Luthuli museum seeks a qualified HVAC service provider for supply, delivery, and installation of new air conditioning units, repositioning of an existing unit, and disposal of an old unit. Open to experienced contractors with relevant expertise. Closing date: 17 june 2026.
Important Dates
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf (RFQ){"closingDate":"05 JUNE 2026","closingTime":"11H00","briefingSession":"{\"date\":\"12 JUNE 2026\",\"time\":\"11H00\",\"venue\":\"11H00\",\"is_compulsory\":true}"}
Contact Information
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf (RFQ){"name":"................................................................................","email":"[email protected]","phone":null,"department":"S; REMOVAL AND REPOSITIONING AN ALREADY","address":null}
Submission Guidelines
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf (RFQ)1. No sub-contracting will be permitted without the approval and consent of the Project Officer due to knowledge and
experience required in order to render an effective service towards the HVAC work.
2. Once appointed, no additional costs incurred by Service Provider will be accepted by the Museum. Therefore, all
anticipated costs should be included in this quotation.
3. The successful Service Provider will be required to submit a Letter of Good Standing in terms of COIDA; or his/her
latest assessment and proof of payment thereof; or proof of registration with the Compensation Commissioner (only
in cases of a new registration), prior to commencement of work.
4. The Service Provider must take all necessary precautions to ensure that he/she complies in all respects with the
environmental safety legislation and the Occupational Health and Safety Act (OHSA) aimed at protecting the health
and safety of workers and others in the workplace.
Damages
1. The Service Provider shall inform the Project Officer of any damages caused by the specialist operations or testing,
on the day that such damages occur.
2. Any damage to property, as the result of the specialist’s operations, shall be the responsibility of the specialist.
Safety
1. All reasonable care shall be taken to prevent injury to people or damage to property by ensuring that equipment is
properly secured and maintained and to ensure they are in good working order and equipped with the required
safety devices.
Evaluation Criteria
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf (RFQ)Mandatory
Functional
Technical Specifications
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf (RFQ)The Luthuli Museum requires removal, reallocation, proper disposal, supply and installation of air-conditioner in
designated areas. These include the Nokukhanya Luthuli Resource Centre Boardroom, Education/Collections office and
Security Guardhouse.
The Luthuli Museum therefore seeks to appoint a professional and qualifying Service Provider with expertise for the
work explained below.
The appointment of a qualified and experienced HVAC service provider for the provision of
Supply, delivery and installation of new air conditioning units; removal and repositioning
An already existing air conditioning unit; and removal and disposal of an old air
Conditioning unit at luthuli museum
1. Background and discussion
1.1 The Luthuli Museum has identified and prioritized the need to appoint a suitably qualifying and experienced
service provider to perform professional air-conditioning unit removal, reinstallation, proper disposal and supply
and installation of new air conditioning units.
1.2 Upgrade work will be achieved through procurement of two new air-conditioning units, replacing existing units
with location and operational challenges.
1.3 The other existing units are dysfunctional and faulty and require removal and safe disposal.
1.4 The existing air-conditioners are mid wall split units located at the Nokukhanya Luthuli Resource Centre
Boardroom, Collections/Education Office and security guardhouse.
2.1 The NLRC boardroom setup requires central air-conditioning for improved location and air-circulation
experience during meetings, presentations and video conferencing.
2.2 The existing wall mounted air-conditioning unit in the boardroom is installed directly above a 75” smart
television.
2.3 This unit sometimes presents leakage challenges, posing damage risks to the newly procured boardroom
television.
2.4 This air-conditioning unit also produces unbearable loud disruptive noise during physical and virtual meetings.
2.5 This noise lasts for approximately 2 minutes, regardless of whether the air-conditioner is on or switched off.
2.6 Apart from the location, leakage and noise challenges, this unit is fully functional and serviced annually.
2.7 Upon removal, this air-conditioning unit will be replaced with a ceiling mounted cassette air-conditioner installed
at the centre of the boardroom.
2.8 Two units require removal and safe disposal with the one at the security guardhouse being completely
dysfunctional and the one at the Collections/Education office being faulty causing persistent main switch
tripping in the building’s electrical distribution board (DB).
2.9 Recommendations as per report from specialists that conducted assessment of the system were to remove and
replace this unit before it causes further electrical damages.
The air-conditioning unit at the security guardhouse will be replaced with the unit removed at the NLRC boardroom
as it is fully functional.
3. Purpose of project
3.1 The purpose of the project is to enhance HVAC needs in the boardroom and staff office spaces, ensuring that
all installation meet specified standards and operational requirements.
of 19
RFQ number: lm 2026/0033
The role of the appointed professional service provider is to conduct the following scope of work:
4.1 Remove existing 12000BTU air-conditioning unit at the NLRC boardroom.
4.2 Reinstall the air-conditioning unit removed from the NLRC boardroom at the security guardhouse.
4.3 Removal and proper disposal of existing dysfunctional 12000BTU air-conditioning unit at the security
guardhouse.
4.4 Removal and proper disposal of faulty 18000BTU air-conditioning unit at the Education/Collections office.
4.5 Supply and install new 18000BTU inverter wall mounted air-conditioning unit with complete fittings at the
Education/Collections office.
4.6 Supply and install new cassette ceiling inverter air-conditioning unit with complete fittings at the NLRC
boardroom.
4.7 Reconnection to existing power supply and electrical connections compliant with safety standards.
4.8 Testing and commission of the installation work.
4.9 Provision of wiring and electrical certification of completed work.
4.10 Adherence to site-specific operational constraints, including working hours and sensitive electronic equipment
considerations.
4.11 Guarantee and maintenance of the installed units for a 12-month period after installation.
.
Experience & Qualifications
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf9. At least 3 Traceable Reference Letters on Company Letterhead (Not older than 5 Years)
10. CVs and Education Qualifications of Key Personnel
11. HVAC Technician Accreditation
12. Registration with, SAIRAC/ SARACCA/ ECASA or recognized national body (proof)
13. Certified copy of wireman’s license
14. Public Liability Insurance
15. COIDA Certificate/ Letter of Good Standing
16. SBD 4 – Bidder Declaration
17. SBD 6.1 – Preferential Procurement Claim Form
18. General Conditions of Contract (GCC) (To initial all pages)
Note: This RFQ must be completed and signed by the authorised company representative.
of 19
RFQ number: lm 2026/0033
Luthuli museum RFQ conditions
1. Quotation conditions
a) Luthuli Museum does not bind itself to accept the lowest or any RFQ, nor shall it be responsible for or pay any
expenses or losses which may be incurred by the bidder in the preparation and delivery of the RFQ.
b) No RFQ shall be deemed to have been accepted unless and until a formal contract/letter of intent is prepared
and executed.
c) Luthuli Museum reserves the right to:
I. Not evaluate and award RFQ that do not comply strictly with the requirements of this RFQ.
II. Select solely on the information received in the RFQs and Enter into negotiations with any one or
more of the preferred bidders(s) based on the criteria specified in the evaluation of this RFQ.
III. Contact any bidder during the evaluation process, to clarify any information, without informing any
other bidders, and no change in the content of the RFQ shall be sought, offered, or permitted.
IV. Award a contract to one or more bidder(s).
V. Withdraw the RFQ at any stage
VI. Accept a separate RFQ or any RFQ in part or full at its own discretion.
VII. Cancel this RFQ or any part thereof at any stage as prescribed in the PPPFA regulation.
VIII. Select the bidder(s) for further negotiations based on the greatest benefit to Luthuli Museum and not
necessarily based on the lowest costs
2. Cost of bidding
The bidder shall bear all costs and expenses associated with the preparation and submission of its RFQ, and the
Luthuli Museum shall under no circumstances be responsible or liable for any such costs, regardless of, without
limitation, the conduct or outcome of the bidding, evaluation, and selection processes.
3. CIDB compliance
3.1 Only those tenderers who are registered with CIDB, or are capable of being so prior to the evaluation of
submissions, in a contractor grading designation equal to or higher than a contractor grading designation
determined in accordance with the sum tenderer, or a value determined in accordance with Regulation
25(1B) or 25(7A) of the Construction Industry Development Regulations, for a 1ME or Higher class of
construction work, are eligible to have their tenders evaluated.
3.2 Joint Venture are eligible to submit tenders provided that:
3.2.1 every member of the joint venture is registered with the CIDB;
3.2.2 the lead partner has a contractor grading designation in the 1ME or Higher class of construction
work; or not lower than one level below the required grading designation in the class of works
construction works under considerations and possess the required recognition status.
3.2.3 The combined contractor grading designation calculated in accordance with the Construction
Industry Development Regulations is equal to or higher than a contractor grading designation
determined in accordance with the sum tendered for a 1ME or Higher class of construction work
or a value determined in accordance with Regulation 25(1B) or 25(7A) of the Construction
Industry Development Regulations.
of 19
RFQ number: lm 2026/0033
6. CIDB Registration – Contractor Grading 1ME or higher
7. Director (s) Certified ID Copy
8. Company Profile
9. At least 3 Traceable Reference Letters on Company Letterhead (Not older than 5 Years)
experience required in order to render an effective service towards the HVAC work.
1.1 The Luthuli Museum has identified and prioritized the need to appoint a suitably qualifying and experienced
service provider to perform professional air-conditioning unit removal, reinstallation, proper disposal and supply
and installation of new air conditioning units.
1.2 Upgrade work will be achieved through procurement of two new air-conditioning units, replacing existing units
with location and operational challenges.
1.3 The other existing units are dysfunctional and faulty and require removal and safe disposal.
1.4 The existing air-conditioners are mid wall split units located at the Nokukhanya Luthuli Resource Centre
2. Project description
2.1 The NLRC boardroom setup requires central air-conditioning for improved location and air-circulation
experience during meetings, presentations and video conferencing.
2.2 The existing wall mounted air-conditioning unit in the boardroom is installed directly above a 75” smart
television.
2.3 This unit sometimes presents leakage challenges, posing damage risks to the newly procured boardroom
television.
2.4 This air-conditioning unit also produces unbearable loud disruptive noise during physical and virtual meetings.
2.5 This noise lasts for approximately 2 minutes, regardless of whether the air-conditioner is on or switched off.
2.6 Apart from the location, leakage and noise challenges, this unit is fully functional and serviced annually.
2.7 Upon removal, this air-conditioning unit will be replaced with a ceiling mounted cassette air-conditioner installed
at the centre of the boardroom.
2.8 Two units require removal and safe disposal with the one at the security guardhouse being completely
dysfunctional and the one at the Collections/Education office being faulty causing persistent main switch
tripping in the building’s electrical distribution board (DB).
2.9 Recommendations as per report from specialists that conducted assessment of the system were to remove and
replace this unit before it causes further electrical damages.
Stage:1 mandatory criteria
a) Central Supplier Database Full Registration Report
b) Valid SARS Tax Pin
c) BBBEE Affidavit/ Certificate
d) CIDB Registration – Contractor Grading 1ME or Higher
e) CIPC Registration Documents
f) Director (s) Certified ID Copy
g) Company Profile
h) At least 3 Traceable Reference Letters on Company Letterhead (Not older than 5 Years)
i) CVs and Education Qualifications of Key Personnel
j) HVAC Technician Accreditation
k) Registration with, SAIRAC/SARACCA/ECASA or recognized national body (attach proof of certificate)
l) Certified copy of wireman’s license.
m) Public Liability Insurance
n) COIDA Certificate/ Letter of Good Standing
o) Public Liability Insurance
p) SBD 4 – Bidder Declaration
q) SBD 6.1 – Preferential Procurement Claim Form
r) General Conditions of Contract (GCC) (To initial all pages)
Note: Bidders that do not meet the set mandatory criteria will be eliminated from further evaluation process.
Stage 2: functionality evaluation
The Functional Criteria that will be used to test the capability of Bidders are as follows: The technical proposal will be
evaluated according to the following criteria and scoring system. The technical score will be calculated out of 100
points, and only those bids that achieve a threshold of 70 points for the technical proposal will move to the next level of
evaluation where a score for price.
Company Profile
and capability.
Company Experience
similar projects executed between 2020 and 2025.
of 19
RFQ number: lm 2026/0033
Reference Letters
and 2025 from previous clients.
submitted.
Total points for functionality 100
1. Company Bidder must be an HVAC Technician No submission -0 points 10%
Accreditation Proof of membership/ accreditation - 10
points
2. Company Bidder must submit a company profile No submission - 0 point 30%
profile indicating their core function, age, 1 to 4 years of operation - 5 points
resources, and capability. 5 to 6 years of operation - 10 points
7 to 9 years of operation - 15 points
> 9 years of operation - 30 points
3. Company Bidders must submit a list of similar No submission - 0 point 30%
Experience relevant projects executed between 2020 1-2 relevant projects submitted - 5 points
and 2025. The list of projects must be 3-4 relevant projects submitted - 10 points
relevant to the scope of work by the 5-6 relevant projects submitted - 15 points
Luthuli Museum. >7 relevant projects submitted - 30 points
4. Reference Bidders must submit reference letters for No submission - 0 point 30%
Letters or work / projects completed between 2020 1-2 relevant references submitted - 5 points
Completion to 2025 from previous clients. (Reference 3-4 relevant references submitted - 10 points
Certificates letters must be written by the clients 5-6 relevant references submitted - 15 points
where the work was done. >7 relevant references submitted - 30 points
Total 100%
of 19
RFQ number: lm 2026/0033
Stage:3. Price and specific goals evaluation
Evaluation of the quotations received is based on the 80/20 preference point system as per PFMA regulation of 2022.
Specific Goal to be evaluated out of 20 Points:
Quality Management
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdfwithin the last five years.
South African Qualifications Authority (SAQA) or other relevant institutes for qualified and registered HVAC,
electrical technicians for electrical connections, trade test certificates, (e.g. National Diploma or Higher
qualification in Mechanical/Refrigeration Mechanic/ Air conditioning & Refrigeration, etc. and Proof of
Registration (SAQCC Registration Gas Card).
of 19
RFQ number: lm 2026/0033
Pricing schedule
Name of Bidder: ................................................................ RFQ Number: ..............................
Closing Date: ..................................
RFQ shall remain valid for acceptance for a period of 60 days counted from closing date.
The Service Provider’s price must include all expenses; disbursements and costs (e.g. supply and delivery of materials
and equipment, labour, etc.) that may be required in and for the execution of the work described in the specification. The
5. Use of contract documents and information; inspection
Pricing Schedule
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdfName of Bidder: ................................................................ RFQ Number: ..............................
Closing Date: ..................................
RFQ shall remain valid for acceptance for a period of 60 days counted from closing date.
The Service Provider’s price must include all expenses; disbursements and costs (e.g. supply and delivery of materials
and equipment, labour, etc.) that may be required in and for the execution of the work described in the specification. The
Service Provider must ensure that they submit costs for all general risks, liabilities and obligations set forth or implied in
the contract as well as overhead charges and profit (in the event that the submission is successful). The tendered price
will be fixed, final and binding.
The appointed specialist will be required to carry out the scope of work as per the approved proposal and the work will
be expected be completed within a time frame of 14 days after receipt of appointment letter.
Item description unit quantity rate amount
1. New Cassette Unit for NLRC Boardroom
Supply and install BTU Cassette Unit air-conditioner complete, with
a standard back-to-back installation, piping, cable and drainpipe, an
electrical power supply to nearest plug socket, and mounting
brackets. Features must include a cooling and heating, minimum
temp of 18°C and maximum temp of 30°C. With auto cool, power
failure auto restart, electronic touch controls with remote, 12 hour
on/off timer. With a 5-year warranty
1.1 18 000 BTU ceiling cassette inverter air-conditioner unit equivalent no. 1
to LG, Carrier, , Samsung, or Daikin. with +8m pipping and
complete connections and accessories at the NLRC boardroom
2. New Mid-Wall Split Unit for Collections/Education Office
Supply and install BTU Split Unit air-conditioner complete, with a
standard back-to-back installation, piping, cable and drainpipe, an
electrical power supply to nearest plug socket, and mounting
brackets. Features must include a cooling and heating, minimum
temp of 18°C and maximum temp of 30°C. With auto cool, power
failure auto restart, electronic touch controls with remote, 12 hour
on/off timer. With a 5-year warranty
2.1 18 000 BTU inverter air-conditioner unit equivalent to LG, Carrier, , no. 1
Samsung, or Daikin. with +4m pipping and complete connections
and accessories at the Collections/Education office
3. Removal and Disposal
3.1 Remove and dispose existing faulty 18 000 BTU mid-wall split unit no. 1
at Collections/Education office
of 19
RFQ number: lm 2026/0033
3.2 Remove and dispose existing dysfunctional 12 000 BTU mid-wall no. 1
split unit at the Security Guardhouse
4. Removal and Reinstallation
4.1 Remove existing 12 000 BTU mid-wall split unit at NLRC no. 1
Boardroom
4.2 Reinstall 12 000 BTU mid-wall split unit at the Guardhouse no. 1
Sub-total
15% VAT
Grand total
The specialists are required to attend a compulsory site inspection meeting at the luthuli museum
At the address below to ascertain the specified work in order to quote appropriately.
Site inspection meeting
Date: 12 June 2026
Time: 11h00 (Persons arriving after 11h15 will not be considered as having attended the compulsory briefing
session)
Venue: The Luthuli Museum,
3233 Nokukhanya Luthuli Street,
Groutville,
KwaDukuza
4450.
Complete below:
1. Delivery Address: Luthuli Museum
3233 Nokukhanya Luthuli Street,
Groutville, KwaDukuza, 4450
2. Indicate Delivery period after order receipt .......................................
3. Is delivery period fixed? Yes/No
4. Is the price(s) fixed? Yes/No
5. Is the quote strictly to specification? Yes/No
I/We, the undersigned, agree that this bidding price shall remain binding on me/us and open for acceptance for the
period stipulated above.
Authorised Company Representative: ........................................................................
Capacity under which this quote is signed: ..................................................................
Signature: ..............................................
Date: ....................................................
of 19
RFQ number: lm 2026/0033
Compliance Requirements
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf (RFQ)The technical requirements include
Compliance with specifications provided in the RFQ documentation
Adherence to the recommended reputable quality brand name and delivery period for the items.
Meeting the minimum requirements as outlined in the specifications to qualify for evaluation.
SKILLS REQUIREMENTS The bidder must demonstrate
Bidders must have a CIDB contractor grading designation of 1 ME or higher.
Proven experience in HVAC supply, installation, maintenance and repairs, specifically for air conditioning units within the last five years.
Registration with, SAIRAC and SARACCA, ECASA or recognized national body (attach proof of certificate)
Certified copy of wireman’s license.
Provision of a CV proving experience of relevant certified industry certifications and qualifications recognised by South African Qualifications Authority (SAQA) or other relevant institutes for qualified and registered HVAC, electrical technicians for electrical connections, trade test certificates, (e.g. National Diploma or Higher qualification in Mechanical/Refrigeration Mechanic/ Air conditioning & Refrigeration, etc. and Proof of Registration (SAQCC Registration Gas Card).
Compliance with health and safety regulations, including signage and site safety protocols.
Knowledge of refrigerant handling regulations and safety standards
Ability to provide detailed reporting and preventative maintenance advice
Technical expertise in diagnosing leaks and faulty components.
Competence in project management to ensure timely delivery and installation. of 19 RFQ NUMBER: LM 2026/0033
Points Allocation: 20 points
B-BBEE Details: n the National Treasury Central database in terms of National Treasury circular no
4A of 2016/17. The bidder must register prior to submitting a proposal/bid.
of 19
RFQ number: lm 2026/0033
Returnable documents checklist
Quotation invitation document must be completed, signed and submitted by the authorised Company representative. All
forms must be properly completed; list below serve as a checklist of your RFQ submission.
(Tick in the relevant block below)
Description yes NO
1. Central Supplier Database Full Registration Report
2. Pricing Schedule / Quotation
3. Valid SARS Tax Pin
4. BBBEE Affidavit/ Certificate
5. CIPC Registration Documents
6. CIDB Registration – Contractor Grading 1ME or higher
7. Director (s) Certified ID Copy
8. Company Profile
9. At least 3 Traceable Reference Letters on Company Letterhead (Not older than 5 Years)
10. CVs and Education Qualifications of Key Personnel
11. HVAC Technician Accreditation
12. Registration with, SAIRAC/ SARACCA/ ECASA or recognized national body (proof)
13. Certified copy of wireman’s license
14. Public Liability Insurance
15. COIDA Certificate/ Letter of Good Standing
16. SBD 4 – Bidder Declaration
17. SBD 6.1 – Preferential Procurement Claim Form
18. General Conditions of Contract (GCC) (To initial all pages)
Note: This RFQ must be completed and signed by the authorised company representative.
of 19
RFQ number: lm 2026/0033
Luthuli museum RFQ conditions
1. Quotation conditions
a) Luthuli Museum does not bind itself to accept the lowest or any RFQ, nor shall it be responsible for or pay any
expenses or losses which may be incurred by the bidder in the preparation and delivery of the RFQ.
b) No RFQ shall be deemed to have been accepted unless and until a formal contract/letter of intent is prepared
Contractual Terms
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf1. The newly supplied air-conditioning units need to provide a 5-year warrantee after installation, testing and approval.
After-sale service plan
1. The appointed service provider will be required to provide post delivery services, in case there are any fault or
defect within the first 12-months, after delivery.
of 19
RFQ number: lm 2026/0033
16. Payment
17. Prices
18. Contract amendments
19. Assignment
20. Subcontracts
21. Delays in the supplier’s performance
22. Penalties
23. Termination for default
24. Dumping and countervailing duties
25. Force Majeure
26. Termination for insolvency
27. Settlement of disputes
28. Limitation of liability
29. Governing language
30. Applicable law
31. Notices
32. Taxes and duties
33. National Industrial Participation Programme (NIPP)
General Conditions of Contract
1. Definitions 1. The following terms shall be interpreted as indicated:
1.1 “Closing time” means the date and hour specified in the bidding
documents for the receipt of bids.
1.2 “Contract” means the written agreement entered into between the
purchaser and the supplier, as recorded in the contract form signed by
the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.3 “Contract price” means the price payable to the supplier under the
contract for the full and proper performance of his contractual
obligations.
1.4 “Corrupt practice” means the offering, giving, receiving, or soliciting
of any thing of value to influence the action of a public official in the
procurement process or in contract execution.
1.5 "Countervailing duties" are imposed in cases where an enterprise
abroad is subsidized by its government and encouraged to market its
products internationally.
1.6 “Country of origin” means the place where the goods were mined,
grown or produced or from which the services are supplied. Goods are
produced when, through manufacturing, processing or substantial and
major assembly of components, a commercially recognized new
product results that is substantially different in basic characteristics or
in purpose or utility from its components.
1.7 “Day” means calendar day.
1.8 “Delivery” means delivery in compliance of the conditions of the
contract or order.
1.9 “Delivery ex stock” means immediate delivery directly from stock
actually on hand.
1.10 “Delivery into consignees store or to his site” means delivered and
unloaded in the specified store or depot or on the specified site in
compliance with the conditions of the contract or order, the supplier
bearing all risks and charges involved until the supplies are so
delivered and a valid receipt is obtained.
1.11 "Dumping" occurs when a private enterprise abroad market its goods
on own initiative in the RSA at lower prices than that of the country of
origin and which have the potential to harm the local industries in the
RSA.
1.12 ”Force majeure” means an event beyond the control of the supplier and
not involving the supplier’s fault or negligence and not foreseeable.
Such events may include, but is not restricted to, acts of the purchaser
in its sovereign capacity, wars or revolutions, fires, floods, epidemics,
quarantine restrictions and freight embargoes.
1.13 “Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of any bidder, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the bidder of the
benefits of free and open competition.
1.14 “GCC” means the General Conditions of Contract.
1.15 “Goods” means all of the equipment, machinery, and/or other materials
that the supplier is required to supply to the purchaser under the
contract.
1.16 “Imported content” means that portion of the bidding price represented
by the cost of components, parts or materials which have been or are
still to be imported (whether by the supplier or his subcontractors) and
which costs are inclusive of the costs abroad, plus freight and other
direct importation costs such as landing costs, dock dues, import duty,
sales duty or other similar tax or duty at the South African place of
entry as well as transportation and handling charges to the factory in
the Republic where the supplies covered by the bid will be
manufactured.
1.17 “Local content” means that portion of the bidding price which is not
included in the imported content provided that local manufacture does
take place.
1.18 “Manufacture” means the production of products in a factory using
labour, materials, components and machinery and includes other
related value-adding activities.
1.19 “Order” means an official written order issued for the supply of goods
or works or the rendering of a service.
1.20 “Project site,” where applicable, means the place indicated in bidding
documents.
1.21 “Purchaser” means the organization purchasing the goods.
1.22 “Republic” means the Republic of South Africa.
1.23 “SCC” means the Special Conditions of Contract.
1.24 “Services” means those functional services ancillary to the supply of
the goods, such as transportation and any other incidental services,
such as installation, commissioning, provision of technical assistance,
training, catering, gardening, security, maintenance and other such
obligations of the supplier covered under the contract.
1.25 “Written” or “in writing” means handwritten in ink or any form of
electronic or mechanical writing.
2. Application 2.1 These general conditions are applicable to all bids, contracts and orders
including bids for functional and professional services, sales, hiring,
letting and the granting or acquiring of rights, but excluding
immovable property, unless otherwise indicated in the bidding
documents.
2.2 Where applicable, special conditions of contract are also laid down to
cover specific supplies, services or works.
2.3 Where such special conditions of contract are in conflict with these
general conditions, the special conditions shall apply.
3. General 3.1 Unless otherwise indicated in the bidding documents, the purchaser
shall not be liable for any expense incurred in the preparation and
submission of a bid. Where applicable a non-refundable fee for
documents may be charged.
3.2 With certain exceptions, invitations to bid are only published in the
Government Tender Bulletin. The Government Tender Bulletin may be
obtained directly from the Government Printer, Private Bag X85,
Pretoria 0001, or accessed electronically from www.treasury.gov.za
4. Standards 4.1 The goods supplied shall conform to the standards mentioned in the
bidding documents and specifications.
5. Use of 5.1 The supplier shall not, without the purchaser’s prior written consent,
contract disclose the contract, or any provision thereof, or any specification,
documents plan, drawing, pattern, sample, or information furnished by or on
and behalf of the purchaser in connection therewith, to any person other
information; than a person employed by the supplier in the performance of the
inspection.
contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for
purposes of such performance.
5.2 The supplier shall not, without the purchaser’s prior written consent,
make use of any document or information mentioned in GCC clause
5.1 except for purposes of performing the contract.
5.3 Any document, other than the contract itself mentioned in GCC clause
5.1 shall remain the property of the purchaser and shall be returned (all
copies) to the purchaser on completion of the supplier’s performance
under the contract if so required by the purchaser.
5.4 The supplier shall permit the purchaser to inspect the supplier’s records
relating to the performance of the supplier and to have them audited by
auditors appointed by the purchaser, if so required by the purchaser.
6. Patent rights 6.1 The supplier shall indemnify the purchaser against all third-party
claims of infringement of patent, trademark, or industrial design rights
arising from use of the goods or any part thereof by the purchaser.
7. Performance 7.1 Within thirty (30) days of receipt of the notification of contract award,
security the successful bidder shall furnish to the purchaser the performance
security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the
purchaser as compensation for any loss resulting from the supplier’s
failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the
contract, or in a freely convertible currency acceptable to the purchaser
and shall be in one of the following forms:
(a) a bank guarantee or an irrevocable letter of credit issued by a
reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the
bidding documents or another form acceptable to the
purchaser; or
(b) a cashier’s or certified cheque
7.4 The performance security will be discharged by the purchaser and
returned to the supplier not later than thirty (30) days following the
date of completion of the supplier’s performance obligations under the
contract, including any warranty obligations, unless otherwise
specified in SCC.
8. Inspections, 8.1 All pre-bidding testing will be for the account of the bidder.
tests and
analyses 8.2 If it is a bid condition that supplies to be produced or services to be
rendered should at any stage during production or execution or on
completion be subject to inspection, the premises of the bidder or
contractor shall be open, at all reasonable hours, for inspection by a
representative of the Department or an organization acting on behalf of
the Department.
8.3 If there are no inspection requirements indicated in the bidding
documents and no mention is made in the contract, but during the
contract period it is decided that inspections shall be carried out, the
purchaser shall itself make the necessary arrangements, including
payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3
show the supplies to be in accordance with the contract requirements,
the cost of the inspections, tests and analyses shall be defrayed by the
purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not
comply with the contract requirements, irrespective of whether such
supplies or services are accepted or not, the cost in connection with
these inspections, tests or analyses shall be defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and
which do not comply with the contract requirements may be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or
analyzed and may be rejected if found not to comply with the
requirements of the contract. Such rejected supplies shall be held at the
cost and risk of the supplier who shall, when called upon, remove them
immediately at his own cost and forthwith substitute them with
supplies which do comply with the requirements of the contract.
Failing such removal the rejected supplies shall be returned at the
suppliers cost and risk. Should the supplier fail to provide the
substitute supplies forthwith, the purchaser may, without giving the
supplier further opportunity to substitute the rejected supplies,
purchase such supplies as may be necessary at the expense of the
supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the
purchaser to cancel the contract on account of a breach of the
conditions thereof, or to act in terms of Clause 23 of GCC.
9. Packing 9.1 The supplier shall provide such packing of the goods as is required to
prevent their damage or deterioration during transit to their final
destination, as indicated in the contract. The packing shall be
sufficient to withstand, without limitation, rough handling during
transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packing, case size and weights shall
take into consideration, where appropriate, the remoteness of the
goods’ final destination and the absence of heavy handling facilities at
all points in transit.
9.2 The packing, marking, and documentation within and outside the
packages shall comply strictly with such special requirements as shall
be expressly provided for in the contract, including additional
requirements, if any, specified in SCC, and in any subsequent
instructions ordered by the purchaser.
10. Delivery 10.1 Delivery of the goods shall be made by the supplier in accordance with
and documents the terms specified in the contract. The details of shipping and/or other
documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
11. Insurance 11.1 The goods supplied under the contract shall be fully insured in a freely
convertible currency against loss or damage incidental to manufacture
or acquisition, transportation, storage and delivery in the manner
specified in the SCC.
12. Transportation 12.1 Should a price other than an all-inclusive delivered price be required,
this shall be specified in the SCC.
13. Incidental 13.1 The supplier may be required to provide any or all of the following
services services, including additional services, if any, specified in SCC:
(a) performance or supervision of on-site assembly and/or
commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance
of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual
for each appropriate unit of the supplied goods;
(d) performance or supervision or maintenance and/or repair of
the supplied goods, for a period of time agreed by the parties,
provided that this service shall not relieve the supplier of any
warranty obligations under this contract; and
(e) training of the purchaser’s personnel, at the supplier’s plant
and/or on-site, in assembly, start-up, operation,
maintenance, and/or repair of the supplied goods.
13.2 Prices charged by the supplier for incidental services, if not included in
the contract price for the goods, shall be agreed upon in advance by the
parties and shall not exceed the prevailing rates charged to other
parties by the supplier for similar services.
14. Spare parts 14.1 As specified in SCC, the supplier may be required to provide any or all
of the following materials, notifications, and information pertaining to
spare parts manufactured or distributed by the supplier:
(a) such spare parts as the purchaser may elect to purchase from the
supplier, provided that this election shall not relieve the supplier
of any warranty obligations under the contract; and
(b) in the event of termination of production of the spare parts:
(i) Advance notification to the purchaser of the pending
termination, in sufficient time to permit the purchaser to
procure needed requirements; and
(ii) following such termination, furnishing at no cost to the
purchaser, the blueprints, drawings, and specifications of the
spare parts, if requested.
15. Warranty 15.1 The supplier warrants that the goods supplied under the contract are
new, unused, of the most recent or current models, and that they
incorporate all recent improvements in design and materials unless
provided otherwise in the contract. The supplier further warrants that
all goods supplied under this contract shall have no defect, arising from
design, materials, or workmanship (except when the design and/or
material is required by the purchaser’s specifications) or from any act
or omission of the supplier, that may develop under normal use of the
supplied goods in the conditions prevailing in the country of final
destination.
15.2 This warranty shall remain valid for twelve (12) months after the
goods, or any portion thereof as the case may be, have been delivered
to and accepted at the final destination indicated in the contract, or for
eighteen (18) months after the date of shipment from the port or place
of loading in the source country, whichever period concludes earlier,
unless specified otherwise in SCC.
15.3 The purchaser shall promptly notify the supplier in writing of any
claims arising under this warranty.
15.4 Upon receipt of such notice, the supplier shall, within the period
specified in SCC and with all reasonable speed, repair or replace the
defective goods or parts thereof, without costs to the purchaser.
15.5 If the supplier, having been notified, fails to remedy the defect(s)
within the period specified in SCC, the purchaser may proceed to take
such remedial action as may be necessary, at the supplier’s risk and
expense and without prejudice to any other rights which the purchaser
may have against the supplier under the contract.
16. Payment 16.1 The method and conditions of payment to be made to the supplier
under this contract shall be specified in SCC.
16.2 The supplier shall furnish the purchaser with an invoice accompanied
by a copy of the delivery note and upon fulfillment of other obligations
stipulated in the contract.
16.3 Payments shall be made promptly by the purchaser, but in no case later
than thirty (30) days after submission of an invoice or claim by the
supplier.
16.4 Payment will be made in Rand unless otherwise stipulated in SCC.
17. Prices 17.1 Prices charged by the supplier for goods delivered and services
performed under the contract shall not vary from the prices quoted by
the supplier in his bid, with the exception of any price adjustments
authorized in SCC or in the purchaser’s request for bid validity
extension, as the case may be.
18. Contract 18.1 No variation in or modification of the terms of the contract shall be
amendments made except by written amendment signed by the parties concerned.
19. Assignment 19.1 The supplier shall not assign, in whole or in part, its obligations to
perform under the contract, except with the purchaser’s prior written
consent.
20. Subcontracts 20.1 The supplier shall notify the purchaser in writing of all subcontracts
awarded under this contracts if not already specified in the bid. Such
notification, in the original bid or later, shall not relieve the supplier
from any liability or obligation under the contract.
21. Delays in the 21.1 Delivery of the goods and performance of services shall be made by
supplier’s the supplier in accordance with the time schedule prescribed by the
performance purchaser in the contract.
21.2 If at any time during performance of the contract, the supplier or its
subcontractor(s) should encounter conditions impeding timely delivery
of the goods and performance of services, the supplier shall promptly
notify the purchaser in writing of the fact of the delay, its likely
duration and its cause(s). As soon as practicable after receipt of the
supplier’s notice, the purchaser shall evaluate the situation and may at
his discretion extend the supplier’s time for performance, with or
without the imposition of penalties, in which case the extension shall
be ratified by the parties by amendment of contract.
21.3 No provision in a contract shall be deemed to prohibit the obtaining of
supplies or services from a national department, provincial department,
or a local authority.
21.4 The right is reserved to procure outside of the contract small quantities
or to have minor essential services executed if an emergency arises, the
supplier’s point of supply is not situated at or near the place where the
supplies are required, or the supplier’s services are not readily
available.
21.5 Except as provided under GCC Clause 25, a delay by the supplier in
the performance of its delivery obligations shall render the supplier
liable to the imposition of penalties, pursuant to GCC Clause 22,
unless an extension of time is agreed upon pursuant to GCC Clause
21.2 without the application of penalties.
21.6 Upon any delay beyond the delivery period in the case of a supplies
contract, the purchaser shall, without canceling the contract, be entitled
to purchase supplies of a similar quality and up to the same quantity in
substitution of the goods not supplied in conformity with the contract
and to return any goods delivered later at the supplier’s expense and
risk, or to cancel the contract and buy such goods as may be required
to complete the contract and without prejudice to his other rights, be
entitled to claim damages from the supplier.
22. Penalties 22.1 Subject to GCC Clause 25, if the supplier fails to deliver any or all of
the goods or to perform the services within the period(s) specified in
the contract, the purchaser shall, without prejudice to its other remedies
under the contract, deduct from the contract price, as a penalty, a sum
calculated on the delivered price of the delayed goods or unperformed
services using the current prime interest rate calculated for each day of
the delay until actual delivery or performance. The purchaser may also
consider termination of the contract pursuant to GCC Clause 23.
23. Termination 23.1 The purchaser, without prejudice to any other remedy for breach of
for default contract, by written notice of default sent to the supplier, may
terminate this contract in whole or in part:
(a) if the supplier fails to deliver any or all of the goods within
the period(s) specified in the contract, or within any
extension thereof granted by the purchaser pursuant to GCC
Clause 21.2;
(b) if the Supplier fails to perform any other obligation(s) under
the contract; or
(c) if the supplier, in the judgment of the purchaser, has
engaged in corrupt or fraudulent practices in competing for
or in executing the contract.
23.2 In the event the purchaser terminates the contract in whole or in part,
the purchaser may procure, upon such terms and in such manner as it
deems appropriate, goods, works or services similar to those undelivered,
and the supplier shall be liable to the purchaser for any excess costs for
such similar goods, works or services. However, the supplier shall
continue performance of the contract to the extent not terminated.
23.3 Where the purchaser terminates the contract in whole or in part, the
purchaser may decide to impose a restriction penalty on the supplier by
prohibiting such supplier from doing business with the public sector for a
period not exceeding 10 years.
23.4 If a purchaser intends imposing a restriction on a supplier or any
person associated with the supplier, the supplier will be allowed a time
period of not more than fourteen (14) days to provide reasons why the
envisaged restriction should not be imposed. Should the supplier fail to
respond within the stipulated fourteen (14) days the purchaser may regard
the intended penalty as not objected against and may impose it on the
supplier.
23.5 Any restriction imposed on any person by the Accounting Officer /
Authority will, at the discretion of the Accounting Officer / Authority,
also be applicable to any other enterprise or any partner, manager,
director or other person who wholly or partly exercises or exercised or
may exercise control over the enterprise of the first-mentioned person,
and with which enterprise or person the first-mentioned person, is or was
in the opinion of the Accounting Officer / Authority actively associated.
23.6 If a restriction is imposed, the purchaser must, within five (5) working
days of such imposition, furnish the National Treasury, with the
following information:
(i) the name and address of the supplier and / or person restricted by the
purchaser;
(ii) the date of commencement of the restriction
(iii) the period of restriction; and
(iv) the reasons for the restriction.
These details will be loaded in the National Treasury’s central database
of suppliers or persons prohibited from doing business with the public
sector.
23.7 If a court of law convicts a person of an offence as contemplated in
sections 12 or 13 of the Prevention and Combating of Corrupt Activities
Act, No. , the court may also rule that such person’s name be
endorsed on the Register for Tender Defaulters. When a person’s name
has been endorsed on the Register, the person will be prohibited from
doing business with the public sector for a period not less than five years
and not more than 10 years. The National Treasury is empowered to
determine the period of restriction and each case will be dealt with on its
own merits. According to section 32 of the Act the Register must be
open to the public. The Register can be perused on the National Treasury
website.
24. Anti-dumping 24.1 When, after the date of bid, provisional payments are required, or antiand countervailing dumping or countervailing duties are imposed, or the amount of a
duties and rights provisional payment or anti-dumping or countervailing right is
increased in respect of any dumped or subsidized import, the State is
not liable for any amount so required or imposed, or for the amount of
any such increase. When, after the said date, such a provisional
payment is no longer required or any such anti-dumping or
countervailing right is abolished, or where the amount of such
provisional payment or any such right is reduced, any such favourable
difference shall on demand be paid forthwith by the contractor to the
State or the State may deduct such amounts from moneys (if any)
which may otherwise be due to the contractor in regard to supplies or
services which he delivered or rendered, or is to deliver or render in
terms of the contract or any other contract or any other amount which
may be due to him
25. Force 25.1 Notwithstanding the provisions of GCC Clauses 22 and 23, the
Majeure supplier shall not be liable for forfeiture of its performance security,
4.6 Supply and install new cassette ceiling inverter air-conditioning unit with complete fittings at the NLRC
boardroom.
4.7 Reconnection to existing power supply and electrical connections compliant with safety standards.
4.8 Testing and commission of the installation work.
4.9 Provision of wiring and electrical certification of completed work.
4.10 Adherence to site-specific operational constraints, including working hours and sensitive electronic equipment
considerations.
4.11 Guarantee and maintenance of the installed units for a 12-month period after installation.
.
5. Technical requirements
a standard back-to-back installation, piping, cable and drainpipe, an
electrical power supply to nearest plug socket, and mounting
brackets. Features must include a cooling and heating, minimum
temp of 18°C and maximum temp of 30°C. With auto cool, power
failure auto restart, electronic touch controls with remote, 12 hour
on/off timer. With a 5-year warranty
1.1 18 000 BTU ceiling cassette inverter air-conditioner unit equivalent no. 1
to LG, Carrier, , Samsung, or Daikin. with +8m pipping and
complete connections and accessories at the NLRC boardroom
standard back-to-back installation, piping, cable and drainpipe, an
electrical power supply to nearest plug socket, and mounting
brackets. Features must include a cooling and heating, minimum
temp of 18°C and maximum temp of 30°C. With auto cool, power
failure auto restart, electronic touch controls with remote, 12 hour
on/off timer. With a 5-year warranty
2.1 18 000 BTU inverter air-conditioner unit equivalent to LG, Carrier, , no. 1
Samsung, or Daikin. with +4m pipping and complete connections
and accessories at the Collections/Education office
of 19
RFQ number: lm 2026/0033
4.3. Name of company/firm...............................................................................
4.4. Company registration number: .....................................................................
4.5. Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that
the points claimed, based on the specific goals as advised in the tender, qualifies the company/
firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated
in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary proof to the
satisfaction of the organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any
other remedy it may have –
(a) disqualify the person from the tendering process;
(b) recover costs, losses or damages it has incurred or suffered as a result of
that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a
result of having to make less favourable arrangements due to such
cancellation;
(d) recommend that the Bidder or contractor, its shareholders and directors, or
only the shareholders and directors who acted on a fraudulent basis, be
restricted from obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other side)
rule has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
of 19
RFQ number: lm 2026/0033
1.12 ”Force majeure” means an event beyond the control of the supplier and
not involving the supplier’s fault or negligence and not foreseeable.
obtained directly from the Government Printer, Private Bag X85,
Pretoria 0001, or accessed electronically from www.treasury.gov.za
4. Standards 4.1 The goods supplied shall conform to the standards mentioned in the
bidding documents and specifications.
5. Use of 5.1 The supplier shall not, without the purchaser’s prior written consent,
contract disclose the contract, or any provision thereof, or any specification,
documents plan, drawing, pattern, sample, or information furnished by or on
and behalf of the purchaser in connection therewith, to any person other
information; than a person employed by the supplier in the performance of the
inspection.
contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for
purposes of such performance.
5.2 The supplier shall not, without the purchaser’s prior written consent,
make use of any document or information mentioned in GCC clause
5.1 except for purposes of performing the contract.
5.3 Any document, other than the contract itself mentioned in GCC clause
5.1 shall remain the property of the purchaser and shall be returned (all
copies) to the purchaser on completion of the supplier’s performance
under the contract if so required by the purchaser.
5.4 The supplier shall permit the purchaser to inspect the supplier’s records
relating to the performance of the supplier and to have them audited by
auditors appointed by the purchaser, if so required by the purchaser.
6. Patent rights 6.1 The supplier shall indemnify the purchaser against all third-party
claims of infringement of patent, trademark, or industrial design rights
arising from use of the goods or any part thereof by the purchaser.
7. Performance 7.1 Within thirty (30) days of receipt of the notification of contract award,
security the successful bidder shall furnish to the purchaser the performance
security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the
purchaser as compensation for any loss resulting from the supplier’s
failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the
contract, or in a freely convertible currency acceptable to the purchaser
and shall be in one of the following forms:
(a) a bank guarantee or an irrevocable letter of credit issued by a
reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the
bidding documents or another form acceptable to the
purchaser; or
(b) a cashier’s or certified cheque
7.4 The performance security will be discharged by the purchaser and
returned to the supplier not later than thirty (30) days following the
date of completion of the supplier’s performance obligations under the
contract, including any warranty obligations, unless otherwise
specified in SCC.
8. Inspections, 8.1 All pre-bidding testing will be for the account of the bidder.
tests and
analyses 8.2 If it is a bid condition that supplies to be produced or services to be
rendered should at any stage during production or execution or on
completion be subject to inspection, the premises of the bidder or
contractor shall be open, at all reasonable hours, for inspection by a
representative of the Department or an organization acting on behalf of
the Department.
8.3 If there are no inspection requirements indicated in the bidding
documents and no mention is made in the contract, but during the
contract period it is decided that inspections shall be carried out, the
purchaser shall itself make the necessary arrangements, including
payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3
show the supplies to be in accordance with the contract requirements,
the cost of the inspections, tests and analyses shall be defrayed by the
purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not
comply with the contract requirements, irrespective of whether such
supplies or services are accepted or not, the cost in connection with
these inspections, tests or analyses shall be defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and
which do not comply with the contract requirements may be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or
analyzed and may be rejected if found not to comply with the
requirements of the contract. Such rejected supplies shall be held at the
cost and risk of the supplier who shall, when called upon, remove them
immediately at his own cost and forthwith substitute them with
supplies which do comply with the requirements of the contract.
suppliers cost and risk. Should the supplier fail to provide the
substitute supplies forthwith, the purchaser may, without giving the
supplier further opportunity to substitute the rejected supplies,
purchase such supplies as may be necessary at the expense of the
supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the
purchaser to cancel the contract on account of a breach of the
conditions thereof, or to act in terms of Clause 23 of GCC.
9. Packing 9.1 The supplier shall provide such packing of the goods as is required to
prevent their damage or deterioration during transit to their final
destination, as indicated in the contract. The packing shall be
sufficient to withstand, without limitation, rough handling during
transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packing, case size and weights shall
take into consideration, where appropriate, the remoteness of the
goods’ final destination and the absence of heavy handling facilities at
all points in transit.
9.2 The packing, marking, and documentation within and outside the
packages shall comply strictly with such special requirements as shall
be expressly provided for in the contract, including additional
requirements, if any, specified in SCC, and in any subsequent
instructions ordered by the purchaser.
10. Delivery 10.1 Delivery of the goods shall be made by the supplier in accordance with
and documents the terms specified in the contract. The details of shipping and/or other
documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
11. Insurance 11.1 The goods supplied under the contract shall be fully insured in a freely
convertible currency against loss or damage incidental to manufacture
or acquisition, transportation, storage and delivery in the manner
specified in the SCC.
12. Transportation 12.1 Should a price other than an all-inclusive delivered price be required,
this shall be specified in the SCC.
13. Incidental 13.1 The supplier may be required to provide any or all of the following
services services, including additional services, if any, specified in SCC:
(a) performance or supervision of on-site assembly and/or
commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance
of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual
for each appropriate unit of the supplied goods;
(d) performance or supervision or maintenance and/or repair of
the supplied goods, for a period of time agreed by the parties,
provided that this service shall not relieve the supplier of any
warranty obligations under this contract; and
(e) training of the purchaser’s personnel, at the supplier’s plant
and/or on-site, in assembly, start-up, operation,
maintenance, and/or repair of the supplied goods.
13.2 Prices charged by the supplier for incidental services, if not included in
the contract price for the goods, shall be agreed upon in advance by the
parties and shall not exceed the prevailing rates charged to other
parties by the supplier for similar services.
14. Spare parts 14.1 As specified in SCC, the supplier may be required to provide any or all
of the following materials, notifications, and information pertaining to
spare parts manufactured or distributed by the supplier:
(a) such spare parts as the purchaser may elect to purchase from the
supplier, provided that this election shall not relieve the supplier
of any warranty obligations under the contract; and
(b) in the event of termination of production of the spare parts:
(i) Advance notification to the purchaser of the pending
termination, in sufficient time to permit the purchaser to
procure needed requirements; and
(ii) following such termination, furnishing at no cost to the
purchaser, the blueprints, drawings, and specifications of the
spare parts, if requested.
15. Warranty 15.1 The supplier warrants that the goods supplied under the contract are
new, unused, of the most recent or current models, and that they
incorporate all recent improvements in design and materials unless
provided otherwise in the contract. The supplier further warrants that
all goods supplied under this contract shall have no defect, arising from
design, materials, or workmanship (except when the design and/or
material is required by the purchaser’s specifications) or from any act
or omission of the supplier, that may develop under normal use of the
supplied goods in the conditions prevailing in the country of final
destination.
15.2 This warranty shall remain valid for twelve (12) months after the
goods, or any portion thereof as the case may be, have been delivered
to and accepted at the final destination indicated in the contract, or for
eighteen (18) months after the date of shipment from the port or place
of loading in the source country, whichever period concludes earlier,
unless specified otherwise in SCC.
15.3 The purchaser shall promptly notify the supplier in writing of any
claims arising under this warranty.
15.4 Upon receipt of such notice, the supplier shall, within the period
specified in SCC and with all reasonable speed, repair or replace the
defective goods or parts thereof, without costs to the purchaser.
15.5 If the supplier, having been notified, fails to remedy the defect(s)
within the period specified in SCC, the purchaser may proceed to take
such remedial action as may be necessary, at the supplier’s risk and
expense and without prejudice to any other rights which the purchaser
may have against the supplier under the contract.
16. Payment 16.1 The method and conditions of payment to be made to the supplier
under this contract shall be specified in SCC.
16.2 The supplier shall furnish the purchaser with an invoice accompanied
by a copy of the delivery note and upon fulfillment of other obligations
stipulated in the contract.
16.3 Payments shall be made promptly by the purchaser, but in no case later
than thirty (30) days after submission of an invoice or claim by the
supplier.
16.4 Payment will be made in Rand unless otherwise stipulated in SCC.
17. Prices 17.1 Prices charged by the supplier for goods delivered and services
performed under the contract shall not vary from the prices quoted by
the supplier in his bid, with the exception of any price adjustments
authorized in SCC or in the purchaser’s request for bid validity
extension, as the case may be.
18. Contract 18.1 No variation in or modification of the terms of the contract shall be
amendments made except by written amendment signed by the parties concerned.
19. Assignment 19.1 The supplier shall not assign, in whole or in part, its obligations to
perform under the contract, except with the purchaser’s prior written
consent.
20. Subcontracts 20.1 The supplier shall notify the purchaser in writing of all subcontracts
awarded under this contracts if not already specified in the bid. Such
notification, in the original bid or later, shall not relieve the supplier
from any liability or obligation under the contract.
21. Delays in the 21.1 Delivery of the goods and performance of services shall be made by
supplier’s the supplier in accordance with the time schedule prescribed by the
performance purchaser in the contract.
21.2 If at any time during performance of the contract, the supplier or its
subcontractor(s) should encounter conditions impeding timely delivery
of the goods and performance of services, the supplier shall promptly
notify the purchaser in writing of the fact of the delay, its likely
duration and its cause(s). As soon as practicable after receipt of the
supplier’s notice, the purchaser shall evaluate the situation and may at
his discretion extend the supplier’s time for performance, with or
without the imposition of penalties, in which case the extension shall
be ratified by the parties by amendment of contract.
21.3 No provision in a contract shall be deemed to prohibit the obtaining of
supplies or services from a national department, provincial department,
or a local authority.
21.4 The right is reserved to procure outside of the contract small quantities
or to have minor essential services executed if an emergency arises, the
supplier’s point of supply is not situated at or near the place where the
supplies are required, or the supplier’s services are not readily
available.
21.5 Except as provided under GCC Clause 25, a delay by the supplier in
the performance of its delivery obligations shall render the supplier
liable to the imposition of penalties, pursuant to GCC Clause 22,
unless an extension of time is agreed upon pursuant to GCC Clause
21.2 without the application of penalties.
21.6 Upon any delay beyond the delivery period in the case of a supplies
contract, the purchaser shall, without canceling the contract, be entitled
to purchase supplies of a similar quality and up to the same quantity in
substitution of the goods not supplied in conformity with the contract
and to return any goods delivered later at the supplier’s expense and
risk, or to cancel the contract and buy such goods as may be required
to complete the contract and without prejudice to his other rights, be
entitled to claim damages from the supplier.
22. Penalties 22.1 Subject to GCC Clause 25, if the supplier fails to deliver any or all of
the goods or to perform the services within the period(s) specified in
the contract, the purchaser shall, without prejudice to its other remedies
under the contract, deduct from the contract price, as a penalty, a sum
calculated on the delivered price of the delayed goods or unperformed
services using the current prime interest rate calculated for each day of
the delay until actual delivery or performance. The purchaser may also
consider termination of the contract pursuant to GCC Clause 23.
23. Termination 23.1 The purchaser, without prejudice to any other remedy for breach of
for default contract, by written notice of default sent to the supplier, may
terminate this contract in whole or in part:
(a) if the supplier fails to deliver any or all of the goods within
the period(s) specified in the contract, or within any
extension thereof granted by the purchaser pursuant to GCC
Clause 21.2;
(b) if the Supplier fails to perform any other obligation(s) under
the contract; or
(c) if the supplier, in the judgment of the purchaser, has
engaged in corrupt or fraudulent practices in competing for
or in executing the contract.
23.2 In the event the purchaser terminates the contract in whole or in part,
the purchaser may procure, upon such terms and in such manner as it
deems appropriate, goods, works or services similar to those undelivered,
and the supplier shall be liable to the purchaser for any excess costs for
such similar goods, works or services. However, the supplier shall
continue performance of the contract to the extent not terminated.
23.3 Where the purchaser terminates the contract in whole or in part, the
purchaser may decide to impose a restriction penalty on the supplier by
prohibiting such supplier from doing business with the public sector for a
period not exceeding 10 years.
23.4 If a purchaser intends imposing a restriction on a supplier or any
person associated with the supplier, the supplier will be allowed a time
period of not more than fourteen (14) days to provide reasons why the
envisaged restriction should not be imposed. Should the supplier fail to
respond within the stipulated fourteen (14) days the purchaser may regard
the intended penalty as not objected against and may impose it on the
supplier.
23.5 Any restriction imposed on any person by the Accounting Officer /
Section
Source: LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdfRFQs received will be evaluated on mandatory criteria, and Price & specific goals comparison.
Stage:1 mandatory criteria
a) Central Supplier Database Full Registration Report
b) Valid SARS Tax Pin
c) BBBEE Affidavit/ Certificate
d) CIDB Registration – Contractor Grading 1ME or Higher
e) CIPC Registration Documents
f) Director (s) Certified ID Copy
g) Company Profile
h) At least 3 Traceable Reference Letters on Company Letterhead (Not older than 5 Years)
i) CVs and Education Qualifications of Key Personnel
j) HVAC Technician Accreditation
k) Registration with, SAIRAC/SARACCA/ECASA or recognized national body (attach proof of certificate)
l) Certified copy of wireman’s license.
m) Public Liability Insurance
n) COIDA Certificate/ Letter of Good Standing
o) Public Liability Insurance
p) SBD 4 – Bidder Declaration
q) SBD 6.1 – Preferential Procurement Claim Form
r) General Conditions of Contract (GCC) (To initial all pages)
Note: Bidders that do not meet the set mandatory criteria will be eliminated from further evaluation process.
Stage 2: functionality evaluation
The Functional Criteria that will be used to test the capability of Bidders are as follows: The technical proposal will be
evaluated according to the following criteria and scoring system. The technical score will be calculated out of 100
points, and only those bids that achieve a threshold of 70 points for the technical proposal will move to the next level of
evaluation where a score for price.
The evaluation of the functional/technical detail of the proposal will be based on the following criteria:
Functional Factor Criteria Description Weight (%)
Company
Accreditation
Company Profile
and capability.
Company Experience
similar projects executed between 2020 and 2025.
of 19
RFQ number: lm 2026/0033
Reference Letters
and 2025 from previous clients.
submitted.
Total points for functionality 100
Scoring sheet
No. Criteria Proof required Points allocation Weight
1. Company Bidder must be an HVAC Technician No submission -0 points 10%
Accreditation Proof of membership/ accreditation - 10
points
2. Company Bidder must submit a company profile No submission - 0 point 30%
profile indicating their core function, age, 1 to 4 years of operation - 5 points
resources, and capability. 5 to 6 years of operation - 10 points
7 to 9 years of operation - 15 points
> 9 years of operation - 30 points
3. Company Bidders must submit a list of similar No submission - 0 point 30%
Experience relevant projects executed between 2020 1-2 relevant projects submitted - 5 points
and 2025. The list of projects must be 3-4 relevant projects submitted - 10 points
relevant to the scope of work by the 5-6 relevant projects submitted - 15 points
Luthuli Museum. >7 relevant projects submitted - 30 points
4. Reference Bidders must submit reference letters for No submission - 0 point 30%
Letters or work / projects completed between 2020 1-2 relevant references submitted - 5 points
Completion to 2025 from previous clients. (Reference 3-4 relevant references submitted - 10 points
Certificates letters must be written by the clients 5-6 relevant references submitted - 15 points
where the work was done. >7 relevant references submitted - 30 points
Total 100%
of 19
RFQ number: lm 2026/0033
Stage:3. Price and specific goals evaluation
Evaluation of the quotations received is based on the 80/20 preference point system as per PFMA regulation of 2022.
Specific Goal to be evaluated out of 20 Points:
Specific goal criteria points
Race HDP (100% Black Equity Ownership) 10
Gender HDP (Women Equity Ownership is 51% or more) 4
Youth Equity Ownership (Youth Equity Ownership is 100%) 4
People with Disability 2
Total 20
Claim for Specific Goals for 20 Points Allocation
The 20 points will be applied as follow:
a) If a Bidder is a Black company with a minimum of 100% Black Equity Ownership, 10 Points must be allocated.
(If Black Equity Ownership is less than 100%, no points may be allocated)
b) If HDP Women Equity Ownership is 51% or more, 4 Points must be allocated. (If Women Equity Ownership is
less than 51%, no Points may be allocated).
c) If Youth Equity Ownership is 100%, 4 Points must be allocated. (If Youth Equity Ownership is less than 100%,
no Points may be allocated).
d) If an entity has a Disabled Ownership 2 Points must be allocated. Proof must be submitted, in the form of
Doctor’s Notification of Disability. (If there is no Disabled Equity Ownership, no Points may be allocated).
e) Points may be allocated cumulatively in respect of the above Four Groups under relevant circumstances, as set
above.
Bidders must submit the following documents to claim points:
than 3 months)
Failure on the part of a service provider to submit proof or documentation required in terms of this RFQ to claim
points for specific goals will be interpreted to mean that preference points for specific goals are not claimed.
of 19
RFQ number: lm 2026/0033
Sbd 4
Declaration of interest
1. Any legal person, including persons employed by the state1, or persons having a kinship with persons employed by the
state, including a blood relationship, may make an offer or offers in terms of this invitation to bid (includes an advertised
competitive bid, a limited bid, a proposal or written price quotation). In view of possible allegations of favouritism, should
the resulting bid, or part thereof, be awarded to persons employed by the state, or to persons connected with or related
to them, it is required that the bidder or his/her authorised representative declare his/her position in relation to the
evaluating/adjudicating authority where-
are/is involved in the evaluation and or adjudication of the bid(s), or where it is known that such a relationship
exists between the person or persons for or on whose behalf the declarant acts and persons who are involved
with the evaluation and or adjudication of the bid.
2. In order to give effect to the above, the following questionnaire must be completed and submitted with the bid.
2.1 Full Name of bidder or his or her representative: ...................................................................
2.2 Identity Number:...............................................................................................................
2.3 Position occupied in the Company (director, trustee, shareholder2, member):
.....................................................................................................................................
2.4 Registration number of company, enterprise, close corporation, partnership agreement or trust:
.....................................................................................................................................
2.5 Tax Reference Number: ...................................................................................................
2.6 VAT Registration Number: ..............................................................................................
2.6.1 The names of all directors / trustees / shareholders / members, their individual identity numbers, tax reference numbers
and, if applicable, employee / PERSAL numbers must be indicated in paragraph 3 below.
1“State” means –
(a) any national or provincial department, national or provincial public entity or constitutional institution within the
meaning of the Public Finance
Management Act, 1999 (Act No. );
(b) any municipality or municipal entity;
(c) provincial legislature;
(d) national Assembly or the national Council of provinces; or
(e) Parliament.
2”Shareholder” means a person who owns shares in the company and is actively involved in the management of the enterprise or
business and exercises control over the enterprise.
of 19
RFQ number: lm 2026/0033
2.7 Are you or any person connected with the bidder YES / NO
presently employed by the state?
2.7.1 If so, furnish the following particulars:
Name of person / director / trustee / shareholder/ member: ..............................................
Name of state institution at which you or the person
connected to the bidder is employed : .............................................
Position occupied in the state institution: .............................................
Any other particulars:
........................................................................
........................................................................
........................................................................
2.7.2 If you are presently employed by the state, did you obtain YES / NO
the appropriate authority to undertake remunerative
work outside employment in the public sector?
2.7.2.1 If yes, did you attach proof of such authority to the bid YES / NO
document?
(Note: Failure to submit proof of such authority, where
applicable, may result in the disqualification of the bid.
2.7.2.2 If no, furnish reasons for non-submission of such proof:
...............................................................................
...............................................................................
...............................................................................
2.8Did you or your spouse, or any of the company’s directors / YES / NO
trustees / shareholders / members or their spouses conduct
business with the state in the previous twelve months?
2.8.1 If so, furnish particulars:
.............................................................................
.............................................................................
..............................................................................
2.9Do you, or any person connected with the bidder, have YES / NO
any relationship (family, friend, other) with a person
employed by the state and who may be involved with
the evaluation and or adjudication of this bid?
2.9.1 If so, furnish particulars.
........................................................................
of 19
RFQ number: lm 2026/0033
........................................................................
........................................................................
2.10 Are you, or any person connected with the bidder, YES/NO
aware of any relationship (family, friend, other) between any other
bidder and any person employed by the state who may be involved with
the evaluation and or adjudication of this bid?
2.10.1 If so, furnish particulars.
........................................................................
........................................................................
........................................................................
2.11 Do you or any of the directors / trustees / shareholders / members YES/NO
of the company have any interest in any other related companies whether or
not they are bidding for this contract?
2.11.1 If so, furnish particulars:
........................................................................................
........................................................................................
........................................................................................
3 Full details of directors / trustees / members / shareholders.
Full Name Identity Personal Income State Employee
Number Tax Reference Number / Persal
Number Number
of 19
RFQ number: lm 2026/0033
Request for Quotation
3233 Nokukhanya Luthuli Street - Groutville - KwaDukuza - 4450
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
LM 20260033 PROVISION OF PROFESSIONAL REMOVAL DISPOSAL SUPPLY DELIVERY AND INSTALLATION OF AIRCON UNITS FOR LUTHULI MUSEUM - RE ADVERYISEMENT.pdf
The Luthuli Museum seeks a qualified and experienced HVAC service provider to supply, deliver, and install new air conditioning units, remove and reposition an existing unit, and remove and dispose of an old unit. The project includes upgrading HVAC systems in the Nokukhanya Luthuli Resource Centre Boardroom, Education/Collections Office, and Security Guardhouse. The tender closes on 17 June 2026, with a compulsory briefing session on 12 June 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Wednesday, 17 June 2026 - 11:00
Venue
Luthuli Museum, 3233 Nokukhanya Luthuli Street, Groutville, 4450
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
05 Jun
2026
Tender Published
Tender was published
17 Jun
2026
Closing Date
Tender closing date
Matched by category & region
Company Accreditation
Bidder must be an accredited HVAC Technician (10 points).
Company Profile
Company profile indicating core function, age, resources, and capability (up to 30 points based on years of operation).
Company Experience
Demonstrated experience in HVAC supply, installation, maintenance, and repairs with a list of relevant projects executed between 2020 and 2025 (up to 30 points based on the number of projects).
Reference Letters
Reference letters for work/projects completed between 2020 and 2025 (up to 30 points based on the number of references).
Preference Points
System
80/20 Preferential Procurement Policy Framework Act (PPPFA) regulations.
Specific Goals
Race
10 points for 100% Black Equity Ownership.
Gender
4 points for 51% or more Women Equity Ownership.
Youth
4 points for 100% Youth Equity Ownership.
Disability
2 points for People with Disability Ownership.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
3233 Nokukhanya Luthuli Street, Groutville, 4450, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
+27 32 559 6822[email protected]luthulimuseum.org.za3233 Nokukhanya Luthuli Street, Groutville, 4450, South Africa
Median Estimate
R 960 000
Range
Based on General government tender averages. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
As Gauteng’s security tender landscape intensifies in 2026, contractors must navigate a complex compliance environment where a single oversight can disqualify an entire bid. With over 300 active security tenders in the province, regulatory adherence—particularly PSIRA registration—remains the non-negotiable foundation for participation. This guide clarifies the legal obligations, verification processes, and documentation required to ensure your submission meets the strict standards of South African procurement law.
In 2026, Western Cape contractors face a regulatory landscape where compliance is the gatekeeper to opportunity. With 148 active construction tenders in the province, the difference between winning and wasting time often comes down to understanding the CIDB grading system. A misaligned grade, lapsed certification, or missing documentation can disqualify even the most technically sound bid. This isn’t just bureaucracy—it’s the framework ensuring only capable, verified suppliers compete for public sector work.
Security contractors in Gauteng must now navigate a tightening regulatory landscape that intertwines ICT procurement with stringent safety and compliance standards. In 2026, every tender is scrutinised for PSIRA validity, CSD clearance, BBBEE status, SARS TCS compliance, and COIDA standing. Missing or outdated documentation can instantly disqualify a bid, jeopardising lucrative contracts and exposing firms to legal penalties. Understanding the updated framework is therefore not optional—it is essential for survival and growth in the provincial market.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.