Skip to main content
ToolsForensic Analysissmartux

smartux

Supplier Forensic Analysis · Scanned: 2026/06/01

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
1
Total Value
R 92M

Recent Awards

1 awards · Total: R 92 323 414,00

Showing 5 of 1
RFB: RW10384657/22R - DESIGN, MANUFACTURE, SUPPLY, DELIVERY, INSTALLATION, COMMISSIONING AND PUTTING INTO SERVICE OF AN ELECTRICAL & SMALL POWER AND LIGHTING INSTALLATION AND ASSOCIATED WORKS AT THE VEREENIGING CATHEDRAL HEADER AND ENGINE ROOM 4 VALVE ISOLATION CHAMBERS AT VEREENIGING PUMPING STATION
Rand Water
Ref: RW10384657/22R
R 92 323 414,00
13 Feb 2024

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →