Skip to main content
ToolsForensic Analysisrwk electrical

rwk electrical

Supplier Forensic Analysis · Scanned: 2026/06/10

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
1
Total Value
R 8,7M

Recent Awards

1 awards · Total: R 8 719 568,00

Showing 5 of 1
ENG003 OF 2023: TENDER FOR THE ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF A 500-KW PEAK GRID-TIED SOLAR PV PLANT AT GWAING WASTEWATER TREATMENT WORKS, INCLUDING A 24-MONTH OPERATION AND MAINTENANCE PERIOD
George Municipality
Ref: ENG003 OF 2023
R 8 719 568,00
20 Jul 2023

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →