes the Delivery and Supply of Stationary Services Providerβs legal responsibilities.
The Supply and Delivery of Stationary Services Provider as a legal entity, therefore an employer is
and remains accountable for the quality and the execution of the health and safety program for their
employees and contractor employees. This document reflects minimum requirements and should
not be construed as all encompassing.
The Supply and Delivery of Stationary Services Provider is expected to have a OHS Management
system that will incorporate these requirements as well as all the relevant applicable legislation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
8. SHE Requirements
8.1 Project and Scope of Work Details
Location: Address and identification of specific structures - refer to the contracts/other contractual
documentation (works information) where the exact detail is contained.
Project description/detailed scope of work: The Supplier is required to supply stationery items to GCD.
The Supplier is expected to deliver as per specification. Delivery to be on an as and when requested basis.
(Refer to the Scope of Work Document for the comprehensive details)
Program details:
Section 16(1) creates a legal presumption, and therefore no appointment is required. The Contractor
shall provide the full names, contact telephone number and business address of the Chief Executive
Officer.
9. SHE/Q Policy
The Supply and Delivery of Stationary Services Provider and the contractor companies shall each
have a SHE/Q Policy authorised by their Chief Executive (OHS Act Section 16(1) appointee) that
clearly states overall SHE/Q objectives and commitment to improving Safety, Health, Environment
and Quality performance and must be displayed and shared with all stakeholders.
Eskom has a SHEQ Policy that clearly states the policy principles by which Eskom operates and the
commitment to SHEQ excellence and is authorised by the Eskom Group Chief Executive. (See
Annexure C)
10. OHS Requirements
The Client expects the Supply and Delivery of Stationary Services Provider and Contractor to engage
in safety culture initiatives in line with the Eskom SHEQ Policy and value, Zero Harm.
It is required that the Supply and Delivery of Stationary Services Provider and Contactor comply with
the relevant applicable legislation, specifications, and standards in accordance with the scope of the
project.
This Contract will abide by applicable legislative requirements and be aligned to Eskom SHEQ
Policies, standards, and procedures.
A section 37(2) agreement must be signed between the Client and the Supply and Delivery of
Stationary Services Provider before contract award. A signed copy of this agreement is submitted to
the Client prior to commencement of any activities on site.
The Supply and Delivery of Stationary Services Provider must ensure that a section 37(2) agreement
is signed between them and all their appointed contractors/suppliers for the contract.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
The Supply and Delivery of Stationary Services Provider, always, considers itself to be the
βEmployerβ for the purposes of the OHS Act, and shall not consider itself under the supervision or
management of the Client regarding compliance with the SHE Requirements.
The Supply and Delivery of Stationary Services Provider and its Contractors shall ensure that all
their employees, contractors and agents undergo the relevant Eskom SHEQ induction and
companyβs induction prior to starting the works.
The Client, or any person appointed by the Client, may, at any stage during the execution of this
contract refuse any Employee or Contractor access to the premises if such person has been found
to commit an unsafe act or any unsafe working practice or is found not to be qualified or authorised
in terms of the SHE Requirements.
10.1 Legal and Other Requirements
It is required that all Contractors comply with the relevant applicable legislation, specifications, and
standards in accordance with the scope of the project.
It is the duty of the Supply and Delivery of Stationary Services Provider and contractor to ensure that
they are familiar with the necessary SHE legislation required.
11. Enforcement of SHE Requirements and Non-compliance
The Supply and Delivery of Stationary Services Provider shall submit their procedure on how they
would deal with enforcement and non-compliance to SHE requirements.
12. Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the βBill of Rightsβ is clear on the rights of children,
especially when it comes to:
a) being protected from exploitative labour practices.
b) not to be required or permitted to perform work or provide services that
social development; and the Basic Conditions of Employment Act, Chapter six Section 43
βProhibition of employment of childrenβ.
child in terms of the constitution.
Where work is being performed which is not prohibited in terms of the constitution, then such work
must be conducted in terms of the OHS Act βRegulations on Hazardous Work by Children in South
Africaβ with emphasis on paragraph 2 Purpose and Interpretation.
Eskom does not condone the use of child labour and therefore all efforts must be exercised to avoid
it.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
13. OHS Act
All contractors shall have an up-to-date copy of the OHS Act and Regulations at all work sites which
will be available to all employees. (Reference GAR 4).
14. Cost allocation for SHE Compliance
The Supply and Delivery of Stationary Services Provider shall ensure that the submitted tender
adequately made provision for the cost of Occupational Health and Safety measures.
Note: the costing for OHS must be detailed, itemised based on the overall contracted scope of the
project (i.e.) Medical surveillance (Medicals), provision of PPE, safety equipment purchases,
resources and SHE training etc.
15. Training
The Supply and Delivery of Stationary Services Provider and its Contractor need to ensure that the
resources to work on the contract have the required related training, knowledge, and experience
specific to the scope of work/services.
16. Site Induction
The Supply and Delivery of Stationary Service Provider shall ensure that all his employees and
contractor employees undergo their company induction and Eskom Induction with regard to the
approved OHS plan, general hazards prevalent on the Eskom site, risk assessment, rules and
regulations, and other related aspects.
All visitors must remain in the care and custody of a person (host) who has been properly inducted.
17. Access and Security Control
Access and Security control shall be done according to the Eskom Access Control Policies.
Employees, contractors, and visitors shall be subjected to induction training and substance abuse
tests when entering Eskom sites, or as and when required whilst on Eskom sites.
It may be required that prior to access being granted that person(s) complete the required training
e.g., employee training, occupational health and safety training or any other prescribed training.
The following are prohibited items and shall not be allowed on Eskom sites unless the necessary
authorisation for possession has been obtained:
ammunition issued to the South African Security Forces)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
18. Site Rules (Zero Harm to People and the Environment)
The objective of this section is to define the rules that are over and above the internal regulations
and procedures of Eskom and relevant legislation which will ensure zero harm to persons and the
environment. These rules will be specific to the project and site.
Eskom Life Saving Rules
Six Life Saving rules have been developed that will apply to all Eskom Employees, agents,
consultants, contractors and visitors. Failure to adhere to these rules will be considered a serious
transgression. These rules are being implemented to prevent serious injury or death of any
employee, labour broker or contractor working in any area within Eskom.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
(That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required permit to
work.
Ensure safe live working
Rule 6
Eskom will take a stance of zero tolerance on these rules
Any non-compliance to any health and safety requirement is subject to discipline/removal of person
from the project site.
Non-compliance to a Life Saving rule will be considered serious misconduct and will lead to serious
disciplinary action, which may include dismissal.
This is to ensure that every person who works on or visits an Eskom work site returns home safely
to their family
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
No person shall damage, alter, remove, render ineffective, or interfere with anything that has been
provided for the protection of the site, or for the health and safety of persons.
No person under the influence of alcohol, drugs or medication (in a state of intoxication) or any other
condition that may render him incapable of controlling himself or of other persons under his charge
shall be allowed to enter the site.
All safety and warning signs shall be always obeyed.
Entering or leaving the Site will only take place at official access control points and may only be done
via the official designated walkways.
All employees shall adhere to the SHE and other site-specific rules.
The Supply and Delivery of Stationary Service Provider must have a process in place to address
employees that have contravened Health and Safety Requirements.
Smoking is only permitted at designated areas in accordance with the requirements of the smoking
policy (32-1126: Eskom Smoking Policy).
Do not use Cellular phones in areas where cell phone usage is prohibited.
All fire extinguishers brought to site during supply and delivery shall be:
Ensure that all drivers and passengers wear seatbelts, where fitted, while travelling in a motor
vehicle. Vehicles not fitted with seatbelts must be retrofitted according to the vehicle manufacturerβs
specifications.
Ensure that no employees, including contractor employees, when performing work for Eskom, are
transported at the back of bakkies / vans and trucks.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
The Supply and Delivery of Stationary Services Provider shall provide a Substance Abuse
management policy which is in line with the Eskom Procedure (Eskom Substance Abuse Procedure
32-37)
19. Hazard Identification and Risk Assessment
The supplier shall prepare and provide a Baseline Risk Assessment as per the Scope of work for
the contract.
The Supply and Delivery of Stationary Services Provider shall develop a Risk Assessment in line
with Section 8(2)(d) for the OHS Act and where applicable Construction Regulation 9 (1)
(a-e), in alignment to Eskom 32-520 procedure.
Emerging risks and hazards must be managed as the execution of work progresses. This means
that if there are significant changes to a process or activity, or any new process, then these should
also be subjected to risk assessment.
All risks must be rated.
Attendance registers must be kept of all the employees involved in compiling the risk assessment
Please refer to Annexure F (Risk assessment Template); it may be used as a minimum guideline.
19.1 Emergency Care
The Supply and Delivery of Stationary Services Provider shall ensure that his employees and
contractor employees are familiar with the emergency numbers and are provided with stickers, with
the emergency numbers printed on.
Emergency numbers will also be part of the SHE induction.
Eskom has established a contract with ER24 for all employees and its contractor employees for
emergency medical assistance incurred whilst on duty anywhere in South Africa. The telephone
number is 086 123 7566 (08612 Eskom).
The Supply and Delivery of Stationary Services Provider and contractor shall ensure that alternative
arrangements shall be made for possible incidents occurring while on ESKOM site for supply and
delivery.
19.2 Compensation of Occupational Injuries and Diseases Act (COIDA)
The Supply and Delivery of Stationary Services Provider shall submit proof of registration and letter
of good standing with the compensation fund or with a licensed compensation insurer for his
company and each of his contractors based on South African legislative requirements. This must
remain valid for the duration of the contract. The Letter of Good Standing shall reflect the name of
the Supply and Delivery of Stationary Services Provider and/or Contractor Company.
20. Vehicle Safety Management
All vehicles and equipment shall meet the legislative requirements pertaining to the OHS Act, the
National Road Traffic Act, National Environmental Act and Eskom Vehicle Safety Specification
Procedure 240-62946386.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
21. Housekeeping
Where applicable the Supply and Delivery of Stationary Services Provider and his contractor
resources shall participate in housekeeping programme.
22. Personal Protective Equipment (PPE)
In terms of Section 8 of the OHS Act, the duty of the employer is to take steps to eliminate or mitigate
(hierarchy of control measures) any hazard or potential hazard to the safety or health of employees
before resorting to PPE.
Where applicable the Supply and Delivery of Stationary Services Provider employees and contractor
employees including visitors, shall always use the relevant internationally recognised approved riskbased PPE, as a minimum:
This specification applies to all activities where PPE is required. It sets out Eskomβs minimum
PPE requirement to be met by contractors with the exclusion of the requirements stipulated
about the Eskom Corporate Identity.
The Supply and Delivery of Stationary Services Provider shall ensure that his employees understand
why the personal protective equipment is necessary and that they use them correctly.
Strict non-compliance measures must be administered to any employee not complying with the use
of PPE and that employee shall be removed from the Site.
23. Incident Investigation
The Supply and Delivery of Stationary Services Provider and Contactors shall report all
incidents/accidents as required in terms of the legislation.
All SHE incident reporting, classification and investigation will be done according to the requirements
set out in the Eskom documents 32-95 (Occupational Health and Safety Incident Management
Procedure) and 240-13307117 (Environmental Incident Management Procedure) (latest version)
the 2nd of every month. The reporting format is indicated on Form 75 :( Refer to Annexure D)
24. Omissions of this SHE Requirements
By drawing up these SHE requirements Eskom has endeavoured to address the most critical aspects
relating to SHE issues to assist the Supply and Delivery of Stationary Services Provider to
adequately addressing the health and safety management of persons.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
Should Eskom not have addressed all aspects pertaining to the work that is tendered for, the Supply
and Delivery of Stationary Services Provider need to ensure that all applicable SHE requirements
are identified and included in their management system.
[1] 32-727: Safety, Health, Environment and Quality Policy
[24] ISO 9001: 2015 Quality Management Systems - Requirements
and SHE Files and submit such to the QCI Services Provider. In turn, Supply and Delivery of
The Supply and Delivery of Stationary Services Provider must have a SHE file in which records of
these SHE requirements and the SHE plan or manual are kept. All information required in this
document and plan, for the duration of the Supply and Delivery of Stationary Services Provider and
contractorsβ contract, is to be recorded in the file.
A copy of the SHE file shall be handed over to the Client at the end of the contract.
26. Employeesβ right of refusal to work in an unsafe situation
Employees have a duty to take reasonable care of their own as well as other personβs health and
safety at work and to cooperate with the employer, carry out lawful orders, including reporting unsafe
situations and incidents.
Refer to Eskom Procedure 240-43848327- Employeesβ right of refusal to work in an unsafe situation.
The aim of the procedure is to ensure that an environment is created that promotes zero harm by
empowering employees and contractors to take responsibility for their own safety and that of others.
27. Contract Sign Off
On completion of the contract, all appointed contractors shall close out their project documentation
and SHE Files and submit such to the QCI Services Provider. In turn, Supply and Delivery of
Stationary Services Provider shall likewise close out his/her project documentation and SHE file and
handover it to the Eskom Project Manager.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
28. Annexure A: The Clientβs Non-Negotiable Occupational Health & Safety
Title: Health and Safety Document Identifier: 559-1128394689
supply stationery items to
Functional Area: SHEQ Sustainability Management GCD. The Supplier is
expected to deliver as per
specification. Delivery to
be on an as and when Revision: 1
requested basis.
Total Pages: 20
Disclosure Classification: Controlled Disclosure
Senior Advisor OHS Middle Manager SHEQRS Senior Manager (Acting)
2026/02/05Date: 05/02/2026 Date: 2026/02/05 Date:
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
Project Scope: ................................................................................................................................ 1
1. Introduction ............................................................................................................................... 4
2. Supporting Clauses .................................................................................................................. 4
2.1 Scope ............................................................................................................................... 4
2.2 Purpose ............................................................................................................................ 5
2.3 Applicability ...................................................................................................................... 5
2.4 Effective date ................................................................................................................... 5
3. Normative/Informative References............................................................................................ 5
3.1 Normative ......................................................................................................................... 5
3.2 Informative ....................................................................................................................... 6
3.3 Definitions ........................................................................................................................ 7
4. Abbreviations ............................................................................................................................ 8
5. Roles and Responsibilities ........................................................................................................ 9
6. Process for Monitoring ............................................................................................................ 10
7. Document Content .................................................................................................................. 10
8. SHE Requirements ................................................................................................................. 11
9. SHE/Q Policy .......................................................................................................................... 11
10. OHS Requirements ................................................................................................................ 11
11. Enforcement of SHE Requirements and Non-compliance ....................................................... 12
12. Hazardous Work by Children (Child Labour) ........................................................................... 12
13. OHS Act ................................................................................................................................. 13
14. Cost allocation for SHE Compliance ....................................................................................... 13
15. Training .................................................................................................................................. 13
16. Site Induction .......................................................................................................................... 13
17. Access and Security Control ................................................................................................... 13
18. Site Rules (Zero Harm to People and the Environment) ......................................................... 14
19. Hazard Identification and Risk Assessment ............................................................................ 16
20. Vehicle Safety Management ................................................................................................... 16
21. Housekeeping ........................................................................................................................ 17
22. Personal Protective Equipment (PPE) .................................................................................... 17
23. Incident Investigation .............................................................................................................. 17
24. Omissions of this SHE Requirements ..................................................................................... 17
25. SHE File ................................................................................................................................. 18
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
26. Employeesβ right of refusal to work in an unsafe situation ....................................................... 18
27. Contract Sign Off .................................................................................................................... 18
28. Annexure A: The Clientβs Non-Negotiable Occupational Health & Safety Requirements ......... 19
29. Annexures: B, C, D & E .......................................................................................................... 20
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
1. Introduction
and Environmental (SHE) management by controlling SHE risks/impacts consistent with its SHEQ
policy and objectives.
Zero harm is one of ESKOM values. The aim of Eskomβs adoption of Zero Harm as one of its values
is to strive to, and achieve world class safety, health and environmental performance, where all
Guardians (employees and contractors) return home safely every day and without harm done to the
environment we operate in.
The aim of the Safety Health and Environmental (SHE) requirements is to provide potential bidders
or suppliers with:
compliance with certain high-level requirements for SHE.
contract, and
needs to adhere or align to & demonstrate commitment towards zero harm
the tenderer is timeously made aware of:
indirectly.
activity or operation. In such situations, contractors shall be responsible for developing their own
health and safety plans/procedures/manuals/work instructions to adequately address their
specialised activities and scope of operation.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
2.2 Purpose
To provide the tenderer/s with Eskomβs minimum requirements to respond to and provide relevant
OHS bidding documents which will be assessed by the Client (Eskom) to determine if the tenderer
is competent in respect to OHS management for the contract.
2.3 Applicability
Note: Where the date for revision of a document on the Eskom Document Centre website has passed,
the document is still current, irrespective of its revision date having passed.
3.1 Normative
[1] 32-727: Safety, Health, Environment and Quality Policy
[2] 32-520 OHS Risk Assessment Procedure
[3] Basic Conditions of Employment Act No .
[4] Occupational Health and Safety Act and Regulations No .
[5] Pressure Equipment Regulations 2009 under OHS ACT
[6] National Road Traffic Act .
[7] Disaster Management Act and Regulations promulgated thereunder
[8] 32-37 Eskom Substance Abuse Procedure
[9] 240-62196227: Life-saving Rules Standard
[10] 240-155373927: Eskom COVID-19 Health and Safety Policy Statement
[11] All Directives issued by the Department of Employment and Labour in respect of
COVID-19
[12] Compensation for Occupational Injuries and Diseases Act
[13] 32-345 Eskom Vehicle Safety Specifications,
[14] 32-124 Eskom Fire Risk Management,
[15] 32-1126 Smoking Policy,
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
[16] 240-62946386 Eskom Vehicle and Driver Safety Management Procedure
[17] 240-43848327- Employeesβ right of refusal to work in an unsafe condition
[18] 32-123 Emergency planning standard,
[19] 32-95 OHS Incident Management Procedure
3.2 Informative
Note: The following is a list of documents that can be used as a guide to meet legal and
[20] Tobacco Products Control Act (Updated 2011.05.19)
[21] SANS 1186 Symbolic Safety Signs
[22] SANS 10232-3: Emergency Information Systems β Part 3: Emergency Response Guide
[23] Constitution Of the Republic Of South Africa No
[24] ISO 9001: 2015 Quality Management Systems - Requirements
[25] ISO 14001:2015, Environmental Management Systems
[26] ISO 45001: 2018 Occupational Health and Safety (OH&S) Management Systems
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
3.3 Definitions
3.3.1 Aspect: An activity, product or service of the organisation which can/or has potential to
interact with the environment.
3.3.2 Baseline risk assessment: (32-520) baseline operational risks refer to the health and
safety risks associated with all standard processes and routine activities in the business.
3.3.3 Client: any person for whom construction work is being performed.
3.3.4 Competent Person: means a person who has in respect of the work or task to be performed
the required knowledge, training and experience and, where applicable, qualifications,
specific to that work or task: Provided that where appropriate qualifications and training are
registered in terms of the provisions of the National Qualification Framework Act, 2000 (Act
No.), those qualifications and that training must be regarded as the required
qualifications and training; and is familiar with the Act and with the applicable regulations
made under the Act;
3.3.5 Contractor: means an employer as defined in section 1 of the Act who performs construction
work and includes principal contractors. In relation to this document, where the word
βcontractorβ is used, it will mean all or some of the following: principal contractors, appointed
contractors, suppliers, vendors, service providers and consultants
3.3.6 Environmental risk assessment means a systematic process of evaluating the potential
risks that may be involved in a projected activity or undertaking.
3.3.7 Eskom Requirements: Eskom requirements which evolve from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals
3.3.8 Hazard: means a source of, or exposure to danger.
3.3.9 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
3.3.10 Impacts: Any change to the environment whether adverse or beneficial, wholly or partial
resulting from environmental aspects.
3.3.11 Medical surveillance: means a planned programme or periodic examination (which may
include clinical examinations, biological monitoring, or medical tests) of employees by an
occupational health practitioner or, in prescribed cases, by an occupational medicine
practitioner.
3.3.12 Method Statement: is a written document detailing work procedures and sequences of
operations.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
3.3.13 On Site/Site: Any workplace where the contractor or his employees performs contract
related work.
3.3.14 Planned Task Observation: is an independent observation made during the planned
period in which the task is being executed.
3.3.15 Risk: the probability that injury or damage will occur.
3.3.16 Risk Assessment: means a programme to determine any risk associated with any hazard
at a construction site to identify the steps needed to be taken to remove, reduce, or control
such hazard.
3.3.17 Safety Health and Environmental file: means a file or other record in permanent form,
containing the information on the SHE management system to be implemented during course
of the contract
3.3.18 Safety, Health and Environmental Plan: means a written plan that addresses hazards
identified during the risk assessment process as well as the identified impacts in the SHE
specification. This would typically include safe work procedures to mitigate, reduce or control
the hazards identified.
3.3.19 Safety, Health and Environmental (SHE) Specification: a record detailing health and
safety requirements the client provides to the potential bidders to guide them of the relevant
contract specific health and safety requirements. This is to ensure the health and safety of
employees and the direct and indirect communities, as well as duty of care for the
environment.
3.3.20 Safe Work Procedures: Safe work procedures are a series of specific steps that guide a
worker through a task from start to finish in a chronological order. Safe work procedures are
designed to reduce the risk by minimizing potential exposure.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
5.1 Commitment to SHE
proactively involved in the day-to-day operations, in particular SHE aspects of any project / contract.
themselves and their fellow workers. Senior Management must provide strategic direction and
demonstrate commitment in terms of SHE issues both on strategic level and operational level.
5.2 The Supply and Delivery of Stationary Services Providerβs accountabilities to their
contractor, it is imperative for the Client to be informed. Such contractors must, in every respect,
meet the Clientβs SHE requirements.
his contractors. The Supply and Delivery Stationary Services Provider will also be responsible
for initiating any remedial action (recovery plan) that may be necessary to ensure that the
contractor complies with all requirements.
appointed have the necessary competencies and resources to perform the work safely.
organisational structured procedure to deal with employees who have transgressed
organisational and legal requirements.
including the contractor employees, including date of induction, relevant skills, and licenses, and
be able to produce this list at the request of the relevant officials. These records shall be filed in
the SHE File.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
disregarding a health & safety notice, instruction or regulation shall immediately report this to the
person concerned. If the person persists, stop the person from working and report the matter to
the relevant Supervisor immediately.
6.1 Related/Supporting Documents
Eskom OHS Act section 37 (2) agreement (to be completed by the Project Manager) (24077037682)
Annexure A β Client non-negotiable OHS requirements
Annexure B - Acknowledgement Form for Eskom SHE Rules and other requirements (32-726)
Annexure C -SHEQ Policy 32-727
Annexure D- Form 75 Contractor Monthly Statistical Report
and remains accountable for the quality and the execution of the health and safety program for their
employees and contractor employees. This document reflects minimum requirements and should
not be construed as all encompassing.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
Section 16(1) creates a legal presumption, and therefore no appointment is required. The Contractor
shall provide the full names, contact telephone number and business address of the Chief Executive
have a SHE/Q Policy authorised by their Chief Executive (OHS Act Section 16(1) appointee) that
clearly states overall SHE/Q objectives and commitment to improving Safety, Health, Environment
and Quality performance and must be displayed and shared with all stakeholders.
commitment to SHEQ excellence and is authorised by the Eskom Group Chief Executive. (See
Annexure C)
in safety culture initiatives in line with the Eskom SHEQ Policy and value, Zero Harm.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
βEmployerβ for the purposes of the OHS Act, and shall not consider itself under the supervision or
management of the Client regarding compliance with the SHE Requirements.
their employees, contractors and agents undergo the relevant Eskom SHEQ induction and
companyβs induction prior to starting the works.
contract refuse any Employee or Contractor access to the premises if such person has been found
to commit an unsafe act or any unsafe working practice or is found not to be qualified or authorised
in terms of the SHE Requirements.
10.1 Legal and Other Requirements
they are familiar with the necessary SHE legislation required.
would deal with enforcement and non-compliance to SHE requirements.
12. Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the βBill of Rightsβ is clear on the rights of children,
especially when it comes to:
a) being protected from exploitative labour practices.
b) not to be required or permitted to perform work or provide services that
social development; and the Basic Conditions of Employment Act, Chapter six Section 43
βProhibition of employment of childrenβ.
child in terms of the constitution.
must be conducted in terms of the OHS Act βRegulations on Hazardous Work by Children in South
Africaβ with emphasis on paragraph 2 Purpose and Interpretation.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
adequately made provision for the cost of Occupational Health and Safety measures.
Note: the costing for OHS must be detailed, itemised based on the overall contracted scope of the
project (i.e.) Medical surveillance (Medicals), provision of PPE, safety equipment purchases,
resources and SHE training etc.
contractor employees undergo their company induction and Eskom Induction with regard to the
approved OHS plan, general hazards prevalent on the Eskom site, risk assessment, rules and
regulations, and other related aspects.
All visitors must remain in the care and custody of a person (host) who has been properly inducted.
tests when entering Eskom sites, or as and when required whilst on Eskom sites.
It may be required that prior to access being granted that person(s) complete the required training
e.g., employee training, occupational health and safety training or any other prescribed training.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
18. Site Rules (Zero Harm to People and the Environment)
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from or
into.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
provided for the protection of the site, or for the health and safety of persons.
No person under the influence of alcohol, drugs or medication (in a state of intoxication) or any other
condition that may render him incapable of controlling himself or of other persons under his charge
shall be allowed to enter the site.
employees that have contravened Health and Safety Requirements.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
that if there are significant changes to a process or activity, or any new process, then these should
also be subjected to risk assessment.
Please refer to Annexure F (Risk assessment Template); it may be used as a minimum guideline.
19.1 Emergency Care
contractor employees are familiar with the emergency numbers and are provided with stickers, with
the emergency numbers printed on.
Eskom has established a contract with ER24 for all employees and its contractor employees for
emergency medical assistance incurred whilst on duty anywhere in South Africa. The telephone
number is 086 123 7566 (08612 Eskom).
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
resources shall participate in housekeeping programme.
22. Personal Protective Equipment (PPE)
In terms of Section 8 of the OHS Act, the duty of the employer is to take steps to eliminate or mitigate
(hierarchy of control measures) any hazard or potential hazard to the safety or health of employees
before resorting to PPE.
employees including visitors, shall always use the relevant internationally recognised approved riskbased PPE, as a minimum:
This specification applies to all activities where PPE is required. It sets out Eskomβs minimum
of PPE and that employee shall be removed from the Site.
set out in the Eskom documents 32-95 (Occupational Health and Safety Incident Management
Procedure) and 240-13307117 (Environmental Incident Management Procedure) (latest version)
the 2nd of every month. The reporting format is indicated on Form 75 :( Refer to Annexure D)
relating to SHE issues to assist the Supply and Delivery of Stationary Services Provider to
adequately addressing the health and safety management of persons.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
and Delivery of Stationary Services Provider need to ensure that all applicable SHE requirements
are identified and included in their management system.
25. SHE File
these SHE requirements and the SHE plan or manual are kept. All information required in this
document and plan, for the duration of the Supply and Delivery of Stationary Services Provider and
contractorsβ contract, is to be recorded in the file.
26. Employeesβ right of refusal to work in an unsafe situation
Employees have a duty to take reasonable care of their own as well as other personβs health and
safety at work and to cooperate with the employer, carry out lawful orders, including reporting unsafe
situations and incidents.
Refer to Eskom Procedure 240-43848327- Employeesβ right of refusal to work in an unsafe situation.
empowering employees and contractors to take responsibility for their own safety and that of others.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
28. Annexure A: The Clientβs Non-Negotiable Occupational Health & Safety
Requirements
documentation.
requirements.
ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by
third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
Health and Safety Requirements for Supply and Unique Identifier: 559-1128394689
Delivery of Stationary to Group Capital Division Revision: 1
Page:
29. Annexures: B, C, D & E
240-157835076_She
Q_Policy_Poster.pdf
resources to work on the contract have the required related training, knowledge, and experience
specific to the scope of work/services.
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tendererβs particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N/A
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2
Schedule
Annexure D Imported Content Declaration β Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE [where applicable and as stipulated under tender Data] Safety Documents will be required as per the scope of work. ο Quality Documents will be required as per the scope of work. ο Other safety/quality COIDA - Original certificate of good standing or proof ο documents as of application issued by the Compensation Fund required per scope (COID) or a licensed compensation insurer (South of works African tenderers only) Environmental Documents will be required as per the scope of work. ο Due Audited Financial Statements of the tenderer for the ο Diligence/financial previous 18 months, or to the extent that such analysis statements are not available, for the last year. In the case of a joint venture or special purpose vehicle (SPV) specially formed for this tender, audited financial statements for each participant in the JV / SPV must be submitted.
Start-up enterprises formed within the last 12 months are not required to submit audited financial statements, but if successful in this Invitation to Tender; will be required to furnish statements for the first year once available. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Reference Returnable From Suppliers at at * closing (Non- prior Award. required required closing. required Tender (disqualifiable) Contract disqualifiable) to Tender Returnable Returnable Returnable DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA Functionality/Technical N/A Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, membersβ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _._ _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _._ _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the membersβ resolution is annexed to this Form. Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position:(Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031
Certificate for trust I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _._ _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. ο¨ Or: Incorrect or incomplete for the following reasons: ο¨ Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender ο¨
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] ο¨ __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder: ο¨
We are a Distributor/Importer/Agent and our Principal, being the Original Equipment Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position to supply cataloguing information for items. We attach the letter from the OEM confirming its position. ο¨ Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 60 File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 28 Identifier Invitation to Tender Effective Date 07 April 2026 Review Date April 2031 Invitation to Tender/Request for Proposal No: ____________________ Name of Tenderer: ___________ _ _ Country of registration: _______________________________________ Full names of contact person: __________________________________ Contact details: Tel (landline): Cell phone: e-mail address: Name of tenderer: Full names of authorised signatory
B-BBEE Minimum Level: 0
Points Allocation: 20 points
B-BBEE Details: when payment is
effected.
Prices will be scored out of 80 points.
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
PPPFA.
A maximum of 20 points may be awarded to a tenderer for the specific
goal specified for the tender. The points scored for the specific goal
must be added to the points scored for price and the total must be
rounded off to the nearest two decimal places. Subject to section
2(1)(f) of the Preferential Procurement Policy Framework Act, the
contract must be awarded to the tenderer scoring the highest points.
B-BBEE Status Level of Number of points
Contributor (80/20 system)
1 20
2 18
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
3 14
4 12
5 8
6 6
7 4
8 2
Non-compliant contributor 0
Tender Returnable if the above elements are requirements.
EMEβs must be submitted (affidavit must be completed fully), or
{"closingDate":"07 April 2026","closingTime":"10h00","briefingSession":"{\"date\":\"09 June 2026\",\"time\":\"10:00\",\"venue\":\"ion A non-compulsory clarification meeting with representatives of\",\"is_compulsory\":true}"}
{"name":"Ms Teams","email":"[email protected]","phone":"013 296 3837","department":"Supply Chain Management","address":"r which may be"}
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tendererβs particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F N/A
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2
Schedule
Annexure D Imported Content Declaration β Supporting Annexure G3 Y
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4 Y
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *
1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N/A
3.13 Functionality requirements Functionality requirements are not applicable.
3.15 Evaluation of Price Prices will be evaluated as follows
evaluation parameters relating to uncertainty and risk, where
6. Unconditional discounts will be taken into account for evaluation
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points.
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
A maximum of 20 points may be awarded to a tenderer for the specific
goal specified for the tender. The points scored for the specific goal
must be added to the points scored for price and the total must be
contract must be awarded to the tenderer scoring the highest points.
B-BBEE Status Level of Number of points
Contributor (80/20 system)
Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Quality Requirements
(Enquiry/Contract/Quality Requirements for Supplier Quality
2. The supplier shall submit a quality method statement based on
ISO 9001 and specific to the scope of work. The quality method
3. The supplier shall submit a signed/ approved quality policy
sanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
2. Tenderers submit more than one [tender/proposal] either
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size
(The upload size per document is 500 megabytes and total
submission is restricted to 4 gigabytes).
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
Effective Date 07 April 2026
Review Date April 2031
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
ISO 9001 and specific to the scope of work. The quality method
statement should address all the supplierβs business
management processes to ensure that all of Eskomβs
requirements are fully met on a consistent basis.
the contract the CSDG established in the CIDB
Infrastructure contracts published in GN 1779,
Government Gazette No. April 2023].
1.1.17 Contract Participation Goals (CPG) N/A
(if applicable)
[Note that the requirements of a contract
participation goal relating to the engagement of
targeted enterprises as established in the aforesaid
standard applies to:
(a) construction works contracts in the General
Building (GB) and to Civil Engineering (CE) classes
of construction works;
(b) construction works contracts of an estimated
minimum project duration of 6 months; and
(c) construction works contracts in which at least
25% of the main contract could reasonably be
SHEQ requirements; and/or
Occupational Health and Safety (OHS) Requirements
2. Baseline OHS Risk Assessment (BRA)
identification, assessment and management of Safety and Health
risks should be done in relation to the scope of work. The
methodology used for the risk assessment must be submitted and
provided together with the BRA by the supplier.
requirements form signed and submitted by the tenderer.
SUPPORTING EVIDENCE [where applicable and
as stipulated under tender Data]
Safety Documents will be required as per the scope of work. ο
Quality Documents will be required as per the scope of work. ο
Other safety/quality COIDA - Original certificate of good standing or proof ο
documents as of application issued by the Compensation Fund
required per scope (COID) or a licensed compensation insurer (South
of works African tenderers only)
Environmental Documents will be required as per the scope of work. ο
Due Audited Financial Statements of the tenderer for the ο
Diligence/financial previous 18 months, or to the extent that such
analysis statements are not available, for the last year.
All categories:
requirements form signed and submitted by the tenderer.
Owner/CEO/MD.
Quality Requirements
1. The supplier shall complete and sign Form A
(Enquiry/Contract/Quality Requirements for Supplier Quality
Management Specification 240-105658000/ QM 58 and ISO
9001).
2. The supplier shall submit a quality method statement based on
ISO 9001 and specific to the scope of work. The quality method
statement should address all the supplierβs business
management processes to ensure that all of Eskomβs
requirements are fully met on a consistent basis.
3. The supplier shall submit a signed/ approved quality policy
(aligned with the supplierβs strategic direction). (documented
information).
4. The supplier shall submit a copy of quality objectives.
(documented information).
5. The supplier shall submit documented information for Control of
Externally Provided Processes, Products and Services.
6. The supplier shall submit a copy of the documented information
for roles, responsibilities, and authorities, specific to the project/
scope of work/ technical requirements. Examples of relevant
documented information are organization charts, job
descriptions, work instructions, duty statements, manuals,
procedures.
Financial viability (submission of financial statements); and/or
months);
purpose vehicle (SPV) especially formed for this tender, latest &
approved annual financial statements for each participant in the
JV / SPV is required; and
accounting period as the annual financial statements (only
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Clause Number from Standard
Tender Data
Conditions of Tender
applicable to South African Organizations that are not required to
audited by Companies Act ).
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Proof that the tenderer recommended for award has met the
stipulated contractual requirements must be submitted prior to
contract award.
Failure to meet stipulated Contractual Requirements by the
stipulated deadlines may result in the tenderer being regarded
as non-responsive and ineligible for contract award.
3.24 Sign form of Agreement/ The conditions of the contract will be:
Contractual Conditions
NEC3 Supply Contract (SC3) with the following main and secondary
options:
Main Option B- Priced contract with bill of quantities
Secondary Option
2.28 CIDB Requirements (where CIDB Requirements are not applicable.
applicable for Engineering and
Construction Works Contracts)
2.29 Contract Skills Development Not applicable.
Goals (CSDG)
2.30 Contract Participation Goals Not applicable.
Please note:
Tenderers are requested to bear in mind Eskom's standard payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
suppliers within 60 days of receipt of undisputed invoices.
Eskom reserves the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market-related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary companies as this
may be interpreted as subcontracting with themselves and / or using their subsidiaries for fronting.
Where a main contractor subcontracts with a subsidiary, this must be declared in its tender documents.
A report containing a list of potential sub-contractors may be drawn by accessing the following link:
www.csd.gov.za
βproof of B-BBEE status level of contributorβ means-
(a) the B-BBEE status level certificate issued by an authorised body or person; or
(b) a sworn affidavit as prescribed by the B-BBEE Codes of Good Practice; or
(c) any other requirement prescribed in terms of the Broad-Based Black Economic Empowerment Act
1.2 Tender returnables
The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline.
Note the following: -
These returnables are required to be completed, signed (if required on the returnable) and submitted with
the tender at Tender closing date and time. If not completed, signed (if required on the returnable) and/or
submitted by tender closing, the tenderer will be disqualified.
These returnables are required to be completed, signed (if required on the returnable) and submitted with
Tender at Tender closing date and time; however, if not submitted by Tender closing, or submitted with
incomplete information or without a required signature, the Procurement Practitioner will, in writing,
request the tenderer to submit the returnable within 5 working days. If the returnable is not completed,
signed if required and/or received by the Procurement Practitioner within 5 working days of the request,
the tenderer will be disqualified.
The 5 working days period does not apply to CIDB proof of grading. Refer to the returnable table the
prescribed period for CIDB proof of grading.
# Returnables required at Tender Closing date and time for evaluation: -
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
These returnables are required to be submitted at tender closing date and time. These returnables will
not be requested by the Procurement Practitioner. A tenderer that does not submit the required returnable
at stipulated deadline or submits an incomplete returnable; will not be disqualified but will score zero.
Returnable required prior to Contract Award.
Returnables that are mandatory for contract award must be submitted prior to award, completed if
completion is a requirement and signed if signature is a requirement.
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Basic Compliance Electronic copy of the tender in a PDF format. The ο
completed price schedule needs to be submitted in
PDF and a copy in excel format (The upload size per
document is 500 megabytes and total submission is
restricted to 4 gigabytes).
Annexure A Authorisation Form. ο
Annexure B Acknowledgement Form. ο
Annexure C Tenderers Particulars. ο
Annexure D Integrity Pact Declaration form. ο
Annexure E CPA for local goods/services (if applicable). ο
Annexure F CPA(IG) for imported goods/services (if applicable). N/A
Annexure G1-G4 SBD 6.2 -Declaration certificate for local production ο
and content and Annexures G2,G3,G4.
Annexure H SBD 1- to be completed and submitted by all ο
(applicable for all tenderers.
suppliers including
Foreign suppliers)
# Annexure I SBD 6.1- Preference Points Claim Form in terms of ο
PPPFA 2022 regulations.
Annexure J SBD 4 β Bidders Disclosure. ο
Reverse e-auction N/A
training
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
acknowledgement
form
E-tendering Help ο
Manual
acknowledgement
form
Additional Letter of intent to form a JV/consortium or Valid joint ο
Documents required venture agreement confirming the rights and
in the event of JV: - obligations of each of the joint venture partners and
their profit-sharing ratios.
Separate written confirmation that the joint venture will ο
operate as a single business entity (incorporated) for
the duration of the contract or this may be included as
an obligation within the JV agreement.
Details and confirmation of a single designated bank ο
account in the name of the JV and independent of the
individual JV partners, as set out in the joint venture
agreement.
# Specific Goals A tendererβs failure to submit proof that it meets the ο
specific goals will not result in its disqualification.
The tenderer will, however, be scored zero for
Specific Goals for purposes of PPPFA scoring and
ranking.
Tax Clearance A certified copy of a tax clearance certificate is ο
Certificates required from foreign tenderers (with a footprint in
South Africa but that are not registered on CSD and
have not provided a SARS pin number) and local
tenderers (that have not provided their SARS e-filing
PIN number for verification by Eskom and/or their
CSD profile / CSD number).
Foreign suppliers with no footprint in South Africa must
complete the SBD1 document; however, no proof of
tax compliance is required.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Tax Evaluation Evaluation questionnaire to determine whether a N/A
Questionnaire (if company, close corporation (CC) or Trust is a personal
services contract service provider for purposes of PAYE.
and was included as
annexure)
Compliance with To the extent that the tenderer falls within the definition ο
Employment Equity of a βdesignated Employerβ as contemplated in the
Act Employment Equity Act , the tenderer is
required to furnish the Employer with proof of
compliance with the Employment Equity Act, including
proof of submission of the Employment Equity report
to the Department of Labour. (South African tenderers
only).
CIDB Valid proof of the required CIDB grading designation N/A
for the main contractor; JV and /or sub-contractor as
may be required in the tender data at tender closing
deadline or within 21 working days from the closing
date of submission of tenders if this is agreed with the
Employer.
NEC Contract NEC Contract, completed. ο
C1.1 Form of Offer and Acceptance (if not already ο
submitted in the NEC Contract).
C1.2 Data provided by the Supplier (if not already ο
submitted in the NEC Contract).
The price Schedule to be submitted in excel format ο
(The limit is 50MB per file and total submission of
900MB per submission).
Additional N/A
documents required
(Ecsa/
SACPCMP/CVs/
permits/licenses/
specific registration
documents
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, Β© copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 60
File name: 20260602_Invitation to Tender_ StationerySupply and Delivery of Stationery
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 28
Identifier
Invitation to Tender
Effective Date 07 April 2026
Review Date April 2031
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
(if applicable to
scope of work)
Mandatory contractual requirements
SUPPORTING EVIDENCE [applicable to all
tenders]
Mandatory CSD Registration (CSD number/CSD Report) ο
Contractual
Environmental Requirements
Effective Date 07 April 2026
Review Date April 2031
Number Description Annexure Attached (Y /
N / n/a)
expected to be subcontracted out in one or more of
the following CIDB classes of construction works:
i) Civil Engineering (CE)
ii) Electrical Engineering Work (EB)
iii) General Building Works (GB)
iv) Mechanical Engineering (ME)
1.1.18 Scope of Work Y
1.1.19 NEC3 Supply Contract (SC3) Y
1.1.20 Price Schedule PDF and excel format Y
1.2 Tender Data
the Eskom E- tendering page. The documents need to be uploaded
under the folder Technical, Commercial, Financial, and other.
All documents need to be submitted in a PDF format (The upload size
per document is 500 megabytes and total submission is restricted to 4
gigabytes). The price schedule needs to be submitted in PDF and
a copy in excel format.
05 June 2026. Confirmation must be sent to Eskom Representative
on e-mail [email protected]/ [email protected]
stating the company name, representative name, identification
number, position and contact details of each proposed attendee.
2.16 Seeking clarification The tenderer will notify Eskom of any clarifications required before
closing time for clarification queries, which is 3 (three) working days
before the deadline for tender submission.
2.22 Alternative tenders Alternative tenders are not allowed.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award and will need to ensure that
all materials delivered to Eskom are labelled in line with Eskomβs
labelling specifications as may be stipulated by Eskom. Where
cataloguing is a requirement, the Pricing Schedule must also include
a line item for cataloguing, which tenderers are required to quote for.
Goal, it will not be disqualified. However, it will be awarded 0 points
for that Specific Goal.
3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for
the 80/20 system. Eskom will add the score from Pricing and Specific
completion is a requirement and signed if signature is a requirement.
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Basic Compliance Electronic copy of the tender in a PDF format. The ο
completed price schedule needs to be submitted in
PDF and a copy in excel format (The upload size per
document is 500 megabytes and total submission is
restricted to 4 gigabytes).
Annexure A Authorisation Form. ο
Annexure B Acknowledgement Form. ο
Annexure C Tenderers Particulars. ο
Annexure D Integrity Pact Declaration form. ο
Annexure E CPA for local goods/services (if applicable). ο
Annexure F CPA(IG) for imported goods/services (if applicable). N/A
Annexure G1-G4 SBD 6.2 -Declaration certificate for local production ο
and content and Annexures G2,G3,G4.
Annexure H SBD 1- to be completed and submitted by all ο
(applicable for all tenderers.
suppliers including
Foreign suppliers)
# Annexure I SBD 6.1- Preference Points Claim Form in terms of ο
PPPFA 2022 regulations.
Annexure J SBD 4 β Bidders Disclosure. ο
NEC Contract NEC Contract, completed. ο
C1.1 Form of Offer and Acceptance (if not already ο
submitted in the NEC Contract).
C1.2 Data provided by the Supplier (if not already ο
submitted in the NEC Contract).
The price Schedule to be submitted in excel format ο
(The limit is 50MB per file and total submission of
900MB per submission).
construction
Environmental Management.
Submit the CV of designated person/s
6. Medium to High Risk: N/A
Aspects and Impacts register related to the scope of
work
submitted by the tenderer
2 All categories: Environmental (or SHE/SHEQ) policy Yes
signed by Company Owner/CEO/MD
3 High &Medium Risk Only: Costing for Environmental N/A
environmental management related to the overall scope
of work/service to be performed.
e.g. Oil spillages clean up, awareness training, waste
removal and disposal etc.
N/A = Not Records applicable provided
4. High Risk Only: Environmental Competency. N/A
resources e.g.
β Environmental Officer/s
5. High Risk Only: Environmental Officer CV with N/A
minimum 3 yearsβ experience in construction
{"name":null,"email":null,"phone":null,"department":null,"address":"e to the above numbered contract made or to be made between"}
Supply and delivery of stationery to group capital division
C1.3 Forms of Securities
Pro formas for Bonds & Guarantees
For use with the NEC3 Supply Contract (SC3)
The conditions of contract stated in the Contract Data Part 1 may include the following Options:
Option X14 Advanced payment to the Supplier
These Options require a bond or guarantee βin the form set out in the Goods
For use with the NEC3 Supply Contract (SC3)
The conditions of contract stated in the Contract Data Part 1 may include the following Options:
Option X14 Advanced payment to the Supplier
These Options require a bond or guarantee βin the form set out in the Goods Informationβ.
treated as part of the Goods Information.
The organisation providing the bond / guarantee does so by copying the pro forma document onto itβs
letterhead without any change to the text or format and completing the required details. The completed
document is then given to the Purchaser within the time stated in the contract.
Part c1: agreements and contract data c1.3 Sc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
the advanced payment has been repaid to the Purchaser in terms of the Contract, or liquidated by
deductions from other payments due to the Supplier.
5. The amount of the bond shall be payable to the Purchaser upon the Purchaserβs demand and no later
than 7 days following the submission to the Surety of a certificate signed by the Supply Manager stating
the amount of the Purchaserβs losses, damages and expenses incurred as a result of the non-
Part c1: agreements and contract data c1.3 Sc3 proforma guarantees
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
performance aforesaid. The signed certificate shall be deemed to be conclusive proof of the extent of
the Purchaserβs loss, damage and expense.
6. Our total liability hereunder shall not exceed the sum of ............................. (R ................) which is equal
to the advance payment.
Signature of Witness(s)
Name(s) (printed)
Part c1: agreements and contract data c1.3 Sc3 proforma guarantees
{"name":null,"email":null,"phone":null,"department":null,"address":"n the conditions of contract identified in"}
Supply and delivery of stationery to group capital division
C1.1 Form of Offer & Acceptance
Offer
The Purchaser, identified in the Acceptance signature block, has solicited offers to enter into a contract for
the procurement of:
Supply and Delivery of Stationery to Group Capital Division
The tenderer, identified in the Offer signature block, has
eit
of Deviations (if any), contact the Purchaserβs agent (whose details are given in the Contract Data) to
arrange the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to
be provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
signature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Goods Information including Supply Requirements
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
of the goods .................................................................................. 3
3 Supply Requirements ................................................................................................................... 4
4 Constraints on how the Supplier Provides the Goods ................................................................. 4
4.1 Work to be done by the Delivery Date ......................................................................................... 4
4.1.1 Packing lists for cases and their contents .................................................................................... 4
4.1.2 Copy of invoice for the goods ...................................................................................................... 4
4.1.3 Delivery Note................................................................................................................................ 4
4.1.4 Test results and maintenance manuals (if applicable) ................................................................ 4
4.2 Constraints at the delivery place and place of use ...................................................................... 5
4.3 Services & oth
Payment Terms: payment certificate to the Supplier Purchaser
10. The Purchaser approves payment certificate and provides the Supplier Purchaser
a Goods receipt number
11. The Supplier submits invoices for approval and processing to Eskom Supplier
GCD accountants payable [email protected]
Within one week of receiving a payment certificate from the Supply Manager
Proof of ownership (CIPS documentation) and breakdown of Shareholding information
B-BBEE Minimum Level: 0
B-BBEE Details: lly excluded.
5 Procurement
5.1 Subcontracting
5.1.1 Preferred subcontractors
Not defined in this contract.
5.1.2 Limitations on subcontracting
Limitation in accordance with Preferential Procurement Policy Framework Act (PPPFA) No. .
5.1.3 Other requirements related to procurement
Section 1: Preference Point Scoring System
In accordance with Section 2(1)(d)(i) of PPPFA, that requires contracting with persons, or categories of
persons, historically disadvantaged by unfair discrimination on the basis of race, gender or disability. The
scorecard applicable is the 80/20 as stated below:
B-BBEE Status Level of
Contributor Number of points (80/20 system)
1 20
2 18
3 14
4 12
5 8
6 6
Part c3: scope of work c3.2 Sc3 supplierβs goods information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Supply and delivery of stationery to group capital division
7 4
8 2
Non-compliant contributor 0 To claim
preferen
ce points as specific goals, a tenderer must submit the following documentation:
/CIPC affidavit.
agent in the name of the JV. Sworn Affidavits are not acceptable for Jvs and may result zero scoring
on points.
A tenderer failing to documentation for the allocation of preference points will not be disqualified, butmay only score points out of 90/80 for price
scores zero points out of 10/20 for specific goals.
Section 2: Objective Criteria - May change award from the highest ranked tenderer to another tenderer in
accordance with the requirements
{"name":null,"email":null,"phone":null,"department":"1 Clear A4 Folders Each (Pack of 10)","address":null}
of the goods .................................................................................. 3
3 Supply Requirements ................................................................................................................... 4
4 Constraints on how the Supplier Provides the Goods ................................................................. 4
4.1 Work to be done by the Delivery Date ......................................................................................... 4
4.1.1 Packing lists for cases and their contents .................................................................................... 4
4.1.2 Copy of invoice for the goods ...................................................................................................... 4
4.1.3 Delivery Note................................................................................................................................ 4
4.1.4 Test results and maintenance manuals (if applicable) ................................................................ 4
4.2 Constraints at the delivery place and place of use ...................................................................... 5
4.3 Services & oth
used for calculation of the estimated contract value. The evaluation of prices will be based on rates
3.2 To supply requested stationery items on an as and when basis at the right quality, quantity and time.
3.3 The Goods will conform with the quality, description and other particulars of the goods stated in the
3.4 The Goods will be of satisfactory quality and fit for any intended use expressly or impliedly made
3.6 The Goods will conform with all quality standards.
Limitation in accordance with Preferential Procurement Policy Framework Act (PPPFA) No. .
Section 1: Preference Point Scoring System
In accordance with Section 2(1)(d)(i) of PPPFA, that requires contracting with persons, or categories of
scorecard applicable is the 80/20 as stated below
Contributor Number of points (80/20 system)
ce points as specific goals, a tenderer must submit the following documentation
on points.
A tenderer failing to documentation for the allocation of preference points will not be disqualified, butmay only score points out of 90/80 for price
scores zero points out of 10/20 for specific goals.
accordance with the requirements of the PPPFA [clause 2(1)(f)]
Section 3: Contractual Requirements - Contractual requirements are not evaluation criteria. They are
required to be met and assessed after the evaluation and ranking of the tenders.
4.8 Quality .......................................................................................................................................... 6
Part 3: Scope of Work ................................................................................................................................ 1
C3.1: Purchaserβs Goods Information ........................................................................................................ 2
1 Overview and purpose of the goods and services ....................................................................... 3
2 Specification and description of the goods .................................................................................. 3
3 Supply Requirements ................................................................................................................... 4
4 Constraints on how the Supplier Provides the Goods ................................................................. 4
4.1 Work to be done by the Delivery Date ......................................................................................... 4
4.1.1 Packing lists for cases and their contents .................................................................................... 4
4.1.2 Copy of invoice for the goods ...................................................................................................... 4
4.1.3 Delivery Note................................................................................................................................ 4
4.1.4 Test results and maintenance manuals (if applicable) ................................................................ 4
4.2 Constraints at the delivery place and place of use ...................................................................... 5
4.3 Services & other things to be provided by the Purchaser or Supplier ......................................... 5
4.3.1 Giving notice of Delivery .............................................................................................................. 5
4.3.2 Checking packing and marking before dispatch .......................................................................... 5
4.3.3 Contracting for transport .............................................................................................................. 5
4.3.4 Loading the goods ....................................................................................................................... 5
4.3.5 Unloading the goods .................................................................................................................... 5
4.4 Management meetings ................................................................................................................ 5
4.5 Documentation control ................................................................................................................. 5
4.6 Health and safety risk management ............................................................................................ 5
4.7 Environmental constraints and management .............................................................................. 6
4.8 Quality .......................................................................................................................................... 6
4.9 Invoicing and payment ................................................................................................................. 6
4.10 Contract change management..................................................................................................... 6
4.11 Provision of bonds and guarantees ............................................................................................. 7
4.12 Records of Defined Cost, payments & assessments of compensation events to be kept by the
Supplier 7
5 Procurement................................................................................................................................. 7
5.1 Subcontracting ............................................................................................................................. 7
5.1.1 Preferred subcontractors ............................................................................................................. 7
5.1.2 Limitations on subcontracting ...................................................................................................... 7
5.1.3 Other requirements related to procurement ................................................................................. 7
5.1.4 Cataloguing requirements by the Supplier ................................................................................... 9
Part c3: scope of work c3.2 Sc3 supplierβs goods information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
4.11 Provision of bonds and guarantees
The form in which a bond or guarantee required by the conditions of contract (if any) is to be provided by the
Supplier is given in Part 1 Agreements and Contract Data, document C1.3, Sureties.
does not affect the Purchaserβs right to termination stated in this contract.
4.6 Health and safety risk management
4.7 Environmental constraints and management
before award
4.9 Invoicing and payment
Deliverables generally follow the process outlined in Table 1.
Table 1: Process for Review and Acceptance of Deliverables (in the case of a fee
remuneration methodology)
Note: Stationery items will be procured on an as and when basis. Quantities are merely estimates to be
used for calculation of the estimated contract value. The evaluation of prices will be based on rates
received.
information:
4.10 Contract change management
Part c3: scope of work c3.2 Sc3 supplierβs goods information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
Supply Contract (SC3)
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and [Insert at award stage]
(Reg No. ___________ )
for Supply and Delivery of Stationery to Group Capital
Division
Contents: No of
pages
Part C1 Agreements & Contract Data [β]
Part C2 Pricing Data [β]
Part C3 Scope of Work
Part c1: agreements & contract data
Contents: No of
pages
C1.1 Form of Offer and Acceptance [3]
[to be inserted from Returnable Documents at award
stage]
C1.2a Contract Data provided by the Purchaser [12]
C1.2b Contract Data provided by the Supplier [2]
C1.3 Proforma Guarantees [3]
C2 Bill of Quantities [4]
C3.1 Purchaserβs Goods Information [9]
CONTRACT - ii - SC3 COVER PAGES
Contents: No of
pages
Part C1 Agreements & Contract Data [β]
Part C2 Pricing Data [β]
Part C3 Scope of Work [β]
CONTRACT No. [Insert at award stage]
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _________
Mandatory: Valid CSD (Central Supplier Database) number required to access the eTendering system. Suppliers must register on the portal before submission.
Closing date: 23 August 2022 at 15:42. Note: This date conflicts with the tender record (25 June 2026). Verify the correct deadline in the official tender listing.
For system issues: Contact the buyer responsible for the published tender. General portal access: Use https://tenderbulletin.eskom.co.za or https://eTendering.eskom.co.za. Automated submission confirmations sent from [email protected].
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to βuploadβ their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be βdroppedβ or βuploadedβ. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
Quick and direct access is also available by using the following links:
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
2 Problems
A channel of communication has been created in case users of the system experiences a problem
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 Whatβs New
A new functionality to βadd closed tendersβ. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
4 Getting Started
To gain access to eTendering portal
1. Open your web browser
2. Type TenderBulletin (eskom.co.za) or https://eTendering.eskom.co.za
3. eTendering system login page will be displayed:
Fig 1
Registration Form Steps to follow
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Plus prefix e.g +27
capture picture to validate that you
are not a robot.
click on register button
the registerer to verify the email sent to
the provided email address.
click on βResend Verification Emailβ
button
on link provided on
the email.
etendering site with a login screen
displayed, now complete the login
with your verified email address and
password
*
Fig1.1
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig2a.
Fig2b.
Fig3.
4. Once the email is verified, login using your registered email address and password then the
OTP page will be displayed
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5. OTP sent to the registered cellphone number and email address
6. Insert the otp number then click βVerify OTPβ button, to resend OTP click on βResend OTPβ
button
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7. Landing page once OTP is verified
8. Select the preferred βRef Noβ
9. A page with the preferred Tender information is displayed before tender documentation can
be submitted.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
10. Click on βCreate New Submissionβ button to submit required Tender documents
11. Landing page once clicked on βCreate New Submissionβ button. Take note of the
mentioned disclaimers.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
12. To submit tender documents, click on βAdd fileβ button
13. Upload required tender documents by:
1. Giving the file a name
2. Select the listed file type e.g.: Technical, commercial, finance and etc
3. Choose the file you need to upload
4. Then click on βUploadβ button, Fig5.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
Fig4.
Fig5.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
14. Once clicked on βUploadβ button, this page will be displayed with the submitted document(s).
Continue to submit all the required documents under the correct category ,i.e: Technical
should be selected if technical documentation is uploaded and etc. Verify all required
documents are uploaded before making βFinal Submissionβ by clicking on βFinalize
Submissionβ button.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
15. Click on βFinalize Submissionβ button. A file size cannot exceed 50MB and a total size of
all uploaded files should not exceed 900MB.
16. Once βFinalize Submissionβ button is clicked the pop-up message confirming the submission
will pop-up
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
17. Click on βFinalise and Close Submissionβ button to finalize the submission of documents.
If not all documents were submitted or still wish to add or submit more documents, click on
βNo, continue adding filesβ button.
18. Once the submission is finalised the page with all submitted documents will display with the
submission and closed time and date timestamp at the bottom.
19. To view submitted tenders, click on βMy Submissionsβ menu option. All your individually
submitted tenders will be displayed.
If you want to view or verify the submitted documents, click on βView Submissionβ button
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
20. Once the submission process is complete an email with be sent to the submitter with all
submitted documents on email,Fig6.This is the final step for the submitter or tenderer.
It is vital to save the email with the submission ID for future enquiry if need be.
From:Eskom E-Tender Document Submission 28 <[email protected]>
Date:Tue,23Aug2022,3:42pm
Subject: Response To Submitter
Eskom E-Tender Document Submission 28
Hi Monalisa
You have finalized a new submission with submission id:14 on tender #MPKUS10086PS
closing date : 2022-11-30 10:00:00.
Have started the submission from 2022-08-23 14:28:33 and finalized at 2022-08-23
15:42:28
Tender Description:
Award for Provision of Office Cleaning and Janitorial Services at Kusile Power Station
Project
Files Submitted:
ID Original Name Title Size Type
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
Thanks,
Eskom E-Tender Document Submission 28 Automated Mail
Β© 2022 Eskom E-Tender Document Submission 28. All rights reserved.
NB: This Email and its contents are subject to the Eskom Holdings SOC Ltd EMAIL
LEGAL NOTICE which can be viewed at
http://www.eskom.co.za/Pages/Email_Legal_Spam_Disclaimer.aspx
Fig6.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
5 Edit Registration
To edit already registered information such as Name, Organization, CSD and cell phone number
select βEdit Registrationβ on the drop down, Fig1. New window with information that needs to be
updated pop ups,Fig2. Click on βUpdateβ button to update registration details.
Fig1.
Fig2.
6 Log off Button
To logout, click βLog outβ on the dropdown next to your name
Fig1.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
7 Password reset
To reset a forgotten password, click βForgot your passwordβ Fig1. and a new screen will
pop up to enter an alternative email where the new password will be sent Fig2.Confirmation
message will be sent to the user, Fig3.
Fig1.
Fig2.
Fig3.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
An email confirming password reset will be sent to the email provided.
Click on the link or βReset Passwordβ button to reset the password.
Fig4.
A new window will pop up to reset and confirm the new password, Fig5.Enter new
password and confirm then click on βReset Passwordβ button.
Fig5.
OTP window will pop up, type in the OTP sent to either the cell phone or email address.
Fig6.
Β© 2023 Eskom of 19
Proprietary and Confidential
Eskom eTendering System
User Manual
OTP successfully goes through and lands on the below screen, password is successfully
reset.
Fig7.
8 General
This system is compatible to most web browsers however we recommend Ms Edge.
The end.
Β© 2023 Eskom of 19
A new functionality to βadd closed tendersβ. Closed tenders refers to the tenders which are not listed
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
38 Test7.pdf testingCom 33141 Commercial
40 Test1.pdf testingTech 33502 Technical
41 Test15.pdf testingFin 33141 Finance
1 Background
eTendering system is a web-based system that allows suppliers bidding for various tenders advertised
on Tender Bulletin system to βuploadβ their tender documents. Currently the tenderers or suppliers
submit tender documents at various Eskom tender offices. eTendering system replaces the manual or
physical submission of tender documents at various Eskom tender offices. eTendering system in a
nutshell is an electronic box where tender documents can be βdroppedβ or βuploadedβ. Suppliers will
be required to register their details before they can be granted access to the eTendering system. An
OTP (one time pin) will be sent to both their cell phone and email address.
of the public, to view and access Eskom published tenders. eTendering hyperlink will be found
on this site. Members of the public may follow prompt instructions once they have clicked on
the eTendering link (https://eTendering.eskom.co.za). This link will allow them to upload the
required tender documentation.
members of the public, to view information about published tenders and submit their tender
documents.
eTendering system.
with the system. In a case users come across some difficulties in using Tender bulletin, eTendering
and OpenText systems they need to contact the buyer responsible for the published tender.
3 Whatβs New
A new functionality to βadd closed tendersβ. Closed tenders refers to the tenders which are not listed
on Tenderbulletin as normal tenders, but are tenders sent directly to the relevant and potential
suppliers who meet the selection and evaluation criteria to offer what the buyer needs. These
suppliers will be sent a link via email to bid privately.
Β© 2023 Eskom of 19
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annexure L- E-tendering Help Manual for supplier.pdf
240-12248652_List of Tender Returnables_Cat 4_ Rev 7.xlsx
240-68099512 Form A_Cat 4_ Rev 9.docx
20260129_C3 1 SC3 Purchasers Goods Information.pdf
20260128_C1 1 SC3 Offer Acceptance (3).pdf
20260602_Invitation to Tender_ Stationery.pdf
Eskom - Standard Conditions of Tender - 30 January 2025.pdf
240-126469599_Method Statement template -Rev 3 .docx
20260128_C1 2a SC3 Data by Purchaser (1).pdf
20260128_C2 SC3 Bill of Quantities.xlsx
240-108987034_Template_Rev 2_Environmental Tender returnable and and Scoring Card_Stationer_LM.pdf
20260128_C1 3 SC3 Proforma Guarantees.pdf
E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx
20260128_C0 SC3 Contract cover pages.pdf
559-1128394689_Health and Safety Requirements for Supply and Delivery of Stationary to GCD_Rev 1_OT (003).pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Organization
EskomContact Person
Ngwanamahula Makgai
Phone
017-799-2302
[email protected]
Website
www.eskom.co.za/
Address
Maxwell Dr, Sunninghill, Sandton, 2157, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
02 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Key Personnel
Learn how to submit a winning bid with these related articles
Get deep intelligence on Supplies: Stationery/Printing. Unlock full pricing strategies, bid frequency, and historical win rates.
Data conflicts
None detected
Maxwell Dr, Sunninghill, Sandton, 2157, South Africa
π‘ Want more tendering tips and strategies?
Explore Our Blog