Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Grootdraai Dam - Standerton - Standerton - 2430
Organization Type
GOVERNMENT
Published
09 Jun 2026
OCDS Reference
ocds-9t57fa-158601
AI Document Analysis Stages
Important Dates
Source: WTE1006CE.pdf (TENDER){"closingDate":"24 JUNE 2026","closingTime":"11H00","briefingSession":"{\"date\":\"17 June 2026\",\"time\":\"10H00 am\",\"venue\":\"e:17 June 2026\",\"is_compulsory\":true}"}
Postal address: or to be deposited in: department water and sanitation the bid box at the entrance of supply chain management office construction east office building private bag x2023 standerton standerton 2430 2430
Categories
Request for Quotation
Grootdraai Dam - Standerton - Standerton - 2430
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
WTE1006CE.pdf
The tender is for the removal and disposal of asbestos roof sheets, fascia, and barge boards for house refurbishment at Grootdraai Dam near Standerton, Mpumalanga. The project is managed by the Department of Water and Sanitation, with a CIDB contractor grading designation of 2GB. The closing date is 24 June 2026 at 11:00 UTC.
Date & Time
Wednesday, 24 June 2026 - 11:00
Venue
Grootdraai Dam, Construction East Offices near Standerton town.
09 Jun
2026
Tender Published
Tender was published
24 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 395 600
Range
Based on 15 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: WTE1006CE.pdf (TENDER){"name":"Mr D Mongwe","email":"[email protected]","phone":"083 600 5718","department":"OF WATER AND SANITATION","address":"ANDERTON TOWN IN"}
Evaluation Criteria
Source: WTE1006CE.pdf (TENDER)Mandatory
Preferential
Exclusions
Technical Specifications
Source: WTE1006CE.pdf (TENDER)Mpumalanga province, CIDB contractor grading designation of CIDB 2gb.
Methodology
Source: WTE1006CE.pdfthe following shall apply:
3.1 A. Specification
air monitoring authority
removed.
certificate for air monitoring must be given to the Department of Water and Sanitation – Construction East.
Quality Management
Source: WTE1006CE.pdf5. Use of contract documents and information; inspection
Compliance Requirements
Source: WTE1006CE.pdf (TENDER)CIDB grading/category: 2GB
Contractor grading designation of CIDB 2gb
Tax compliance central supplier
Tax compliance status
Tax compliance requirements
Tax compliance status (tcs) pin may be made via e-filing through the SARS website
Csd number
CSD Report
CSD Report for each bidder who formed a (JV)
Central supplier database (csd), a csd number
Central Supplier Database
2. Tax compliance requirements
2.3 Application for tax compliance status (tcs) pin may be made via e-filing through the SARS website
Separate tcs certificate / pin / csd number.
2.6 Where NO tcs is available but the bidder is registered on the central supplier database (csd), a csd number
VAT registration number
Supplier compliance tax compliance central supplier
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance status
B-BBEE Minimum Level: 1
Points Allocation: 80 points
B-BBEE Details: TON 2430
Bidding procedure enquiries may be directed to technical enquiries may be directed to:
CONTACT PERSON Mr D Mongwe CONTACT PERSON Mr: S Ndlovu
Telephone number 083 600 5718 telephone number 060 980 5896
Facsimile number facsimile number n/a
E-MAIL ADDRESS [email protected] E-MAIL ADDRESS [email protected]
Supplier information
Name of bidder
Postal address
Street address
Telephone number code number
Cellp hone number
Facsimile number code number
E-mail address
VAT registration number
Supplier compliance tax compliance central supplier
ORSTATUS SYSTEM PIN: DATABASE No: MAAA
B-bbee status level tick applicable box] b-bbee status level sworn [tick applicable box]
Verification certificate affidavit
Yes No Yes No
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/ SWORN AFFIDAVIT (FOR EMES & QSEs) MUST BE SUBMITTED IN
Order to qualify for preference points for b-bbee]
Are you the accredited
Are you a foreign based supplier
REPRESENTATIVE IN Yes No
FOR THE SOUTH AFRICA FOR Yes No
Goods/service/works
The goods [if yes, answer part
Offered?
/Services /works [if yes enclose proof] b:3 ]
Offered?
Questionnaire to bidding foreign suppliers
Is the entity a resident of the republic of south africa (RSA)? yes NO
Does the entity have a branch in the RSA? yes NO
Does the entity have a permanent establishment in the RSA? yes NO
Does the entity have any source of income in the RSA? yes NO
Is the entity liable in the RSA for any form of taxation? Yes NO
If the answer is “NO” to all of the above, then IT is not a requirement to register for a tax compliance status
System pin code from the south african revenue service (SARS) and if not register as per 2.3 Below.
3.
Part b
Terms and conditions for bidding
1. Bid submission:
1.1. Bids must be submitted
Health & Safety
Source: WTE1006CE.pdf(a) The bid must be signed on the Invitation to Bid form (SBD 1) annexed hereto with all blanks in the bid and the
appendix filled in.
(b) All spaces in the bid forms and other annexures shall be completed in full.
(c) Section 3 in the bid document and the Pricing Schedule must be fully completed and priced out by the
bidder.
(d) The bid documents shall not be separated in any way, nor must any pages be detached from the original
documents.
(a) The original Bid, together with a cover letter and supporting documents, shall be sealed in an envelope endorsed:
“Original Bid: WTE 1006 CE: REMOVE AND DISPOSE ASBESTOS ROOF SHEETS, FASCIA AND BARGE BOARDS FOR
contribution from level 1 to 2 3
which are QSE or EME
Total scored points 20
10.
Specific goals” means specific goals as contemplated in section 2(1)(d) of the PPPFA Act which may include
contracting with persons, or categories of persons, historically disadvantaged by unfair discrimination on the basis of
race, gender and disability including the implementation of programmes of the Reconstruction of Development
Programme as published in Government Gazette No. 16085 date 23 November 1994.
“Ownership” means the percentage ownership and control, exercised by individuals within an enterprise.
"Disability" means, in respect of a person, a permanent impairment of a physical, intellectual, or sensory function,
which results in restricted, or lack of, ability to perform an activity in the manner, or within the range, considered
normal for a human being.
i. A blind person (in terms of the Blind Persons Act, 1968 (Act no.);
ii. A deaf person, whose hearing is impaired to such an extent that he/she cannot use it as a primary means of
communication.
iii. A person who, as a result of permanent disability, requires a wheelchair, calliper or crutch to assist him/her to
move from one place or another.
iv. A person who requires an artificial limb; or
v. A person who suffers from a mental illness (in terms of the Mental Health Act, 1973 (Act no. ).
"Youth" means, in respect of a person younger than 35 years of age.
"Location of enterprise” Local equals province. Where a project cuts across more than one province, the bidder
may be located in any of the relevant provinces to claim and be allocated the points.
lawful instruction pertaining to occupational health and safety, given by or on behalf of the employer —
(a) compliance with requirements of the asbestos plan of work that was approved for that site-specific asbestos
work in terms of regulation 15.
(b) as far as is reasonably practicable, the use of non-destructive wet methods during asbestos removal work.
(c) the prevention of asbestos dust becoming airborne.
(d) the appropriate type and use of personal protective equipment and clothing.
(e) wearing of monitoring equipment to measure personal exposure to asbestos.
(f) reporting for medical surveillance as required by regulation 17.
(g) the cleaning up and disposal of any asbestos waste.
(h) decontamination of the structure of a workplace, building or plant, of any visible dust residue where
asbestos removal work has been undertaken.
(i) housekeeping at the workplace, personal hygiene and good environmental and health practices, including
eating, drinking and smoking in designated places, as provided; 17
(j) information and training received as contemplated in regulation 7; and
(k) the correct decontamination procedures that must be followed as given in the approved work plan.
15.
the registered asbestos contractor must—
NOTE: Before commencement of asbestos work, ensure that—
(i) an approved inspection authority has been appointed in writing.
(a) Undertake only the type of asbestos work for which they are registered by the chief inspector.
(b) Appoint an occupational health and safety representative as contemplated in section 17 of the Act
(C) Appoint in writing an asbestos removal supervisor for each asbestos work site, who must ensure—
(i) occupational health and safety compliance on the asbestos removal site.
(ii) compliance with safe asbestos removal procedures.
(iii) the correct use of personal protective equipment.
(iv) proper decontamination and waste disposal.
(d) Adhere to the removal methodology and associated control measures provided in the plan of work
approved for that specific asbestos work.
(e) Ensure that the employee medical and training records are available on site for inspection and validation.
(f) Ensure that at least the following information for every employee is recorded and kept for a minimum period
of 50 years-
(i) Physical address of every asbestos work project; and
(ii) names and identification numbers of employees potentially exposed.
(g) The registered asbestos contractor is registered and in good standing with the Compensation Fund or with
a licensed compensation insurer as contemplated in the Compensation for Occupational Injuries and Diseases
Act, 1993.
(h) Where a fatality or permanent disabling injury occurs during asbestos work, ensure that a report about the
fatality or injury is provided to the Department of Water and Sanitation and to the Department of Labour
Approved Inspection authority as contemplated in section 24 of the Act, and in accordance with regulations 8
and 9 of the General Administrative Regulations, 2003, and that the report includes the measures that the
contractor intends to implement to ensure safe asbestos work.
(1) A written approved plan of work, as contemplated in regulation 12(3), must include at least the
following:
(a) Name, contact details and responsibilities of the registered asbestos contractor, approved inspection
authority, asbestos waste transporter, asbestos waste disposal site and asbestos client;
(b) name and contact details of the asbestos removal supervisor for the asbestos work site;
(c) details of the asbestos to be removed, including the location, type, estimated quantity and condition of the
asbestos;
(d) a list of employees' names and identification numbers with verification of valid asbestos training and
medical surveillance records for the asbestos work site;
(e) expected commencement and completion dates;
(f) air monitoring method used, and frequency of air monitoring, in accordance with regulation 16;
(g) details of how the asbestos removal work will take place, including methods of removal, tools and
equipment, and the appropriate personal protective equipment to be used;
(h) details relating to the requirements of decontamination facilities and decontamination procedures;
(i) details of demarcation, labelling and signage requirements for regulated asbestos areas, asbestos waste
and temporary on-site storage areas;
(j) procedure for decontamination of the work area, tools and equipment;
(k) emergency procedures in the event of uncontrolled asbestos release;
(l) method for disposal of asbestos waste;
(m) detail of asbestos clearance certification; and
(n) specific relevant prohibitions.
(2) The approved plan of work, as contemplated in regulation 12(3), must contain the signatures of—
(a) the asbestos client accepting the duties as contemplated in regulation 11(2) and (3);
(b) the registered asbestos contractor accepting the duties as contemplated in regulation 12; and
(c) the approved inspection authority for asbestos accepting the duties as contemplated in regulation 13.
3.2 Safety Requirements
1. Roof sheets M2 760
1. Definitions 1. The following terms shall be interpreted as indicated:
1.1 “Closing time” means the date and hour specified in the bidding
documents for the receipt of bids.
1.2 “Contract” means the written agreement entered into between the
purchaser and the supplier, as recorded in the contract form signed by
the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.3 “Contract price” means the price payable to the supplier under the
contract for the full and proper performance of his contractual
obligations.
1.4 “Corrupt practice” means the offering, giving, receiving, or soliciting
of any thing of value to influence the action of a public official in the
procurement process or in contract execution.
1.5 "Countervailing duties" are imposed in cases where an enterprise
abroad is subsidized by its government and encouraged to market its
products internationally.
1.6 “Country of origin” means the place where the goods were mined,
grown or produced or from which the services are supplied. Goods are
produced when, through manufacturing, processing or substantial and
major assembly of components, a commercially recognized new
product results that is substantially different in basic characteristics or
in purpose or utility from its components.
1.7 “Day” means calendar day.
1.8 “Delivery” means delivery in compliance of the conditions of the
contract or order.
1.9 “Delivery ex stock” means immediate delivery directly from stock
actually on hand.
1.10 “Delivery into consignees store or to his site” means delivered and
unloaded in the specified store or depot or on the specified site in
compliance with the conditions of the contract or order, the supplier
bearing all risks and charges involved until the supplies are so
delivered and a valid receipt is obtained.
1.11 "Dumping" occurs when a private enterprise abroad market its goods
on own initiative in the RSA at lower prices than that of the country of
origin and which have the potential to harm the local industries in the
in its sovereign capacity, wars or revolutions, fires, floods, epidemics,
quarantine restrictions and freight embargoes.
1.13 “Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of any bidder, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the bidder of the
benefits of free and open competition.
1.14 “GCC” means the General Conditions of Contract.
1.15 “Goods” means all of the equipment, machinery, and/or other materials
that the supplier is required to supply to the purchaser under the
contract.
1.16 “Imported content” means that portion of the bidding price represented
by the cost of components, parts or materials which have been or are
still to be imported (whether by the supplier or his subcontractors) and
which costs are inclusive of the costs abroad, plus freight and other
direct importation costs such as landing costs, dock dues, import duty,
sales duty or other similar tax or duty at the South African place of
entry as well as transportation and handling charges to the factory in
the Republic where the supplies covered by the bid will be
manufactured.
1.17 “Local content” means that portion of the bidding price which is not
included in the imported content provided that local manufacture does
take place.
1.18 “Manufacture” means the production of products in a factory using
labour, materials, components and machinery and includes other
related value-adding activities.
1.19 “Order” means an official written order issued for the supply of goods
or works or the rendering of a service.
1.20 “Project site,” where applicable, means the place indicated in bidding
documents.
1.21 “Purchaser” means the organization purchasing the goods.
1.22 “Republic” means the Republic of South Africa.
1.23 “SCC” means the Special Conditions of Contract.
1.24 “Services” means those functional services ancillary to the supply of
the goods, such as transportation and any other incidental services,
such as installation, commissioning, provision of technical assistance,
training, catering, gardening, security, maintenance and other such
obligations of the supplier covered under the contract.
1.25 “Written” or “in writing” means handwritten in ink or any form of
electronic or mechanical writing.
2. Application 2.1 These general conditions are applicable to all bids, contracts and orders
including bids for functional and professional services, sales, hiring,
letting and the granting or acquiring of rights, but excluding
immovable property, unless otherwise indicated in the bidding
documents.
2.2 Where applicable, special conditions of contract are also laid down to
cover specific supplies, services or works.
2.3 Where such special conditions of contract are in conflict with these
general conditions, the special conditions shall apply.
3. General 3.1 Unless otherwise indicated in the bidding documents, the purchaser
shall not be liable for any expense incurred in the preparation and
submission of a bid. Where applicable a non-refundable fee for
documents may be charged.
3.2 With certain exceptions, invitations to bid are only published in the
Contractual Terms
Source: WTE1006CE.pdf16. Payment
17. Prices
18. Contract amendments
19. Assignment
20. Subcontracts
21. Delays in the supplier’s performance
22. Penalties
23. Termination for default
24. Dumping and countervailing duties
25. Force Majeure
26. Termination for insolvency
27. Settlement of disputes
28. Limitation of liability
29. Governing language
30. Applicable law
31. Notices
32. Taxes and duties
33. National Industrial Participation Programme (NIPP)
34. Prohibition of restrictive practices
General Conditions of Contract
1. Definitions 1. The following terms shall be interpreted as indicated:
1.1 “Closing time” means the date and hour specified in the bidding
documents for the receipt of bids.
1.2 “Contract” means the written agreement entered into between the
purchaser and the supplier, as recorded in the contract form signed by
the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.3 “Contract price” means the price payable to the supplier under the
contract for the full and proper performance of his contractual
obligations.
1.4 “Corrupt practice” means the offering, giving, receiving, or soliciting
of any thing of value to influence the action of a public official in the
procurement process or in contract execution.
1.5 "Countervailing duties" are imposed in cases where an enterprise
abroad is subsidized by its government and encouraged to market its
products internationally.
1.6 “Country of origin” means the place where the goods were mined,
grown or produced or from which the services are supplied. Goods are
produced when, through manufacturing, processing or substantial and
major assembly of components, a commercially recognized new
product results that is substantially different in basic characteristics or
in purpose or utility from its components.
1.7 “Day” means calendar day.
1.8 “Delivery” means delivery in compliance of the conditions of the
contract or order.
1.9 “Delivery ex stock” means immediate delivery directly from stock
actually on hand.
1.10 “Delivery into consignees store or to his site” means delivered and
unloaded in the specified store or depot or on the specified site in
compliance with the conditions of the contract or order, the supplier
bearing all risks and charges involved until the supplies are so
delivered and a valid receipt is obtained.
1.11 "Dumping" occurs when a private enterprise abroad market its goods
on own initiative in the RSA at lower prices than that of the country of
origin and which have the potential to harm the local industries in the
RSA.
1.12 ”Force majeure” means an event beyond the control of the supplier and
not involving the supplier’s fault or negligence and not foreseeable.
Such events may include, but is not restricted to, acts of the purchaser
in its sovereign capacity, wars or revolutions, fires, floods, epidemics,
quarantine restrictions and freight embargoes.
1.13 “Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of any bidder, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the bidder of the
benefits of free and open competition.
1.14 “GCC” means the General Conditions of Contract.
1.15 “Goods” means all of the equipment, machinery, and/or other materials
that the supplier is required to supply to the purchaser under the
contract.
1.16 “Imported content” means that portion of the bidding price represented
by the cost of components, parts or materials which have been or are
still to be imported (whether by the supplier or his subcontractors) and
which costs are inclusive of the costs abroad, plus freight and other
direct importation costs such as landing costs, dock dues, import duty,
sales duty or other similar tax or duty at the South African place of
entry as well as transportation and handling charges to the factory in
the Republic where the supplies covered by the bid will be
manufactured.
1.17 “Local content” means that portion of the bidding price which is not
included in the imported content provided that local manufacture does
take place.
1.18 “Manufacture” means the production of products in a factory using
labour, materials, components and machinery and includes other
related value-adding activities.
1.19 “Order” means an official written order issued for the supply of goods
or works or the rendering of a service.
1.20 “Project site,” where applicable, means the place indicated in bidding
documents.
1.21 “Purchaser” means the organization purchasing the goods.
1.22 “Republic” means the Republic of South Africa.
1.23 “SCC” means the Special Conditions of Contract.
1.24 “Services” means those functional services ancillary to the supply of
the goods, such as transportation and any other incidental services,
such as installation, commissioning, provision of technical assistance,
training, catering, gardening, security, maintenance and other such
obligations of the supplier covered under the contract.
1.25 “Written” or “in writing” means handwritten in ink or any form of
electronic or mechanical writing.
2. Application 2.1 These general conditions are applicable to all bids, contracts and orders
including bids for functional and professional services, sales, hiring,
letting and the granting or acquiring of rights, but excluding
immovable property, unless otherwise indicated in the bidding
documents.
2.2 Where applicable, special conditions of contract are also laid down to
cover specific supplies, services or works.
2.3 Where such special conditions of contract are in conflict with these
general conditions, the special conditions shall apply.
3. General 3.1 Unless otherwise indicated in the bidding documents, the purchaser
shall not be liable for any expense incurred in the preparation and
submission of a bid. Where applicable a non-refundable fee for
documents may be charged.
3.2 With certain exceptions, invitations to bid are only published in the
Government Tender Bulletin. The Government Tender Bulletin may be
obtained directly from the Government Printer, Private Bag X85,
Pretoria 0001, or accessed electronically from www.treasury.gov.za
4. Standards 4.1 The goods supplied shall conform to the standards mentioned in the
bidding documents and specifications.
5. Use of 5.1 The supplier shall not, without the purchaser’s prior written consent,
contract disclose the contract, or any provision thereof, or any specification,
documents plan, drawing, pattern, sample, or information furnished by or on
and behalf of the purchaser in connection therewith, to any person other
information; than a person employed by the supplier in the performance of the
inspection.
contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for
purposes of such performance.
5.2 The supplier shall not, without the purchaser’s prior written consent,
make use of any document or information mentioned in GCC clause
5.1 except for purposes of performing the contract.
5.3 Any document, other than the contract itself mentioned in GCC clause
5.1 shall remain the property of the purchaser and shall be returned (all
copies) to the purchaser on completion of the supplier’s performance
under the contract if so required by the purchaser.
5.4 The supplier shall permit the purchaser to inspect the supplier’s records
relating to the performance of the supplier and to have them audited by
auditors appointed by the purchaser, if so required by the purchaser.
6. Patent rights 6.1 The supplier shall indemnify the purchaser against all third-party
claims of infringement of patent, trademark, or industrial design rights
arising from use of the goods or any part thereof by the purchaser.
7. Performance 7.1 Within thirty (30) days of receipt of the notification of contract award,
security the successful bidder shall furnish to the purchaser the performance
security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the
purchaser as compensation for any loss resulting from the supplier’s
failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the
contract, or in a freely convertible currency acceptable to the purchaser
and shall be in one of the following forms:
(a) a bank guarantee or an irrevocable letter of credit issued by a
reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the
bidding documents or another form acceptable to the
purchaser; or
(b) a cashier’s or certified cheque
7.4 The performance security will be discharged by the purchaser and
returned to the supplier not later than thirty (30) days following the
date of completion of the supplier’s performance obligations under the
contract, including any warranty obligations, unless otherwise
specified in SCC.
8. Inspections, 8.1 All pre-bidding testing will be for the account of the bidder.
tests and
analyses 8.2 If it is a bid condition that supplies to be produced or services to be
rendered should at any stage during production or execution or on
completion be subject to inspection, the premises of the bidder or
contractor shall be open, at all reasonable hours, for inspection by a
representative of the Department or an organization acting on behalf of
the Department.
8.3 If there are no inspection requirements indicated in the bidding
documents and no mention is made in the contract, but during the
contract period it is decided that inspections shall be carried out, the
purchaser shall itself make the necessary arrangements, including
payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3
show the supplies to be in accordance with the contract requirements,
the cost of the inspections, tests and analyses shall be defrayed by the
purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not
comply with the contract requirements, irrespective of whether such
supplies or services are accepted or not, the cost in connection with
these inspections, tests or analyses shall be defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and
which do not comply with the contract requirements may be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or
analyzed and may be rejected if found not to comply with the
requirements of the contract. Such rejected supplies shall be held at the
cost and risk of the supplier who shall, when called upon, remove them
immediately at his own cost and forthwith substitute them with
supplies which do comply with the requirements of the contract.
Failing such removal the rejected supplies shall be returned at the
suppliers cost and risk. Should the supplier fail to provide the
substitute supplies forthwith, the purchaser may, without giving the
supplier further opportunity to substitute the rejected supplies,
purchase such supplies as may be necessary at the expense of the
supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the
purchaser to cancel the contract on account of a breach of the
conditions thereof, or to act in terms of Clause 23 of GCC.
9. Packing 9.1 The supplier shall provide such packing of the goods as is required to
prevent their damage or deterioration during transit to their final
destination, as indicated in the contract. The packing shall be
sufficient to withstand, without limitation, rough handling during
transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packing, case size and weights shall
take into consideration, where appropriate, the remoteness of the
goods’ final destination and the absence of heavy handling facilities at
all points in transit.
9.2 The packing, marking, and documentation within and outside the
packages shall comply strictly with such special requirements as shall
be expressly provided for in the contract, including additional
requirements, if any, specified in SCC, and in any subsequent
instructions ordered by the purchaser.
10. Delivery 10.1 Delivery of the goods shall be made by the supplier in accordance with
and documents the terms specified in the contract. The details of shipping and/or other
documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
11. Insurance 11.1 The goods supplied under the contract shall be fully insured in a freely
convertible currency against loss or damage incidental to manufacture
or acquisition, transportation, storage and delivery in the manner
specified in the SCC.
12. Transportation 12.1 Should a price other than an all-inclusive delivered price be required,
this shall be specified in the SCC.
13. Incidental 13.1 The supplier may be required to provide any or all of the following
services services, including additional services, if any, specified in SCC:
(a) performance or supervision of on-site assembly and/or
commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance
of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual
for each appropriate unit of the supplied goods;
liability shall be accepted in regard to claims arising from the fact that pages are missing or duplicated.
and the service provider will be paid for what is required.
than 14 days after receipt of official DWS order as and when requested by end-user.
contract period.
1.12 ”Force majeure” means an event beyond the control of the supplier and
not involving the supplier’s fault or negligence and not foreseeable.
obtained directly from the Government Printer, Private Bag X85,
Pretoria 0001, or accessed electronically from www.treasury.gov.za
4. Standards 4.1 The goods supplied shall conform to the standards mentioned in the
bidding documents and specifications.
5. Use of 5.1 The supplier shall not, without the purchaser’s prior written consent,
contract disclose the contract, or any provision thereof, or any specification,
documents plan, drawing, pattern, sample, or information furnished by or on
and behalf of the purchaser in connection therewith, to any person other
information; than a person employed by the supplier in the performance of the
inspection.
contract. Disclosure to any such employed person shall be made in
confidence and shall extend only so far as may be necessary for
purposes of such performance.
5.2 The supplier shall not, without the purchaser’s prior written consent,
make use of any document or information mentioned in GCC clause
5.1 except for purposes of performing the contract.
5.3 Any document, other than the contract itself mentioned in GCC clause
5.1 shall remain the property of the purchaser and shall be returned (all
copies) to the purchaser on completion of the supplier’s performance
under the contract if so required by the purchaser.
5.4 The supplier shall permit the purchaser to inspect the supplier’s records
relating to the performance of the supplier and to have them audited by
auditors appointed by the purchaser, if so required by the purchaser.
6. Patent rights 6.1 The supplier shall indemnify the purchaser against all third-party
claims of infringement of patent, trademark, or industrial design rights
arising from use of the goods or any part thereof by the purchaser.
7. Performance 7.1 Within thirty (30) days of receipt of the notification of contract award,
security the successful bidder shall furnish to the purchaser the performance
security of the amount specified in SCC.
7.2 The proceeds of the performance security shall be payable to the
purchaser as compensation for any loss resulting from the supplier’s
failure to complete his obligations under the contract.
7.3 The performance security shall be denominated in the currency of the
contract, or in a freely convertible currency acceptable to the purchaser
and shall be in one of the following forms:
(a) a bank guarantee or an irrevocable letter of credit issued by a
reputable bank located in the purchaser’s country or abroad,
acceptable to the purchaser, in the form provided in the
bidding documents or another form acceptable to the
purchaser; or
(b) a cashier’s or certified cheque
7.4 The performance security will be discharged by the purchaser and
returned to the supplier not later than thirty (30) days following the
date of completion of the supplier’s performance obligations under the
contract, including any warranty obligations, unless otherwise
specified in SCC.
8. Inspections, 8.1 All pre-bidding testing will be for the account of the bidder.
tests and
analyses 8.2 If it is a bid condition that supplies to be produced or services to be
rendered should at any stage during production or execution or on
completion be subject to inspection, the premises of the bidder or
contractor shall be open, at all reasonable hours, for inspection by a
representative of the Department or an organization acting on behalf of
the Department.
8.3 If there are no inspection requirements indicated in the bidding
documents and no mention is made in the contract, but during the
contract period it is decided that inspections shall be carried out, the
purchaser shall itself make the necessary arrangements, including
payment arrangements with the testing authority concerned.
8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3
show the supplies to be in accordance with the contract requirements,
the cost of the inspections, tests and analyses shall be defrayed by the
purchaser.
8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not
comply with the contract requirements, irrespective of whether such
supplies or services are accepted or not, the cost in connection with
these inspections, tests or analyses shall be defrayed by the supplier.
8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and
which do not comply with the contract requirements may be rejected.
8.7 Any contract supplies may on or after delivery be inspected, tested or
analyzed and may be rejected if found not to comply with the
requirements of the contract. Such rejected supplies shall be held at the
cost and risk of the supplier who shall, when called upon, remove them
immediately at his own cost and forthwith substitute them with
supplies which do comply with the requirements of the contract.
suppliers cost and risk. Should the supplier fail to provide the
substitute supplies forthwith, the purchaser may, without giving the
supplier further opportunity to substitute the rejected supplies,
purchase such supplies as may be necessary at the expense of the
supplier.
8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the
purchaser to cancel the contract on account of a breach of the
conditions thereof, or to act in terms of Clause 23 of GCC.
9. Packing 9.1 The supplier shall provide such packing of the goods as is required to
prevent their damage or deterioration during transit to their final
destination, as indicated in the contract. The packing shall be
sufficient to withstand, without limitation, rough handling during
transit and exposure to extreme temperatures, salt and precipitation
during transit, and open storage. Packing, case size and weights shall
take into consideration, where appropriate, the remoteness of the
goods’ final destination and the absence of heavy handling facilities at
all points in transit.
9.2 The packing, marking, and documentation within and outside the
packages shall comply strictly with such special requirements as shall
be expressly provided for in the contract, including additional
requirements, if any, specified in SCC, and in any subsequent
instructions ordered by the purchaser.
10. Delivery 10.1 Delivery of the goods shall be made by the supplier in accordance with
and documents the terms specified in the contract. The details of shipping and/or other
documents to be furnished by the supplier are specified in SCC.
10.2 Documents to be submitted by the supplier are specified in SCC.
11. Insurance 11.1 The goods supplied under the contract shall be fully insured in a freely
convertible currency against loss or damage incidental to manufacture
or acquisition, transportation, storage and delivery in the manner
specified in the SCC.
12. Transportation 12.1 Should a price other than an all-inclusive delivered price be required,
this shall be specified in the SCC.
13. Incidental 13.1 The supplier may be required to provide any or all of the following
services services, including additional services, if any, specified in SCC:
(a) performance or supervision of on-site assembly and/or
commissioning of the supplied goods;
(b) furnishing of tools required for assembly and/or maintenance
of the supplied goods;
(c) furnishing of a detailed operations and maintenance manual
for each appropriate unit of the supplied goods;
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Organization
Water and SanitationContact Person
Nonhlanhla Hlatshwako
Phone
033-239-1299
[email protected]
Address
Grootdraai Dam - Standerton - Standerton - 2430
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
09 Jun 2026
AI status
Not enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
The DWS manages South Africa's water resources, infrastructure, and sanitation policy and services.
Key Personnel
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
Get deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.