Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Hunslett & Lower Germiston - Rosherville - Johannesburg - 1459
Organization Type
GOVERNMENT
Published
10 Jun 2026
OCDS Reference
ocds-9t57fa-158769
ESKOM holdings soc ltd invites tenders for the supply and manufacturing of jig plates, couplings, and accessories over a three-year period. This request for quotation (RFQ) targets suppliers capable of meeting technical, quality, and compliance requirements for fabricated metal products.
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Eskom Standard Condition of Tender.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Request for Quotation
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Eskom Standard Condition of Tender.pdf
Date & Time
Tuesday, 30 June 2026 - 10:00
Venue
TEAMS LINK ATTACHED ON ITT
10 Jun
2026
Tender Published
Tender was published
30 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 6 115 853
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A comprehensive guide to securing medical equipment maintenance tenders in South African public hospitals. Learn about SLA management, OEM certifications, and clinical engineering requirements.
A technical guide for manufacturers and distributors to supply high-end medical equipment and technology to Gauteng's largest public hospitals.
In 2026, General contractors in the Western Cape operate within an increasingly stringent compliance landscape, where B-BBEE (Broad-Based Black Economic Empowerment) visibility is non-negotiable. With 173 active General tenders in the province, procurement officers are under pressure to verify empowerment credentials meticulously. A misaligned or expired B-BBEE certificate can disqualify an otherwise competitive bid. Understanding how your B-BBEE level is calculated—and ensuring alignment with the Public Finance Management Act (PFMA) and Preferential Procurement Policy Framework Act (PPPFA)—is critical to securing public sector contracts.
For South African General contractors, the path to government procurement is paved with non-negotiable regulatory requirements. The most common barrier to entry is not a lack of capability, but a failure to master the foundational compliance frameworks that govern every bid. This complete regulatory guide to CSD and BBBEE compliance for General sector tender suppliers in South Africa demystifies the process. It provides a meticulous, step-by-step field manual for ensuring your company is fully compliant and audit-ready, enabling you to confidently access the R billions in opportunities across infrastructure maintenance, facilities management, and service delivery within the General sector.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Submission Guidelines
Source: Eskom Standard Condition of Tender.pdf (unknown)Returnable Documents: [Section present but content not extracted - document may require manual review or AI-assisted extraction for full details]
What the document states:
Bidder guidance:
Compliance Requirements
Source: Eskom Standard Condition of Tender.pdf (unknown)Insufficient searchable text - AI extraction recommended
What the document states:
Bidder guidance:
Description
Source: eTendering_ExternalUser_Guide_Final.pdfThis document is the Eskom eTendering System User Manual (Revision 3.0, dated 28 August 2023). It is a generic system guide for suppliers on how to register, login, and submit tenders electronically. It does not contain the actual tender specifications for jig plates, couplings, and accessories.
Important Dates
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)No specific dates for this tender are stated in the document. The document is a system user guide and does not contain tender-specific dates.
Contact Information
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)IT/Technology issues: ITCARE support team, toll-free 0860 724 365. Tender submission issues: contact the designated buyer for the specific tender. CSD registration required for system access.
Submission Guidelines
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)Electronic submission via Eskom eTendering system only. Registration with a valid CSD number is required before access is granted. Submission steps: (1) Register on the eTendering portal, (2) Verify email, (3) Login with email and password, (4) Receive OTP to cell phone and email, (5) Select tender reference number, (6) Click 'Create New Submission', (7) Upload documents using 'Add file' button — assign correct category (Technical, Commercial, Finance), (8) Click 'Finalize Submission', (9) Click 'Finalise and Close Submission'. File limits: maximum 50MB per file, 900MB total. After finalization, a confirmation email with submission ID is sent — save this for records. To view submissions, use 'My Submissions' menu. Contact designated buyer for tender submission issues.
Returnable Documents
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)Document categories for upload: Technical, Commercial, Finance. Each file must be named and assigned the correct category before uploading. Verify all required documents are uploaded under correct categories before finalizing submission.
Evaluation Criteria
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)The core eligibility criterion explicitly stated is that suppliers must have a CSD number. The document does not contain specific technical, financial, or B-BBEE eligibility criteria for this particular tender; those would be in the separate tender specification documents which must be uploaded.
Technical Specifications
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)No technical specifications for jig plates, couplings, or accessories are contained in this document. This document is a system user guide for the eTendering portal only — it does not contain the actual tender specifications.
Financial Requirements
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)No financial requirements specified in this document.
Compliance Requirements
Source: eTendering_ExternalUser_Guide_Final.pdf (TENDER)CSD (Central Supplier Database) number is required to gain access to the eTendering system. No other compliance requirements are stated in this document.
Section
Source: eTendering_ExternalUser_Guide_Final.pdfNo evaluation criteria are specified. This document is a system user guide only.
Description
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdfContact Information
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Submission Guidelines
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Evaluation Criteria
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Suppliers must be legally registered in South Africa (if domestic) or comply with applicable laws. Joint ventures must identify a key person with authority to bind all parties within 2 weeks of Contract Date. Supplier composition cannot be altered without Purchaser's written consent. Suppliers must not have been found guilty of illegal or corrupt practices. Suppliers must maintain required insurance coverage from starting date until end of service period or termination certificate.
Technical Specifications
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Pricing Schedule
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdfFinancial Requirements
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Compliance Requirements
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)B-BBEE Requirements
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Health & Safety
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdfContractual Terms
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdfSpecial Conditions
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf (unknown)Section
Source: NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdfEvaluation Criteria
Source: Annexure M - Technical Evaluation - Jig Plates Assembly Components.pdf (unknown)Must be a manufacturer (not a middleman). Must own/operate CNC Lathe, CNC Milling Machine, and Drilling Machine. Must have a minimum of three previous similar jobs/projects. Must achieve a minimum technical evaluation score of 80%.
Experience & Qualifications
Source: Annexure M - Technical Evaluation - Jig Plates Assembly Components.pdf (unknown)previous jobs/projects.
previous jobs/projects.
previous jobs/projects.
Requirements
Source: Annexure M - Technical Evaluation - Jig Plates Assembly Components.pdf (unknown)scope governed by the following
criteria. Sub contractor to submit
documentation of workshop
machinery capabilities relating to
manufacturing of Jig Components (as
per drawings that will be supplied).
Section
Source: Annexure M - Technical Evaluation - Jig Plates Assembly Components.pdfCriteria Returnables for submission Evaluation Range Range Weighting COMMENT
Points
1 = less than 1 signed & deliver
Provide copies of signed orders/contracts and/or delivery order of similar work with 1 = 5
References notes/completion certificates from at least 3 reputable reputable companies. 2 = 10 15%
companies (minimum 3 jobs) on similar work. 2 = 2-3 orders 3 = 15
3 = above 3 orders
Jig Plate:
Provide a proof of manufacturing similar componets from
previous jobs/projects.
Spigot Plate:
Provide a proof of manufacturing similar componets from
previous jobs/projects. 1 = Jig Plate 1 = 15
Jacking Bracket: 2 = Spigot Plate 2 = 5
Methodology Provide a proof of manufacturing similar componets from 3 = Jacking Bracket 3 = 5 40%
previous jobs/projects. 4 = Expanding Drive 4 = 10
Expanding Drive: 5 = Coupling Bushes 5 = 5
Provide a proof of manufacturing similar componets from
previous jobs/projects.
Coupling Bushes:
Provide a proof of manufacturing similar componets from
previous jobs/projects.
Eligibility of subcontractor to complete
scope governed by the following
criteria. Sub contractor to submit
documentation of workshop
CNC Lathe Machine 1. CNC Lathe Machine 1 = 15machinery capabilities relating to
CNC Milling machine 2. CNC Milling machine 2 = 15 35%
manufacturing of Jig Components (as Drilling Machine 3. Drilling Machine 3 = 5
per drawings that will be supplied).
Subcontractor will be disqualified if
operating as Middle Man
The service provider must provide
evidence of controls, management of
quality processes, quality management
Process Flow, Quality plan, work procedure or method 1.Process flow 1 = 5
plans, work instructions and 10%
statement. ISO 9001 Certificate 2. ISO 9001 Certificate 2 = 5
documented control management
systems. ISO 9001 QMS accreditation
will be an advantage = 25 points
Minimum score: 80% 100%
Accepted by:
_____________________
Buti Khanye
Snr. Works Engineer
Description
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdfSupply and manufacture of jig plates, couplings, and accessories for Eskom power stations (e.g., Kendal, Arnot) over a 3-year period. ERI Engineering Development (ED) designs and supplies manufacturing drawings, with Works Engineering assessing them at a Hold Point. Subcontractors must use provided drawings (some still in development) to manufacture assemblies and supply all listed parts, including Bought Out Items.
Contact Information
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf (unknown)Contact: Makoma Raphephela. Department: Works Engineering, Turbo Gen Services, Eskom.
Evaluation Criteria
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf (unknown)Technical Capability
Applicants must demonstrate the technical capability to manufacture precision components as per engineering drawings and specifications.
Experience
Preferable experience in supplying similar components to power stations or industrial facilities.
Quality Assurance
Applicants must have quality assurance processes in place to ensure compliance with the provided specifications and standards (e.g., ISO, DIN).
Supply Chain
Ability to source and supply bought-out items (e.g., screws, springs) as specified in the drawings.
Compliance
Must comply with Eskom’s procurement policies and any relevant South African regulations or standards.
Technical Specifications
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf (unknown)Scope: Supply and manufacture of jig plates, couplings, and accessories for Eskom power stations over a 3-year period.
Key Deliverables:
Power Station-Specific Requirements:
Note: ERI Engineering Development (ED) designs and supplies manufacturing drawings. Works Engineering assesses drawings at a Hold Point before subcontractor proceeds.
Compliance Requirements
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf (unknown)Subcontractor must:
Requirements
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf (unknown)Jig Plate Overview Table:
Section
Source: SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf (unknown)Arnot HP/IP Jig MAIN ASSEMBLY:
Description
Source: Annexure K - SDL &I_Jig Plates.pdfSupply and manufacturing of jig plates, coupling and accessories for a period of three (3) years. This is a Supplier Development Localisation and Industrialisation (SDL&I) annexure focused on transformation obligations rather than technical scope.
Submission Guidelines
Source: Annexure K - SDL &I_Jig Plates.pdf (unknown)This document (Annexure K - SDL&I Undertaking) is a supplementary annexure, not the main tender document. It does not contain submission instructions, deadlines, or returnable document lists. However, it specifies:
Evaluation Criteria
Source: Annexure K - SDL &I_Jig Plates.pdf (unknown)Suppliers must comply with Preferential Procurement Policy Framework Act; submit B-BBEE improvement plan as essential document; demonstrate ability to meet localization targets; commit to transformation goals including job creation for local communities; have capacity for three-year manufacturing/supply contract.
Technical Specifications
Source: Annexure K - SDL &I_Jig Plates.pdf (unknown)Supply and manufacturing of jig plates, coupling and accessories for a period of three (3) years. This document does not contain detailed technical specifications, product requirements, or scope of work — those are in the main tender document. This annexure focuses on SDL&I obligations only.
Financial Requirements
Source: Annexure K - SDL &I_Jig Plates.pdf (unknown)Ongoing financial commitments for the successful bidder:
Compliance Requirements
Source: Annexure K - SDL &I_Jig Plates.pdf (unknown)B-BBEE Requirements:
B-BBEE Requirements
Source: Annexure K - SDL &I_Jig Plates.pdf (unknown)B-BBEE Improvement Plan mandatory with bid. Level 1 bidders may retain status. Level 5-8 or non-compliant bidders must achieve Level 4 by end of year one, then improve at least one level per year. ERI promotes transformation through preference points based on specific goals under PPPFA.
Section
Source: Annexure K - SDL &I_Jig Plates.pdfSDL&I Matrix is not an evaluation criterion — it is a compliance requirement for award eligibility. Preference points allocated under PPPFA based on specific goals (B-BBEE). Detailed evaluation scoring not contained in this document.
Description
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdfSubmission Guidelines
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdf (unknown)Returnable Documents
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdf (unknown)Evaluation Criteria
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdf (unknown)Key eligibility hinges on OHS compliance: 1. Must achieve a minimum score of 70% on this OHS evaluation template. 2. Must be registered with the Compensation Fund (COIDA) or provide equivalent international documentation. 3. Safety professionals must possess a National Diploma in Safety Management/Environmental Health and be registered with the SACPCMP. 4. The OHS plan and all submitted documents must be specific to the tender's scope of work.
Technical Specifications
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdf (unknown)Methodology
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdfCompliance Requirements
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdf (unknown)Health & Safety
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdfContractual Terms
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdfSection
Source: Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdfDescription
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdfSupply and manufacturing of jig plates, couplings, and accessories for a period of three (3) years. Scope includes all related activities as detailed in the Scope of Work (Annexure 1.1.18) and Pricing Schedule/BOQ (Annexure 1.1.20).
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Closing date and time: 30 June 2026 @ 10h00. Non-compulsory clarification meeting: 19 June 2026 @ 11h00 via Microsoft Teams (link: https://teams.microsoft.com/meet/321282822963288?p=FXCZQD0td1EAJl48IU). Confirm attendance with Eskom Representative (Mpho Maphanga) by providing attendee names, positions, and contact details. Tender validity period: 180 days.
Briefing Session
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Non-compulsory clarification meeting: Date: 19 June 2026, Time: 11h00, Venue: Microsoft Teams (link: https://teams.microsoft.com/meet/321282822963288?p=FXCZQD0td1EAJl48IU). Confirm attendance with Eskom Representative by providing attendee names, positions, and contact details. Note: If the meeting were compulsory, non-attendance would result in disqualification.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Eskom Representative: Mpho Maphanga. Tel: 011 629 4477. Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. Submission via Eskom E-tendering site (Eskom Tender Bulletin).
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Submit electronically via Eskom E-tendering site by 30 June 2026 @ 10h00. All documents must be in PDF format (price list also in Excel). Maximum upload size per document: 500MB; total submission: 4GB. No ZIP files or hard copies accepted. Ensure submission status is marked as 'complete'. Late submissions will not be accepted. If resubmitting, only the latest version will be considered. Mandatory returnables must be fully completed, signed (where required), and submitted by the deadline. Failure to submit mandatory documents (e.g., Annexures A-J, SBD forms) will result in disqualification. Non-disqualifiable returnables may be requested within 5 working days if missing or incomplete; failure to comply will also result in disqualification.
Returnable Documents
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Mandatory returnables (disqualifiable if missing/incomplete): Annexure A (Authorization Form), B (Acknowledgement Form), C (Tenderer’s Particulars), D (Integrity Pact Declaration), E (CPA for Local Goods/Services), F (CPA for Imported Goods/Services), G1-G4 (SBD 6.2 Local Content Declarations), H (SBD 1), I (SBD 6.1 Preference Points Claim), J (SBD 4 Bidders Disclosure), Tax Clearance Certificate, COIDA, CSD Registration, Employment Equity compliance (SA only), NEC Contract, Pricing Schedule, JV documents (if applicable). Non-disqualifiable returnables: May be requested within 5 working days if missing/incomplete. Evaluation-only returnables: Missing/incomplete results in 0 points but not disqualification.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)General
Specific
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Scope: Supply and manufacturing of jig plates, couplings, and accessories for a 3-year period. Technical evaluation criteria: Refer to Annexure M. Functionality requirements apply as per Scope of Work. Pricing must be inclusive of VAT, exclude contingencies, and be corrected for arithmetical errors. Cataloguing may be required post-award; pricing schedule must include a line item for this if applicable. All materials must comply with Eskom’s labelling specifications.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdfMandatory: Valid ISO 9001 Certificate (QMS) as proof of quality management system, controls, processes, and documented management. Additional: Evidence of quality plans, work instructions, and control management. SHEQ requirements: Valid COIDA letter (South African tenderers only).
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdfPricing Schedule/BOQ must be submitted in PDF and Excel format. Upload size per document: ≤500MB; total submission: ≤4GB. Include line items for cataloguing if required. Prices must be inclusive of VAT, exclude contingencies, and be corrected for errors. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Pricing schedule must be submitted in PDF and Excel. Payment terms: Contracts below R50M (incl. VAT) paid within 30 days of undisputed invoice receipt. Contracts above R50M (incl. VAT) paid within 60 days. Eskom reserves the right to negotiate prices if tendered amounts are not market-related. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. No performance bonds or guarantees required for this tender.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Mandatory for all tenders: Proof of valid CSD registration (full report <30 days old), ISO 9001 Certificate (QMS), valid COIDA certificate (South African tenderers only). Additional requirements: Tax clearance certificate (local tenderers must provide SARS e-filing PIN; foreign tenderers with SA footprint must provide proof; foreign tenderers without SA footprint must complete SBD1). Employment Equity compliance proof (South African designated employers only). CIDB grading: Not explicitly required for goods/services contracts but may apply if construction elements are involved. Joint ventures must submit a valid JV agreement, proof of joint/severe liability, and designated bank account details. Subcontracting with subsidiaries must be declared. B-BBEE status proof: Certificate, sworn affidavit, or other prescribed requirement. SBD 6.1 (Preference Points Claim Form) and SBD 4 (Bidders Disclosure) are mandatory. Local content declarations (Annexures G1-G4) required if designated materials are included.
B-BBEE Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)B-BBEE compliance: Submit SBD 6.1 Preference Points Claim Form (PPPFA 2022). Proof of B-BBEE status: Valid certificate, sworn affidavit, or other prescribed requirement. Failure to submit B-BBEE proof does not disqualify but results in 0 points for Specific Goals.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdfMandatory: Valid COIDA certificate of good standing or proof of application (Compensation Fund or licensed insurer) for South African tenderers. Additional SHEQ documents may be required as per scope of work (refer to attached SHEQ requirements).
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdfContract: NEC3 Supply Contract (SC3) with core clauses and selected options: X1 (Price adjustment for inflation), X2 (Changes in law), X3 (Multiple currencies), X7 (Delay damages), X17 (Low performance damages), X20 (Key Performance Indicators), Z (Additional conditions). Payment terms: 30 days for contracts ≤R50M (incl. VAT); 60 days for contracts >R50M (incl. VAT). Eskom may negotiate prices post-bid if not market-related. Tender validity: 180 days. Tender opening: Same as deadline (no public opening for e-tendering).
Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf (RFP)Eligibility: Tenderers (single entity, JV, or consortium) must not be restricted from doing business with Eskom or SOCs. Disqualification risks: Nationality of sanctioned country; multiple tenders (except e-tendering size limits); JV/consortium without joint/severe liability; conflict of interest; non-authorized signatories; National Treasury restrictions; Tender Defaulters list; 100% subcontracting of scope. JV requirements: All members registered with CIDB (if applicable), lead partner meets grading requirements, combined grading meets contract value, and JV agreement includes liability and profit-sharing terms.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdfPricing (80 points): Evaluated on inclusivity of VAT, correction of arithmetical errors, exclusion of contingencies, adjustments for variations/deviations, Net Present Value comparison, and unconditional discounts. Specific Goals (20 points): Scored per PPPFA 2022 regulations. Tenderers ranked by combined score (80/20 system). Objective criteria (Annexure K) may override highest score. Contractual requirements (e.g., CSD, ISO 9001) are non-scoring but mandatory for award.
Hunslett & Lower Germiston - Rosherville - Johannesburg - 1459
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC DRAFT - SC3 Complete Supply Contract - COUPLING ,JIG PLATES & ACCESSORIES - Copy.pdf
ESKOM ROTEK INDUSTRIES SOC Ltd tender for the supply and manufacture of coupling, jig plates, and accessories for a three-year period. This is a NEC3 Supply Contract (SC3) with delivery location at Ex Works Rosherville. The contract includes task orders with delivery dates to be mutually agreed upon contract signature and official order issuance.
Annexure M - Technical Evaluation - Jig Plates Assembly Components.pdf
Eskom tender for the supply and manufacturing of jig plates, couplings, and accessories over three years. The technical evaluation focuses on proven manufacturing capability, specific machinery ownership, and quality management systems.
Annexure K - SDL &I_Jig Plates.pdf
Eskom tender for supply and manufacturing of jig plates, couplings, and accessories for three years, with strong emphasis on supplier development, localization, and socio-economic transformation. Key requirements include B-BBEE improvement plans, skills development commitments, job creation targets, and socio-economic development contributions.
eTendering_ExternalUser_Guide_Final.pdf
This document is a user manual for Eskom's eTendering system, not the core tender specification for 'THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES'. It provides instructions for suppliers on how to register, log in, and submit tender documents electronically to Eskom.
Annexure C - SHE Tender Evaluation_THE SUPPLY AND MANUFACTURING OF JIG PLATE, COUPLING AND ACCESSORIES.pdf
Eskom is tendering for the supply and manufacturing of jig plates, couplings, and accessories for a three-year period. The document provided is Annexure C1: OHS Tender Evaluation Template (High Risk), which details the Occupational Health and Safety requirements that bidders must meet. The tender is classified as 'High Risk' for OHS purposes, and compliance with this template is mandatory for evaluation.
SCOPE OF WORKS_ Jig Plates GENERIC - (2026.01.21)-signed - Copy.pdf
Eskom is seeking a subcontractor to supply and manufacture jig plates, couplings, and accessories for various power stations over a three-year period. The tender includes the manufacturing of specific components as per provided drawings, with additional drawings to follow. The scope covers multiple power stations (e.g., Kendal, Arnot, Duvha, Tutuka) and includes both main assemblies and bought-out items like screws, springs, and circlips. The subcontractor must adhere to the specifications and supply all items as per the assembly drawings.
Invitation to Tender (ITT) or Request for Proposal (RFP) - Manufacturing and supply of Jig Plates and Coupling Accessories (003).pdf
Eskom Holdings SOC Ltd invites tenders for the supply and manufacturing of jig plates, couplings, and accessories over a three-year period. The tender (E1626TGSERI) closes on 30 June 2026 at 10:00 AM UTC, with a validity period of 180 days. Submissions must be electronic via Eskom’s e-tendering portal, with mandatory documents including authorization forms, integrity declarations, and compliance certificates (e.g., ISO 9001, CSD registration). Evaluation follows an 80/20 pricing-preference points system under PPPFA 2022 regulations.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Mpho Maphanga
Phone
013-699-7814
[email protected]
Address
Hunslett & Lower Germiston - Rosherville - Johannesburg - 1459
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
10 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Data conflicts
None detected
Get deep intelligence on Manufacture of fabricated metal products, except machinery and equipment. Unlock full pricing strategies, bid frequency, and historical win rates.