Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
LETHABO POWER STATION - LETHABO POWER STATION - LETHABO POWER STATION -
Organization Type
GOVERNMENT
Published
09 Jun 2026
OCDS Reference
ocds-9t57fa-158477
ESKOM invites bids for the purchase, removal, cutting, and loading of electrostatic ferrous scrap material at lethabo power station under a 6-month contract. Suppliers must comply with strict disclosure and anti-collusion requirements as outlined in sbd4.
Description
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdfThis tender invites offers for the purchase, removal, cutting, and loading of electrostatic ferrous scrap material at Lethabo Power Station for a contract duration of 6 months. The process is governed by principles of transparency, accountability, impartiality, and ethics as per the South African Constitution and relevant legislation.
All submissions must be done through [email protected]
Categories
Request for Bid(Open-Tender)
LETHABO POWER STATION - LETHABO POWER STATION - LETHABO POWER STATION -
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf
Eskom is inviting bids for the purchase, removal, cutting, and loading of electrostatic ferrous scrap material at Lethabo Power Station for a 6-month contract. The tender requires transparency, ethical conduct, and compliance with South African legislation, including declarations of conflicts of interest and anti-collusion measures.
Date & Time
Monday, 15 June 2026 - 10:00
Venue
null
09 Jun
2026
Tender Published
Tender was published
15 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 1 800 000
Range
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd and bbbee compliance for general sector suppliers in south africa (2026) — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African general contractors need to know about complete guide to csd & bbbee compliance for general sector tenders in south africa — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogContact Information
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Department: SUPPLY CHAIN MANAGEMENT
Submission Guidelines
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Submit the following returnable documents:
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)General
Open to natural or juristic persons (companies, partnerships, etc.).
Exclusions
Bidders on the Tender Defaulters Register or Restricted Suppliers List are ineligible.
Conflicts
No undisclosed conflicts of interest (e.g., state employment, relationships with Eskom officials, or competing bids from related entities).
Ethical Standards
Must certify no involvement in corrupt practices, collusion, or bid-rigging.
Compliance Requirements
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Requirements
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Description
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)General 1. Parties 1.1 The Employer, the Eskom Representative and each eligible tenderer submitting a tender shall act timeously, ethically and in a manner which is fair, equitable, transparent, competitive and cost-effective.
Important Dates
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER){"briefingSession":"{\"date\":null,\"time\":null,\"venue\":\"tend a site visit and/or clarification meeting that is cited as being\",\"is_compulsory\":true}"}
Briefing Session
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)Site visit and / or 2.16 Tenderers must attend a site visit and/or clarification meeting that is cited as being clarification compulsory in order to familiarise themselves with the proposed work, services or meeting supply, location, etc. and raise questions. Details of the meeting(s) are stated in the Tender Data. Failure to attend such compulsory meeting/site visit will result in the tender being disqualified.
Contact Information
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g 2.2 Ensure that Eskom has received the complete original tender and one (1)"}
Returnable Documents
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)Tender closing 2.2 Ensure that Eskom has received the complete original tender and one (1) time complete hard copy of the original tender at the address and in the tender box or facsimile number or e-mail address specified in the Tender Data by no later than the deadline for tender submission. Proof of posting or of courier delivery will not be taken by Eskom as proof of delivery. Eskom will not accept a tender submitted telephonically or by e-mail, unless stated otherwise in the Tender Data.
Evaluation Criteria
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)General
Specific
Technical Specifications
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)supply identified in the
specification and/or works
Quality Management
Source: Eskom_Standard_Conditions_of_Tender.docx.pdfon behalf of a tenderer.
Cost of 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the
tendering preparation and submission of a tender, or the negotiation of any contract,
including the costs of any testing necessary to demonstrate that aspects of the
tender satisfy the evaluation criteria.
Pricing Schedule
Source: Eskom_Standard_Conditions_of_Tender.docx.pdfInsurance 2.18 Be informed that the extent (if any) of insurance provided by Eskom may not be
for the full cover required in terms of the relevant category listed in the conditions
of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the 2.19 Include in the rates, prices, and the tendered total of the Prices (if any) all duties,
tender taxes (including VAT), and other levies payable by the successful tenderer. Such
duties, taxes and levies are those applicable 14 (fourteen) days prior to the
deadline for tender submission.
2.20 Provide rates and Prices that are fixed for the duration of the contract and not
subject to contract price adjustment except as provided for in the Enquiry.
2.21 State the rates and Prices in South African Rand unless instructed otherwise in
the Invitation to Tender. The selected conditions of contract may provide for part
payment in other currencies. Submit r Prices in accordance with the exchange
rate and base date as stipulated in the Invitation to tender.
Alterations to 2.22 Not make any alterations or additions to the tender documents, other than for
documents purposes of complying with instructions issued by the Eskom Representative or
if necessary to correct errors made by the tenderer. All such alterations shall be
initialed by all signatories to the tender. Corrections may not be made using
correction fluid, correction tape or the like.
Alternative 2.23 Submit alternative tenders only if a main tender is also submitted, and only if this
tenders is permitted in the Invitation to Tender. Accept that an alternative tender may be
based only on the criteria stated in the Tender Data and as acceptable to
Clarification and 2.24 Provide clarification and documents as required by the Eskom Representative
correction of during the evaluation of tenders, if not submitted. However, mandatory tender
Prices after returnables (that were required at tender submission deadline) will not be
tender requested and may not be submitted after tender submission deadline.
submission Clarifications may include providing a breakdown of rates or Prices, and may not
result in changes to prices or substance of the tender submitted, except as
required by the Eskom Representative to confirm the correction of arithmetical
errors discovered in the evaluation of tenders. The total of the Prices as
corrected by Eskom with the concurrence of the tenderer, shall be binding upon
the tenderer.
Sign Form of 2.25 Undertake to check the final draft of the contract provided by the Eskom
forecasted rates of invoicing are taken into account when determining the Price.
Arithmetical 3.16 Check responsive tenders for arithmetical errors/ discrepancies between
errors amounts in figures and in words, the amount in words shall govern.
240-62044728 Rev 10 Eskom Standard Identifier
Conditions of Tender Effective Date May 2022
Review Date May 2027
a) the gross misplacement of the decimal point in any unit rate; or
b) omissions made in completing the pricing schedule or bill of quantities, or
c) arithmetical errors due to :-line item totals resulting from the product of
a unit rate and a quantity in a bill of quantities or schedule of prices; or
d) the summation of the prices
tender offer to either confirm the tender offer as tendered or to accept the
corrected total of prices
Where the tenderer elects to confirm the tender offer as tendered; Eskom will
correct the error as follows:-
d) If a bill of quantities/pricing schedule applies and there is an error in the line
item total resulting from the product of the unit rate and the quantity, the line
item total shall govern, and the rate shall be corrected.
rate, the line item total as quoted shall govern, and the unit rate shall be
corrected.
e) Where there is an error in total of the prices either as a result of other
corrections required by this checking process or in the tenderer’s addition of
prices, the total of the prices shall govern and the tenderer shall be asked to
revise the selected item prices (and their rates if bill of quantities apply) to
achieve the tendered total of the prices.
(fraudulent/ expired) then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE
certificate/affidavit is provided at Tender closing deadline, or the
information/documents provided are fraudulent or have expired; then the
tenderer will not be disqualified (if otherwise deemed to be responsive and
acceptable in all other aspects) but will score zero under PPPFA point allocation.
Ranking of 3.18 According to the PPPFA , Eskom will add the score for Pricing and the
tenders B-BBEE level together and rank the suppliers from the highest to the lowest.
Objective criteria 3.19 A contract may be awarded to a tenderer that did not score the highest points only
in accordance with Section 2(1) (f) of the PPPFA Act . If Eskom intends
to apply objective criteria in terms of Section 2 (1) (f), Eskom must stipulate the
applicable objective criteria in the tender documents. Functionality and any
element of the B-BBEE scorecard may not be used as objective criteria.
Compliance Requirements
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)stated basic compliance of tender will render a tender non-responsive. It must further be noted that a tenderer’s failure to provide one (1) complete hard copy of the original tender, will result in the disqualification of the tender from further evaluation. Tenderers will not be permitted to provide one (1) complete hard copy after the tender submission deadline date, and Eskom is not responsible for making copies of original tenders. Mandatory 3.10 A tender that does not include mandatory documents or information as stipulated tender in the Invitation to Tender and by the required deadlines; will be deemed non- returnables responsive. Pre-Qualification Tenderers, who comply with the basic compliance and mandatory tender Criteria 3.11 returnables, are required to comply with Pre-Qualification criteria, if stipulated in the Invitation to Tender. It must be noted that Eskom will not measure a criterion twice in the different evaluation phases, as this is regarded as ‘double dipping’. Designated 3.12 Certain materials are identified by dti as designated materials and a specified materials and percentage (gatekeeper for further evaluation) must be bought from local thresholds companies. A tenderer’s failure to meet stipulated gatekeepers as per the dti’s requirement for local support of designated materials will also render the tender non- responsive. Functionality 3.13 If functionality is a criterion; tenderers are scored against the technical requirements functionality criteria and have to meet the minimum threshold as stated in the Tender Data. Only if this minimum threshold is met/exceeded will the tender be evaluated further. Financial 3.14 Eskom has to determine the risk of doing business with a supplier who may pose analysis financial risks to Eskom in the execution of the contract. During evaluation of the financial statements, Eskom will try to identify mitigating factors/ requirements for the tenderer to meet, if applicable. However, should there be insufficient suitable mitigating factors or the risk is deemed too high; Eskom may disqualify the tender. Evaluation of 3.15 Evaluate the price according to the criteria/requirements set in the Tender Data. Price Factors such as CPA, FOREX, commodity increases, discounts, NPV, forecasted rates of invoicing are taken into account when determining the Price. Arithmetical 3.16 Check responsive tenders for arithmetical errors/ discrepancies between errors amounts in figures and in words, the amount in words shall govern. Check the highest ranked tender/tenderer with the highest number of evaluation points after the evaluation of tender offers with respect to the following errors/omissions:- Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 9 File name: Eskom Standard Conditions of Tender Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-62044728 Rev 10 Eskom Standard Identifier Conditions of Tender Effective Date May 2022 Review Date May 2027
the gross misplacement of the decimal point in any unit rate; or
omissions made in completing the pricing schedule or bill of quantities, or
arithmetical errors due to :-line item totals resulting from the product of a unit rate and a quantity in a bill of quantities or schedule of prices; or
the summation of the prices Eskom will notify the tenderer of all errors/omissions that are identified in the tender offer to either confirm the tender offer as tendered or to accept the corrected total of prices Where the tenderer elects to confirm the tender offer as tendered; Eskom will correct the error as follows
If a bill of quantities/pricing schedule applies and there is an error in the line item total resulting from the product of the unit rate and the quantity, the line item total shall govern, and the rate shall be corrected. Where there is an obviously gross misplacement of the decimal point in the unit rate, the line item total as quoted shall govern, and the unit rate shall be corrected.
Where there is an error in total of the prices either as a result of other corrections required by this checking process or in the tenderer’s addition of prices, the total of the prices shall govern and the tenderer shall be asked to revise the selected item prices (and their rates if bill of quantities apply) to achieve the tendered total of the prices. Eskom will consider the rejection of a tender offer if the tenderer does not correct or does not accept the correction of errors in the required manner. Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit B-BBEE provided. If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level (certificate/CSD number/CSD report) must be provided at tender submission deadline; or the tender will be disqualified. If sub-contracting to designated groups pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE status and the sub-contractors’ CSD number or B- BBEE certificate/affidavit will need to be provided at tender submission deadline. Should the information/documents provided indicate that the level is in dispute (fraudulent/ expired) then the tender will be disqualified. However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is provided at Tender closing deadline, or the information/documents provided are fraudulent or have expired; then the tenderer will not be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects) but will score zero under PPPFA point allocation. Ranking of 3.18 According to the PPPFA , Eskom will add the score for Pricing and the tenders B-BBEE level together and rank the suppliers from the highest to the lowest. Objective criteria 3.19 A contract may be awarded to a tenderer that did not score the highest points only in accordance with Section 2(1) (f) of the PPPFA Act . If Eskom intends to apply objective criteria in terms of Section 2 (1) (f), Eskom must stipulate the applicable objective criteria in the tender documents. Functionality and any element of the B-BBEE scorecard may not be used as objective criteria. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 9 File name: Eskom Standard Conditions of Tender Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-62044728 Rev 10 Eskom Standard Identifier Conditions of Tender Effective Date May 2022 Review Date May 2027 Reverse e- 3.20 Reverse e-auction is an electronic price and preference point system (aligned to Auction PPPFA) that aims to achieve the most competitive prices. Eskom reserves the right to utilize reverse e-auction in certain enquiries. Where reverse e-auction is utilized in a specific enquiry this will be indicated in the respective enquiry and the relevant reverse e-auction supporting documents will form part of the enquiry. The Tenderers will be required to submit a complete tender but without prices. Where a supplier includes prices in their tender; these prices will not be considered and be disregarded. Acceptance of 3.21 Notify Eskom's acceptance to the successful tender before the expiry of the tender validity period, or agreed additional validity period. Inform the successful and unsuccessful tenderers only once approval has been granted by the Eskom Adjudication Authority. For open tenders, this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal. Prepare contract 3.22 Revise the contract documents issued by Eskom as part of the Enquiry documents documents to take account of: Addenda issued during the tender period, Inclusion of some of the tender returnables as stated, Inclusion of changes as agreed during negotiations, Other revisions or documents agreed to between Eskom and the successful tenderer during negotiations, Sign Form of 3.23 Arrange for authorised signatories of both parties to complete and sign the Agreement original and one copy of the Form of Agreement. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 9 File name: Eskom Standard Conditions of Tender Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
B-BBEE Details: ritten consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 9
File name: Eskom Standard Conditions of Tender
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document
240-62044728 Rev 10 Eskom Standard Identifier
Conditions of Tender Effective Date May 2022
Review Date May 2027
as agent returnable.
Compliance with 2.27 Comply with relevant legislation such as NT instructions (CSD, etc.), CIDB
relevant regulations for construction works; designated materials according to dti, PPPFA
legislation (NT regulations; Amended B-BBEE Codes, COIDA; OHS Act; Eskom’s requirements for
instructions, Safety, Health, Environment and Quality (SHEQ) etc. and any other applicable
CIDB, PPPFA legislation/regulations as may be set out in Invitation to Tender.
etc)
2.28 Tenderers are required to provide reasonable proof to the satisfaction of Eskom,
that safety, health, environmental and quality (SHEQ) systems, policies and
capabilities are in place at the time of contract award. All costs and personnel
associated with SHEQ should be reflected in the tender for Eskom’s assessment
thereof.
2.29 Where CIDB is applicable; proof of registration on CIDB is mandatory at tender
closing deadline. Should this not be received as stipulated in the enquiry; the
tender will be disqualified. However, in the event that, at tender deadline
submission, only proof of application for registration on CIDB is available, then
this must be submitted by tender closing deadline, while the actual proof of
CIDB registration (printout from CIDB database) must be submitted by contract
award.
Contract Skills 2.30 The Contractor shall achieve in the performance of the contract the CSDG
Development established in the CIDB Standa
B-BBEE Requirements
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)2.32 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or falsified any information, certificate, affidavit or document. A fraudulent B-BBEE certificate/affidavit or ‘fronting’ will be reported to the B-BBEE Commissioner and the tenderer will be suspended from business with any State Owned Company for up to 10 years and may even be sentenced to jail.
Health & Safety
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf240-62044728 Rev 10 Eskom Standard Identifier
Conditions of Tender Effective Date May 2022
Review Date May 2027
as agent returnable.
Compliance with 2.27 Comply with relevant legislation such as NT instructions (CSD, etc.), CIDB
relevant regulations for construction works; designated materials according to dti, PPPFA
legislation (NT regulations; Amended B-BBEE Codes, COIDA; OHS Act; Eskom’s requirements for
instructions, Safety, Health, Environment and Quality (SHEQ) etc. and any other applicable
etc)
2.28 Tenderers are required to provide reasonable proof to the satisfaction of Eskom,
that safety, health, environmental and quality (SHEQ) systems, policies and
capabilities are in place at the time of contract award. All costs and personnel
associated with SHEQ should be reflected in the tender for Eskom’s assessment
thereof.
2.29 Where CIDB is applicable; proof of registration on CIDB is mandatory at tender
closing deadline. Should this not be received as stipulated in the enquiry; the
tender will be disqualified. However, in the event that, at tender deadline
submission, only proof of application for registration on CIDB is available, then
this must be submitted by tender closing deadline, while the actual proof of
CIDB registration (printout from CIDB database) must be submitted by contract
award.
Contract Skills 2.30 The Contractor shall achieve in the performance of the contract the CSDG
Goal (CSDG) Contract (Published in GGN36760 of March 2020). CSDG is applicable to all
classes of works exceeding R60 million and where the contract duration is 12
months or more or to Professional services/service contract/order where the
estimated contract exceed R5 million and where the contract duration is 12
months or more.
Contract 2.31 Contractor shall achieve in the performance of the contract the Contract
Participation Participation Goals (CPG) relating to the engagement of targeted enterprise as
Goals (CPG) established in the CIDB standard for Indirect targeting for enterprise
development through Construction works contracts (Published in GN No:36190
of the 25 February 2013)
Contract participation goals is only applicable in Grade 7-9 General Building
(GB) and Civil Engineering (CE) contract where the contract duration is 6
months or more.
Construction Works contracts in which at least 25% of the main contract could
reasonably be expected to be sub-contracted out in one or more of the following
classes: -
Civil Engineering (CE)
security. Eskom reserves the right to reject the financial institution if found not to
be suitable.
Respond to 3.1 Respond to a request for clarification received earlier than the closing time for
clarification clarification of queries. The responses will be published to all tenderers in the
same manner the enquiry documents were issued and it is the tenderers
responsibility to check the Eskom Tender Bulletin and NT e-Tender Portal
regularly for updated responses to clarifications by the Eskom Representative.
Issue Addenda 3.2 If necessary, issue Addenda that may amend, amplify, or add to the Enquiry
documents. If a tenderer applies for an extension to the deadline for tender
submission, in order to take Addenda into account in preparing a tender, Eskom
may grant such an extension and the Eskom Representative shall notify all
tenderers of the extension.
Return late 3.3 Return tenders received after the deadline for tender submission unopened to
tenders the tenderer submitting a late tender. Tenders will be deemed late if they are
not received at the designated facsimile machine or in the designated tender box
at the date and time stipulated as the deadline for tender submission
Tender opening 3.4 Open the tenders in the presence of the tenderers’ representatives who choose
to attend at the time and place stated in the Tender Data. Tenders for which an
acceptable notice of withdrawal has been submitted will not be opened.
3.5 At tender opening, Eskom will announce the names of the tenderers. Prices may
be announced if so stated in the Tender Data.
Non-disclosure 3.6 Unless required to do so by law, not disclose to tenderers, or to any other person
not officially concerned with such processes, information relating to the
evaluation and comparison of tenders and recommendations for the award of a
contract, until after the award of the contract to the successful tenderer.
Grounds for 3.7 Reject a tender after the Eskom Supplier Reconsideration Committee has
rejection established through the Eskom prescribed processes, that there is proof that the
tenderer influenced the processing of tenders or awarding of the contract; that
colluding/ bid rigging or any fraudulent activity has taken place in connection
Contractual Terms
Source: Eskom_Standard_Conditions_of_Tender.docx.pdfnon-receipt of communications from or by a tenderer
Eskom's rights 1.6 Eskom may accept or reject any variation, deviation or alternative tender and
to accept or reserves the right to accept the whole or any part of the tender. Eskom may cancel
reject any tender the tender process at any time prior to the formation of a contract and will give
written reasons for the cancellation upon written request to do so. After the
cancellation of the tender process or the rejection of all tenders due to non-
compliance with the thresholds, Eskom may abandon the proposed work and
services, have it performed in any other manner, or re-issue a similar invitation to
tender at any time. Eskom, its subsidiaries, shareholders, advisors, directors,
employees, representatives including the Eskom Representative shall not be liable
for any losses, claims or damages of whatsoever nature or howsoever arising
which may be sustained by a tenderer or any other person as a result of its
participation or any amendment, termination or suspension of the process set out
in this Invitation to Tender or its exclusion from participating in the tender process
at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any one or more
negotiate selected tenderer(s) in accordance with Eskom’s approved procurement policies
and procedures.
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information
regarding contained in the tender documents is correct and complete, Eskom does not,
accuracy of however, make any representations or warranties, express or implied, as to the
tender accuracy or completeness of such information and Eskom expressly disclaims any
240-62044728 Rev 10 Eskom Standard Identifier
Conditions of Tender Effective Date May 2022
Review Date May 2027
documents and all liability for such representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when
marked “CONFIDENTIAL”.
Tender validity 2.13 Hold the tender(s) valid for acceptance by Eskom at any time within the validity
period after the deadline for tender submission. Extend the validity period for a
specified additional period if Eskom requests the tenderer to do so. A tenderer
agreeing to the request will not be required or permitted to modify a tender. If
contracts have not been concluded and the tender validity has not been
extended (as prescribed in the Eskom PSCM 32-1034) and lapses; then the
tenders are deemed to be invalid and the procurement process cannot
continue. A new procurement process will have to be initiated.
Confidentiality 2. 14 Treat as confidential all matters arising in connection with the tender. Use and
and copyright of copy the documents provided by Eskom only for the purpose of preparing and
documents submitting a tender in response to this Invitation to Tender.
Standardised 2.15 Obtain, if required, for the purposes of submitting a tender, copies of the latest
specifications revision of standardised specifications and/or other documents, which are not
and other attached to the Invitation to Tender, but which may be incorporated in the contents
publications of the enquiry documents by reference.
Special Conditions
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)2.3 Any reference to time will mean South African Standard Time (SAST), i.e. GMT+2 hours. The closing time will be determined by using the Telkom time signal as available over the telephone. This time will be strictly adhered to.
Requirements
Source: Eskom_Standard_Conditions_of_Tender.docx.pdf (TENDER)Eligibility 2.1 Submit a tender only if the tenderer (whether a single company or a structure similar to a Joint Venture) complies with the eligibility criteria stated in the Tender Data and the tenderer, or any of his principals, is not under any restriction to do business with Eskom/State Owned Companies. Tenderers are not permitted to sub-contract 100% of the SOW. Any tender that is based on 100% sub-contracting will be deemed ineligible and will be disqualified.
Section
Source: Eskom_Standard_Conditions_of_Tender.docx.pdftender satisfy the evaluation criteria.
2.8 Return the mandatory tender returnables to Eskom for evaluation purposes by
twice in the different evaluation phases, as this is regarded as ‘double dipping’.
materials and percentage (gatekeeper for further evaluation) must be bought from local
Functionality 3.13 If functionality is a criterion; tenderers are scored against the technical
requirements functionality criteria and have to meet the minimum threshold as stated in the
analysis financial risks to Eskom in the execution of the contract. During evaluation of the
Evaluation of 3.15 Evaluate the price according to the criteria/requirements set in the Tender Data.
Check the highest ranked tender/tenderer with the highest number of evaluation
points after the evaluation of tender offers with respect to the following
relevant regulations for construction works; designated materials according to dti, PPPFA
instructions, Safety, Health, Environment and Quality (SHEQ) etc. and any other applicable
CIDB, PPPFA legislation/regulations as may be set out in Invitation to Tender.
that safety, health, environmental and quality (SHEQ) systems, policies and
Description
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)Offer to purchase for the purchase, remove, cutting and loading of electrostatic ferrous scrap material at lethabo power station for contract duration of 6 months.
Important Dates
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown){"closingDate":"15 June 2026","briefingSession":"{\"date\":null,\"time\":null,\"venue\":\"e their technical capability to perform the\",\"is_compulsory\":false}"}
Briefing Session
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)A non-compulsory site clarification meeting will be held Date:11 June 2026 Time: 10:00 Location: Lethabo Power Station Public
Contact Information
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown){"name":null,"email":"[email protected]","phone":"+27 17 749 5105","department":"s indicated at the project site as per","address":"hase” document shall be"}
Returnable Documents
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)Your tender returnable, as submitted by you together with this “Offer to Purchase” document shall be submitted
Evaluation Criteria
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)Mandatory
Disqualifiers
Technical Specifications
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
ESKOM generation requires the services for the purchase, remove, cutting
And loading of electrostatic ferrous scrap material at lethabo power
Station for contract duration of 6 months.
work instruction / task order.
ensure the area is cleaned should there be an oil spill.
disposed.
Notes
a. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment incurred while working on this project arising from theft, damage or personal injury.
b. You will be required to adhere to the condition as laid out by the Eskom site agent with regards
to site access etc.
c. Littering is prohibited at all times. Facilities will have to be made available on site during
dismantling operations for the collection of disposal waste material. No rubble whatsoever is to be
left on site.
d. Additional precautions must be taken when using cutting equipment. Portable fire fighting
equipment must be available on site during all stages of the work programme.
e. You will be required to be put on an Eskom permit, prior to commencement of and work. After
completion of the work, it is imperative that you notify the Eskom site agent, so that the job can be
signed off.
f. All work must comply with the OHSA Act no . All Safety requirements and
documentation shall be available on the site
g. This is a open tender
h. No accommodation will be allowed on site.
. Eskom will not be responsible for any damages or losses suffered during the removal of the
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
equipment/scrap incurred while working on this project arising from theft, damage or personal injury.
j. You will be required to adhere to the condition as laid out by the Eskom site agent with regards to
site access etc.
k. The successful tenderer will have to build in their rigging costs as well as transportation cost and
any other equipment / valves and pumps that is needed to pump directly into their flow truck.
l. The oil tenderer has to be compliant as per Oil tender returnable and having an Environmental
Waste Management Licence or the certificate from the municipality to transport hazardous waste
between sites / provinces.
6. Finacial evaluation
a. The following criteria and their individual weight in % will be used for the evaluation of price.
Evaluation Criteria Weighting
Financial – Best price 80%
B-bbee 20%
Note:
Eskom’s commercial process will be followed and this process is dependent on the decisions made
by the different Eskom Adjudicating authorities
Pricing Schedule
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdfFor costing purposes, the following table and text messages have been compiled. Please bear in
mind that each material classification is for a type of scrap, and you must factor your costs into your
prices.
For each disposal transaction the rand price will be calculated by multiplying the quoted percentage
of the ITAC (International Trade Administration Commission South Africa) and price by the
Itac
Item DESCRIPTION ITAC CODE ITAC PERCENTAGE
No.
1. Subgrade Metal 215
suppliers should utilise the provided price schedule of ITAC percentage per ton, failure of which will
lead to non-responsive. hereafter referred to as the total offer prices, excluding VAT, remittances in
respect of the agreement are to be made payable to Eskom Holdings SOC Limited,
and are to be paid within five (5) working days after sale, All payments due and payable to
Eskom shall be by bank cheque or electronic bank transfer only.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
8. Value added tax (VAT)
Value Added Tax Act no 89 0f 1991 and VAT invoices will be issued on request.
Declaration (by tenderers) of good standing regarding tax
IT is a condition of tenderers that:
8.1 It is an absolute requirement that the taxes of the successful tenderer must be in
order, or that suitable arrangement is made with the Receiver of Revenue to
satisfy them.
8.2 The tenderer must include with his tender documents a copy of a Tax Clearance
Certificate (in respect of Tenders)
8.3 If the certificate is not included or found to be incorrect, Eskom may, in addition to
any other remedy it may have:
8.4 Recover from the contractor all costs, losses or damage incurred or sustained by
Eskom as a result of the award of the disposal agreement: and/or
8.5 Cancel the disposal agreement and claim any damages, which Eskom may suffer
by having to make less favourable arrangements after such cancellation.
8.6 Each party to Consortium/Sub-contractor must complete a separate declaration.
The onus will be on the tenderer to obtain “Tax Clearance Certificate (in respect of tenders)”, from the
office of the South African Revenue Services (SARS) and submit the same with their tenders.
(Disqualified) (non- Award
disqualified)
1. Offer to purchase form (price ✓
schedule attached and comments to
price schedule)
2 Valid SARS Tax Clearance ✓
Certificate
3 Affidavit (on DTI Template) ✓
confirming that the B-BBEE
Financial – Best price 80%
B-bbee 20%
Note:
Eskom’s commercial process will be followed and this process is dependent on the decisions made
by the different Eskom Adjudicating authorities
7. Price schedule
No.
1. Subgrade Metal 215
suppliers should utilise the provided price schedule of ITAC percentage per ton, failure of which will
lead to non-responsive. hereafter referred to as the total offer prices, excluding VAT, remittances in
respect of the agreement are to be made payable to Eskom Holdings SOC Limited,
and are to be paid within five (5) working days after sale, All payments due and payable to
Date:
(A copy of the joint venture agreement which incorporates a statement that all partners are liable
jointly and severally for the execution of the contract and that the lead partner is authorised to incur
liabilities, receive instructions and payments and be responsible for the entire execution of the contract
for and on behalf of any and all the partners is attached to the invitation to tender/Request for
proposal).
Compliance Requirements
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)Eskom_Standard_Co Microsoft Word 97 - Contractor Health nditions_of_Tender_-_ 2003 Document and Safety Requireme
TENDER RETURNABLES The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline. NOTE
Returnable required at Tender closing (disqualifiable) - These returnable are required to be fully completed, signed (if required on the returnable) and submitted with the tender at Tender closing date and time. If not fully completed, signed (if required on the returnable) and/or submitted by tender closing the tender will be disqualified.
Offer to purchase form (price ✓ schedule attached and comments to price schedule) 2 Valid SARS Tax Clearance ✓ 3 Affidavit (on DTI Template) ✓ confirming that the B-BBEE Contribution level of the entity. B- BBEE Verification Certificate from Accredited verification agency 4 Secondhand goods certificate from ✓ SAPS/Licensee 5 SBD 4 Form-Bidders Disclosure ✓ 6 Integrity Pact Declaration Form ✓
CIPRO Registration Documents ✓
Authority to Submit Form ✓
Copies of ID Documents of ✓ Directors
Proof of the registration on National ✓ Treasury’s Central Supplier Database (except Foreign Suppliers / Central Supplier Database (CSD) or number MAAA (.....................)
Valid Letter of good standing with ✓ COID)
Technical Requirements ✓
Technical inventory list
Method statement based on
5.1 Provide Employees/Driver’s Medical fitness ✓ certificate. 5.2 Provide valid driver’s licence. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. of 26 File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION ON A 6(SIX) MONTH CONTRACTUAL PERIOD Template Investment Recovery 240-75978567 Rev 2 Identifier Offer to Purchase Template Effective Date 01 June 2021 OLT2128192 Review Date June 2027 Eskom Health and Safety Requirements Proof Required Ref Checklist Yes No 5.3 Provide PDP and Truck Operator appointment
Provide Substance abuse procedure ✓
Provide Vehicle management and driver safety ✓ procedure.
Including but not limited the inspection, and maintenance of vehicles used for business. Driver fitness and fatigue management
Is the acknowledgement of Eskom's SHE rules ✓ and requirements form (Annexure B) signed and submitted by the tenderer?
Provide Company Incident Management ✓ Procedure
Environmental aspect and impact register to ✓ address e.g., oil spillages ANNEXURE E: ENVIRONMENTAL REQUIREMENTS Number Environmental Management System (EMS) Requirements
Environmental Environmental policy signed by top management (CEO Policy / managing director), dated and version controlled. Policy must commit to compliance to all relevant legislation/laws, Pollution prevention and continual improvement.
Emergency Emergency preparedness procedure/plan specific to preparedness plan environmental emergencies, with emergency contact (EPP) details
Waste Management Waste management plan on how waste generated on strategy/Plan site will be managed, to include where disposal occurs. Note: Disposal to be at licenced landfill sites and indicate how waste oil will be managed. Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. of 26 File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION ON A 6(SIX) MONTH CONTRACTUAL PERIOD Template Investment Recovery 240-75978567 Rev 2 Identifier Offer to Purchase Template Effective Date 01 June 2021 OLT2128192 Review Date June 2027 ANNEXURE F: TECHNICAL EVALUATION CRITERIA Technical evaluation is going to be two phase, desktop evaluation and site visit inspection. It will be an inherent requirement for each tenderer to demonstrate their technical capability to perform the requirement of the contract. Technical evaluation criteria (100%) Weight Approach and Methodology 100%
Does the contractor have necessary technical and mechanical ability, and have the acumen to manage and process the project quantities for the project?
Does the contractor have experience of the industry and display an ethical track record in line with the Second-Hand Good Act?
Is there confidence that the contractor will be able to perform in this contract effectively, efficiently, timeously, and economically? Total 100% The following criteria and their individual weight in % will be used for the evaluation of technical proposal. Questions – Evaluation of a Scrap Dealer (RATE COMPANIES 1-5, 1 – POOR, 2 – FAIR, 3 – AVARAGE, 4 – GOOD AND 5 – EXCELLENT) Scrap Dealer’s Name:__________________________________________ Location: __________________________________________ 1 2 3 4 5 Company Documentation Vat / Tax Certificate Registration at any relevant industry Second Hand Act Registration for scrap or recycling. Safety Policy
B-BBEE Minimum Level: 2
B-BBEE Details: nvestment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
The following documentation are to be submitted together with the tender
Document.
No. Returnable From Suppliers Returnable Returnable Returnable
required at required at required
Tender Tender prior
Closing closing to Contract
(Disqualified) (non- Award
disqualified)
1. Offer to purchase form (price ✓
schedule attached and comments to
price schedule)
2 Valid SARS Tax Clearance ✓
Certificate
3 Affidavit (on DTI Template) ✓
confirming that the B-BBEE
Contribution level of the entity. B-
BBEE Verification Certificate from
Accredited verification agency
4 Secondhand goods certificate from ✓
SAPS/Licensee
5 SBD 4 Form-Bidders Disclosure ✓
6 Integrity Pact Declaration Form ✓
7. CIPRO Registration Documents ✓
8. Authority to Submit Form ✓
8. Copies of ID Documents of ✓
Directors
9. Proof of the registration on National ✓
Treasury’s Central Supplier
Database (except Foreign Suppliers
/ Central Supplier Database (CSD)
or number MAAA (.....................)
10. Valid Letter of good standing with ✓
Coid)
11. Technical Requirements ✓
scope of work
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Re
Health & Safety
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdfSecurity
Storage facilities
Dismantling & Demolition
Machinery/plant
Type of trucks
Number of Trucks
Do they process or agent only
Do they buy off the street
Total 100%
Comments: ____________________________________________________
____________________________________________________
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
Annexure g
Section 37(2) agreement
Concluded between
Eskom Holdings SOC Limited
And
..................................................................................................................................................
(Name of contractor/supplier)
I, .........................................[(insert name of person representing contractor/supplier
company)representing ............................................. [insert name of contractor/supplier], do hereby
acknowledge that ............................................................... [insert name of contractor/supplier]
is an employer in his/her own right, with duties as prescribed in the Occupational Health and Safety
Act No. (“the Act”), as amended, and agree to ensure that all work will be performed and/or
machinery or plant used in accordance with the provisions of the Act.
I undertake that ......................................................... [insert name of contractor/supplier] shall
strictly adhere to, and ensure that his/her employees adhere to, the provisions of the Occupational
Health and Safety Act, 1993 (Act ).
I have been provided with SHE specifications for project/service ....................................[insert
brief details of project/service, for example, name, contract/project number] ...............................
and will comply with the requirements set out in these.
I accept and agree that the SHE specifications constitute arrangements and procedures between
.................................................................... (insert name of contractor/supplier) and [insert
name of subsidiary or Eskom Holdings SOC Limited] which will ensure compliance by
.......................................... [insert name of contractor/supplier] with the provisions of the Act, as
contemplated in section 37(2) of the Act.
This agreement constitutes the sole agreement between the parties, and no variation, modification,
or waiver of any of the provisions of this agreement or consent to any departure from these shall, in
any manner, be of any force or effect, unless confirmed in writing and signed by both parties, and
such variation, modification, waiver, or consent shall be effective only in the specific instance and for
the specific purpose and to the extent for which it was made or given.
This agreement is signed on behalf of the parties, each signatory to this warranting that he/she has
the requisite authority to do so.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
Signed this .......................... day of .................................... 20 ............... at
...................................................... (Place)
(Full Name)...................................................... (Signature) .......................................on
behalf of .............................................................. (Contractor/supplier)
Contractor Responsible Manager (responsible for signing the contract
on behalf of the contractor/supplier)
Witnesses
1. ......................................................
2. ........................................................
Signed this ........................... day of ........................... 20 .................. at ......... (Place)
(Full name.................................................. (Signature) .......................................... on
behalf of [insert name of subsidiary or Eskom Holdings SOC Limited]
(Contracts and/or Project Manager or Representative)
Witnesses
1. ......................................................
2. .......................................................
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Requirements
Eskom_Standard_Co Microsoft Word 97 - Contractor Health
nditions_of_Tender_-_ 2003 Document and Safety Requireme
a. TENDER RETURNABLES
a. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment incurred while working on this project arising from theft, damage or personal injury.
b. You will be required to adhere to the condition as laid out by the Eskom site agent with regards
to site access etc.
c. Littering is prohibited at all times. Facilities will have to be made available on site during
dismantling operations for the collection of disposal waste material. No rubble whatsoever is to be
left on site.
d. Additional precautions must be taken when using cutting equipment. Portable fire fighting
equipment must be available on site during all stages of the work programme.
e. You will be required to be put on an Eskom permit, prior to commencement of and work. After
completion of the work, it is imperative that you notify the Eskom site agent, so that the job can be
signed off.
f. All work must comply with the OHSA Act no . All Safety requirements and
documentation shall be available on the site
g. This is a open tender
h. No accommodation will be allowed on site.
. Eskom will not be responsible for any damages or losses suffered during the removal of the
item it wishes to retain.
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
submitting the accompanying bid, do hereby make the following statements that I certify to be
true and complete in every respect:
3.1 I have read and I understand the contents of this disclosure;
3.2 I understand that the accompanying bid will be disqualified if this disclosure is found not to be
true and complete in every respect;
3.3 The bidder has arrived at the accompanying bid independently from, and without consultation,
communication, agreement or arrangement with any competitor. However, communication
between partners in a joint venture or consortium2 will not be construed as collusive bidding.
3.4 In addition, there have been no consultations, communications, agreements or arrangements
with any competitor regarding the quality, quantity, specifications, prices, including methods,
factors or formulas used to calculate prices, market allocation, the intention or decision to
submit or not to submit the bid, bidding with the intention not to win the bid and conditions or
delivery particulars of the products or services to which this bid invitation relates.
3.4 The terms of the accompanying bid have not been, and will not be, disclosed by the bidder,
directly or indirectly, to any competitor, prior to the date and time of the official bid opening or
of the awarding of the contract.
3.5 There have been no consultations, communications, agreements or arrangements made by
the bidder with any official of the procuring institution in relation to this procurement process
prior to and during the bidding process except to provide clarification on the bid submitted
where so required by the institution; and the bidder was not involved in the drafting of the
specifications or terms of reference for this bid.
3.6 I am aware that, in addition and without prejudice to any other remedy provided to combat any
restrictive practices related to bids and contracts, bids that are suspicious will be reported to
the Competition Commission for investigation and possible imposition of administrative
penalties in terms of section 59 of the Competition Act No and or may be reported
to the National Prosecuting Authority (NPA) for criminal investigation and or may be restricted
from conducting business with the public sector for a period not exceeding ten (10) years in
terms of the Prevention and Combating of Corrupt Activities Act No or any other
applicable legislation.
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE
information furnished herein is correct, that it is understood that the tenderer's
tender/proposal may be rejected, and that Eskom will act against the tenderer should any
aspect of this this declaration prove to be false, and
information furnished herein is correct, that it is understood that the JV's tender/proposal may
be rejected, and that Eskom will act against the JV should any aspect of this declaration prove
to be false; and
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
Annexure d: safety requirements
1. 1.1 Provide Baseline Risk Assessment (BRA), ✓
relevant to the scope of work which must
address;
1.2 Identification of SHE hazards, i.e.,
assessment of SHE risks related to the scope of
work
nature of business, e.g., supply/ delivery of
transformer .
3. SHE policy signed by CEO/ MD – Should have ✓
the next review date, should comply with OHS
Act Section 7
4. Provide the following SHE Competency training ✓
certificates.
4.1 First aiders level 2
4.2 Fire Fighting Training
certificate
5. 5.1 Provide Employees/Driver’s Medical fitness ✓
certificate.
5.2 Provide valid driver’s licence.
8. Is the acknowledgement of Eskom's SHE rules ✓
and requirements form (Annexure B) signed
and submitted by the tenderer?
9. Provide Company Incident Management ✓
preparedness plan environmental emergencies, with emergency contact
(EPP) details
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
PPE
Security
(Name of contractor/supplier)
I, .........................................[(insert name of person representing contractor/supplier
company)representing ............................................. [insert name of contractor/supplier], do hereby
acknowledge that ............................................................... [insert name of contractor/supplier]
is an employer in his/her own right, with duties as prescribed in the Occupational Health and Safety
Act No. (“the Act”), as amended, and agree to ensure that all work will be performed and/or
machinery or plant used in accordance with the provisions of the Act.
I undertake that ......................................................... [insert name of contractor/supplier] shall
strictly adhere to, and ensure that his/her employees adhere to, the provisions of the Occupational
Health and Safety Act, 1993 (Act ).
I have been provided with SHE specifications for project/service ....................................[insert
brief details of project/service, for example, name, contract/project number] ...............................
and will comply with the requirements set out in these.
Environmental
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdfIn terms of the National Environmental Management Act, section 28 “Every person who causes
has caused or may cause significant pollution or degradation of the environment must take
reasonable measures to prevent such pollution or degradation from occurring, continuing, or
recurring.
10. Guarantee / warranty
Eskom Holdings SOC Limited gives no guarantee or warranty to the workability or condition of
the equipment for sale, other than allow each buyer to familiar themselves at the site prior to
tendering in terms of the Consumer Protection Act. All equipment will be sold “Voetstoots”.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
11. Offers
Offers received for this tender will be deemed valid for a period of THREE (3) months (90
days) from tender closing date.
Eskom reserves the right not to accept the lowest or any tender / offer or withdraw any
item it wishes to retain.
The successful purchaser will be notified.
The onus will be on the tenderer to obtain “Tax Clearance Certificate (in respect of tenders)”,
from the office of the South African Revenue Services (SARS) and submit the same with their
tenders.
12. Variation
No variation or modification of the proposed agreement shall be in force, unless the same is
confirmed in writing.
Yours Faithfully
Phallang Mokoena
Investment Recovery
Procurement & Supply Chain Management
Enquiry NO: olt2128192
CLOSING DATE: 15 June 2025 @ 10:00
CONTACT PERSON: Phallang Mokoena
Email: [email protected]
NB! A bidder who has an existing or expired contract with Eskom and has defaulted in terms of that
contract will be disqualified and not be awarded a new contract.
A bidder who has an open non-conformance will be disqualified and not awarded a new contract.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
This tender proof the tenderer is fully aware of the condition of the tender and the price they
have offered on the tender proofs their full intention and will to purchase the scrap
“VOETSTOOTS” as is for their price as offered.
Please provide full and proper details according to the requirements below. Incomplete or
unclear Tender Documentation can be rejected.
Offer submitted by - name : .......................................SIGNATURE:..................
Date: ......................................... CELL: ......................................... E- mail.................................
Who are legally authorized to provide this tender on behalf of:
Business name:......................................................CSD Number:........................
Business adress:..................................................................................................
Tel:.............................................
Annexure a: sbd4
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
Bidder’s disclosure
1. Purpose of the form
Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In
line with the principles of transparency, accountability, impartiality, and ethics as enshrined in
the Constitution of the Republic of South Africa and further expressed in various pieces of
legislation, it is required for the bidder to make this declaration in respect of the details required
hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted
Suppliers, that person will automatically be disqualified from the bid process.
2. Bidder’s declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any
person having a controlling interest1 in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state
employee numbers of sole proprietor/ directors / trustees / shareholders / members/ partners
or any person having a controlling interest in the enterprise, in table below.
Full Name Identity Number Name of State institution
2.2 Do you, or any person connected with the bidder, have a relationship with any person who is
employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any
person having a controlling interest in the enterprise have any interest in any other related
enterprise whether or not they are bidding for this contract? YES/NO
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
Safety File
Coida
Site/ Yard Cleanliness
Oil spills Kit
Suitable Fire Fighting Equipment
Hazardous & Non-Hazardous
separated
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
Ltd, Reg No 2002/015527/30.
of 26
File name: OFFER TO PURCHASE, COLLECT AND REMOVE SCRAP FERROUS METAL AT LETHABO POWER STATION
On a 6(six) month contractual period
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128192 Review Date June 2027
equipment/scrap incurred while working on this project arising from theft, damage or personal injury.
j. You will be required to adhere to the condition as laid out by the Eskom site agent with regards to
site access etc.
k. The successful tenderer will have to build in their rigging costs as well as transportation cost and
any other equipment / valves and pumps that is needed to pump directly into their flow truck.
l. The oil tenderer has to be compliant as per Oil tender returnable and having an Environmental
8.1 It is an absolute requirement that the taxes of the successful tenderer must be in
order, or that suitable arrangement is made with the Receiver of Revenue to
satisfy them.
8.2 The tenderer must include with his tender documents a copy of a Tax Clearance
Certificate (in respect of Tenders)
8.3 If the certificate is not included or found to be incorrect, Eskom may, in addition to
any other remedy it may have:
8.4 Recover from the contractor all costs, losses or damage incurred or sustained by
Eskom as a result of the award of the disposal agreement: and/or
8.5 Cancel the disposal agreement and claim any damages, which Eskom may suffer
by having to make less favourable arrangements after such cancellation.
8.6 Each party to Consortium/Sub-contractor must complete a separate declaration.
The onus will be on the tenderer to obtain “Tax Clearance Certificate (in respect of tenders)”, from the
office of the South African Revenue Services (SARS) and submit the same with their tenders.
9. Environmental requirements
In terms of the National Environmental Management Act, section 28 “Every person who causes
has caused or may cause significant pollution or degradation of the environment must take
reasonable measures to prevent such pollution or degradation from occurring, continuing, or
recurring.
monitoring plan
methodology used for the risk
assessment must be submitted.
2. Valid Letter of Good Standing or equivalent, i.e., ✓
10. Environmental aspect and impact register to ✓
address e.g., oil spillages
Annexure e: environmental requirements
Number Environmental Management System (EMS) Requirements
1. Environmental Environmental policy signed by top management (CEO
Policy / managing director), dated and version controlled.
strategy/Plan site will be managed, to include where disposal occurs.
Note: Disposal to be at licenced landfill sites and
indicate how waste oil will be
managed.
Environmental Policy
Contractual Terms
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)Please quote the tender enquiry number on all correspondence.
Special Conditions
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf (unknown)All offers to purchase are treated as confidential! NO late offers will be accepted!
Section
Source: OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf# These returnable are mandatory for evaluation and therefore required at tender closing
will not be disqualified but score zero.
with any competitor regarding the quality, quantity, specifications, prices, including methods,
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
OFFER TO PURCHASE SCRAP FERROUS MATERIAL 6 MONTHS LETHABO PS.pdf
Eskom is inviting tenders for the purchase, removal, cutting, and loading of electrostatic ferrous scrap material at Lethabo Power Station for a 6-month contract. The tender closes on 15 June 2026 at 10:00 UTC. The successful bidder will be responsible for cleaning the site, adhering to safety and environmental regulations, and ensuring compliance with all legal and technical requirements.
Eskom_Standard_Conditions_of_Tender.docx.pdf
Eskom is inviting tenders for the purchase, removal, cutting, and loading of electrostatic ferrous scrap material at Lethabo Power Station for a 6-month contract. The tender process is governed by Eskom's Standard Conditions of Tender, with strict compliance, ethical, and procedural requirements.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Phallang Mokoena
Phone
017-827-8591
[email protected]
Address
LETHABO POWER STATION - LETHABO POWER STATION - LETHABO POWER STATION -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
09 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Data conflicts
None detected
Get deep intelligence on Disposals: General. Unlock full pricing strategies, bid frequency, and historical win rates.