Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
01 Landros Mare Street - POLOKWANE - POLOKWANE - 0699
Organization Type
GOVERNMENT
Published
05 Jun 2026
OCDS Reference
ocds-9t57fa-158278
Limpopo government seeks an independent project management and quality assurance service provider for a 12-month sap S/4HANA implementation project at lnw. Open tender (RFB) with closing date 03 july 2026. NO briefing session scheduled.
Important Dates
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf (TENDER){"closingDate":"03 July 2026","closingTime":"11h00","briefingSession":"{\"date\":\"22 June 2026\",\"time\":\"10h00\",\"venue\":\"e: 22 June 2026\",\"is_compulsory\":true}"}
The appointment is subject to the conditions specified in the bid document, including compliance with all applicable regulatory requirements and evaluation criteria.
Categories
Request for Bid(Open-Tender)
01 Landros Mare Street - POLOKWANE - POLOKWANE - 0699
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf
Lepelle Northern Water (LNW) invites bids for the appointment of an independent Project Management and Quality Assurance (QA) service provider to oversee the SAP S/4HANA implementation project. The contract duration is 12 months, focusing on strengthening project governance, ensuring high-quality standards, and driving successful implementation of the remaining scope. The project covers multiple SAP modules (e.g., FICO, MM, SuccessFactors, Payroll) and includes activities like phase gate reviews, testing assurance, defect management, and post-go-live support. The tender closes on **03 July 2026 at 11:00 UTC** and mandates attendance at a compulsory briefing session on **22 June 2026** in Polokwane.
Date & Time
Friday, 03 July 2026 - 11:00
Venue
01 Landros Mare Street, Lepelle House, Polokwane, 0699
05 Jun
2026
Tender Published
Tender was published
03 Jul
2026
Closing Date
Tender closing date
Median Estimate
R 198 360
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogContact Information
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf (TENDER){"name":null,"email":"[email protected]","phone":"015 295 1800","department":null,"address":"JECT AT LNW FOR A PERIOD OF TWELVE(12) MONTHS"}
Evaluation Criteria
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf (TENDER)Mandatory
Preferential
Technical Specifications
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf (TENDER)Select the applicable option Tenders Good standing
If “Good standing”, please state the purpose of this application
Particulars of applicant
Name/Legal name
(Initials & Surname
or registered name)
Trading name
(if applicable)
ID/Passport no Company/Close Corp.
registered no
Income Tax ref no PAYE ref no 7
VAT registration no 4 SDL ref no L
Customs code UIF ref no U
Telephone no C O D E N U M B E R Fax C O D E N U M B E R
no
E-mail address
Physical address
Postal address
Particulars of representative (Public Officer/Trustee/Partner)
Surname
First names
ID/Passport no Income Tax ref no
Telephone no C O D E N U M B E R Fax C O D E N U M B E R
no
E-mail address
Physical address
4 | P a g e
Particulars of tender (If applicable)
Tender number
Estimated Tender
amount R ,Audit
Expected duration
Are you currently aware of anyyear(s)Audit investigation against you/the company? YES NO of the tender
If “YES” provide details
Particulars of the 3 largest contracts previously awarded
Date started Date finalised Principal Contact person Telephone number Amount
Appointment of representative/agent (Power of Attorney)
I the undersigned confirm that I require a Tax Clearance Certificate in respect of Tenders or Goodstanding.
I hereby authorise and instruct to apply to and receive from
SARS the applicable Tax Clearance Certificate on my/our behalf.
C c y y m m d d
Signature of representative/agent Date
Name of
representative/
agent
Lepelle Northern Water (LNW) is a state-owned water utility providing water and sanitation services
across the Limpopo province. LNW has offices and pumps stations across the province while the head
office at 1st Landros Mare, in Polokwane. As part of its ICT digital transformation strategy, LNW is
upgrading its Enterprise Resource Planning (ERP) system from SAP ECC6 to SAP S/4HANA Private
Cloud Edition. This upgrade is undertaken in a form of green field implementation as it was
recommended to be a best approach under LNW’s circumstance.
To ensure the project delivers a high-quality, functional, and reliable system, LNW requires an
independent service provider to conduct Project Management and Quality Assurance (QA) services
throughout the project lifecycle. The project has already moved from Prepare and Explore phases and
currently it is in the Realise phase although the Explore stage is not fully signed off.
The project has started a while back with Project Management driven within the organization together
with the Service Provider and currently the project has progressed to an advanced stage where most
of the work has been completed. However, it was observed that to strengthen the project governance,
and successful implementation of the project, LNW should consider appointment of a service provider
to independently provide Project Management and Quality Assurance Services.
Therefore, the focus of Project Management will be on planning, controlling, monitoring and driving
the implementation of the remaining scope of work to ensure successful implementation. Whilst the
Quality assurance services is expected to ensure high quality standards for implementation of SAP
S/4 Hana for LNW.
The Project Management and Qualified Assurance service provider is expected meet the following
3.1 Overview of Scope
The Independent Project Management and Quality Assurance service provider will be responsible for
planning, coordinating, monitoring, and managing project management activities throughout the
project lifecycle, including governance support, risk and issue management, stakeholder coordination,
project scheduling, progress tracking, reporting, change control, and quality assurance processes.
The service provider will further be responsible for reviewing project deliverables, including functional
and technical specifications, against defined business requirements across the SAP Activate
methodology phases to ensure compliance with SAP best practices, Lepelle Northern Water (LNW)
policies, and applicable government regulations governing ERP implementation within a Schedule 3B
government entity.
3.2 Modules and Activities in Scope
The Independent Project management and Quality Assurance services will cover the implementation
of the following modules and activities:
i. S/4HANA Private Cloud ERP
ii. SuccessFactors (Employee Central, Performance & Goals, and SAP Integration Suite –
SFSF Edition) (HR)
iii. S/4HANA Payroll
iv. S/4HANA Project Systems (PS)
v. S/4HANA Plant Maintenance (PM) and SAP Service and Asset Management (SSAM)
vi. S/4HANA Materials Management (MM)
vii. S/4HANA Sales and Distribution (SD)
viii. S/4HANA Finance and Control (FICO)
ix. S/4HANA Accounts Payable
x. S/4HANA Asset Accounting
xi. S/4HANA General Ledger and Reporting
8 | P a g e
xii. S/4HANA Bank and Cash Management
xiii. S/4HANA Accounts Receivable
xiv. SAP Analytics Cloud
xv. SAP Business Technology Platform (BTP)
xvi. Data Migration
xvii. System Integrations
3.3 Project Management Activities
3.4 The Project Manager will be expected to dedicate three working days per week to the project for
the duration of the engagement. Project Governance and Oversight
3.5 Phase Gate Reviews (SAP Activate) Conduct formal phase gate reviews across:
9 | P a g e
3.6 Business and Functional Design Assurance
Review Business Process Design (BPD)s and Functional Design Documents (FDDs)
Assess alignment with:
3.7 Technical Design and Architecture Assurance
3.8 Data Migration Assurance
3.9 Testing Assurance
3.10 Defect Management Oversight
3.11 Independent Testing Validation
10 | P a g
3.12 Security, Controls and Compliance Assurance
3.13 Change Management and User Readiness
3.14 Integration and Interface Assurance
3.15 Cutover and Go-Live Readiness
3.16 Post-Go-Live Support and Benefits Realization
4. Deliverables
The service provider will be expected to deliver the following outputs:
Security and Compliance Reports
11 | P a g
o Overall project management and quality assessment
o Project performance evaluation against scope, schedule, budget, and deliverables
o Governance, stakeholder management, and project reporting summary
o Risk, issue, and mitigation summary
o Change management and decision register summary
o Lessons learnt and continuous improvement roadmap
o Benefits realization, ROI, and value realization analysis
o Recommendations for post-implementation support, sustainability, and optimization of
the SAP environment
5. Expected outcomes
The engagement is expected to:
6. Duration of contract
The contract will be for a period of TWELVE (12) months
7. Procurement process
The normal LNW procurement process will be followed in line with the company's SCM policy and
procedures with no deviations from the normal anticipated at this stage.
12 | P a g e
1. Validity of Tender : 150 Days (5 Months)
2. Contract Period : TWELVE (12Months
3. Advert date : 05 June 2026
4. Closing date : 03 July 2026
5. A compulsory briefing session will be held as
follows;
All bidders must attend the briefing session and sign the official attendance register.
NB: Failure to attend the compulsory briefing session and/or sign the attendance register will
result in disqualification of the bid. In the case of a Joint Venture (JV) or consortium,
attendance by the lead partner representative will be accepted.
Methodology
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdfrecommended to be a best approach under LNW’s circumstance.
and technical specifications, against defined business requirements across the SAP Activate
methodology phases to ensure compliance with SAP best practices, Lepelle Northern Water (LNW)
policies, and applicable government regulations governing ERP implementation within a Schedule 3B
government entity.
3.2 Modules and Activities in Scope
methodology and project plan/schedule outlining how they will
manage the project for LNW which will include the following
elements:
1. Activities, 2. Milestones, 3. Resource, 4. Costs, 5.
Experience & Qualifications
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdfsupporting documentation will
result in the service provider
forfeiting points for this
category.
15 | P a g e
KEY PERSONNEL Expertise of key team members Attach CVs reflecting the 30
in SAP S/4HANA Quality minimum experience EXPERIENCE AND
experience. minimum NQF Level 6 in IT
or any qualification relevant
to the applicable SAP NB: Bidders must submit one
module, for the following CV (on the provided CV
required consultants/team template) per required
members for evaluation on consultant/team member,
experience: clearly indicating the
individual’s relevant 1. FICO Consultant
experience in the applicable
functional area, qualifications, 2. MM Consultant
and certifications. Failure to
qualifications for each
required consultant/team 4. Payroll Consultant
member will result in the
experience of the team will
be calculated and if the
average experience of the
team is:
= 10 points
= 20 points
30 points
40 points
16 | P a g e
Expertise of Project Manager in Minimum Requirements: 30
SAP S/4 HANA Implementation, - at least 5 years’ ICT/ERP
project management experience
experience.
(PRINCE2 or PMP or
indicating the individual’s
SAP S/4HANA implementation
Scoring: experience, project
management experience, - Does not meet
qualifications, and relevant
requirements / no submission
certifications. Failure to
submit the required CV and = 0 points
qualifications will result in the - 5 years’ experience and
service provider forfeiting
qualifications = 10 points points for this category.
Certificates of attendance will - 6-9 years’ experience and
not be considered.
qualifications = 20 points
and qualifications = 30
points
IMPLEMENTATION Submission of the detailed project Implementation Plan and 20
Tertiary Qualifications (Highest order)
(Summary)
1.
2. 1.
3. 2.
4. 3.
5. 4.
qualifications and my experience.
............................................................................. ..........................
Quality Management
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdfDescription render project management and quality assurance services for the sap S4/HANAIMPLEMENTION
Project at lnw for a period of twelve(12) months
Bid response documents may be deposited in the bid box situated at 01 landros mare street polokwane
independent service provider to conduct Project Management and Quality Assurance (QA) services
throughout the project lifecycle. The project has already moved from Prepare and Explore phases and
currently it is in the Realise phase although the Explore stage is not fully signed off.
with the Service Provider and currently the project has progressed to an advanced stage where most
of the work has been completed. However, it was observed that to strengthen the project governance,
and successful implementation of the project, LNW should consider appointment of a service provider
to independently provide Project Management and Quality Assurance Services.
requirements:
2.1 Demonstrable expertise in Project Management and Quality Assurance for large-scale SAP
implementations.
2.2 At least 3 or more years of experience in cloud-based SAP S/4HANA deployments and risk
6 | P a g e
management frameworks.
2.3 Proven track record in test planning, defect management, and performance testing.
2.4 The service provider must provide a details project schedule and milestones through which the
scope of work will be delivered.
2.5 The service provider is expected to work with the implementation partner and the LNW to ensure
successful delivery of the project.
2.6 The Service Provider must deploy a strong team of resources which demonstrate relevant and
credible experience for a project of this magnitude.
2.7 From time to time, the Service Provider may be required to suspend or slow down its activities due
to dependencies on the Implementation Partner and Lepelle Northern Water (LNW) in finalizing
required deliverables. In such instances, the Service Provider shall not be entitled to invoice LNW
for any standby, idle, or waiting periods. Where such delays are not attributable to the Service
duration or project timelines on a time-only basis, without any adjustment to the agreed contract
value, pricing structure, or initial budget allocation. LNW shall use reasonable endeavors to resolve
outstanding issues and provide the required input or deliverables within a reasonable timeframe to
enable the Service Provider to resume work. Any lost time incurred by the service provider due to
such delays will be compensated through an extension of the service period at no additional cost,
provided that such extension remains within the contract period.
2.8 The service provider will be expected to work from LNW office in Polokwane most of the duration of
the contract although hybrid model might be adopted as and when a need arises.
2.9 All the recommendations from the Service Provider will be presented to the LNW working
committee and the implementation partner for discussion before reports are adopted.
2.10 This project has been started a while back and the service provider will be expected to quickly
familiarise themselves with the project to avoid undue delays.
2.11 The service provider is expected to demonstrate professionalism in conducting all the reviews
in accordance with the highest standards which will prevent the project and LNW from failing.
2.12 The service provider is expected to deploy equivalent resources in case where the initially
7 | P a g e
deployed resource resigns or are relieved from their employment.
2.13 The quality assurance activities will only be conducted during the transition from one phase of
the project to the next phase.
2.14 The Service Provider is expected to be truthful and honest in its response to this bid.
3. Scope of work
3.1 Overview of Scope
planning, coordinating, monitoring, and managing project management activities throughout the
project lifecycle, including governance support, risk and issue management, stakeholder coordination,
project scheduling, progress tracking, reporting, change control, and quality assurance processes.
Security and Compliance Reports
11 | P a g
o Overall project management and quality assessment
o Project performance evaluation against scope, schedule, budget, and deliverables
o Governance, stakeholder management, and project reporting summary
o Risk, issue, and mitigation summary
o Change management and decision register summary
o Lessons learnt and continuous improvement roadmap
o Benefits realization, ROI, and value realization analysis
o Recommendations for post-implementation support, sustainability, and optimization of
the SAP environment
Pricing Schedule
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf(Yes /NO)
Joint Venture (JV) bidders must submit a JV Agreement clearly indicating the
lead partner and the percentage split of participation for each partner, totaling
100%. Failure to provide this information may result in disqualification.
2 Full completion and signing of SBD 4 and SBD 3.1
Attach Proof of registration on the Central Suppliers Database (CSD). In
case of a JV, all Partners must submit. This will be verified online.
Attach proof of municipal rates and taxes (in the name of the company or a
director), not older than three months, as proof of business or residential
address. Alternatively, bidders may submit a signed lease agreement in the
name of the company or a dated stamped letter from the relevant tribal
authority.
1) Score tender evaluation points for financial offer.
2) Confirm that tenderers are eligible for the Preference Points Allocation (As per the
Preferential Procurement regulations 2022) claimed, and if so, score tender evaluation
points.
3) Calculate total quotation evaluation points using estimated rates total and preference
points.
4) Rank bidders offered from the highest points scorer of tender evaluation points to the
lowest.
5) Recommend the bidders with the highest number of quotation evaluation points for the
award of the contract, unless there are compelling and justifiable reasons not to do so.
NB: NO BIDS WILL BE CONSIDERED FROM PERSONS IN THE SERVICE OF THE STATE (see
definition on SBD 4 attached)
18 | P a g e
must be added to the points scored for price.
19 | P a g e
Sbd 3.1
9 pricing schedule – firm prices
(Purchases)
Note: only firm prices will be accepted. Non-firm prices (including
Prices subject to rates of exchange variations) will not be
NB: - Pricing above must include all chargeable items - deliverables, disbursement, travelling
and any other related cost to the exercise. No items will be paid outside the above fixed price.
20 | P a g e
10 contract conditions
Financial Requirements
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf (TENDER)Payment Terms: Payment Terms
Item Number Description Hourly Rate Unit of Measure Total Hours Amount
1 Explore Activity Unit
2 Realise Activity Unit
3 Deploy Activity Unit
4 Run Activity Unit
Subtotal
VAT
Total
NB: - Pricing above must include all chargeable items - deliverables, disbursement, travelling
and any other related cost to the exercise. No items wil
Compliance Requirements
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf (TENDER)2.1 Demonstrable expertise in Project Management and Quality Assurance for large-scale SAP implementations. 2.2 At least 3 or more years of experience in cloud-based SAP S/4HANA deployments and risk 6 | P a g e management frameworks. 2.3 Proven track record in test planning, defect management, and performance testing. 2.4 The service provider must provide a details project schedule and milestones through which the scope of work will be delivered. 2.5 The service provider is expected to work with the implementation partner and the LNW to ensure successful delivery of the project. 2.6 The Service Provider must deploy a strong team of resources which demonstrate relevant and credible experience for a project of this magnitude. 2.7 From time to time, the Service Provider may be required to suspend or slow down its activities due to dependencies on the Implementation Partner and Lepelle Northern Water (LNW) in finalizing required deliverables. In such instances, the Service Provider shall not be entitled to invoice LNW for any standby, idle, or waiting periods. Where such delays are not attributable to the Service Provider, LNW shall, subject to internal approvals, grant a reasonable extension of the contract duration or project timelines on a time-only basis, without any adjustment to the agreed contract value, pricing structure, or initial budget allocation. LNW shall use reasonable endeavors to resolve outstanding issues and provide the required input or deliverables within a reasonable timeframe to enable the Service Provider to resume work. Any lost time incurred by the service provider due to such delays will be compensated through an extension of the service period at no additional cost, provided that such extension remains within the contract period. 2.8 The service provider will be expected to work from LNW office in Polokwane most of the duration of the contract although hybrid model might be adopted as and when a need arises. 2.9 All the recommendations from the Service Provider will be presented to the LNW working committee and the implementation partner for discussion before reports are adopted. 2.10 This project has been started a while back and the service provider will be expected to quickly familiarise themselves with the project to avoid undue delays. 2.11 The service provider is expected to demonstrate professionalism in conducting all the reviews in accordance with the highest standards which will prevent the project and LNW from failing. 2.12 The service provider is expected to deploy equivalent resources in case where the initially 7 | P a g e deployed resource resigns or are relieved from their employment. 2.13 The quality assurance activities will only be conducted during the transition from one phase of the project to the next phase. 2.14 The Service Provider is expected to be truthful and honest in its response to this bid.
B-BBEE Minimum Level: 6
Points Allocation: 1 points
B-BBEE Details: 2. Value for money
3. LNW SCM Policy
4. PPPFA and associated regulations
8.1 Bid Evaluation Method
Tender will be evaluated in terms of the following four stages:
13 | P a g e
8.1.1 Stage 1. Administrative Compliance
Minimum documents required for this bid submitted (yes /NO)
Completed SBD1
Completed SBD 6.1 forms
Valid SARS Tax PIN
Company registration documents / CIPC (CK)
Valid B-BBEE Certificate / Sworn Affidavit
All the above administrative MUST be submitted with the tender document
8.1.2 Stage 2 - Mandatory requirements
Submitted
NO documents required
(Yes /NO)
Joint Venture (JV) bidders must submit a JV Agreement clearly indicating the
lead partner and the percentage split of participation for each partner, totaling
100%. Failure to provide this information may result in disqualification.
2 Full completion and signing of SBD 4 and SBD 3.1
Attach Proof of registration on the Central Suppliers Database (CSD). In
case of a JV, all Partners must submit. This will be verified online.
Attach proof of municipal rates and taxes (in the name of the company or a
director), not older than three months, as proof of business or residential
address. Alternatively, bidders may submit a signed lease agreement in the
name of the company or a dated stamped letter from the relevant tribal
authority.
Clearly visible Certified valid ID copies of the company Directors, not less
than 6 months.
All bid documents must be completed in full and in BLACK ink where
applicable; (No tampering of bid documents with either correction fluid, sticky
Health & Safety
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdfE-MAIL ADDRESS [email protected] E-MAIL ADDRESS [email protected]
I certify that the information furnished in paragraphs 1, 2
and 3 ABOVE IS CORRECT.
Contractual Terms
Source: Tender document -LNW_24_25_26 APPOINTMENT OF AN INDEPENDENT PROJECT MANAGEMENT AND QUALITY ASSURANCE SERVICE PROVIDER.pdf1. Full adherence to the contract and other applicable Acts will be applicable during the
contract; and
2. Submission of detailed report per service rendered (no payment will be made until final
approval of the report by the end user)
3. Full adherence to the Occupational and Health and Safety Act, Act and other
applicable Acts will be applicable during the course of the contract.
21 | P a g e
Annexure a summary cv template
Complete and submit this Summary CV Template for each proposed consultant or team member. Instruction:
Tick (✔) the applicable role(s) for which CVs are submitted.
Tick
Consultant Role (✔)
☐ SAP FICO Consultant
☐ SAP MM Consultant
☐ SAP SuccessFactors Consultant
☐ SAP Payroll Consultant
☐ SAP PM Consultant
☐ SAP PS Consultant
☐ SAP SD Consultant
☐ SAP SSAM Consultant
☐ Project Manager
Full Name(s)
Surname
ID Number
Employment History
Tertiary Qualifications (Highest order)
(Summary)
1.
2. 1.
3. 2.
4. 3.
5. 4.
6.
Relevant Projects Completed Recently
Type: Quality
Start
Description Assurance on Name
and Position or role (on the
No. Name of SAP S4/HANA of
End project)
Project Implementation Client
dates
projects
1.
2.
3.
4.
22 | P a g e
Certification:
I, the undersigned, certify that, to the best of my knowledge and belief, this data correctly describes me, my
qualifications and my experience.
............................................................................. ..........................
Signature of person named in the schedule Date
23 | P a g e
Sbd4
Bidder’s disclosure
1. Purpose of the form
Any person (natural or juristic) may make an offer or offers in terms of this
invitation to bid. In line with the principles of transparency, accountability,
impartiality, and ethics as enshrined in the Constitution of the Republic of South
Africa and further expressed in various pieces of legislation, it is required for
the bidder to make this declaration in respect of the details required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the
List of Restricted Suppliers, that person will automatically be disqualified from
the bid process.
2. Bidder’s declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members /
partners or any person having a controlling interest1 in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if
applicable, state employee numbers of sole proprietor/ directors / trustees /
shareholders / members/ partners or any person having a controlling interest
in the enterprise, in table below.
Full Name Identity Number Name of State
institution
2.2 Do you, or any person connected with the bidder, have a relationship
1 the power, by one person or a group of persons holding the majority of the equity
of an enterprise, alternatively, the person/s having the deciding vote or power to
influence or to direct the course and decisions of the enterprise.
Sbd4
with any person who is employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members /
partners or any person having a controlling interest in the enterprise have any
interest in any other related enterprise whether or not they are bidding for this
contract? YES/NO
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
3.7 Technical Design and Architecture Assurance
3.8 Data Migration Assurance
3.9 Testing Assurance
3.10 Defect Management Oversight
3.11 Independent Testing Validation
10 | P a g
3.12 Security, Controls and Compliance Assurance
3.13 Change Management and User Readiness
3.14 Integration and Interface Assurance
3.15 Cutover and Go-Live Readiness
3.16 Post-Go-Live Support and Benefits Realization
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Organization
Lepelle Northern WaterContact Person
Happiness Baloyi
Phone
015-295-1800
[email protected]
Website
lepellewater.co.za/
Address
1 Landdros Mare St, Polokwane Central, Polokwane, 0699, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Data conflicts
None detected
1 Landdros Mare St, Polokwane Central, Polokwane, 0699, South Africa
Get deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.