Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
69 Devereux Avenue - Vincent - East London - 5201
Organization Type
GOVERNMENT
Published
19 Jun 2026
OCDS Reference
ocds-9t57fa-159511
This tender is for the construction of new sanitation facilities at daza junior secondary school in the eastern cape under the sanitation 60 programme. IT is a government contract issued by the mvula trust for a building contractor.
Date & Time
Friday, 10 July 2026 - 12:00
Venue
null
Categories
Request for Bid(Open-Tender)
69 Devereux Avenue - Vincent - East London - 5201
19 Jun
2026
Tender Published
Tender was published
10 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
DAZA JSS UNPRICED BOQ.pdf
Tender for construction of new sanitation facilities at Daza Junior Secondary School in Eastern Cape under the Sanitation 60 Programme. The contract uses JBCC Principal Building Agreement Edition 4.1 (March 2005) with specific amendments. The project duration is 18 weeks with a penalty of R2000 per calendar day for delays, capped at 10% of contract value. The Mvula Trust acts as both Employer and Principal Agent.
Median Estimate
RΒ 296Β 007
Range
Based on 4 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: DAZA JSS UNPRICED BOQ.pdfProvisions (Clause 13).
13 F: ............. V: ............. T: ............. Item
Security (Clause 14).
14 F: ............. V: ............. T: ............. Item
Execution
Preparation for and execution of the works
Evaluation Criteria
Source: DAZA JSS UNPRICED BOQ.pdf (unknown)Tenderers must be familiar with JBCC contracts and South African construction regulations. Must have capacity to provide all temporary works and services. Must comply with Occupational Health and Safety Act No. 85 of 1993 and Construction Regulations 2014. Must be able to provide required insurances and security. Must price all items individually (no lump sums). Must submit valid tender for 20 weeks. Must be willing to accept contract without payment guarantee (Government contract).
Methodology
Source: DAZA JSS UNPRICED BOQ.pdfencroachment onto any adjoining properties, buildings,
etc., or servitudes and the cost of any remedial
measures as required by the Principal Agent shall be
borne by the Contractor.
102 F: ............. V: ............. T: ............. Item
C10. Method Statement
the Principal Agent, a Method Statement outlining the
methods of construction and labour and plant resources
that he proposes to use in the execution of the Works.
Quality Management
Source: DAZA JSS UNPRICED BOQ.pdf49 F: ............. V: ............. T: ............. Item
Inspection of the Site (B3.3)
50 F: ............. V: ............. T: ............. Item
Existing premises occupied (B3.4)
51 F: ............. V: ............. T: ............. Item
Previous work - dimensional accuracy (B3.5)
52 F: ............. V: ............. T: ............. Item
Previous work - defects (B3.6)
53 F: ............. V: ............. T: ............. Item
Services - known (B3.7)
54 F: ............. V: ............. T: ............. Item
Services - unknown (B3.8)
55 F: ............. V: ............. T: ............. Item
Protection of trees (B3.9)
56 F: ............. V: ............. T: ............. Item
Articles of value (B3.10)
57 F: ............. V: ............. T: ............. Item
Inspection of adjoining properties (B3.11)
58 F: ............. V: ............. T: ............. Item
Management of contract (b4)
Management of the Works (B4.1)
59 F: ............. V: ............. T: ............. Item
Pricing Schedule
Source: DAZA JSS UNPRICED BOQ.pdfof errors or omissions in pricing due to brevity of
descriptions of items which are fully described when
read in conjunction with the relevant clauses of the said
rates to take into account these requirements as no
claims for extras arising from these matters will be
subsequently entertained or admitted.
48 F: ............. V: ............. T: ............. Item
each item in this section of the bill of quantities and
should not lump the items into a single sum or
amount. This fully priced schedule must be included
as part of the priced bill of quantities returnable with
tender submission
in this section of the bill of quantities and should
not lump the items into a single sum or amount.
of the priced bill of quantities returnable with tender
submission
The tenderer is referred to the "General Preambles for
Trades 2017" for supplementary and comprehensive
expansion of descriptions, appropriate provision for
which shall be deemed to have been included in all
relevant rates.
Health & Safety
Source: DAZA JSS UNPRICED BOQ.pdfBuilding agreement and preliminaries
1. The Principal Building Agreement shall be the JBCC
Series Edition 4.1, March 2005 as recommended by the
Joint Building Contract Committee and as amended by
this Tender Enquiry.
The JBCC Principal Building Agreement contract data
form an integral part of this agreement
2. The Preliminaries shall be JBCC Series 2000, May
2005 for use with the Principal Building Agreement as
recommended by the Joint Building Contracts
Committee and as amended by this Tender Enquiry
shall be deemed to be incorporated herein.
Preambles for trades
The General Preambles for Trades 2017 published by
the Association of South African Quantity Surveyors
shall be deemed to be incorporated in these bills of
quantities and no claims arising from brevity of
description of items fully described in the said General
Preambles will be entertained
Supplementary preambles and/or specifications are
incorporated in these bills of quantities to satisfy the
requirements of this project. Such supplementary
preambles and/or specifications shall take precedence
over the provisions of the General Preambles
The contractor's prices for all items through-out these
bills of quantities shall take account of and include
where applicable for all of the obligations, requirements
and specifications given in the General Preambles and
in any supplementary preambles and/or specifications
Carried to Collection R
Section 1
Bill No. 2
Ecdoe sanitation 60:
Daza junior secondary school
If any ambiguity or discrepancy in any of the documents
forming part of the contract is found, then the contract
data and or amendments within the special conditions of
contract and herein shall prevail in cases of conflict
between any of the documents
Insertion of health and safety
Quantities
Contractors are required to insert quantities next to
each item in this section of the bill of quantities and
should not lump the items into a single sum or
amount. This fully priced schedule must be included
as part of the priced bill of quantities returnable with
tender submission
Pricing of preliminaries
Contractors are required to price all individual items
in this section of the bill of quantities and should
not lump the items into a single sum or amount.
This fully priced schedule must be included as part
of the priced bill of quantities returnable with tender
Ecdoe sanitation 60:
Daza junior secondary school
Prior to pricing the principal contractor must familiarize
him/herself with the Occupational Health and Safety Act
No. , Construction Regulations 2014, other
relevant Regulations and Standards as well as project
specific Health & Safety specifications.
The items in this Bill do not contain quantities hence the
Contractor must insert his own quantities based on his
individual requirements to comply with the Health and
Safety obligations and demands of the Occupational
Health and Safety Act No. , Construction
Regulations 2014, other relevant Regulations and
Standards as well as project specific Health & Safety
Specifications.
The costs included herein must incorporate Community
Liaison Officer (CLO).
Occupational health and safety
General:
1 Preparation of Contractor's site specific Health and
Safety Plan. Item
2 Submission of the Health and Safety File. Item
3 Principal Contractor's initial obligations in respect of the
OHS Act and Construction Regulations. Item
4 Principal Contractor's time related obligations in respect
of the OHS Act and Construction Regulations for the
entire construction period. Item
5 Provision of full time Health and Safety Officer for the
entire construction period. Item
6 Induction training of personnel. Item
7 Provision of first aid boxes. Item
8 SANS approved weld mesh type temporary barrier
fencing 1,8m high covered with a 80% knitted HDPE
monofilament green shed netting fixed to and including
100mm diameter gum poles set securely min 300mm
deep in ground at max 3m spacing including excavation,
backfilling, etc.
m 450
Carried to Collection R
Section 1
Bill No. 2
Ecdoe sanitation 60:
Daza junior secondary school
9 Extra over mesh fence for double swing vehicle gate
size 5.5 x 1,8m high. No 1
10 Extra over mesh fence for pedestrian gate size 1.8 x
1,8m high. No 1
Provision for Personal Protective Equipment and
Protective Clothing:
11 Reflective vests. Item
12 Hard hats. Item
13 Protective foot wear. Item
14 Ear Plugs. Item
15 Dust Masks. Item
Costs of Medical Certificates and Medical
Surveillance:
16 Initial (baseline) medical examinations. Item
17 Exit Examinations. Item
Noise Monitoring:
18 Establishment of noise zones. Item
19 Audiograms. Item
Carried to Collection R
Section 1
Bill No. 2
Ecdoe sanitation 60:
Daza junior secondary school
Section 1
Bill No. 2
Collection
Page Amount
No
Total Brought Forward from Page No. 26
Carried Forward to Summary of Section No. 1 R
Section 1
Bill No. 2
completion, hoardings, safety screens, barriers, access
gates, covered gangways and the like as necessary for
the enclosure of the works and elements thereof all for
the protection of the public and others.
67 F: ............. V: ............. T: ............. Item
Advertising (B6.3)
68 F: ............. V: ............. T: ............. Item
unauthorised persons from the Works and the site and
shall set up notice boards to that effect.
No workmen or labourers (except security guards) are to
be allowed under any circumstances to sleep or deposit
any kit on the premises. The Contractor must provide
any necessary independent shelter or shed required for
any labour or watchmen on site, to the approval of the
No
Section 1
BILL No. 2
Health and safety
The General Preambles for Trades 2017 published by
the Association of South African Quantity Surveyors
shall be deemed to be incorporated in these bills of
quantities and no claims arising from brevity of
description of items fully described in the said General
Section 1
Bill No. 2
Health and Safety
Ecdoe sanitation 60:
Section 1
Bill No. 2
Health and Safety
Ecdoe sanitation 60:
him/herself with the Occupational Health and Safety Act
No. , Construction Regulations 2014, other
relevant Regulations and Standards as well as project
specific Health & Safety specifications.
fencing 1,8m high covered with a 80% knitted HDPE
monofilament green shed netting fixed to and including
100mm diameter gum poles set securely min 300mm
deep in ground at max 3m spacing including excavation,
backfilling, etc.
m 450
Section 1
Bill No. 2
Health and Safety
Ecdoe sanitation 60:
Section 1
Bill No. 2
Health and Safety
Ecdoe sanitation 60:
Section 1
Bill No. 2
Health and Safety
No
Total Brought Forward from Page No. 26
Carried Forward to Summary of Section No. 1 R
Section 1
Bill No. 2
Health and Safety
Contractual Terms
Source: DAZA JSS UNPRICED BOQ.pdfOffer, acceptance and performance (Clause 2).
2 F: ............. V: ............. T: ............. Item
Documents (Clause 3).
Clause 3.1 is deleted and substituted with: 'This tender
is for a Government Contract. No Payment Guarantee
will be provided.'
Clause 3.3 is deleted and substituted with:
arrange for formal signing of the agreement once the
priced bill of quantities/lump sum document, security,
insurances and waiver of lien, where acceptable, have
been provided and effected'.
3 F: ............. V: ............. T: ............. Item
Design responsibility (Clause 4).
4 F: ............. V: ............. T: ............. Item
Employer's agents (Clause 5).
5 F: ............. V: ............. T: ............. Item
Site representative (Clause 6).
6 F: ............. V: ............. T: ............. Item
Compliance with regulations (Clause 7).
7 F: ............. V: ............. T: ............. Item
bodily injury or illness of any person or physical loss or
damage to any property, other than the works, arising
out or due to the execution of the works or occupation of
the site by the contractor or his sub contractors'.
9 F: ............. V: ............. T: ............. Item
Works insurances (Clause 10).
10 F: ............. V: ............. T: ............. Item
Liability insurances (Clause 11).
11 F: ............. V: ............. T: ............. Item
Effecting insurances (Clause 12).
12 F: ............. V: ............. T: ............. Item
State Provisions (Clause 13).
13 F: ............. V: ............. T: ............. Item
Security (Clause 14).
14 F: ............. V: ............. T: ............. Item
Latent defects liability period (Clause 27).
Clause 27.0 is amended by the addition of the following
clauses:
"27.3 Any water leakage into the building, whether in the
roof, external wall or other element of the building
susceptible to water leakage shall, unless proven to be
a design defect, or as a result of obvious storm damage,
be classified as a latent defect in terms of clause 1.0
Definitions and Interpretations".
"27.4 The Contractor shall attend to defects during the
satisfaction of the Principal Agent and will not be
permitted to wait until the end of the Defect Liability
the amount authorised for payment in terms of clause
31.3 shall be at the sole discretion of the principal agent
and such inclusion shall only be considered upon the
provision, by the contractor, of an approved guarantee
issued by a registered commercial bank.
Dispute Settlement (Clause 40)
38 F: ............. V: ............. T: ............. Item
CONTRACT DETAILS (Clause 42.2)
Clause 42.2.1
Works Description: Construction of new ablution
facilities.
Clause 42.2.2
Site Description: The site is the existing school.
Clause 42.2.3
Work or Installations by Others: NIL
Clause 42.2.4
This Agreement is for a State Contract :- Yes
Payment will be made for materials and goods:- Yes
Dispute resolution :- Mediation (in terms of clause 40)
followed by litigation.
INSURANCES (Clause 42.3)
Clause 42.3.1
for the sum of: Contract Sum plus 10%
With a deductible of : Not exceeding 5% of each and
every claim.
Clause 42.3.2
Supplementary insurance is required : Yes
Contractor for the amount of: Contract Sum plus 20%
(with a deductible to be determined by the Insurance
company issuing the policy).
Clause 42.3.3
professional consultants shall not be responsible for
any act or omission on the part of the Contractor which
may result in any patent or latent defects, in materials or
workmanship, breach or neglect of any local regulations.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf
Tender for construction of sanitation facilities at Daza Junior Secondary School in Eastern Cape under Sanitation 60 Programme. Implementing agent is The Mvula Trust on behalf of Eastern Cape Department of Education. Tender uses 80/20 preference point system with price (80 points) and specific goals (20 points). Contract duration is 24 weeks with penalties for late completion.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
THE MVULA TRUSTContact Person
Anele Nqambi
Phone
043-726-2255
[email protected]
Website
www.themvulatrust.org.za/
Address
67, 69 Devereux Ave, Berea, East London, 5241, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
19 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Learn how to submit a winning bid with these related articles
Important Dates
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)Contact Information
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)Submission Guidelines
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)Evaluation Criteria
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)CIDB registration valid on evaluation and award days (4GB or higher). Joint ventures must comply with CIDB Regulation 25(6) Table 9 requirements and have separate bank account, consolidated CSD registration, SARS tax compliance for all partners, valid COIDA/FEM, separate VAT registration. Maximum two current projects under construction at evaluation. Not awarded/considered for two or more projects by TMT on various programmes. Tax compliance status verified online. Must not be listed on Register of Tender Defaulters or convicted of fraud/corruption in last five years.
Technical Specifications
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)Financial Requirements
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)Compliance Requirements
Source: TMT-ECDoE-2627-SAN60-CL38 DAZA JSS.pdf (TENDER)Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
67, 69 Devereux Ave, Berea, East London, 5241, South Africa
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.