Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
KWAZULUNATAL - KwaZuluNatal - KWAZULUNATAL - 3610
Organization Type
GOVERNMENT
Published
05 Jun 2026
OCDS Reference
ocds-9t57fa-158200
ESKOM seeks bids for a 3-year enabling agreement to dispose of scrap mixed e-waste, including non-functional computer equipment, from KZN operating unit and majuba power station on an as-needed basis. Open to qualified disposal service providers. Contract duration is fixed at three years from signature date.
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER){"closingTime":"2.2","briefingSession":"{\"date\":null,\"time\":null,\"venue\":\"tend a site visit and/or clarification meeting that is stipulated as being\",\"is_compulsory\":true}"}
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)are submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfof a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfreasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
2000. If Eskom intends to apply Objective Criteria envisaged in section 2(1)(f), Eskom
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdftenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdfincluding the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Important Dates
You are are required to collect scrap to a minimum load of 1 ton estimate
Categories
Request for Bid(Open-Tender)
KWAZULUNATAL - KwaZuluNatal - KWAZULUNATAL - 3610
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025 - JAN 2030.pdf
ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Monday, 15 June 2026 - 10:00
Venue
null
05 Jun
2026
Tender Published
Tender was published
15 Jun
2026
Closing Date
Tender closing date
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Matched by category & region
Learn how to submit a winning bid with these related articles
Median Estimate
R 1 875 000
Range
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
{"closingDate":"05 JUNE 2026","closingTime":"10H00","briefingSession":"{\"date\":null,\"time\":null,\"venue\":\"ion NONE\",\"is_compulsory\":true}"}
Contact Information
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdf (TENDER){"name":null,"email":"[email protected]","phone":"031 710 5674","department":"AND MAJUBA PS “AS AND WHEN”","address":"r which may be"}
Evaluation Criteria
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdf (TENDER)1.1.6 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.8 Technical Evaluation Criteria Annexure K Y
1.1.10 Safety Evaluation Requirements Annexure M Y
1.1.11 Environmental Evaluation Requirements Annexure N Y
1.1.12 Quality Evaluation Requirements Annexure O Y
Functionality/techini
Prices will be scored out of 80 points VIA THE EAUCTION PRICING
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
the 80/20 system. Eskom will add the score from Pricing and Specific
Contractual Requirements are not evaluation criteria. They will
be assessed after the evaluation and ranking of the tenders.
Technical Specifications
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdf (TENDER)The scope of work will include the purchase, collection and removal of MIXED EWASTEl on
an “as and when” required basis contract within Eskom KZN Operating Unit and Majuba
PS for a contract period of three (3) years from date of signature.
The purchaser will be responsible for the safe collection, handling, removal, loading and
transportation of the material and to clean the site and must provide their own Bins where
necessary, qualified labour and suitable certified plant, machinery, equipment and transport
for this purpose.
Each load of MIXED EWASTE, as removed must be weighed at a suitable weighing facility
nearest to the site of collection and will be for the account of the Purchaser. The weighbridge
facility must be acceptable for Eskom. An Eskom representative must witness the weighing
(must sign the weighbridge documentation, add name and contact details in print) and keep
a copy that must be handed to the relevant Eskom Senior Official responsible for the
management of the goods on behalf of Eskom. The purchaser must provide a copy of the
weighbridge document to the relevant Eskom Investment Recovery Officer. Collections and
payments will be monitored by means of collection registers to be separately maintained by
the purchaser and the Eskom Investment Recovery Officer. It will be the duty of the purchaser
to, on a regular basis as will be requested, to the Eskom Investment Recovery Officer for
main purpose to reconcile information between the contractual parties.
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 44
File name:
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 25
Identifier
Offer to purchase
Effective Date 02 June 2025
Review Date June 2030
The purchaser must assure the site be left clean at completion of their collection and
removal of the goods.
IT is to be noted that KZN has 3 x warehouses, in access of 50 cnc’s and
About 30 substations and 3 power stations. The collection of the
Mixed ewaste scrap will require you to cover the entire of the KZN
Province on an as and when required basis. The successful tenderer
Will also be required to place skips at all 3 warehouses in KZN. IT is
Also to be noted that all work will be issued on estimates and NO
Guarantee on quantity will be provided. Once collected and weighed,
Then payment to ESKOM will be initiated.
On an as and when required basis, it will be required that the tenderer assist Eskom in
destroying the pre-paid meters onsite before loading and removing the scrap. This
will be supervised by Eskom representive.
The MIXED EWASTE on sale will be identified by Eskom.
Bid response documents may be deposited in the bid box situated at (street address)
N/a
Bidding procedure enquiries may be directed to technical enquiries may be directed to:
CONTACT PERSON Reqeba Kamroodeen CONTACT PERSON
Telephone number 031 710 5674 telephone number
FACSIMILE NUMBER n/a FACSIMILE NUMBER
E-MAIL ADDRESS [email protected] E-MAIL ADDRESS
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellphone number
Facsimile number code number
E-mail address
VAT registration
Number
Supplier tax central
Compliance status compliance supplier
Or
System pin: database
No: MAAA
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 44
File name:
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 240-114238630 Rev 25
Identifier
Offer to purchase
Effective Date 02 June 2025
Review Date June 2030
Are you the
Accredited
REPRESENTATIVE IN ARE YOU A FOREIGN BASED Yes No
SOUTH AFRICA FOR Yes No SUPPLIER FOR THE GOODS
The goods /services offered? [If yes, answer the
/Services [if yes enclose proof] questionnaire below]
Offered?
Questionnaire to bidding foreign suppliers
Is the entity a resident of the republic of south africa (RSA)? yes NO
Does the entity have a branch in the RSA? yes NO
Does the entity have a permanent establishment in the RSA? yes NO
Does the entity have any source of income in the RSA? yes NO
Is the entity liable in the RSA for any form of taxation? Yes NO
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance status
System pin code from the south african revenue service (SARS) and if not register as per 2.3 Below.
Part b
Terms and conditions for bidding
1. Bid submission:
1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be
ACCEPTED FOR CONSIDERATION. (e-tendering only)
1.2. All bids must be submitted on the official forms provided (not to be re-typed) or in the manner
Prescribed in the bid document.
1.3. This bid is subject to the preferential procurement policy framework act, 2000 and the
Preferential procurement regulations, the general conditions of contract (gcc) and, if
Applicable, any other special conditions of contract.
1.4. The successful bidder will be required to fill in and sign a written contract form (sbd7).
2. Tax compliance requirements
2.1 Bidders must ensure compliance with their tax obligations.
2.2 Bidders are required to submit their unique personal identification number (pin) issued by SARS
To enable the organ of state to verify the taxpayer’s profile and tax status.
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS website
Www.SARS.GOV.ZA.
2.4 Bidders may also submit a printed tcs certificate together with the bid.
2.5 In bids where consortia / joint ventures / sub-contractors are involved; each party must submit
A separate tcs certificate / pin / csd number.
2.6 Where NO tcs pin is available but the bidder is registered on the central supplier database (csd),
A csd number must be provided.
2.7 NO bids will be considered from persons in the service of the state, companies with directors
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 44
File name:
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Methodology
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdfTechnical Requirements ✓
list
based on scope of
work
Scope of work
Quality Management
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdfEffective Date 02 June 2025
Review Date June 2030
d. Additional precautions must be taken when using cutting equipment. Portable fire fighting
equipment must be available on site during all stages of the work programme.
e. The SCRAP MIXED EWASTE is sold with unknown quantity, unless specifically mentioned of oil
but any oil remaining in the equipment shall become the property of successful tenderer and the
tenderer will be responsible for any oil spillage.
f. The successful tenderer will be required to be obtain an Eskom permit, prior to commencement
of work. After completion of the work, it is imperative that you notify the Eskom site agent, so that
the job can be signed off.
g. All work must comply with the OHSA Act no . All Safety requirements and
documentation shall be available on the site
h. Any oil spills caused during the work programme will need to be rehabilitated by the successful
tenderer.
i. This is an open tender.
j. A tenderer who has an existing or expired contract with Eskom and has defaulted in terms
of that contract will be disqualified and not be awarded a new contract
k. A tenderer who has an open non-conformance that has not been closed, will be disqualified and
not awarded a new contract.
l. No accommodation will be allowed on site.
Financial Requirements
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdf (TENDER)Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
Eskom reserves the right to negotiate with preferred bidders after a competitive bidding process or price
quotations should the tendered prices not be market related.
Main contractors/ suppliers are discouraged from subcontracting with their subsidiary compa
Compliance Requirements
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdf (TENDER)tax compliance is
tax compliance status ___________________
tax compliance certificate as a tender returnable by
Tax compliance status
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS website
Tcs pin is available but the bidder is registered on the central supplier database (csd),
CSD registration
CSD number)
CSD Registration √
CSD number/CSD Report)
CSD number
Csd number must be provided
Central Supplier Database (CSD) registration Report or MAAA
Central Supplier Database (CSD), please provide your supplier registration number with
Central supplier database (csd),
joint venture agreement confirming the
joint venture agreement
Joint Venture Agreement which incorporates a statement
power of attorney in the case of
power of attorney signed by the legally authorised
2. Tax compliance requirements
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS website
A separate tcs certificate / pin / csd number.
2.6 Where NO tcs pin is available but the bidder is registered on the central supplier database (csd),
A csd number must be provided.
Points Allocation: 20 points
B-BBEE Details: and Footer portrait template
Document 240-114238630 Rev 25
Identifier
Offer to purchase
Effective Date 02 June 2025
Review Date June 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
or this may be included as an obligation within
the JV agreement.
Details and confirmation of a single √
designated bank account in the name of the
JV and independent of the individual JV
partners, as set out in the joint venture
agreement.
B-BBEE Affidavit (on DTI Template) confirming that √
the B-BBEE Contribution level of the entity.
B-BBEE Verification Certificate from
Accredited verification agency
Tax Clearance Certificates A certified copy of a tax clearance certificate √
is required from foreign tenderers (with a
footprint in South Africa but that are not
registered on CSD and have not provided a
SARS pin number) and local tenderers (that
have not provided their SARS e-filing PIN
number for verification by Eskom and/or their
CSD profile / CSD number).
Foreign suppliers with no footprint in South
Africa must complete the SBD1 document;
however, no proof of tax compliance is
required.
CSD Submitted proof of the registration on √
National Treasury’s Central Supplier
Database (CSD) registration Report or MAAA
registration number (Valid & Current)
It should be noted that as per National
Treasury Instruction No: /18; a
tender will not be awarded to a
recommended tenderer that has a tax non-
compliance status
Second-Hand Good Second-hand goods act certificate from √
Certificate SAPS/License (for scrap dealers and
recyclers) (Valid & Current)
Controlled Disclosure
Anonymously report fraud
Health & Safety
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdfNumber Description Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required Annexure D Y
to download and read the Supplier Integrity Pact. It
is accessible on the Eskom Tender Bulletin via
Eskom Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.6 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.7 *SBD 4 – Bidders Disclosure Annexure J Y
1.1.8 Technical Evaluation Criteria Annexure K Y
1.1.9 Section 37 (2) Agreement Annexure L Y
1.1.10 Safety Evaluation Requirements Annexure M Y
1.1.11 Environmental Evaluation Requirements Annexure N Y
1.1.12 Quality Evaluation Requirements Annexure O Y
1.1.13 Reverse e-auction training acknowledgement form (if Not Applicable
applicable)
1.1.14 Reverse e-auction process (if applicable) Not Applicable
1.1.15 E-tendering Help Manual acknowledgement form Not Applicable
1.1.16 E-tendering Help Manual for supplier No Applicable
1.1.17 Pricing Schedule/BOQ (if not contained in Contract) Refer of the Invitation to
Tenders are to be submitted to [email protected]
2.7-.2.11Submitting a tender The tender documents are published on the informal tender
bulletin as follows:
Part One – Commercial
Part Two – Safety
Part Three – Environmental
applicable:
Safety COIDA - Original certificate of good standing √
or proof of application issued by the
Compensation Fund (COID) or a licensed
compensation insurer (South African
tenderers only)
information furnished herein is true and correct, that it is understood that the tenderer's tender may
be rejected, and that Eskom will act against the tenderer should any aspect of this declaration prove
to be false, and
information furnished herein is true and correct that it is understood that the JV's tender may be
rejected, and that Eskom will act against the JV should any aspect of this declaration prove to be
false; and
Environmental
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdfEnvironmental Refer Annexure N for detailed √
No. (EXCLUDING VAT) PER TON
1 As and when Mixed Ewaste (Pre-Meters, Non
injury.
b. You will be required to adhere to the condition as laid out by the Eskom site agent with regards to
site access etc.
c. Littering is prohibited at all times. Facilities will have to be made available on site during
dismantling operations for the collection of disposal waste material. No rubble whatsoever is to be
left on site.
Contractual Terms
Source: ENQUIRY - OLT2128191 EWASTE 3 YEAR CONTRACT.pdfsanctions list. A tenderer shall be found to have the nationality
of a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
2. Tenderers submit more than one [tender] either individually or
as a partner in a joint venture (JV) or consortium, except on an
E-Tendering system where there is a limit size (900MB) for
submission and the tenderers may submit more than one
submission with the same tender number.
Effective Date 02 June 2025
Review Date June 2030
Reference Returnable From Suppliers at at **
closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable)
to Tender Returnable Returnable Returnable
Ewaste Certificate From a professional registration body (eg. √
EWASA or similar)
Method Statement Your recycling process ✓
Company Registration The tenderer must submit (Companies and √
Documents Intellectual Property Commission (CIPC)
company registration documents or CIPRO
documents or any declaration of Shareholding
and Directorship - in order for Eskom to
assess any conflict of interest.
COIDA Valid certificate of good standing √
Pricing schedule Completed pricing schedule (if not already √
submitted in the NEC or other Contract).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Maxwell Dr, Sunninghill, Sandton, 2157, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
017-799-2302[email protected]www.eskom.co.zaMaxwell Dr, Sunninghill, Sandton, 2157, South Africa
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Disposals: General. Unlock full pricing strategies, bid frequency, and historical win rates.