Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
67 Koranna Avenue - Doringkloof - Centurion - 0157
Organization Type
GOVERNMENT
Published
02 Jun 2026
OCDS Reference
ocds-9t57fa-157843
The border management authority (gauteng) invites quotations for the supply and delivery of new, high-quality office furniture, including cabinets, desks, and chairs, for its head office. This RFQ is open to compliant suppliers with valid tax, b-bbee, and VAT documentation.
Submit the following returnable documents: VAT registration number, Tax Compliance Status (TCS) PIN (obtainable via SARS e-filing), or Central Supplier Database (CSD) number. If the answer to all tax compliance questions is 'NO', registration for a TCS PIN is not required. Ensure all forms are signed and submitted as originals or photocopies with original signatures.
Evaluation will use the 80/20 preference point system (for tenders up to R50 million). Points are allocated as follows: 80 points for price, 20 points for specific goals (e.g., B-BBEE). Bidders must complete the SBD 6.1 form to claim preference points. Failure to submit this form or substantiate claims may result in zero points for preferences. Quality standards must be met; disputes will be referred to arbitration.
Supply and deliver new, unused office furniture for the Border Management Authority Head Office. Items include: Mahogany Veneer 2 Door Glass Cabinets (1000mm x 440mm x 2000mm), Mahogany Veneer L-Shape Desks with Leather Inlay and Side Pedestal Cabinets (1800mm x 900mm x 760mm), Venus Mesh High Back Chairs (black fabric, 5-position lock, gas spindle), and Easy Chair Visitor (fabric upholstered, gliding base, black). Goods must conform to specified standards, be of recent models, and incorporate all design/material improvements. Suppliers must allow inspections, testing, and audits as required. Warranty: 12 months post-delivery or 18 months post-shipment (whichever is earlier). Defective goods must be repaired or replaced at the supplier’s cost.
Submit the following forms: SBD 1 (Invitation to Quote and Terms & Conditions), SBD 3 (Pricing Schedule - firm prices only; non-firm prices will be rejected), SBD 4 (Bidder’s Disclosure), and SBD 6.1 (Preference Points Claim Form). Pricing must cover all goods, obligations, and delivery costs (inclusive of VAT). Payment terms: within 30 days of approved invoice submission. Performance security may be required post-award (e.g., bank guarantee or cashier’s cheque). Prices must remain fixed unless adjusted per contract terms.
Mandatory compliance: Valid Tax Clearance Certificate (original from SARS) or TCS PIN (via e-filing). If no TCS PIN is available but the bidder is registered on the Central Supplier Database (CSD), provide the CSD number. VAT registration number is required. B-BBEE: Submit a valid B-BBEE Status Level Verification Certificate or sworn affidavit (for EMEs/QSEs) to qualify for preference points. Foreign suppliers must confirm residency, branch, or permanent establishment in South Africa or provide proof of exemption. Non-South African employees are prohibited unless vetted with valid work permits.
Closing date: 5 June 2026 at 11:00 AM. No compulsory briefing session is scheduled.
For enquiries, contact Supply Chain Management via email: [email protected]. Technical enquiries may be directed to Jimmy Sibiya at [email protected]. Do not submit quotes to these email addresses; use only for enquiries.
Supply and delivery of office furniture for head office
quality standards have been met. Disputes as to what constitutes a reasonable standard will be
The evaluation will be evaluated as follows
(iv)SBD 6.1 form: Preference Points claim form in
indicate how they claim for each preference point
Supply and delivery of office furniture for head office h004l2706rfq00059
Rence points claim form in terms of the preferential procurement
This preference form must form part of all tenders invited. It contains general information and
serves as a claim form for preference points for specific goals.
1.1 The following preference point systems are applicable to invitations to tender
the 80/20 system for requirements with a Rand value of up to R50 000 000 (all
the 90/10 system for requirements with a Rand value above R50 000 000 (all
a) The applicable preference point system for this tender is the 80/20 preference point system.
b) Either the 90/10 or 80/20 preference point system will be applicable in this tender. The lowest/
1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall be
(b) Specific Goals.
The maximum points for this tender are allocated as follows
Specific goals 20
Total points for Price and SPECIFIC 100
tender to claim points for specific goals with the tender, will be interpreted to mean that
preference points for specific goals are not claimed.
adjudicated or at any time subsequently, to substantiate any claim in regard to preferences,
Preference points claim form in terms of the preferential procurement
15.1 The supplier warrants that the goods supplied under the contract are new, unused, of the most recent or current models, and
that they incorporate all recent improvements in design and materials unless provided otherwise in the contract. The supplier
further warrants that all goods supplied under this contract shall have no defect, arising from design, materials, or workmanship
(except when the design and/or material is required by the purchaser’s specifications) or from any act or omission of the
supplier, that may develop under normal use of the supplied goods in the conditions prevailing in the country of final destination.
15.2 This warranty shall remain valid for twelve (12) months after the goods, or any portion thereof as the case may be, have been
delivered to and accepted at the final destination indicated in the contract, or for eighteen (18) months after the date of shipment
from the port or place of loading in the source country, whichever period concludes earlier, unless specified otherwise in SCC.
15.3 The purchaser shall promptly notify the supplier in writing of any claims arising under this warranty.
15.4 Upon receipt of such notice, the supplier shall, within the period specified in SCC and with all reasonable speed, repair or
replace the defective goods or parts thereof, without costs to the purchaser.
15.5 If the supplier, having been notified, fails to remedy the defect(s) within the period specified in SCC, the purchaser may proceed
to take such remedial action as may be necessary, at the supplier’s risk and expense and without prejudice to any other rights
which the purchaser may have against the supplier under the contract.
16 Payment
16.1 The method and conditions of payment to be made to the supplier under this contract shall be specified in SCC.
16.2 The supplier shall furnish the purchaser with an invoice accompanied by a copy of the delivery note and upon fulfillment of other
obligations stipulated in the contract.
16.3 Payments shall be made promptly by the purchaser, but in no case later than thirty (30) days after submission of an invoice or
claim by the supplier.
16.4 Payment will be made in Rand unless otherwise stipulated in SCC.
17 Prices
17.1 Prices charged by the supplier for goods delivered and services performed under the contract shall not vary from the prices
quoted by the supplier in his bid, with the exception of any price adjustments authorized in SCC or in the purchaser’s request for
bid validity extension, as the case may be.
18 Contract amendments
18.1 No variation in or modification of the terms of the contract shall be made except by written amendment signed by the parties
concerned.
19 Assignment
19.1 The supplier shall not assign, in whole or in part, its obligations to perform under the contract, except with the purchaser’s prior
written consent.
20 Subcontracts
20.1 The supplier shall notify the purchaser in writing of all subcontracts awarded under this contracts if not already specified in the
bid. Such notification, in the original bid or later, shall not relieve the supplier from any liability or obligation under the contract.
21 Delays in the supplier’s performance
Supply Chain Management Quotation Pack
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
21.1 Delivery of the goods and performance of services shall be made by the supplier in accordance with the time schedule
prescribed by the purchaser in the contract.
21.2 If at any time during performance of the contract, the supplier or its subcontractor(s) should encounter conditions impeding timely
delivery of the goods and performance of services, the supplier shall promptly notify the purchaser in writing of the fact of the
delay, its likely duration and its cause(s). As soon as practicable after receipt of the supplier’s notice, the purchaser shall
evaluate the situation and may at his discretion extend the supplier’s time for performance, with or without the imposition of
penalties, in which case the extension shall be ratified by the parties by amendment of contract.
21.3 No provision in a contract shall be deemed to prohibit the obtaining of supplies or services from a national department, provincial
department, or a local authority.
21.4 The right is reserved to procure outside of the contract small quantities or to have minor essential services executed if an
emergency arises, the supplier’s point of supply is not situated at or near the place where the supplies are required, or the
supplier’s services are not readily available.
21.5 Except as provided under GCC Clause 25, a delay by the supplier in the performance of its delivery obligations shall render the
supplier liable to the imposition of penalties, pursuant to GCC Clause 22, unless an extension of time is agreed upon pursuant to
GCC Clause 21.2 without the application of penalties.
21.6 Upon any delay beyond the delivery period in the case of a supplies contract, the purchaser shall, without cancelling the
contract, be entitled to purchase supplies of a similar quality and up to the same quantity in substitution of the goods not supplied
in conformity with the contract and to return any goods delivered later at the supplier’s expense and risk, or to cancel the
contract and buy such goods as may be required to complete the contract and without prejudice to his other rights, be entitled to
claim damages from the supplier.
22 Penalties
22.1 Subject to GCC Clause 25, if the supplier fails to deliver any or all of the goods or to perform the services within the period(s)
specified in the contract, the purchaser shall, without prejudice to its other remedies under the contract, deduct from the contract
price, as a penalty, a sum calculated on the delivered price of the delayed goods or unperformed services using the current
prime interest rate calculated for each day of the delay until actual delivery or performance. The purchaser may also consider
termination of the contract pursuant to GCC Clause 23.
23 Termination for default
23.1 The purchaser, without prejudice to any other remedy for breach of contract, by written notice of default sent to the supplier, may
terminate this contract in whole or in part:
(a) if the supplier fails to deliver any or all of the goods within the period(s) specified in the contract, or within any
extension thereof granted by the purchaser pursuant to GCC Clause 21.2;
(b) if the Supplier fails to perform any other obligation(s) under the contract; or
(c) if the supplier, in the judgment of the purchaser, has engaged in corrupt or fraudulent practices in competing for
or in executing the contract.
23.2 In the event the purchaser terminates the contract in whole or in part, the purchaser may procure, upon such terms and in such
manner as it deems appropriate, goods, works or services similar to those undelivered, and the supplier shall be liable to the
purchaser for any excess costs for such similar goods, works or services. However, the supplier shall continue performance of
the contract to the extent not terminated.
23.3 Where the purchaser terminates the contract in whole or in part, the purchaser may decide to impose a restriction penalty on the
supplier by prohibiting such supplier from doing business with the public sector for a period not exceeding 10 years.
23.4 If a purchaser intends imposing a restriction on a supplier or any person associated with the supplier, the supplier will be allowed
a time period of not more than fourteen (14) days to provide reasons why the envisaged restriction should not be imposed.
Should the supplier fail to respond within the stipulated fourteen (14) days the purchaser may regard the intended penalty as not
objected against and may impose it on the supplier.
23.5 Any restriction imposed on any person by the Accounting Officer / Authority will, at the discretion of the Accounting Officer /
Authority, also be applicable to any other enterprise or any partner, manager, director or other person who wholly or partly
exercises or exercised or may exercise control over the enterprise of the first-mentioned person, and with which enterprise or
person the first-mentioned person, is or was in the opinion of the Accounting Officer / Authority actively associated.
Supply Chain Management Quotation Pack
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
23.6 If a restriction is imposed, the purchaser must, within five (5) working days of such imposition, furnish the National Treasury, with
the following information:
a. the name and address of the supplier and / or person restricted by the purchaser;
b. the date of commencement of the restriction
c. the period of restriction; and
d. the reasons for the restriction.
23.6.1 These details will be loaded in the National Treasury’s central database of suppliers or persons prohibited from doing
business with the public sector.
23.7 If a court of law convicts a person of an offence as contemplated in sections 12 or 13 of the Prevention and Combating of
Corrupt Activities Act, No. , the court may also rule that such person’s name be endorsed on the Register for Tender
Defaulters. When a person’s name has been endorsed on the Register, the person will be prohibited from doing business with
the public sector for a period not less than five years and not more than 10 years. The National Treasury is empowered to
determine the period of restriction and each case will be dealt with on its own merits. According to section 32 of the Act the
Register must be open to the public. The Register can be perused on the National Treasury website.
24 Anti-dumping and countervailing duties and rights
24.1 When, after the date of bid, provisional payments are required, or antidumping or countervailing duties are imposed, or the
amount of a provisional payment or anti-dumping or countervailing right is increased in respect of any dumped or subsidized
import, the State is not liable for any amount so required or imposed, or for the amount of any such increase. When, after the
said date, such a provisional payment is no longer required or any such anti-dumping or countervailing right is abolished, or
where the amount of such provisional payment or any such right is reduced, any such favourable difference shall on demand be
paid forthwith by the contractor to the State or the State may deduct such amounts from moneys (if any) which may otherwise be
due to the contractor in regard to supplies or services which he delivered or rendered, or is to deliver or render in terms of the
contract or any other contract or any other amount which may be due to him.
25 Force Majeure
25.1 Notwithstanding the provisions of GCC Clauses 22 and 23, the supplier shall not be liable for forfeiture of its performance
security, damages, or termination for default if and to the extent that his delay in performance or other failure to perform his
obligations under the contract is the result of an event of force majeure.
25.2 If a force majeure situation arises, the supplier shall promptly notify the purchaser in writing of such condition and the cause
thereof. Unless otherwise directed by the purchaser in writing, the supplier shall continue to perform its obligations under the
contract as far as is reasonably practical, and shall seek all reasonable alternative means for performance not prevented by the
force majeure event.
26 Termination for insolvency
26.1 The purchaser may at any time terminate the contract by giving written notice to the supplier if the supplier becomes bankrupt or
otherwise insolvent. In this event, termination will be without compensation to the supplier, provided that such termination will not
prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the purchaser.
27 Settlement of Disputes
27.1 If any dispute or difference of any kind whatsoever arises between the purchaser and the supplier in connection with or arising
out of the contract, the parties shall make every effort to resolve amicably such dispute or difference by mutual consultation.
27.2 If, after thirty (30) days, the parties have failed to resolve their dispute or difference by such mutual consultation, then either the
purchaser or the supplier may give notice to the other party of his intention to commence with mediation. No mediation in respect
of this matter may be commenced unless such notice is given to the other party.
27.3 Should it not be possible to settle a dispute by means of mediation, it may be settled in a South African court of law.
27.4 Mediation proceedings shall be conducted in accordance with the rules of procedure specified in the SCC.
27.5 Notwithstanding any reference to mediation and/or court proceedings herein,
Supply Chain Management Quotation Pack
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
(a) the parties shall continue to perform their respective obligations under the contract unless they otherwise agree; and
(b) the purchaser shall pay the supplier any monies due the supplier.
28 Limitation of liability
28.1 Except in cases of criminal negligence or willful misconduct, and in the case of infringement pursuant to Clause 6;
i. the supplier shall not be liable to the purchaser, whether in contract, tort, or otherwise, for any indirect or consequential
loss or damage, loss of use, loss of production, or loss of profits or interest costs, provided that this exclusion shall not
apply to any obligation of the supplier to pay penalties and/or damages to the purchaser; and
ii. the aggregate liability of the supplier to the purchaser, whether under the contract, in tort or otherwise, shall not exceed
the total contract price, provided that this limitation shall not apply to the cost of repairing or replacing defective
equipment.
29 Governing language
29.1 The contract shall be written in English. All correspondence and other documents pertaining to the contract that is exchanged by
the parties shall also be written in English.
30 Applicable law
30.1 The contract shall be interpreted in accordance with South African laws, unless otherwise specified in SCC.
31 Notices
31.1 Every written acceptance of a bid shall be posted to the supplier concerned by registered or certified mail and any other notice to
him shall be posted by ordinary mail to the address furnished in his bid or to the address notified later by him in writing and such
posting shall be deemed to be proper service of such notice
31.2 The time mentioned in the contract documents for performing any act after such aforesaid notice has been given, shall be
reckoned from the date of posting of such notice.
32 Taxes and duties
32.1 A foreign supplier shall be entirely responsible for all taxes, stamp duties, license fees, and other such levies imposed outside
the purchaser’s country.
32.2 A local supplier shall be entirely responsible for all taxes, duties, license fees, etc., incurred until delivery of the contracted goods
to the purchaser.
32.3 No contract shall be concluded with any bidder whose tax matters are not in order. Prior to the award of a bid the Department
must be in possession of a tax clearance certificate, submitted by the bidder. This certificate must be an original issued by the
South African Revenue Services.
33 National Industrial Participation (NIP) Programme
33.1 The NIP Programme administered by the Department of Trade and Industry shall be applicable to all contracts that are subject to
the NIP obligation.
34. Prohibition of Restrictive practices
34.1 In terms of section 4 (1) (b) (iii) of the Competition Act No. , as amended, an agreement between, or concerted practice
by, firms, or a decision by an association of firms, is prohibited if it is between parties in a horizontal relationship and if a bidder (s) is
/ are or a contractor(s) was / were involved in collusive bidding (or bid rigging).
34.2 If a bidder(s) or contractor(s), based on reasonable grounds or evidence obtained by the purchaser, has / have engaged in the
restrictive practice referred to above, the purchaser may refer the matter to the Competition Commission for investigation and
possible imposition of administrative penalties as contemplated in the Competition Act No. .
Supply Chain Management Quotation Pack
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
Specifications or terms of reference
Example of pictures of the required furniture for procurement hq 67
Koranna avenue:
Item description qty example pictures
HX503 Mahogany Veneer 2 Door Glass 3
Cabinet with Solid Doors 1000mm x
440mm x 2000mm
HX2518 Mahogany Veneer L-Shape 3
Desk with Leather Inlay with Side
Pedenza
Cabinet 1800mm x 900mm x 760mm
Venus mesh high back chair 3
Standard with:
Black contract fabric seat
1 Lever Middle Pivot Synchro
Mechanism
with 5 Position Lock
SA Gas Spindle
Standard without Arms
Tension Adjuster
Black Nylon Glass Reinforced 700mm
Dia.
Supply Chain Management Quotation Pack
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
Easy Chair Visitor, Fabric Upholstered, 6
Gliding base, Colour Black for visitors/
travellers=
Supply Chain Management Quotation Pack
Invitation to Quote Standardized 30 September 2025
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
closing of the bid and post award, and
lead to contract termination unless vetted and having work permit.
for the service rendered.
payment schedule.
quality standards have been met. Disputes as to what constitutes a reasonable standard will be
referred to an agreed provider of arbitration services.
only if original receipts are provided against a list of expenses that are agreed in advance of the costs
being incurred.
Note: All delivery costs must be included in the bid price, for delivery at the prescribed destination.
insurance fund contributions and skills development levies.
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify
that the points claimed, based on the specific goals as advised in the tender, qualifies the
company/ firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as
indicated in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary proof
to the satisfaction of the organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any
other remedy it may have –
(a) disqualify the person from the tendering process;
(b) recover costs, losses or damages it has incurred or suffered as a result
of that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a
result of having to make less favourable arrangements due to such
cancellation;
(d) recommend that the tenderer or contractor, its shareholders and
directors, or only the shareholders and directors who acted on a
fraudulent basis, be restricted from obtaining business from any organ of
state for a period not exceeding 10 years, after the audi alteram partem
(hear the other side) rule has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
commercially recognized new product results that is substantially different in basic characteristics or in purpose or utility from its
components.
1.7 “Day” means calendar day.
1.8 “Delivery” means delivery in compliance of the conditions of the contract or order.
1.9 “Delivery ex stock” means immediate delivery directly from stock actually on hand.
1.10 “Delivery into consignees store or to his site” means delivered and unloaded in the specified store or depot or on the specified
site in compliance with the conditions of the contract or order, the supplier bearing all risks and charges involved until the
supplies are so delivered and a valid receipt is obtained.
1.11 "Dumping" occurs when a private enterprise abroad market its goods on own initiative in the RSA at lower prices than that of the
country of origin and which have the potential to harm the local industries in the RSA.
1.12 ”Force majeure” means an event beyond the control of the supplier and not involving the supplier’s fault or negligence and not
foreseeable. Such events may include, but is not restricted to, acts of the purchaser in its sovereign capacity, wars or
revolutions, fires, floods, epidemics, quarantine restrictions and freight embargoes.
1.13 “Fraudulent practice” means a misrepresentation of facts in order to influence a procurement process or the execution of a
contract to the detriment of any bidder, and includes collusive practice among bidders (prior to or after bid submission) designed
to establish bid prices at artificial non-competitive levels and to deprive the bidder of the benefits of free and open competition.
1.14 “GCC” means the General Conditions of Contract.
1.15 “Goods” means all of the equipment, machinery, and/or other materials that the supplier is required to supply to the purchaser
under the contract.
1.16 “Imported content” means that portion of the bidding price represented by the cost of components, parts or materials which have
been or are still to be imported (whether by the supplier or his subcontractors) and which costs are inclusive of the costs abroad,
plus freight and other direct importation costs such as landing costs, dock dues, import duty, sales duty or other similar tax or
duty at the South African place of entry as well as transportation and handling charges to the factory in the Republic where the
supplies covered by the bid will be manufactured.
1.17 “Local content” means that portion of the bidding price which is not included in the imported content provided that local
manufacture does take place.
1.18 “Manufacture” means the production of products in a factory using labour, materials, components and machinery and includes
other related value-adding activities.
6.1 The supplier shall indemnify the purchaser against all third-party claims of infringement of patent, trademark, or industrial design
rights arising from use of the goods or any part thereof by the purchaser.
7.1 Within thirty (30) days of receipt of the notification of contract award, the successful bidder shall furnish to the purchaser the
performance security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the purchaser as compensation for any loss resulting from the
supplier’s failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the contract or in a freely convertible currency acceptable to
the purchaser and shall be in one of the following forms:
7.4 a bank guarantee or an irrevocable letter of credit issued by a reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the bidding documents or another form acceptable to the purchaser; or
7.5 a cashier’s or certified cheque
7.6 The performance security will be discharged by the purchaser and returned to the supplier not later than thirty (30) days following
the date of completion of the supplier’s performance obligations under the contract, including any warranty obligations, unless
otherwise specified in SCC.
11.1 The goods supplied under the contract shall be fully insured in a freely convertible currency against loss or damage incidental to
manufacture or acquisition, transportation, storage and delivery in the manner specified in the SCC.
11.2 Upon appointment by the Head of Department the service provider will be required to have a Professional Indemnity insurance
of a minimum cover of R160 million.
13.1 The supplier may be required to provide any or all of the following services, including additional services, if any, specified in
Scc:
(a) performance or supervision of on-site assembly and/or commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual for each appropriate unit of the supplied goods;
(d) performance or supervision or maintenance and/or repair of the supplied goods, for a period of time agreed by the
parties, provided that this service shall not relieve the supplier of any warranty obligations under this contract; and
(e) training of the purchaser’s personnel, at the supplier’s plant and/or on-site, in assembly, start-up, operation,
maintenance, and/or repair of the supplied goods.
13.2 Prices charged by the supplier for incidental services, if not included in the contract price for the goods, shall be agreed upon in
advance by the parties and shall not exceed the prevailing rates charged to other parties by the supplier for similar services.
14.1 As specified in SCC, the supplier may be required to provide any or all of the following materials, notifications, and information
pertaining to spare parts manufactured or distributed by the supplier:
(a) such spare parts as the purchaser may elect to purchase from the supplier, provided that this election shall not relieve
the supplier of any warranty obligations under the contract; and
(b) in the event of termination of production of the spare parts:
(i) Advance notification to the purchaser of the pending termination, in sufficient time to permit the purchaser to
procure needed requirements; and
(ii) following such termination, furnishing at no cost to the purchaser, the blueprints, drawings, and specifications of
the spare parts, if requested.
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
15 Warranty
15.1 The supplier warrants that the goods supplied under the contract are new, unused, of the most recent or current models, and
that they incorporate all recent improvements in design and materials unless provided otherwise in the contract. The supplier
further warrants that all goods supplied under this contract shall have no defect, arising from design, materials, or workmanship
(except when the design and/or material is required by the purchaser’s specifications) or from any act or omission of the
supplier, that may develop under normal use of the supplied goods in the conditions prevailing in the country of final destination.
15.2 This warranty shall remain valid for twelve (12) months after the goods, or any portion thereof as the case may be, have been
delivered to and accepted at the final destination indicated in the contract, or for eighteen (18) months after the date of shipment
from the port or place of loading in the source country, whichever period concludes earlier, unless specified otherwise in SCC.
15.3 The purchaser shall promptly notify the supplier in writing of any claims arising under this warranty.
15.4 Upon receipt of such notice, the supplier shall, within the period specified in SCC and with all reasonable speed, repair or
replace the defective goods or parts thereof, without costs to the purchaser.
15.5 If the supplier, having been notified, fails to remedy the defect(s) within the period specified in SCC, the purchaser may proceed
to take such remedial action as may be necessary, at the supplier’s risk and expense and without prejudice to any other rights
which the purchaser may have against the supplier under the contract.
20.1 The supplier shall notify the purchaser in writing of all subcontracts awarded under this contracts if not already specified in the
bid. Such notification, in the original bid or later, shall not relieve the supplier from any liability or obligation under the contract.
21 Delays in the supplier’s performance
22.1 Subject to GCC Clause 25, if the supplier fails to deliver any or all of the goods or to perform the services within the period(s)
specified in the contract, the purchaser shall, without prejudice to its other remedies under the contract, deduct from the contract
price, as a penalty, a sum calculated on the delivered price of the delayed goods or unperformed services using the current
prime interest rate calculated for each day of the delay until actual delivery or performance. The purchaser may also consider
termination of the contract pursuant to GCC Clause 23.
23.1 The purchaser, without prejudice to any other remedy for breach of contract, by written notice of default sent to the supplier, may
terminate this contract in whole or in part:
(a) if the supplier fails to deliver any or all of the goods within the period(s) specified in the contract, or within any
extension thereof granted by the purchaser pursuant to GCC Clause 21.2;
(b) if the Supplier fails to perform any other obligation(s) under the contract; or
(c) if the supplier, in the judgment of the purchaser, has engaged in corrupt or fraudulent practices in competing for
or in executing the contract.
23.2 In the event the purchaser terminates the contract in whole or in part, the purchaser may procure, upon such terms and in such
manner as it deems appropriate, goods, works or services similar to those undelivered, and the supplier shall be liable to the
purchaser for any excess costs for such similar goods, works or services. However, the supplier shall continue performance of
the contract to the extent not terminated.
23.3 Where the purchaser terminates the contract in whole or in part, the purchaser may decide to impose a restriction penalty on the
supplier by prohibiting such supplier from doing business with the public sector for a period not exceeding 10 years.
23.4 If a purchaser intends imposing a restriction on a supplier or any person associated with the supplier, the supplier will be allowed
a time period of not more than fourteen (14) days to provide reasons why the envisaged restriction should not be imposed.
Should the supplier fail to respond within the stipulated fourteen (14) days the purchaser may regard the intended penalty as not
objected against and may impose it on the supplier.
23.5 Any restriction imposed on any person by the Accounting Officer / Authority will, at the discretion of the Accounting Officer /
25.1 Notwithstanding the provisions of GCC Clauses 22 and 23, the supplier shall not be liable for forfeiture of its performance
security, damages, or termination for default if and to the extent that his delay in performance or other failure to perform his
obligations under the contract is the result of an event of force majeure.
25.2 If a force majeure situation arises, the supplier shall promptly notify the purchaser in writing of such condition and the cause
thereof. Unless otherwise directed by the purchaser in writing, the supplier shall continue to perform its obligations under the
contract as far as is reasonably practical, and shall seek all reasonable alternative means for performance not prevented by the
force majeure event.
26.1 The purchaser may at any time terminate the contract by giving written notice to the supplier if the supplier becomes bankrupt or
otherwise insolvent. In this event, termination will be without compensation to the supplier, provided that such termination will not
prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the purchaser.
27.1 If any dispute or difference of any kind whatsoever arises between the purchaser and the supplier in connection with or arising
out of the contract, the parties shall make every effort to resolve amicably such dispute or difference by mutual consultation.
27.2 If, after thirty (30) days, the parties have failed to resolve their dispute or difference by such mutual consultation, then either the
purchaser or the supplier may give notice to the other party of his intention to commence with mediation. No mediation in respect
of this matter may be commenced unless such notice is given to the other party.
27.3 Should it not be possible to settle a dispute by means of mediation, it may be settled in a South African court of law.
27.4 Mediation proceedings shall be conducted in accordance with the rules of procedure specified in the SCC.
27.5 Notwithstanding any reference to mediation and/or court proceedings herein,
28.1 Except in cases of criminal negligence or willful misconduct, and in the case of infringement pursuant to Clause 6;
i. the supplier shall not be liable to the purchaser, whether in contract, tort, or otherwise, for any indirect or consequential
loss or damage, loss of use, loss of production, or loss of profits or interest costs, provided that this exclusion shall not
apply to any obligation of the supplier to pay penalties and/or damages to the purchaser; and
ii. the aggregate liability of the supplier to the purchaser, whether under the contract, in tort or otherwise, shall not exceed
the total contract price, provided that this limitation shall not apply to the cost of repairing or replacing defective
equipment.
a. The goods supplied shall conform to the standards mentioned in the bidding documents and specifications.
5. Use of contract documents and information; inspection.
a. The supplier shall not, without the purchaser’s prior written consent, disclose the contract, or any provision thereof, or any
specification, plan, drawing, pattern, sample, or information furnished by or on behalf of the purchaser in connection therewith, to
any person other than a person employed by the supplier in the performance of the contract. Disclosure to any such employed
person shall be made in confidence and shall extend only so far as may be necessary for purposes of such performance.
b. The supplier shall not, without the purchaser’s prior written consent, make use of any document or information mentioned in GCC
clause 5.1 except for purposes of performing the contract.
c. Any document, other than the contract itself mentioned in GCC clause 5.1 shall remain the property of the purchaser and shall be
returned (all copies) to the purchaser on completion of the supplier’s performance under the contract if so required by the
purchaser.
d. The supplier shall permit the purchaser to inspect the supplier’s records relating to the performance of the supplier and to have
them audited by auditors appointed by the purchaser, if so required by the purchaser.
8.1 All pre-bidding testing will be for the account of the bidder.
8.2 If it is a bid condition that supplies to be produced or services to be rendered should at any stage during production or execution
or on completion be subject to inspection, the premises of the bidder or contractor shall be open, at all reasonable hours, for
inspection by a representative of the Department or an organization acting on behalf of the Department.
8.3 If there are no inspection requirements indicated in the bidding documents and no mention is made in the contract, but during
the contract period it is decided that inspections shall be carried out, the purchaser shall itself make the necessary
arrangements, including payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3 show the supplies to be in accordance with the contract
requirements, the cost of the inspections, tests and analyses shall be defrayed by the purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not comply with the contract requirements, irrespective of
whether such supplies or services are accepted or not, the cost in connection with these inspections, tests or analyses shall be
defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and which do not comply with the contract requirements may
be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or analyzed and may be rejected if found not to comply with
the requirements of the contract. Such rejected supplies shall be held at the cost and risk of the supplier who shall, when called
upon, remove them immediately at his own cost and forthwith substitute them with supplies which do comply with the
requirements of the contract. Failing such removal the rejected supplies shall be returned at the suppliers cost and risk. Should
the supplier fail to provide the substitute supplies forthwith, the purchaser may, without giving the supplier further opportunity to
substitute the rejected supplies, purchase such supplies as may be necessary at the expense of the supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the purchaser to cancel the contract on account of a breach of
the conditions thereof, or to act in terms of Clause 23 of GCC.
completed online without changing any words. Photocopies of the original Bids documentation
may be used, but an original signature must appear on such photocopies.
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE IS
1.1 “Closing time” means the date and hour specified in the bidding documents for the receipt of bids.
1.2 “Contract” means the written agreement entered into between the purchaser and the supplier, as recorded in the contract form
signed by the parties, including all attachments and appendices thereto and all documents incorporated by reference therein.
1.3 “Contract price” means the price payable to the supplier under the contract for the full and proper performance of his contractual
obligations.
1.4 “Corrupt practice” means the offering, giving, receiving, or soliciting of anything of value to influence the action of a public official
in the procurement process or in contract execution.
1.5 "Countervailing duties" are imposed in cases where an enterprise abroad is subsidized by its government and encouraged to
market its products internationally.
1.6 “Country of origin” means the place where the goods were mined, grown or produced or from which the services are supplied.
3.1 Unless otherwise indicated in the bidding documents, the purchaser shall not be liable for any expense incurred in the preparation
and submission of a bid. Where applicable a non-refundable fee for documents may be charged.
3.2 With certain exceptions, invitations to bid are only published in the Government Tender Bulletin. The Government Tender Bulletin
may be obtained directly from the Government Printer, Private Bag X85, Pretoria 0001, or accessed electronically from
www.treasury.gov.za
10.1 Delivery of the goods shall be made by the supplier in accordance with the terms specified in the contract. The details of
shipping and/or other documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
21.1 Delivery of the goods and performance of services shall be made by the supplier in accordance with the time schedule
prescribed by the purchaser in the contract.
21.2 If at any time during performance of the contract, the supplier or its subcontractor(s) should encounter conditions impeding timely
delivery of the goods and performance of services, the supplier shall promptly notify the purchaser in writing of the fact of the
delay, its likely duration and its cause(s). As soon as practicable after receipt of the supplier’s notice, the purchaser shall
evaluate the situation and may at his discretion extend the supplier’s time for performance, with or without the imposition of
penalties, in which case the extension shall be ratified by the parties by amendment of contract.
21.3 No provision in a contract shall be deemed to prohibit the obtaining of supplies or services from a national department, provincial
department, or a local authority.
21.4 The right is reserved to procure outside of the contract small quantities or to have minor essential services executed if an
emergency arises, the supplier’s point of supply is not situated at or near the place where the supplies are required, or the
supplier’s services are not readily available.
21.5 Except as provided under GCC Clause 25, a delay by the supplier in the performance of its delivery obligations shall render the
supplier liable to the imposition of penalties, pursuant to GCC Clause 22, unless an extension of time is agreed upon pursuant to
GCC Clause 21.2 without the application of penalties.
21.6 Upon any delay beyond the delivery period in the case of a supplies contract, the purchaser shall, without cancelling the
contract, be entitled to purchase supplies of a similar quality and up to the same quantity in substitution of the goods not supplied
in conformity with the contract and to return any goods delivered later at the supplier’s expense and risk, or to cancel the
contract and buy such goods as may be required to complete the contract and without prejudice to his other rights, be entitled to
claim damages from the supplier.
24.1 When, after the date of bid, provisional payments are required, or antidumping or countervailing duties are imposed, or the
amount of a provisional payment or anti-dumping or countervailing right is increased in respect of any dumped or subsidized
import, the State is not liable for any amount so required or imposed, or for the amount of any such increase. When, after the
said date, such a provisional payment is no longer required or any such anti-dumping or countervailing right is abolished, or
where the amount of such provisional payment or any such right is reduced, any such favourable difference shall on demand be
paid forthwith by the contractor to the State or the State may deduct such amounts from moneys (if any) which may otherwise be
due to the contractor in regard to supplies or services which he delivered or rendered, or is to deliver or render in terms of the
contract or any other contract or any other amount which may be due to him.
31.1 Every written acceptance of a bid shall be posted to the supplier concerned by registered or certified mail and any other notice to
him shall be posted by ordinary mail to the address furnished in his bid or to the address notified later by him in writing and such
posting shall be deemed to be proper service of such notice
31.2 The time mentioned in the contract documents for performing any act after such aforesaid notice has been given, shall be
reckoned from the date of posting of such notice.
(i)SBD 1: Invitation to quote/bid and T&Cs of
bidding.
(ii)SBD3: Pricing Schedule
(iii)SBD 4 form: Bidders Disclosure
(iv)SBD 6.1 form: Preference Points claim form in
terms of the Preferential Procurement Regulation
2022; (Note to tenderers: the tenderer must
indicate how they claim for each preference point
system). Attach active BBBEE certificate or
Invitation to Quote Standardized 30 September 2025
Supply and delivery of office furniture for head office h004l2706rfq00059
Sbd 3.1
Pricing schedule – firm prices
(Purchases)
Note: only firm prices will be accepted. Non-firm prices (including
Prices subject to rates of exchange variations) will not be
agreement:
(i) Bidding documents, viz
Contribution in terms of the Preferential Procurement Regulations 2011;
(ii) General Conditions of Contract; and
(iii) Other (specify)
3. I confirm that I have satisfied myself as to the correctness and validity of my bid; that the price(s)
and rate(s) quoted cover all the goods and/or works specified in the bidding documents; that the
price(s) and rate(s) cover all my obligations and I accept that any mistakes regarding price(s) and
rate(s) and calculations will be at my own risk.
Categories
Request for Quotation
67 Koranna Avenue - Doringkloof - Centurion - 0157
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
QUOTE PACK - RFQ00059.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Friday, 05 June 2026 - 11:00
Venue
null
02 Jun
2026
Tender Published
Tender was published
05 Jun
2026
Closing Date
Tender closing date
Organization
Border Management AuthorityContact Person
Jimmy Sibiya
Phone
012-065-1195
[email protected]
Website
www.cbrta.co.za/
Address
350 Witch-Hazel Ave, Eco-Park Estate, Centurion, 0144, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
02 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
012-065-1195[email protected]www.cbrta.co.za350 Witch-Hazel Ave, Eco-Park Estate, Centurion, 0144, South Africa
Key Personnel
Provinces Active
Industries
Median Estimate
R 6 115 853
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Manufacture of furniture. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
A technical guide for manufacturers and suppliers to provide bulk school furniture—from desks to science labs—to Gauteng's growing school network.
Security contractors in Gauteng must now navigate a tightening regulatory landscape that intertwines ICT procurement with stringent safety and compliance standards. In 2026, every tender is scrutinised for PSIRA validity, CSD clearance, BBBEE status, SARS TCS compliance, and COIDA standing. Missing or outdated documentation can instantly disqualify a bid, jeopardising lucrative contracts and exposing firms to legal penalties. Understanding the updated framework is therefore not optional—it is essential for survival and growth in the provincial market.
As we navigate the complex regulatory environment of 2026, Construction contractors in Gauteng must prioritize compliance to access the lucrative government procurement opportunities. With the Construction Industry Development Board (CIDB) playing a crucial role in regulating the industry, understanding the CIDB contractor registration process, required documents, and common mistakes is essential for small and medium-sized enterprises (SMEs) to successfully bid for tenders. In this article, we will break down the regulatory framework, required documentation, and provide a step-by-step compliance approach to help Gauteng SMEs overcome barriers to entry.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our Blog