Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
O. R. Tambo International Airport - Kempton Park - Kempton Park -
Organization Type
GOVERNMENT
Published
07 Jul 2026
OCDS Reference
ocds-9t57fa-161453
This tender, issued by airports company south africa, seeks a contractor to supply, deliver, install security fencing, and construct bundwalls for mini-substations at o.R. Tambo international airport. The project operates under an nec3 engineering and construction contract (ecc3) with a 7-month completion timeline and a 12-month defects liability period.
Date & Time
Tuesday, 28 July 2026 - 11:00
Venue
O. R. Tambo International Airport, 3rd Floor M&E, Idube Boardroom
Categories
Request for Quotation
O. R. Tambo International Airport - Kempton Park - Kempton Park -
07 Jul
2026
Tender Published
Tender was published
28 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf
The tender is for the supply, delivery, installation of a security fence, and construction of a bundwall for mini-substations at O.R. Tambo International Airport over a 12-month period. The contract is governed by the NEC3 Engineering & Construction Contract (ECC3) with specific clauses for pricing, dispute resolution, delay damages, performance bonds, and liability limitations. The project must be completed within 7 months from the starting date, with a defects liability period of 52 weeks post-completion.
Not enough data available to generate an estimate for this tender type.
Learn how to submit a winning bid with these related articles
Your meticulously crafted General sector tender submission can be disqualified for a single, seemingly minor compliance oversight. The reality for South African contractors is that technical competence is no longer sufficient; it is underpinned by a non-negotiable framework of documentary compliance. This regulatory guide: mastering CSD and BBBEE compliance for general sector tenders in south africa provides a comprehensive, step-by-step breakdown of the mandatory registrations and certificates you must secure and present. We detail the precise requirements for CSD, BBBEE, SARS TCS, CIPC, and COIDA, explaining their function within the procurement ecosystem governed by the PFMA and PPPFA. Learn the actionable steps to prepare your business, avoid the most common disqualifying errors, and leverage technology to streamline your compliance process for successful bidding in 2026 and beyond.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
This definitive guide provides General sector contractors with the precise, actionable steps required to achieve and maintain CSD and BBBEE compliance for South African public tenders in 2026. Authored by Dr. Sarah Mokwena, a Legal Compliance Specialist, it meticulously walks through the regulatory framework, mandatory registrations, and the critical documentation needed to avoid disqualification. We dissect the common, costly errors made during submission and provide a clear checklist to ensure your bid is responsive and competitive. Learn how to navigate the Central Supplier Database, validate your BBBEE status, and integrate compliance into your tender preparation process.
💡 Want more tendering tips and strategies?
Explore Our BlogImportant: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdfScope: Supply, delivery, installation of security fence, and construction of bundwall for mini-substations at O.R. Tambo International Airport. The contract is governed by the NEC3 Engineering and Construction Contract (ECC3) and includes Parts C1 (Agreements & Contract Data), C2 (Pricing Data), C3 (Scope of Work), and C4 (Site Information). Works must be completed within 7 months from the Starting Date.
Important Dates
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)Contract completion date: 7 months from the Starting Date (date when ACSA representative signs the contract). Defects date: 52 weeks after Completion of the whole of the works. Defect correction period: 4 weeks. First programme submission: within 2 weeks of the Contract Date. Revised programmes: at intervals no longer than 2 weeks. Quality plan submission: within 2 weeks of the Contract Date. Period for reply: 1 week.
Contact Information
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)Project Manager and Supervisor details are TBC. Address: Airports Company South Africa, O.R. Tambo International Airport, ACSA Admin Building, 3rd Floor North Wing Offices, Kempton Park, 1627. Email and phone: TBC. For insurance-related queries, contact ACSA Treasury at [email protected]. Adjudicator: Selected from the panel listed in Annexure C (e.g., Adv. Mkhululi Duncan Stubbs, Adv. Arzhar Bham SC, etc.). Adjudicator nominating body: Chairman of the Johannesburg Society of Advocates.
Submission Guidelines
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)Submit the following returnable documents as part of your offer: signed Form of Offer and Acceptance, Schedule of Deviations (if applicable), and all requested securities, bonds, guarantees, proof of insurance, and other documentation specified in the Contract Data. Failure to provide these within two weeks of contract award constitutes a repudiation of the agreement. Use the NEC3 Engineering and Construction Contract (ECC3) format for submissions.
Evaluation Criteria
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)General
Specific
Technical Specifications
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)Scope: Supply, delivery, installation of security fence, and construction of bundwall for mini-substations at O.R. Tambo International Airport. Works Information is detailed in Part C3: Scope of Work and referenced drawings/documents. Contractor must ensure works are fit for their intended purpose as stated in the Works Information. Contractor is responsible for correct setting out of the Works; errors in positioning must be rectified at the Contractor’s own cost. Site boundaries: O.R. Tambo International Airport. Access dates: Airfield, Cargo & Terminal Building areas are accessible 24 hours, 7 days a week.
Experience & Qualifications
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdfContractor must provide CVs and key personnel data (including qualifications and experience) as appended to the Tender Schedule. Responsibilities for roles such as Bricklayer must be clearly defined. Contractor must satisfy themselves as to the completeness, sufficiency, and accuracy of all provided information and drawings prior to the Contract Date.
Quality Management
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdfContractor must implement and maintain a quality management system per Works Information. Submit a quality plan for acceptance within 2 weeks of the Contract Date. The Project Manager may reject the plan if it does not allow the Contractor to Provide the Works. Any changes to the quality plan must be resubmitted for acceptance. The Project Manager may instruct corrections to non-compliance; such instructions are not compensation events. Defects date: 52 weeks after Completion. Defect correction period: 4 weeks.
Pricing Schedule
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdfPricing structure: Priced contract with activity schedule (NEC3 ECC3 Option A). Part C2 contains Pricing Data (10 pages). Part C3 contains Scope of Work (8 pages). Contractor must submit hourly rates for Defined Cost of design outside Working Areas (Category of employee and Hourly rate). Equipment rates and adjustments must be specified per the Shorter Schedule of Cost Components. VAT is excluded unless stated otherwise.
Financial Requirements
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)Contract type: Priced contract with activity schedule (NEC3 ECC3 Option A). Currency: South African Rand (ZAR). Payment terms: 30 days from date of valid tax invoice. Assessment interval: between the 20th day of each successive month. Performance bond: 10% of contract value excluding VAT, unconditional and on-demand, provided by an accepted bank or insurer. Delay damages: 0.05% of contract value per day, capped at 10% of contract value. Contractor’s liability for indirect/consequential loss: R0. Contractor must re-insure deductibles for insurance claims (e.g., R275,000 for public liability on landside projects). Contractor must provide proof of insurance before contract signing.
Compliance Requirements
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdf (unknown)Contractor must comply with NEC3 Engineering and Construction Contract (ECC3) conditions, including secondary Options X7 (Delay Damages), X13 (Performance Bond), and X18 (Limitation of Liability). Additional conditions (Z clauses) apply, including anti-corruption (Z21), confidentiality (Z22), and intellectual property (Z24) provisions. Contractor must provide securities, bonds, guarantees, and proof of insurance as specified in the Contract Data. CIDB registration number must be provided. Contractor must adhere to the Compensation for Occupational Injuries and Diseases Act No. 130 of 1993 for employee-related insurance. Joint ventures/consortia are jointly and severally liable (Z20).
Contractual Terms
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdfContract type: NEC3 Engineering and Construction Contract (ECC3) with main Option A (Priced contract with activity schedule) and secondary Options X7 (Delay Damages), X13 (Performance Bond), X18 (Limitation of Liability). Additional Z clauses include: Z1 (Interpretation), Z2 (Project Manager/Supervisor actions), Z9 (Quality Management System), Z12 (Compensation events notification), Z13 (Critical path requirement), Z16 (Termination for delay damages), Z17 (Performance Bond validity), Z18 (Liability limitations), Z19 (Cession/assignment), Z20 (Joint liability), Z21 (Ethics/anti-corruption), Z22 (Confidentiality), Z23 (Liens), Z24 (Intellectual Property). Contract duration: 7 months from Starting Date. Defects date: 52 weeks post-completion. Defect correction period: 4 weeks. Contractor must deliver securities, bonds, guarantees, and proof of insurance within 2 weeks of contract award.
Section
Source: Rec 73979 NEC3 Security Fence and contruction of Bundwall for Mini-Substation.pdfContractor must submit a quality plan for acceptance within 2 weeks of the Contract Date. The plan must comply with the Works Information and enable the Contractor to Provide the Works. Non-acceptance may occur if the plan is insufficient. Compensation events must be notified within 4 weeks; only those affecting the critical path qualify for adjustments to Prices, Completion Date, or Key Dates.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf
The tender is for the supply, delivery, installation of a security fence, and construction of a bundwall for mini-substations at O. R. Tambo International Airport over a 12-month period. Issued by Airports Company South Africa (ACSA), it requires compliance with CIDB grading, tax obligations, and preferential procurement policies. The closing date is 28 July 2026 at 11:00 AM (UTC).
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company South Africa (ACSA)Contact Person
Sandra Sebokolodi
Phone
011-723-1400
[email protected]
Address
O. R. Tambo International Airport - Kempton Park - Kempton Park -
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
07 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
ACSA owns and manages South Africa's principal commercial airports.
Important Dates
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Contact Information
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Submission Guidelines
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Evaluation Criteria
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Mandatory
Functionality
Preference
Technical Specifications
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Financial Requirements
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Compliance Requirements
Source: Rec 73979 SUPPLY DELIVERY INSTALLATION SECURITY FENCE AND CONSTRUCTION OF BUNDWALL FOR MINI-SUBSTATIONS FOR 12 MONTHS_reviewedDM.pdf (TENDER)Data conflicts
None detected
Get deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.