Skip to main content
    BID REQUEST FOR THE DESIGN AND BUILD OF A REFRIGERANT LEAK DETECTION AND GAS EXTRACTION SYSTEM FOR THE CHILLER PLANT AT O.R TAMBO INTERNATIONAL AIRPORT FOR A PERIOD OF 24 MONTHS