Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Passenger Rail Agency of South Africa (PRASA)Location
Gauteng
Closing Date
22 Jun 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
30 WOLMARANS STREET, UMJANTSHI HOUSE - BRAAMFONTEIN - JOHANNESBURG - 2017
Organization Type
GOVERNMENT
Published
08 Jun 2026
OCDS Reference
ocds-9t57fa-158433
The passenger rail agency of south africa (PRASA) seeks to appoint two contractors for as-and-when-required plumbing maintenance across railway stations, buildings, offices, rental properties, and workshops in the south gauteng region. The 24-month contract requires planned and corrective maintenance, adherence to strict response times, and compliance with sabs, SANS, and OHS standards.
Important Dates
Source: RFQ DOCUMENT.pdf (RFQ){"closingDate":"22 JUNE 2026","closingTime":"12:00PM"}
Documents to be hand delivered to the mentioned address on the RFQ document
Categories
Request for Quotation
30 WOLMARANS STREET, UMJANTSHI HOUSE - BRAAMFONTEIN - JOHANNESBURG - 2017
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFQ DOCUMENT.pdf
The Passenger Rail Agency of South Africa (PRASA) invites bids for the appointment of two contractors to provide plumbing maintenance services on an as-and-when-required basis across railway stations, buildings, offices, rental properties, and workshops in the South Gauteng region. The contract duration is 24 months, with a closing date of 22 June 2026 at 12:00 PM UTC. The tender follows a structured evaluation process, including mandatory compliance checks, technical/functional assessments, and price evaluations under the 80/20 Preferential Procurement Policy Framework Act.
Date & Time
Monday, 22 June 2026 - 12:00
Venue
null
08 Jun
2026
Tender Published
Tender was published
22 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 3 105 000
Range
Based on CIDB grading. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
As Gauteng’s security tender landscape intensifies in 2026, contractors must navigate a complex compliance environment where a single oversight can disqualify an entire bid. With over 300 active security tenders in the province, regulatory adherence—particularly PSIRA registration—remains the non-negotiable foundation for participation. This guide clarifies the legal obligations, verification processes, and documentation required to ensure your submission meets the strict standards of South African procurement law.
In 2026, Western Cape contractors face a regulatory landscape where compliance is the gatekeeper to opportunity. With 148 active construction tenders in the province, the difference between winning and wasting time often comes down to understanding the CIDB grading system. A misaligned grade, lapsed certification, or missing documentation can disqualify even the most technically sound bid. This isn’t just bureaucracy—it’s the framework ensuring only capable, verified suppliers compete for public sector work.
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Gauteng’s construction sector remains a high-stakes environment in 2026, with 317 active tenders and 89 organisations vying for contracts. For contractors, the difference between winning and losing often hinges on CIDB grading compliance. A mismatch between your grade and the tender’s contract value means instant disqualification. With regulatory scrutiny tightening, upgrading your CIDB grade isn’t just advantageous—it’s a necessity to access higher-value projects and stay competitive in a crowded market.
💡 Want more tendering tips and strategies?
Explore Our BlogContact Information
{"name":null,"email":"[email protected]","phone":"011 013 1617","department":null,"address":"KSHOPS ON AS AND WHEN"}
Submission Guidelines
Source: RFQ DOCUMENT.pdf (RFQ)Returnable Documents: Returnable Documents means all the documents, Sections and Annexures, as listed in the tables below. There are three types of returnable documents as indicated below and Respondents are urged to ensure that these documents are returned with the quotation based on the consequences of non- submission as indicated below: 16.1. Mandatory Returnable Documents Failure to provide Mandatory Returnable Documents at the Closing Date and time of this RFQ may result in a Respondent’s disqualification. Respondents are therefore urged to ensure that all documents are returned with their Quotations. Request For Quotation SCM_2026 SECTION 3
Returnable Documents
Source: RFQ DOCUMENT.pdf (RFQ)16 returnable documents
below. There are three types of returnable documents as indicated below and Respondents are urged
to ensure that these documents are returned with the quotation based on the consequences of non-
submission as indicated below:
16.1. Mandatory Returnable Documents
in a Respondent’s disqualification. Respondents are therefore urged to ensure that all documents are
returned with their Quotations.
Evaluation Criteria
Source: RFQ DOCUMENT.pdf (RFQ)Mandatory
Technical Threshold
Preference Points
Technical Specifications
Source: RFQ DOCUMENT.pdf (RFQ)Required basis in south gauteng region for a period of 24 months.
Compliance Requirements
Source: RFQ DOCUMENT.pdf (RFQ)Valid Tax Clearance Certificate (must be valid on closing date of
Tax compliance central supplier
Tax compliance status
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS website
Tcs pin is available but the bidder is registered on the central supplier database (csd), a csd
Csd number
Csd number must be provided
Central supplier database (csd), a csd
Central supplier database
Central Supplier Database (CSD) which
Completion Certificate
appointment letter/purchase order/signed 0 Point: No submission or
Appointment Letter/Purchase
(www.etenders.gov.za), on CIDB website for construction related RFQ’s. (where applicable).
in a Respondent’s disqualification. Respondents are therefore urged to ensure that all documents are
disqualification
pricing schedule/Section 4) failure to comply will result into disqualification.
Active CIDB grading level of 3SO or Higher.
Bidder to ensure that their CIDB status is active on the system throughout
of a Quotation in response to it. Please note that PRASA reserves the right to
2. Tax compliance requirements
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS website
Tcs certificate / pin / csd number.
2.6 Where NO tcs pin is available but the bidder is registered on the central supplier database (csd), a csd
N IT is not a requirement to register for a tax compliance status
Points Allocation: 80 points
B-BBEE Details: FORMULA FOR PROCUREMENT OF GOODS AND SERVICES
Points awarded for price
The 80/20 preference point systems
A maximum of 80 points is allocated for price on the following basis
Health & Safety
Source: RFQ DOCUMENT.pdf3 Points: Only three (3) items
The following must be provided in submitted from the 4 listed in the
order to get points on this criterion left column (8%)
Health and i. Operational structure with 2 Points: Only two (2) items
Safety minimum of three (3) submitted from the 4 listed in the
maintenance crew (each crew to left column (6%)
comprise of at least a skilled
personnel and assistant) 1 Point: Only one (1) item
submitted from the 4 listed in the
ii. First Aider (valid certification left column (4%)
required) to be part of the team
0 Point: No submission or
iii. Risk assessment specific to irrelevant submission (0 points)
plumbing maintenance.
iv. Valid letter of good standing
Total 100
Request For Quotation SCM_2026
Stage 3- Price and Specific Goals
The following formula shall be used to allocate scores to the interested bidders:
The maximum points for this tender are allocated as follows:
Details points
Price 80
Specific goals 20
Total points for price and 100
acceptance or rejection by PRASA’s Legal Counsel, prior to consideration for an award of business.
10 national treasury’s central supplier database
Respondents are required to self-register on National Treasury’s Central Supplier Database (CSD) which
has been established to centrally administer supplier information for all organs of state and facilitate the
verification of certain key supplier information. PRASA is required to ensure that price quotations are
invited and accepted from prospective bidders listed on the CSD. Business may not be awarded to a
respondent who has failed to register on the CSD. Only foreign suppliers with no local registered entity
need not register on the CSD. The CSD can be accessed at https://secure.csd.gov.za/.
that is in accordance with the OHS 4 Points: Only four (4) items
ACT OF 1993 and Passenger Rail submitted from the 4 listed in the
Agency of South Africa Health and left column (10%)
safety Specification
3 Points: Only three (3) items
The following must be provided in submitted from the 4 listed in the
order to get points on this criterion left column (8%)
Health and i. Operational structure with 2 Points: Only two (2) items
Safety minimum of three (3) submitted from the 4 listed in the
maintenance crew (each crew to left column (6%)
comprise of at least a skilled
personnel and assistant) 1 Point: Only one (1) item
submitted from the 4 listed in the
ii. First Aider (valid certification left column (4%)
required) to be part of the team
0 Point: No submission or
iii. Risk assessment specific to irrelevant submission (0 points)
plumbing maintenance.
iv. Valid letter of good standing
Total 100
Request For Quotation SCM_2026
Stage 3- Price and Specific Goals
terms of section 59 of the Competition Act No and or may be reported to the National
Prosecuting Authority (NPA) for criminal investigation and or may be restricted from conducting
business with the public sector for a period not exceeding ten (10) years in terms of the Prevention
and Combating of Corrupt Activities Act No or any other applicable legislation.
Request For Quotation SCM_2026
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE IS
Contractual Terms
Source: RFQ DOCUMENT.pdfWithout prejudice to any other rights of PRASA under these conditions, the Supplier warrants that the
items are in accordance with PRASA’s requirements and fit for the purpose for which they are intended
and will remain free from defects for a period of one year (unless another period is stated in the Order)
from acceptance of the items by PRASA.
The Supplier indemnifies PRASA against all actions, suits, claims, demands, costs, charges and
expenses arising in connection therewith arising from the negligence, infringement of intellectual or legal
rights or breach of statutory duty of the Supplier, his subcontractors, agents or servants, or from the
Supplier’s defective design, materials or workmanship.
The Supplier indemnifies PRASA against claims, proceedings, compensation and costs payable arising
out of infringement by the Supplier of the rights of others, except an infringement which arose out of the
use by the Supplier of things provided by PRASA.
Assignment and sub-contracting
The successful Respondent awarded the contract may only enter into a subcontracting arrangement
with PRASA’s prior approval. The contract will be concluded between the successful Respondent and
PRASA, therefore, the successful Respondent and not the sub-contractor will be held liable for
performance in terms of its contractual obligations.
Request For Quotation SCM_2026
Governing law
The order/contract is governed by the law of the Republic of South Africa and the parties hereby submit
to the non-exclusive jurisdiction of the South African courts.
Special Conditions: Funding Contingency
1. Paragraph 8.4 of the PFMA SCM Instruction No. /22 states that the Accounting Authority
may not invite price quotations or bids if no or sufficient provision is made in the budget of the
institution.
2. PRASA has, in terms of section 79 of the PFMA, obtained approval from National Treasury, for a
departure from paragraph 8.4 of the PFMA SCM Instruction No. /22.
3. PRASA is currently in the process of making provision and allocation of budget for the services
required in this RFQ, which provision and/or budget allocation has not yet been completed at the
time of the issuance of this RFQ.
4. PRASA will, however, ensure that provision and/or budget allocation is made prior to the award of
business in this RFQ.
5. Accordingly, any award pursuant to this RFQ is strictly subject to PRASA, inter alia:
5.1. securing the necessary funding allocation; and
5.2. confirming that sufficient budget exists to meet the intended award.
6. PRASA undertakes to keep bidders reasonably informed of the progress and status of the funding
allocation and budgeting process.
7. By submitting a bid, bidders expressly acknowledge and agree that PRASA reserves the right to
cancel this RFQ at any stage prior to award, in the event that PRASA is unsuccessful in making
sufficient provision and/or budget allocation for the required services.
8. PRASA shall not be liable for:
8.1. any claim, loss, or damages of whatsoever nature arising from or in connection with a failure to
source funding; or
8.2. the non-award of tender due to a failure to source funding; and
8.3. bidders waive any right to institute proceedings against PRASA in respect of the circumstances
contemplated above.
Request For Quotation SCM_2026
SIGNED at on this day of 20
Signature of Witness
Name
Signature of Witness
Name
Signature of Bidder’s Authorised Representative:
Name:
Designation: ”
Request For Quotation SCM_2026
Section 6 sbd4
Bidder’s disclosure
1. Purpose of the form
Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In line
with the principles of transparency, accountability, impartiality, and ethics as enshrined in the
Constitution of the Republic of South Africa and further expressed in various pieces of legislation,
it is required for the bidder to make this declaration in respect of the details required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted
Suppliers, that person will automatically be disqualified from the bid process.
2. Bidder’s declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any person
having a controlling interest1 in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state
employee numbers of sole proprietor/ directors / trustees / shareholders / members/ partners or
any person having a controlling interest in the enterprise, in table below.
Full Name Identity Number Name of State
institution
2.2 Do you, or any person connected with the bidder, have a relationship with any person who is
employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any person
1 the power, by one person or a group of persons holding the majority of the equity of an enterprise,
alternatively, the person/s having the deciding vote or power to influence or to direct the course and decisions
of the enterprise.
Request For Quotation SCM_2026
having a controlling interest in the enterprise have any interest in any other related enterprise
whether or not they are bidding for this contract? YES/NO
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
expenses arising in connection therewith arising from the negligence, infringement of intellectual or legal
rights or breach of statutory duty of the Supplier, his subcontractors, agents or servants, or from the
Supplier’s defective design, materials or workmanship.
4.2. Name of company/firm...............................................................................
4.3. Company registration number: .....................................................................
4.4. Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.5. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that
the points claimed, based on the specific goals as advised in the tender, qualifies the company/
firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated
in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary proof to the
satisfaction of the organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any other
remedy it may have –
(a) disqualify the person from the tendering process.
(b) recover costs, losses or damages it has incurred or suffered as a result of
that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a result
of having to make less favourable arrangements due to such cancellation;
(d) recommend that the tenderer or contractor, its shareholders and directors,
or only the shareholders and directors who acted on a fraudulent basis, be
restricted from obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other side) rule
has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
Request For Quotation SCM_2026
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
Request For Quotation SCM_2026
Section 7
Special Conditions
Source: RFQ DOCUMENT.pdf (RFQ)Special Conditions: Funding Contingency
1. Paragraph 8.4 of the PFMA SCM Instruction No. /22 states that the Accounting Authority
may not invite price quotations or bids if no or sufficient provision is made in the budget of the
institution.
2. PRASA has, in terms of section 79 of the PFMA, obtained approval from National Treasury, for a
departure from paragraph 8.4 of the PFMA SCM Instruction No. /22.
required in this RFQ, which provision and/or budget allocation has not yet been completed at the
time of the issuance of this RFQ.
business in this RFQ.
5.1. securing the necessary funding allocation; and
5.2. confirming that sufficient budget exists to meet the intended award.
allocation and budgeting process.
cancel this RFQ at any stage prior to award, in the event that PRASA is unsuccessful in making
sufficient provision and/or budget allocation for the required services.
8.1. any claim, loss, or damages of whatsoever nature arising from or in connection with a failure to
source funding; or
8.2. the non-award of tender due to a failure to source funding; and
8.3. bidders waive any right to institute proceedings against PRASA in respect of the circumstances
contemplated above.
Requirements
Source: RFQ DOCUMENT.pdf (RFQ)2.1 ARE YOU THE Yes No
Yes No 2.2 ARE YOU A FOREIGN BASED
In south africa for the [if yes, answer the
/Works offered?
Goods /services /works [if yes enclose proof] questionnaire below]
Offered?
Is the entity a resident of the republic of south africa (RSA)? yes NO
Does the entity have a branch in the RSA? yes NO
Does the entity have a permanent establishment in the RSA? yes NO
Does the entity have any source of income in the RSA? yes NO
Is the entity liable in the RSA for any form of taxation? Yes NO
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance status
System pin code from the south african revenue service (SARS) and if not register as per 2.3 Below.
Section
Source: RFQ DOCUMENT.pdfStage 1A – Mandatory Requirements
If you do not submit/meet the following mandatory documents/requirements, your bid will be
automatically disqualified.
Only bidders who comply with stage 1A will be evaluated further.
Description of requirement
No. tick
Bidders to fill and sign the CORRECT closing/ Submission register on
a) submission of RFQ documents, failure to comply will result into
disqualification
Completion of ALL RFQ documentation (includes ALL declarations and
pricing schedule/Section 4) failure to comply will result into disqualification.
b)
Active CIDB grading level of 3SO or Higher.
Bidder to ensure that their CIDB status is active on the system throughout
the validity of the tender
c) Note: A trust, consortium or joint venture (including unincorporated
consortia and joint ventures) must submit a consolidated CIDB grading
Verification Certificate for every separate tender
Joint Venture, Consortium Agreement or Partnering Agreement signed by
all parties (if applicable). The agreement should indicate the leading
d)
bidder where applicable.
Stage 1B –Other Mandatory Requirements
If you do not submit/meet the following mandatory documents/requirements, PRASA may request the
bidder to submit the information within five (5) working days. Should this information not be provided,
your bid proposal will be disqualified.
Only bidders who comply with stage 1B will be evaluated further.
No. Description of requirement TICK
a) Valid Tax Clearance Certificate (must be valid on closing date of
submission of the RFQ) or SARS Issued Pin
b) CSD supplier registration number
c) Valid B-BBEE certificate from SANAS accredited rating agency
(Original or Certified copy)/DTI / Companies and Intellectual
Property Commission B-BBEE Certificate (Original or Certified
copy) or Sworn Affidavit signed and stamped by the commissioner
of Oath.
Note: A trust, consortium or joint venture (including unincorporated
consortia and joint ventures) must submit a consolidated B-BBEE
Certificate.
d) Copies of Directors ID documents
e) Poof of banking Account (i.e. letter issued by the bank
f) Company Registration, Certificate of incorporation or CK1
g) Letter of Good Standing (i.e. COIDA)
STAGE 2 - Technical / Functionality Requirements
Qualifying bidders shall be evaluated on technicality / functionality after meeting all compliance
requirements outlined above. The minimum threshold for the technical/functionality requirements is 60%.
PER CRITERION Bidders who score below the minimum requirement shall not be considered for further
evaluation in stage 3.
Summary of the technical/functional requirements are presented in the table 2 below.
Item criteria weight max score min score
1 Company’s Experience 30 30 5 18 3
2 Experience of Key Personnel 50 10X5 5 6X5 3
3 Health and Safety 20 20 5 12 3
Total 100 100 60
NOTE: The Technical or Functionality criteria must be guided by the project scope of work and area of focus
Evaluation of a contractor
Criteria sub-criteria scoring maxi
Points
30%
Bidders should indicate the
experience of previous work done 5 Points: Successfully completed
within the Plumbing Maintenance project worth R1 500 000.00 (30%)
industry in the last 5 years. Only
4 Points: Successfully completed contracts/projects with a minimum
projects worth R1 500 000.00 (24%) value of R1 500 000 will be
considered. Letter of 3 Points: Successfully completed
Appointment/Contract projects worth R1 500 000.00 (18%)
1. Evidence required: 2 Point: Successfully completed
projects worth R1 500 000.00 (12%)
COMPANY 2. The bidders are to submit the
EXPERIENCE following documents: 1point: Successfully completed
projects worth R1 500 000.00 (6%)
3. Provide appointment
letter/purchase order/signed 0 Point: No submission or
contract document. irrelevant submission (0 points)
4. Provide a Reference
Letter/Completion Certificate
corresponding to the
Appointment Letter/Purchase
Order/Contract document
provided. The reference letter
to indicate the following:
company name, contact
Request For Quotation SCM_2026
person and confirmation that
work was completed.
5. One of the documents
provided must indicate value
of the contract.
6. Points will be awarded only if
both documents are submitted.
Years of experience of key personnel NB: The below instances will be 50%
to be directly responsible for regarded as non-submission or
implementation of this contract. irrelevant submission
Provide CV’s and trades qualifications *CV provided without certified EXPERIENCE
with plumbing COC (PIRB). 5 x Key qualification OF KEY
plumbing personnel will be required, PERSONNEL
and they need to be skilled in the *Uncertain qualification provided
plumbing industry
5 Points: 5yrs experience with 10%
relevant trade certification
provided. (10%)
4 Points: 4yrs experience with
relevant trade certification
provided. (8%)
3 Points: 3yrs experience with PLUMBER 1: NQF Level 2 or higher
relevant trade certification with a trade test certificate and CoC
Evaluation of provided. (6%) (PIRB) Key Personnel
2 Point: 2yr experience with
relevant trade certification
provided (4%)
1.Point: 1 yr. experience with
relevant trade certification
provided (2%)
0 Point: No submission or
irrelevant submission (0%)
5 Points: 5yrs experience with 10%
relevant trade certification
provided. (10%)
4 Points: 4yrs experience with
relevant trade certification
provided. (8%)
3 Points: 3yrs experience with
relevant trade certification
provided. (6%)
Request For Quotation SCM_2026
Evaluation of PLUMBER 2: NQF Level 2 or higher 2 Point: 2yr experience with
Key Personnel with a trade test certificate and CoC relevant trade certification
(PIRB) provided (4%)
1.Point: 1 yr. experience with
relevant trade certification
provided (2%)
0 Point: No submission or
irrelevant submission (0%)
5 Points: 5yrs experience with 10%
relevant trade certification
provided. (10%)
4 Points: 4yrs experience with
relevant trade certification
provided. (8%)
3 Points: 3yrs experience with
relevant trade certification Evaluation of PLUMBER 3: NQF Level 2 or higher
provided. (6%) Key Personnel with a trade test certificate and CoC
(PIRB) 2 Point: 2yr experience with
relevant trade certification
provided (4%)
1.Point: 1 yr. experience with
relevant trade certification
provided (2%)
0 Point: No submission or
irrelevant submission (0%)
5 Points: 5yrs experience with 10%
relevant trade certification
provided. (10%)
4 Points: 4yrs experience with
relevant trade certification
provided. (8%)
3 Points: 3yrs experience with
relevant trade certification Evaluation of PLUMBER 4: NQF Level 2 or higher
provided. (6%) Key Personnel with a trade test certificate and CoC
(PIRB) 2 Point: 2yr experience with
relevant trade certification
provided (4%)
1.Point: 1 yr. experience with
relevant trade certification
provided (2%)
0 Point: No submission or
irrelevant submission (0%)
Request For Quotation SCM_2026
5 Points: 5yrs experience with 10%
relevant trade certification
provided. (10%)
4 Points: 4yrs experience with
relevant trade certification
provided. (8%)
Evaluation of PLUMBER 5: NQF Level 2 or higher 3 Points: 3yrs experience with
Key Personnel with a trade test certificate and CoC relevant trade certification
(PIRB) provided. (6%)
2 Point: 2yr experience with
relevant trade certification
provided (4%)
1.Point: 1 yr. experience with
relevant trade certification
provided (2%)
0 Point: No submission or
irrelevant submission (0%)
10%
The bidder to submit a safety plan
that is in accordance with the OHS 4 Points: Only four (4) items
ACT OF 1993 and Passenger Rail submitted from the 4 listed in the
Agency of South Africa Health and left column (10%)
PS = 80 (1 − Pt−Pmin )
Pmin
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
Points awarded for specific goals
3.1. In terms of Regulation 4(2); 5(2); 6(2) and 7(2) of the Preferential Procurement Regulations,
preference points must be awarded for specific goals stated in the tender. For the purposes of
this tender the tenderer will be allocated points based on the goals stated in table 1 below as may
be supported by proof/ documentation stated in the conditions of this tender:
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
Note to tenderers: The tenderer must indicate how they claim points for each preference point
system.)
Number of points Number of points Evidence
claimed (80/20 allocated
The specific goals allocated points in system)
terms of this tender (80/20 system) (To be completed by
(To be completed by the tenderer)
the organ of state)
B-BBEE Level 1 10 Sworn Affidavit or B-
BBEE Certificate
issued by a SANAS
approved agency
EME or QSE at least 51% owned by black 10 Certified copies of ID
owned Documents of the
Owners
Request For Quotation SCM_2026
Section 4
Pricing and delivery schedule
Respondents are required to complete the attached Pricing Schedule
1 Prices must be quoted in South African Rand, inclusive of all applicable taxes.
2 Price offer is firm and clearly indicate the basis thereof.
3 Pricing Bill of Quantity is completed in line with schedule if applicable.
4 Cost breakdown must be indicated.
5 Price escalation basis and formula must be indicated.
6 To facilitate like-for like comparison bidders must submit pricing strictly in accordance with this price
schedule and not utilise a different format. Deviation from this pricing schedule could result in a bid
being declared non-responsive.
7 Please note that should you have offered a discounted price(s), PRASA will only consider such
price discount(s) in the final evaluation stage on an unconditional basis.
8 Respondents are to note that if price offered by the highest scoring bidder is not market related,
PRASA may not award the contract to the Respondent. PRASA may:
9 negotiate a market-related price with the Respondent scoring the highest points;
10 if that Respondent does not agree to a market-related price, negotiate a market-related price with the
Respondent scoring the second highest points;
11 if the Respondent scoring the second highest points does not agree to a market-related price,
negotiate a market-related price with the Respondent scoring the third highest points;
12 If a market-related price is not agreed with the Respondent scoring the third highest points, PRASA
must cancel the RFQ.
I / We (Insert Name of
Bidding Entity) of
code
(Full address) conducting business under the style or title
of: represented by:
in my capacity
as: being duly
authorised, hereby offer to undertake and complete the above-mentioned work/services at the prices
quoted in the bills of quantities / schedule of quantities or, where these do not form part of the contract,
at a lumpsum, of R (amount in
numbers);
(amount in words) Incl. VAT.
Request For Quotation SCM_2026
DELIVERY PERIOD: Suppliers are requested to offer their earliest delivery period possible.
Delivery will be effected within ................... working days from date of order. (To be completed by Service
provider).
Request For Quotation SCM_2026
Section 5
PRASA general conditions of purchase
General
PRASA and the Supplier enter into an order/contract on these conditions to supply the items
(goods/services/works) as described in the order/contract.
Conditions
These conditions form the basis of the contract between PRASA and the Supplier. Notwithstanding
anything to the contrary in any document issued or sent by the Supplier, these conditions apply except
as expressly agreed in writing by PRASA.
No servant or agent of PRASA has authority to vary these conditions orally. These general conditions
of purchase are subject to such further special conditions as may be prescribed in writing by PRASA in
the order/contract.
Price and payment
The price or rates for the items stated in the order/contract may include an amount for price adjustment,
which is calculated in accordance with the formula stated in the order/contract.
The Supplier may be paid in one currency other than South African Rand. Only one exchange rate is
used to convert from this currency to South African Rand. Payment to the Supplier in this currency other
than South African Rand, does not exceed the amounts stated in the order/contract. PRASA pays for
the item within 30 days of receipt of the Suppliers correct tax invoice.
Delivery and documents
The Supplier’s obligation is to deliver the items on or before the date stated in the order/contract. Late
deliveries or late completion of the items may be subject to a penalty if this is imposed in the
order/contract. No payment is made if the Supplier does not provide the item as stated in order/contract.
Where items are to be delivered the Supplier:
Clearly marks the outside of each consignment or package with the Supplier’s name and full details of
the destination in accordance with the order and includes a packing note stating the contents thereof; On
dispatch of each consignment, sends to PRASA at the address for delivery of the items, an advice note
specifying the means of transport, weight, number of volume as appropriate and the point and date of
dispatch; Sends to PRASA a detailed priced invoice as soon as is reasonably practical after dispatch of
the items, and states on all communications in respect of the order the order number and code number
(if any).
Request For Quotation SCM_2026
Containers / packing material
Unless otherwise stated in the order/contract, no payment is made for containers or packing materials or
return to the Supplier.
Title and risk
Without prejudice to rights of rejection under these conditions, title to and risk in the items passes to
PRASA when accepted by PRASA.
Rejection
If the Supplier fails to comply with his obligations under the order/contract, PRASA may reject any part
of the items by giving written notice to the Supplier specifying the reason for rejection and whether and
within what period replacement of items or re-work are required.
In the case of items delivered, PRASA may return the rejected items to the Supplier at the Supplier’s risk
and expense. Any money paid to the Supplier in respect of the items not replaced within the time
required, together with the costs of returning rejected items to the Supplier and obtaining replacement
items from a third party, are paid by the Supplier to PRASA.
In the case of service, the Supplier corrects non-conformances as indicated by PRASA.
Pt−P min
Ps = 80 (1 − )
P min
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
4. Points awarded for specific goals
4.1. In terms of Regulation 4(2); 5(2); 6(2) and 7(2) of the Preferential Procurement Regulations,
preference points must be awarded for specific goals stated in the tender. For the purposes of
this tender the tenderer will be allocated points based on the goals stated in table 1 below as may
be supported by proof/ documentation stated in the conditions of this tender:
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
Note to tenderers: The tenderer must indicate how they claim points for each preference
point system.)
Number of points Evidence
allocated
The specific goals allocated (80/20 system)
points in terms of this tender
(To be completed
by the organ of
state)
B-BBEE Level 1 10 Sworn Affidavit or B-BBEE Certificate
issued by a SANAS approved agency
EME or QSE at least 51% owned 10 Certified copies of ID Documents of the
by black owned Owners
Total 20
Request For Quotation SCM_2026
Declaration with regard to company/firm
4.2. Name of company/firm...............................................................................
4.3. Company registration number: .....................................................................
4.4. Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.5. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that
the points claimed, based on the specific goals as advised in the tender, qualifies the company/
firm for the preference(s) shown and I acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated
in paragraph 1 of this form;
iii) In the event of a contract being awarded as a result of points claimed as shown in
paragraphs 1.4 and 4.2, the contractor may be required to furnish documentary proof to the
satisfaction of the organ of state that the claims are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the
conditions of contract have not been fulfilled, the organ of state may, in addition to any other
remedy it may have –
(a) disqualify the person from the tendering process.
(b) recover costs, losses or damages it has incurred or suffered as a result of
that person’s conduct;
(c) cancel the contract and claim any damages which it has suffered as a result
of having to make less favourable arrangements due to such cancellation;
(d) recommend that the tenderer or contractor, its shareholders and directors,
or only the shareholders and directors who acted on a fraudulent basis, be
restricted from obtaining business from any organ of state for a period not
exceeding 10 years, after the audi alteram partem (hear the other side) rule
has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
Request For Quotation SCM_2026
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
Request For Quotation SCM_2026
Section 7
Specification/scope of work & price schedule
Annexure A
Description
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfScope: Appointment of two contractors for plumbing maintenance (planned and corrective) at Railway Station Platforms, Buildings, Offices, Rental Properties, and Workshops in the South Gauteng region on an as-and-when-required basis. Contract duration: 24 months, terminable for underperformance or substandard work.
Definitions:
Submission Guidelines
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf (unknown)Evaluation Criteria
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf (unknown)Mandatory
Preferred
Technical Specifications
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf (unknown)Scope: Provide planned and corrective plumbing maintenance for building components/infrastructure at Railway Station Platforms, Buildings, Offices, Rental Properties, and Workshops in the South Gauteng region on an as-and-when-required basis. Contract duration: 24 months, terminable for underperformance or substandard work.
Standards: All work must comply with SABS 0400, SANS10400, OHS Act (as amended), and applicable Municipal By-Laws and Regulations.
Response Times:
Deliverables:
Capacity: Must be able to work on multiple sites simultaneously. All materials must be SABS-approved and sourced from reputable suppliers at market-related prices. PRASA-RAIL may query and request justification for material costs.
Quality Control: PRASA-RAIL reserves the right to conduct independent safety and quality audits. Contractor must provide their own quality controls to ensure compliance with specifications and legislation.
Experience & Qualifications
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfPersonnel:
Cost Estimation:
Quality Management
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfStandards: All work must comply with SABS 0400, SANS10400, OHS Act (as amended), and applicable Municipal By-Laws and Regulations.
Work Execution:
Quality Assurance:
Pricing Schedule
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfMaterial Pricing:
Labour and Transport:
Additional Costs:
Final Summary: Must include subtotal (excl. VAT), 15% VAT, and total (incl. VAT).
Financial Requirements
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf (unknown)Pricing Structure:
Payment Terms: Payments may be withheld for poor workmanship until PRASA-RAIL is satisfied.
Compliance Requirements
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf (unknown)Mandatory:
Safety and Legal Compliance:
Personnel:
Documentation:
Penalties:
Health & Safety
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfSafety File:
Legal Compliance:
PPE and Penalties:
Documentation:
Contractual Terms
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfContract Duration: 24 months from appointment acceptance, terminable for underperformance or substandard performance.
Service Level Agreement: Contractor must sign an SLA with PRASA-RAIL FACILITIES. Performance will be reviewed monthly at PRASA-RAIL offices, covering: number of breakdowns, turnaround time for emergency callouts, planned vs. actual progress, submission of reports/invoices, and payment of invoices.
Audit Rights: PRASA-RAIL reserves the right to conduct independent safety and quality audits on completed work. Contractor must provide their own quality controls to ensure compliance with specifications and legislative changes.
Modernization: Contractor must propose modernization products to improve reliability/performance for PRASA-RAIL’s consideration.
Working Hours: Normal working hours are 07:00–17:00, Monday to Friday (excluding meal breaks), unless otherwise regulated by wage measures or statutes.
Termination: Contract may be terminated for repeated non-compliance, including failure to meet response times or safety requirements.
Special Conditions
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdfNegotiations: PRASA-RAIL may negotiate with the 2nd, 3rd, and 4th highest-scoring bidders if necessary.
Availability: Service provider must provide a contact number available 24/7 without failure.
Requirements
Source: ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf (unknown)CIDB Grading: Must hold an active CIDB grade of 3SO or higher (mandatory for submission).
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
ANNEXURE A - BOQ ,Specification_As and When Plumbing repair Maintenance..pdf
The Passenger Rail Agency of South Africa (PRASA) is seeking to appoint two contractors for plumbing maintenance across railway stations, buildings, offices, rental properties, and workshops in the South Gauteng region. The contract duration is 24 months, with work performed on an 'as and when required' basis. The scope includes planned and corrective maintenance, with strict compliance to safety, quality, and administrative requirements. The tender closes on 22 June 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Passenger Rail Agency of South Africa (PRASA)Contact Person
TOKOLLO PRECIUS LEABA
Phone
021-837-7937
[email protected]
Address
30 WOLMARANS STREET, UMJANTSHI HOUSE - BRAAMFONTEIN - JOHANNESBURG - 2017
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
08 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
PRASA manages and operates South Africa's passenger rail and long-distance bus services.
Key Personnel
Data conflicts
None detected
Get deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.