Skip to main content
ToolsForensic Analysisnongoye trading and projects

nongoye trading and projects

Supplier Forensic Analysis · Scanned: 2026/05/24

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
2
Total Value
R 0

Recent Awards

2 awards · Total: R 0

Showing 5 of 2
Maintenance, Refurbishment, Replacement and Upgrade of Medical Air Conditioning and Ventilation Systems, Refridgeration and Nitrogen Freezing Tunnel Plant at Various Institution in the Free State Department of Health. (4ME OR Higher)
Free State - Health
Ref: DOH(FS)46/2021/2022
R 0
15 Dec 2022
Maintenance, refurbishment, replacement and upgrade of medical air, gas and vacuum plants at various institution in the Free State department of health. (4ME OR HIGHER) Closing Date
Free State - Health
Ref: DOH (FS) 45/2021/ 2022
R 0
01 Jan 1900

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →