Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
420 Witch – Hazel Avenue - Eco Park, Block A, Eco Glades 2 Office Park, - Centurion - 0157
Organization Type
GOVERNMENT
Published
10 Jun 2026
OCDS Reference
ocds-9t57fa-158775
The council for medical schemes (cms) seeks a service provider to configure, integrate, and provide support for the ebscon printer with sage evolution, ensuring seamless asset number printing. This tender is for technical experts with experience in sage evolution and printer integration, particularly for asset/barcode label printing.
AI Document Analysis Stages
Description
Request for Quotation
420 Witch – Hazel Avenue - Eco Park, Block A, Eco Glades 2 Office Park, - Centurion - 0157
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf
The Council for Medical Schemes (CMS) seeks a service provider to configure and integrate the EBSCON printer with SAGE Evolution ERP system for asset number printing. The project involves printer configuration, driver installation, middleware setup, report layout customization, testing, user training, and post-implementation support. Bids will be evaluated using the 80/20 preference point system (80 points for price, 20 points for specific goals including HDI, women-owned, disability-owned, and youth-owned enterprise criteria).
Date & Time
Thursday, 18 June 2026 - 11:00
Venue
null
10 Jun
2026
Tender Published
Tender was published
18 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 6 115 853
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
In 2026, General contractors in the Western Cape operate within an increasingly stringent compliance landscape, where B-BBEE (Broad-Based Black Economic Empowerment) visibility is non-negotiable. With 173 active General tenders in the province, procurement officers are under pressure to verify empowerment credentials meticulously. A misaligned or expired B-BBEE certificate can disqualify an otherwise competitive bid. Understanding how your B-BBEE level is calculated—and ensuring alignment with the Public Finance Management Act (PFMA) and Preferential Procurement Policy Framework Act (PPPFA)—is critical to securing public sector contracts.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
As Gauteng’s security tender landscape intensifies in 2026, contractors must navigate a complex compliance environment where a single oversight can disqualify an entire bid. With over 300 active security tenders in the province, regulatory adherence—particularly PSIRA registration—remains the non-negotiable foundation for participation. This guide clarifies the legal obligations, verification processes, and documentation required to ensure your submission meets the strict standards of South African procurement law.
In 2026, Western Cape contractors face a regulatory landscape where compliance is the gatekeeper to opportunity. With 148 active construction tenders in the province, the difference between winning and wasting time often comes down to understanding the CIDB grading system. A misaligned grade, lapsed certification, or missing documentation can disqualify even the most technically sound bid. This isn’t just bureaucracy—it’s the framework ensuring only capable, verified suppliers compete for public sector work.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Project Title: Support and Configuration for Integration of EBSCON Printer with SAGE Evolution. Objective: Appoint a service provider to provide technical support, configuration, and integration services to ensure seamless alignment between the EBSCON printer and SAGE Evolution for asset number printing. Background: CMS uses SAGE Evolution as its ERP system for financial and asset management, and the EBSCON printer for printing asset numbers (labels/tags).
Important Dates
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Closing date: 18 June 2026 at 11:00 AM. Validity period of the bid: 90 days from closing date. CMS may request an extension of the validity period.
Contact Information
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Submission email: [email protected]. Bidding procedure enquiries: Bokamoso Legong, Tel: 012 431 0577, Email: [email protected]. Technical enquiries: William Mothabela, Tel: 012 431 0540, Email: [email protected]. Invoices must be emailed to: [email protected]. Physical address: Block A, Eco Glades 2 Office Park, 420 Witch-Hazel Avenue, Eco Park, Centurion, 0157. General enquiries: Tel: 012 431 0500, Customer Care: 0861 123 267, Email: [email protected].
Submission Guidelines
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Submit your bid via email to: [email protected]. Bids must be delivered by the closing date and time (18 June 2026, 11:00 AM). Late submissions will not be accepted. Use the official forms provided in the RFQ document—do not re-type. Documents submitted via cloud services (e.g., WeTransfer, Google Drive, Dropbox) will not be considered. The successful bidder must sign a written contract form (SBD7). CMS reserves the right to reject late, incomplete, or non-compliant bids.
Returnable Documents
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)1.1. Bids must be delivered by the stipulated time to the correct address. Late bids will not be accepted for 1.2. All bids must be submitted on the official forms provided–(not to be re-typed) or in the manner prescribed
Evaluation Criteria
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Bidders must be tax compliant (SARS PIN required), registered on Central Supplier Database (CSD), complete and sign SBD 1, 4, and 6.1 forms, submit valid B-BBEE Certificate or Sworn Affidavit. Companies with directors employed by state, those listed on National Treasury restricted bidders database, or with past fraud convictions are disqualified. Foreign suppliers must provide tax compliance documentation if applicable.
Technical Specifications
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Scope: Configure and integrate the EBSCON printer with SAGE Evolution (including asset module). Ensure compatibility with asset tagging/barcode printing processes. Install and configure necessary drivers and middleware. Customise report layouts or stationery for asset label printing. Provide testing and validation of the printing process. Offer user training and documentation. Provide post-implementation support. Technical Requirements: Proven experience with SAGE Evolution implementation and support. Experience with printer configuration and integration (barcode/asset label printers preferred). Understanding of asset management modules and workflows within SAGE Evolution. Ability to troubleshoot printer-driver and system integration issues. Deliverables: Fully configured and functional integration between SAGE Evolution and EBSCON printer. Testing report confirming successful asset number printing. User training and support documentation. Post-implementation support plan.
Methodology
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdfPayment structure: CMS pays within 30 days of receiving a valid tax invoice for completed work. Payments are tied to milestones/deliverables as per the project implementation plan. Invoices must be emailed to [email protected] and reference the Purchase Order number. No services/goods may be delivered without an official Purchase Order from CMS’s Supply Chain Management Unit.
Quality Management
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdfQuality requirements: Goods and services must conform to the standards specified in the bidding documents. Supplies may be inspected, tested, or analysed during or after delivery. Non-compliant supplies will be rejected, and the supplier must replace them at their own cost. The supplier must permit CMS to inspect records and audit performance. Pre-bidding testing costs are the bidder’s responsibility. If inspections reveal compliance, CMS covers the cost; if non-compliant, the supplier covers the cost. The supplier must indemnify CMS against third-party claims of patent, trademark, or industrial design infringement.
Financial Requirements
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Payment terms: CMS will pay in full within 30 days after receipt of an original tax invoice for work completed to its satisfaction. Payments are milestone-based as per the project implementation plan. All invoices must reference the Purchase Order number and be emailed to [email protected]. No goods/services shall be delivered without an official Purchase Order from CMS’s Supply Chain Management Unit. Pricing must align with the quoted bid price unless adjusted per SCC or bid validity extension.
Compliance Requirements
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Mandatory compliance documents: SARS Tax Compliance Status (TCS) PIN or CSD registration number. Valid B-BBEE Certificate or Sworn Affidavit (for EMEs and QSEs). Completed and signed SBD 1, SBD 4, and SBD 6.1. Certified copies of South African IDs of directors/owners/shareholders. CIPC registration documents. Foreign suppliers: Must confirm RSA residency, branch, permanent establishment, income source, or tax liability. If none apply, no SARS TCS PIN is required. Tax Compliance: Bidders must be tax-compliant. Non-compliant bidders will be notified and given 7 working days to submit proof of compliance or arrangements to resolve outstanding obligations. Failure to comply results in bid rejection. Consortia/Joint Ventures: Each party must submit separate TCS Certificates/PINs/CSD numbers. Disqualification: Bids from persons in the service of the state, or entities with directors/members in the service of the state, will not be considered. Bidders listed on the National Treasury’s database of restricted suppliers or tender defaulters are disqualified.
B-BBEE Requirements
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)B-BBEE requirements: A valid B-BBEE Certificate or Sworn Affidavit (for EMEs and QSEs) must be submitted to qualify for preference points. Specific Goals (20 points) are allocated for: HDI Ownership (5 points), Company Size (3 points), Black Women Owned (5 points), Ownership by People with Disabilities (3 points), Youth Ownership (4 points). Points are awarded based on ownership percentages and company classification. Mandatory documents for verification: Certified IDs, B-BBEE Certificate/Sworn Affidavit, CIPC documents, and medical certificates (for disability claims). Failure to submit proof results in 0 points for Specific Goals.
Health & Safety
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdfThe Council for Medical Schemes is a statutory body established by the Medical Schemes Act () to provide regulatory
supervision of private health financing through medical schemes; and functions as a Schedule 3A Public Entity.
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE IS CORRECT.
I accept that the state may reject the bid or act against me in terms of paragraph 6 of PFMA
SCM instruction /22 on preventing and combating abuse in the supply chain
3.1. Unless otherwise indicated in the bidding documents, the purchaser shall not be liable for any expense incurred in the
preparation and submission of a bid. Where applicable a non-refundable fee for documents may be charged.
3.2. With certain exceptions, invitations to bid are only published in the Government Tender Bulletin. The Government Tender
Bulletin may be obtained directly from the Government Printer, Private Bag X85, Pretoria 0001, or accessed electronically
from www.treasury.gov.za
10.1. Delivery of the goods shall be made by the supplier in accordance with the terms specified in the contract. The details of
shipping and/or other documents to be furnished by the supplier are specified in SCC.
10.2. Documents to be submitted by the supplier are specified in SCC.
24.1. When, after the date of bid, provisional payments are required, or antidumping or countervailing duties are imposed,
or the amount of a provisional payment or anti-dumping or countervailing right is increased in respect of any
dumped or subsidized import, the State is not liable for any amount so required or imposed, or for the amount of
any such increase. When, after the said date, such a provisional payment is no longer required or any such anti-
dumping or countervailing right is abolished, or where the amount of such provisional payment or any such right is
reduced, any such favourable difference shall on demand be paid forthwith by the contractor to the State or the
Chairperson: Dr T. Mabeba Chief Executive & Registrar: Dr M. Gumede
Block A, Eco Glades 2 Office Park, 420 Witch-Hazel Avenue, Eco Park, Centurion, 0157
Tel: 012 431 0500 Fax: 012 430 7644 Customer Care: 0861 123 267
[email protected] www.medicalschemes.co.za
State may deduct such amounts from moneys (if any) which may otherwise be due to the contractor in regard to
supplies or services which he delivered or rendered, or is to deliver or render in terms of the contract or any other
contract or any other amount which may be due to him
31.1. Every written acceptance of a bid shall be posted to the supplier concerned by registered or certified mail and any
other notice to him shall be posted by ordinary mail to the address furnished in his bid or to the address notified later
by him in writing and such posting shall be deemed to be proper service of such notice.
31.2. The time mentioned in the contract documents for performing any act after such aforesaid notice has been given,
shall be reckoned from the date of posting of such notice.
Contractual Terms
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdfContract terms are governed by the General Conditions of Contract (GCC) and any Special Conditions of Contract (SCC). Key terms: Contract must be written in English and interpreted under South African law. Payment: Within 30 days of receipt of a valid tax invoice, based on completed milestones. Prices must not vary from the bid unless adjusted per SCC. Contract amendments require written agreement. Assignment of obligations requires purchaser’s prior written consent. Subcontracts must be notified in writing. Delays may incur penalties calculated using the current prime interest rate per day. Termination for default or insolvency is possible. Force majeure events may relieve the supplier of liability. Disputes: Resolved via mutual consultation, mediation, or South African courts. Liability: Supplier’s aggregate liability is capped at the contract price, excluding repair/replacement costs. Insurance: Goods must be fully insured against loss or damage. Taxes: Local suppliers are responsible for all taxes until delivery. Foreign suppliers are responsible for taxes outside South Africa. Performance security: Required within 30 days of contract award (bank guarantee, irrevocable letter of credit, or cashier’s cheque). Warranty: 12 months for defects in design, materials, or workmanship. Inspections: Premises must be open for inspection during reasonable hours. Non-compliant supplies may be rejected at the supplier’s cost.
Special Conditions
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)CMS reserves the right to: Extend the closing date under exceptional circumstances. Not return any proposals or subsequent information. Not enter into any relationship or correspondence regarding submissions. Reject any bid or not appoint a bidder, particularly for fraud, corruption, collusion, or reputational risk. Cancel the award if the bidder engaged in corrupt or fraudulent activities. Validate all claims made in the proposal. Withdraw an award or cancel a contract if the bidder is found non-tax-compliant. The successful bidder must work under CMS supervision and abide by its Code of Conduct and organisational guidelines. All proposals must include all requested information for evaluation. CMS is not liable for costs incurred by bidders in preparing or submitting proposals.
Requirements
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf (RFQ)Are you the accredited are you a representative foreign-based in south africa supplier for the for the goods /services /works offered? /Works [if yes, enclose proof] [if yes, answer part b:3] offered?
Section
Source: RFQ -Support and Configuration for Integration of EBSCON Printer with SAGE Evolution.pdf3. Evaluation criteria process
3.1. Table 1 – Evaluation Process and Criteria
Stage Details
Phase 1 Price and Specific Goals evaluation criteria: The purpose of these criteria is to evaluate bidders based on bid
price and Specific Goals.
be assessed using the 80/20 formula (Preference Points System) for Price and Specific Goals as indicated in the
PPPFA Regulations.
Table 3- Price and Specific Goals
(a) Historically Disadvantaged Individuals (5 Points)
80% - 100% Black Owned 5 Points
50% - 79.99 Black Owned 4 Points
20% - 49.99% Black Owned 3 Points
(b) Size of the Company (3 Points)
EME 3 Points
QSE 2 Points
Generic Enterprise 1 Points
(c) Black Woman Owned Enterprise (5 Points)
75% - 100% Black Women 5 Points
Specific Goals 20 Owned
51% - 74,99% Black Women 3 Points
d) Ownership by People with Disabilities (3 Points)
75% - 100% Ownership by People with 3 Points
51% - 74,99% Ownership by People with 2 Points
Specific Goals evaluation criteria: The purpose of these criteria is to evaluate bidders based on bid
(e) Ownership by Youth (under 35 years) (4 Points)
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Council for Medical SchemesContact Person
Bokamoso Legong
Phone
012-431-0500
[email protected]
Website
www.medicalschemes.co.za/
Address
Block A Eco Glades 2 Office Park, 420 Witch-Hazel Ave, Eco-Park Estate, Centurion, 0157, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
10 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Data conflicts
None detected
Block A Eco Glades 2 Office Park, 420 Witch-Hazel Ave, Eco-Park Estate, Centurion, 0157, South Africa
Get deep intelligence on Manufacture of coke and refined petroleum products. Unlock full pricing strategies, bid frequency, and historical win rates.