Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
https://tenderbulletin.eskom.co.za - Mpumalanga - Mpumalanga - 2420
Organization Type
GOVERNMENT
Published
09 Jul 2026
OCDS Reference
ocds-9t57fa-161907
ESKOM holdings soc ltd invites tenders for specialised tactical armed response security services and aerial surveillance at grootvlei power station in mpumalanga for a 6-month period. The contract requires deployment of 30 grade c armed tactical officers with grade b supervisors, plus a site manager and safety officer, to provide 24/7 protection of critical infrastructure within a 5km radius. This open tender (e3214gxmpgro) closes on 22 july 2026 and will be evaluated on a 90/10 price/b-bbee preference basis.
Date & Time
Wednesday, 22 July 2026 - 10:00
Venue
MS Teams
Categories
Request for Bid(Open-Tender)
https://tenderbulletin.eskom.co.za - Mpumalanga - Mpumalanga - 2420
09 Jul
2026
Tender Published
Tender was published
22 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Technical Evaluation Criteria.pdf
Median Estimate
R 436 911
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Comprehensive guide to Institute of IT Professionals South Africa membership. Certification levels, requirements for ICT professionals, and how IITPSA membership enhances credibility for SITA and government IT tenders.
Definitive guide to Health Professions Council of South Africa registration for healthcare professionals bidding on government tenders. Covers the 12 professional boards, step-by-step registration, CPD requirements, foreign qualification evaluation, provincial health department tender opportunities, and how AI Tender Matching on Tenders-SA.org helps you find HPCSA-requiring contracts.
The definitive guide to ECSA professional registration for engineering professionals targeting South African government infrastructure tenders. Covers Pr Eng, Pr Tech Eng, Pr Cert Eng, Pr Techni Eng categories, the registration process via the new ECSA Self-Service Portal, the Identification of Engineering Work Rule, CIDB grading linkage, CPD requirements, and how ECSA registration unlocks access to public sector engineering contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogTenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Technical Evaluation Criteria.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Submission Guidelines
Source: Technical Evaluation Criteria.pdf (unknown)Returnable Documents: (No further details provided in the available text.)
Compliance Requirements
Source: Technical Evaluation Criteria.pdf (unknown)Insufficient searchable text - AI extraction recommended
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to tender-_.pdf
ESKOM is seeking a service provider for specialised tactical armed response security services and aerial surveillance at Grootvlei Power Station in Mpumalanga for a 6-month period. The tender (E3214GXMPGRO) requires deployment of 30 armed tactical security personnel (15 per shift) with Grade C certification, SASSETA firearms training, and valid SAPS firearm competency certificates. Services include 24/7 primary security, ad-hoc tactical response teams, static guarding for outages, and coverage of critical infrastructure within 5km radius. Evaluation follows a 4-step process with 90/10 or 80/20 price/B-BBEE preference scoring. Submission is electronic via Eskom's e-tendering portal by 22 July 2026 10:00am.
Annexure B.pdf
This is an OHS (Occupational Health and Safety) acknowledgement form (Annexure B) for Eskom's tender for specialised tactical armed response security services and aerial surveillance in Mpumalanga for 6 months. The form requires suppliers/contractors to acknowledge understanding and compliance with Eskom's OHS legal requirements, standards, and contractor management obligations.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf
Eskom Grootvlei Power Station seeks a 6-month contract for specialised tactical armed response security services and aerial surveillance in Mpumalanga. The tender follows a 90/10 or 80/20 preference point system with B-BBEE specific goals. Key SDL&I obligations include 100% local procurement content, B-BBEE improvement/retention plans, job creation/retention, and skills development for security officers (Grade C to B or B to A). Non-compliance with SDL&I obligations incurs a 3% contract value penalty and 3% invoice retention.
C3 1 ECC3 Employers Works Information (Repaired).pdf
ESKOM seeks a security service provider for specialised tactical armed response and aerial surveillance at Grootvlei Power Station and Vaal Dam Pump Station in Mpumalanga for 6 months. The contract requires 30 personnel (15 per shift) with Grade C armed tactical officers, Grade B supervisors, plus ad-hoc tactical response teams (10 Grade C + 1 Grade B) and static guarding (20 Grade C). Key requirements include NKP compliance, SASSETA firearms training, Regulation 21 certification, and comprehensive risk management for critical infrastructure protection.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Wandile Magagula
Phone
017-749-9561
[email protected]
Address
https://tenderbulletin.eskom.co.za - Mpumalanga - Mpumalanga - 2420
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
09 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Description
Source: Invitation to tender-_.pdfProvision of specialised tactical armed response security services and aerial surveillance for a period of 6 months at Grootvlei Power Station, Mpumalanga. The service includes primary security teams, ad-hoc tactical response, static guarding, and comprehensive site security management.
Important Dates
Source: Invitation to tender-_.pdf (RFP)Contact Information
Source: Invitation to tender-_.pdf (RFP)Submission Guidelines
Source: Invitation to tender-_.pdf (RFP)Evaluation Criteria
Source: Invitation to tender-_.pdf (RFP)Tenderers must: be registered on National Treasury's Central Supplier Database (CSD); not be restricted by National Treasury or on Tender Defaulters list; not have nationality of sanctioned countries; not submit more than one tender; not have conflicts of interest (common controlling partners, relationships enabling information access/influence); be signed by authorised persons; not subcontract 100% of scope; meet all basic compliance requirements (eligibility, complete submission, commercial/financial/technical info, CSD number). JV/consortium agreements must stipulate joint and several liability. Foreign suppliers with SA footprint need tax clearance; those without need only SBD1.
Technical Specifications
Source: Invitation to tender-_.pdf (RFP)Methodology
Source: Invitation to tender-_.pdfQuality Management
Source: Invitation to tender-_.pdfFinancial Requirements
Source: Invitation to tender-_.pdf (RFP)Compliance Requirements
Source: Invitation to tender-_.pdf (RFP)Health & Safety
Source: Invitation to tender-_.pdfEnvironmental
Source: Invitation to tender-_.pdfContractual Terms
Source: Invitation to tender-_.pdfDescription
Source: Annexure B.pdfEvaluation Criteria
Source: Annexure B.pdf (unknown)Must be a registered company/supplier capable of providing specialised tactical armed response security services and aerial surveillance. Must demonstrate understanding and ability to comply with Eskom OHS standards (32-136), statutory OHS acts, and contractor management requirements. Must have adequate resources and competencies for the 6-month contract period in Mpumalanga.
Technical Specifications
Source: Annexure B.pdf (unknown)Compliance Requirements
Source: Annexure B.pdf (unknown)Health & Safety
Source: Annexure B.pdfContractual Terms
Source: Annexure B.pdfDescription
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdfContact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Returnable Documents
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Open market tender - no designated sector requirements. No CIDB compulsory training required. B-BBEE status level determines preference points (Level 1-8 or non-compliant). Companies with annual revenue ≤R10M qualify as EME (sworn affidavit acceptable). Companies with revenue ≤R50M qualify as QSE (sworn affidavit if ≥51% Black owned, otherwise full QSE scorecard). Companies >R50M require valid B-BBEE certificate. Tenderers failing to provide B-BBEE documentation score 0 points for specific goals but are not disqualified. Must be capable of providing specialised tactical armed response and aerial surveillance services.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdfPricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdfFinancial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Special Conditions
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdf (TENDER)Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template - August 2023 (002) (003) rev (00D).pdfDescription
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)reference Provision of Security Services at Grootvlei Power pages Station and Vaal Dam Pump Station For 6 months
Important Dates
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion/MS Teams","is_compulsory":false}"}
Briefing Session
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)placement Station/MS Teams
Contact Information
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"oyer’s requirements for the service"}
Returnable Documents
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)contained in the report:
Evaluation Criteria
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)Security company registered with PSIRA; Valid firearm licenses in company name; SASSETA-accredited training for all armed personnel; Regulation 21 compliance for firearms; NKP qualification for Site Manager; Proven experience in National Key Point security; Ability to deploy within 12-48 hours notice; Financial capacity for 6-month contract with penalty provisions; Compliance with all listed South African legislation (NKP Act, Firearms Control Act, PSIRA, OHS Act, NEMA, etc.); Eskom supplier database registration preferred.
Technical Specifications
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)of the service ...................................................................................................................... 4
1.1 Executive overview ............................................................................................................................ 4
1.2 Employer’s requirements for the service ........................................................................................... 4
1.3 Interpretation and terminology ........................................................... Error! Bookmark not defined.
2 Management strategy and start up. ...................................................................................................... 8
2.1 The Contractor’s plan for the service ................................................................................................. 8
2.2 Management meetings ...................................................................................................................... 9
2.3 Contractor’s management, supervision and key people ................................................................. 10
2.4 Documentation control ..................................................................
Methodology
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)2.2 Management meetings progress and challenges.
Experience & Qualifications
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)2.3 Contractor’s management, supervision and key people person be replaced, such information will be conveyed to the Employer.
Quality Management
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)plant performance. e. The Contractor ensures that all plant and materials for the Works are to the standard and quality accepted by the Employer and ensures that they are suitable for the purpose intended by the manufacturer.
Pricing Schedule
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)2.5 Invoicing and payment Within one week of receiving a payment certificate from the Service Manager in terms of core clause 51.1, the in the Service Manager’s payment certificate.
Financial Requirements
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)Payment Terms: payment certificate from the Service Manager in terms of core clause 51.1, the
Contractor provides the Employer with a tax invoice showing the amount due for payment equal to that stated
in the Service Manager’s payment certificate.
The Contractor shall address the tax invoice to
and include on each invoice the following information:
Compliance Requirements
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)No specific requirements found
B-BBEE Details: d.
3.3 Quality assurance requirements ...................................................................................................... 12
4 Procurement .......................................................................................................................................... 12
4.1 People .............................................................................................................................................. 12
4.1.1 Minimum requirements of people employed .............................................................................. 12
4.1.2 BBBEE and preferencing scheme ............................................... Error! Bookmark not defined.
4.2 Subcontracting ................................................................................... Error! Bookmark not defined.
4.2.1 Preferred subcontractors ............................................................. Error! Bookmark not defined.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
4.2.2 Subcontract documentation, and assessment of subcontract tendersError! Bookmark not
defined.
4.2.3 Limitations on subcontracting ...................................................... Error! Bookmark not defined.
4.2.4 Attendance on subcontractors ..................................................... Error! Bookmark not defined.
4.3 Plant and Materials ............................................................................ Error! Bookmark not defined.
4.3.1 Specifications ............................................................................... Error! Bookmark not defined.
4.3.2 Correction of defects .................................................................... Error! Bo
Health & Safety
Source: C3 1 ECC3 Employers Works Information (Repaired).pdfand Special Operation uniform or gear (i.e. protective shields, bottom sticks).
Supervisor’s Responsibilities:
Site Manager’s Responsibilities:
Regulation Act, Firearms and Ammunition Act and OSHACT)
assessment).
Develop and update risk mitigation strategies
Incident Management and response.
Manage and supervise security staff and contractors
Intelligence and information security (monitor security intelligence and threat alerts)
Participate in joint security meetings and compliance audit.
1x Security Site Manager (Grade A, NKP qualified, valid driver's license).
1x Full-time Safety Officer (safety file management, audit participation, compliance oversight).
[12] Occupational Health and Safety Act
[13] Prevention of Organised Crime Act
[14] Protected Disclosures Act
[15] The Promotion of Access to Information Act
[16] Critical Infrastructure Protection Act
[17] National Key Points Act and Regulations, Act
[18] National Key Points Directive, CS/OPS/NSP/P/329/1/B
[19] The Criminal Procedure Act
[20] Firearms Control Act
[21] National Strategic Intelligence Act
[22] Eskom's Procurement and Supply Chain Management Policy 32-1033
[23] Private Security Industry Regulation Act and Regulations, Act
[24] Private Security Industry Levies Act
[25] Eskom's Procurement and Supply Chain Management Procedure 32-1034
[26] Integrated Risk Management Policy 32-86
[27] Safety, Health, Environment and Quality (SHEQ) Policy 32-727
[28] Eskom Incident Management Procedure 32-95
[29] Eskom Delegation of Authority Policy 240-62072907
[30] Employment Equity Act
[31] The Eskom Code of Ethics 32-527
1.4 Interpretation and terminology
2.1 The Contractor’s plan for the service
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
deployed personnel and the screen results be made available prior to deployment.
Not older than 3 months. And to be renewed annually for the duration of the contract
Safety file reviewed and approved.
Access authorization process (site permit), including medical fitness assessments.
No security officers are to be deployed in terms of this contract, before undergoing
necessary Eskom induction. Eskom reserves the right to remove such Officers that
have not complied with this requirement from their sites or duties as per this
agreement at the cost to the contractor.
commencements of their duties in terms of this contract.
per this contract.
as per, clause Option X17.1 NEC TSC Refurbishment. The Contractor will be informed about the Low service
damages in form of writing and if this happens repeatedly a meeting will be arranged immediately whereby an
early warning that will be in writing will be given to the Contractor.
3.1 Health and safety risk management
a. The Contractor shall adhere to all OHS Legal requirements, OHS corporate policies, standards
and procedures to which Eskom subscribes and as indicated on the issued SHE specification.
b. The Contractor shall, when coming on site (Grootvlei Power Station), abide by the Cardinal
c. The Contractor shall also abide by the Grootvlei’s Safety, Health and Environmental
d. The Contractor shall, when coming on site (Grootvlei Power Station), make use of approved
personal protective clothing such as overalls, safety shoes, safety hat, safety goggles, dust
mask and gloves when necessary.
e. The Employer follows an accident prevention policy that includes the investigation of all
accidents involving personnel and property. This is done with the intention of introducing
control measures to prevent a recurrence of the same incidents. The Contractor is expected
to fully co- operate to achieve this objective. The Contractor will report any incident and
accidents to Grootvlei Power Station within 24 hours. This report does not relieve the
keep records in terms of the Occupational Health and Safety Act, and Compensation for
f. The Contractor implements a safety plan and maintains the safety system until the completion
of the whole of the works. The plan, will as a minimum, contain PPE information, written safe
work procedures, job specific risk assessments, safety meetings, etc. The plan will be to the
Employer’s satisfaction and will be accepted prior to the commencement of any work.
g. The Contractor will be subject to periodic audits by the Employer to ensure compliance with
the plan. Any deviations will be corrected to the Employer’s satisfaction.
h. The Service Manager has the right to stop the Contractor's work activities which, in the opinion
of Service Manager, is un-safe. The Contractor may only continue with work activities when all
safety deficiencies have been corrected to the Service Manager’s satisfaction. The Contractor
shall have no claim against the Employer in respect of delay due to the above.
3.2 Environmental Constraints and Management
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
a) Adherence to the ‘Duty of Care’ as stipulated in section 28 of the National Environmental Management Act
, which emphasises the responsibility to pollution prevention and environmental degradation.
Environmental
Source: C3 1 ECC3 Employers Works Information (Repaired).pdflegislation, policies, standards and procedures (Work Instructions) not limited to:
▪ National Environmental Management Act
▪ National Environmental Management: Waste Act
▪ National Environmental Management: Air Quality Act 39 0f 2004
▪ Eskom Waste Standard 32-245
▪ Eskom Environmental Incident Management Procedure (240-133 087 117)
▪ Grootvlei Waste Management Procedure GVLE 0002
▪ Eskom SHEQ Policy-32-727 and policy statements
▪ ISO 14001:2025 Environmental Management System
b) All incidents shall be managed according to Eskom Environmental incident management procedure 240-
c) Polluter pays principles applies to all Contractors. It is the responsibility of the polluter to clean all spillages
and for the rehabilitation of the polluted land and incurring of associated costs.
d) Employer personnel will conduct regular environmental audits. All Contractors are expected to participate
and ensure that corrective actions are executed.
e) Eskom Grootvlei Power Station shall issue non-conformances where there are deviations from Grootvlei
f) All environmental management system documentation, records, reports shall be made available for review
when requested.
Contractual Terms
Source: C3 1 ECC3 Employers Works Information (Repaired).pdfduties as detailed in site specific scope of work, determined by changing risks and /or business
requirements.
for crowd control.
containment and command of other serious incidents that threaten the safety and security of the NKP.
firearms; they are expected to use relevant firearms for crowd control.
completed.
Tactical Armed Response X 20 Security Officer Minimum Requirements (as and when required
service):
as detailed in site specific scope of works, determined by changing risks and/ or business requirements.
equipment for crowd control.
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
containment and command of other serious incidents that threaten the safety and security of the NKP and Non
o Prevent plant tampering and vandalism.
o Unauthorised access attempts to restricted buildings/areas.
o Prevent Copper cable theft and asset removal.
o Prevent Security breaches and industrial action threats.
Armed escort for personnel in high-risk situations
Immediate tactical response to security incidents.
KPI – financial penalties as specified in the Scope of work.
Equipment failure penalties: 5% monthly reduction for each critical system failure.
Compliance violations: 10% monthly reduction for regulatory breaches.
Personnel shortfalls; 3% daily reduction for each unfilled position.
Material breach of contract terms.
Failure to meet critical KPI thresholds for consecutive months.
Loss of essential licenses or certificates.
Serious safety incidents due to negligence including accidental discharge.
1.2.1.1 Scope
paragraphs.
1.4.1.1 Normative
[1] ISO 9001 Quality Management Systems
[2] ISO 18788: 2015 Management System for Private Security Operations
[3] Control of Access to Public Premises and Vehicles Act, No. 53, 1985
[4] Protection of Constitutional Democracy against Terrorists and Relative Activities, Act
[5] Constitution of the Republic of South Africa, 1996
[6] Public Finance Management Act
[7] Protection of Information Act
[8] Prevention and Combating of Corrupt Activities Act
Part c3: scope of work c3.1 Tsc3 employer’s service information
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
[9] Labour Relations Act
[10] Basic Conditions of Employment Act
[11] Basic Conditions of Employment Act : Sectoral Determination 6: Private Security
Requirements
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf (unknown)and at any given time which includes:
Section
Source: C3 1 ECC3 Employers Works Information (Repaired).pdf3.3 Quality assurance requirements
a. The Contractor shall adhere to all quality requirements as noted in the quality evaluation criteria
b. The Contractor implements a quality system and maintains the quality system until the
of the ISO9001 and the Eskom Supplier Contract Quality Requirements Specification (240
e. The Contractor ensures that all plant and materials for the Works are to the standard and quality
3 Health and safety, the environment and quality assurance ............................................................. 11
3.3 Quality assurance requirements ...................................................................................................... 12
Data conflicts
None detected
Get deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.