Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Western Cape
Closing Date
04 Aug 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Muldersvlei Substation,R101, Old Paarl Road, - Klapmuts - Cape Town - 7560
Organization Type
GOVERNMENT
Published
07 Jul 2026
OCDS Reference
ocds-9t57fa-161633
This tender from eskom's national transmission company is for the supply, installation, termination, commissioning, and handover of 11kv switchgear at the muldersvlei site, including associated cable works and training. IT is aimed at principal contractors with expertise in high-voltage electrical construction and strict health and safety management. The project has a scheduled duration from 1 april 2025 to 30 may 2025.
Date & Time
Tuesday, 04 August 2026 - 10:00
Venue
Muldersvlei
Two (2) clarification meetings are required. 1St non-compulsory meeting will be conducted virtual via ms team-meeting. Date: 16 july 2026 time: 10:00-12:30 venue: ms teams 2. Second meeting-compulsory site visit-face to face in muldersvlie. Compulsory site visit meeting: date: 16 july 2026 time: 14:00-16:00 venue: muldersvlie substation-face to face compulsory meeting street address muldersvlei substation, r101, old paarl road, klapmuts, cape town (traveling on the n1 from cape town to paarl. Take the stellenbosch turn-off r304 to stellenbosh. After the weighbridge, turn left on the r101. Proceed for about 1 km and turn left to the station.) GPS coordinates, -33.817868S 18.808316E
Categories
Request for Quotation
Muldersvlei Substation,R101, Old Paarl Road, - Klapmuts - Cape Town - 7560
07 Jul
2026
Tender Published
Tender was published
04 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
559-66~1.DOC
Median Estimate
R 2 626 047
Range
Based on 4 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogTenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: 559-66~1.DOC, Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf, Annex-c_Local content Declaration-Summary Schedule.pdf and 2 more. You don’t need to refresh — this page will pick up the updated review automatically.
Description
Source: Supplier Quality Management Specification (QM 58).pdfSpecification title: Supplier Quality Management (QM 58), Document Identifier: 240-105658000, Revision 3.
Important Dates
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Closing date: 17 October 2021.
Contact Information
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Supply Chain Management department.
Submission Guidelines
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Returnable Documents:
Returnable Documents
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Suppliers must prepare and submit quality documentation as per the tender selected category (indicated in Form A) using the List of Tender Returnables document (240-12248652).
Evaluation Criteria
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Technical Specifications
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Scope: Supplier Quality Management Specification (QM 58), Document Identifier: 240-105658000, Revision 3.
Methodology
Source: Supplier Quality Management Specification (QM 58).pdfMethodology for quality control and preservation:
Experience & Qualifications
Source: Supplier Quality Management Specification (QM 58).pdfQuality audits and related performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures.
Quality Management
Source: Supplier Quality Management Specification (QM 58).pdfDetailed quality management system requirements:
Pricing Schedule
Source: Supplier Quality Management Specification (QM 58).pdfNo pricing schedule, rates, bill of quantities, or payment schedules provided.
Financial Requirements
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)No specific pricing format, bonds, guarantees, payment terms, or financial capacity requirements stated in the quality management specification.
Compliance Requirements
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)References to compliance frameworks:
Health & Safety
Source: Supplier Quality Management Specification (QM 58).pdfReferences to Eskom's Safety, Health, Environment, and Quality (SHEQ) Policy (32-727).
Contractual Terms
Source: Supplier Quality Management Specification (QM 58).pdfPreservation management programme requirements:
Requirements
Source: Supplier Quality Management Specification (QM 58).pdf (unknown)Capability and capacity assessments required for suppliers providing:
Section
Source: Supplier Quality Management Specification (QM 58).pdfQuality criteria based on ISO 9001 standard.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
Annex-c_Local content Declaration-Summary Schedule.pdf
240-77~1.DOC
E-Tenderers E-Tendering Training Acknowledgement.pdf
This document is an E-Tendering Training Acknowledgement Form (Template ID: 240-9722574 Rev 1) for the Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover tender by Eskom National Transmission Company of South Africa. It is a mandatory returnable document that must be completed prior to e-tendering participation. The tender closes on August 4, 2026 at 10:00 UTC.
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx
Tender for Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover over 6 months by Eskom National Transmission Company in Western Cape. The document primarily contains an Environmental Management Declaration form requiring contractor compliance with environmental standards, reporting, and documentation requirements.
Appendix A - June 2026.docx
Eskom National Transmission Company of South Africa (NTCSA) is seeking a contractor for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei substation in the Western Cape. The project duration is 6 months with a closing date of August 4, 2026.
Annexures C D E.xlsx
Eskom National Transmission Company of South Africa is seeking a contractor for Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover over a 6-month period in Western Cape. The tender requires strict compliance with SATS 1286.2011 local content declaration requirements, with detailed schedules for tracking imported vs local content, exempted imports, and foreign currency payments.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom seeks a supplier for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei, Western Cape, over a 6-month period. The contract is governed by Eskom's General Conditions of Purchase, which define the commercial and legal framework.
QM.pdf
Eskom tender for supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei Substation over 6 months, with heavy emphasis on documented quality management systems and project-specific quality plans.
240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf
Eskom tender for Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover (6-month period) in Western Cape. The technical specification (240-56030619 Rev 3) governs MV cable accessories for 11kV-33kV systems, covering heat shrink, cold shrink, cold applied, and mixed technologies. Based on SANS 1332 with this standard taking precedence. Closing date: August 4, 2026.
Authorisation Form - 08 November 2024 (1).pdf
This is an Authorisation Form document for the 'Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover' tender issued by Eskom National Transmission Company of South Africa. The document is not the full tender but a mandatory form requiring the tenderer to prove their legal authority to submit a bid. It outlines different certification requirements based on the tenderer's organizational structure (Company, Close Corporation, Partnership, Joint Venture, Sole Proprietor, or Trust). The form must be completed, signed, and submitted with supporting certified documents.
20240226_Transmission Industry Waste Management Plan_2023-2028.pdf
This document is NOT the tender document for the 'Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover' project. It is Eskom Transmission's internal 'Industry Waste Management Plan Update 2023-2028' (Revision 5). The tender information provided (title, organization, closing date) appears to be separate metadata, but the document content itself is a comprehensive 5-year corporate waste management strategy, not a specific request for proposals for switchgear work.
240-68099512 Form A_Cat 2_ Rev 9.pdf
Eskom National Transmission Company of South Africa is tendering for the Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover project in Western Cape, with a 6-month duration. The tender requires compliance with Eskom's Supplier Quality Requirements (Specification 240-105658000) and ISO 9001:2015 standards. Category 2 pre-contract quality assessment applies, with extensive post-contract quality monitoring, audits, and nonconformity management requirements.
SBD 6.2 Declaration Certificate.pdf
This tender document (SBD 6.2) is a Declaration Certificate for Local Production and Content for Designated Sectors, required for the Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover tender by Eskom National Transmission Company. It mandates compliance with South African local content requirements, specifically a 90% minimum threshold for cables.
Tx Environmental Managemement Tender Returnable .pdf
Eskom National Transmission Company of South Africa is seeking a contractor for Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover over a 6-month period. This tender returnable document focuses on environmental management compliance requirements that must be submitted with the tender.
8021.pdf
This tender document contains technical specifications for cable joint kits required for the Muldersvlei 11kV Switchgear project. The specifications cover transition joint kits for connecting 3-core XLPE cables to 3-core PILC (paper-insulated lead-covered) cables at 11kV and 22kV voltage levels, as well as transition trifurcating joint kits for connecting 3-core PILC cables to 1-core XLPE cables at 11kV, 22kV, and 33kV levels. Various cable cross-sectional ranges from 16mm² to 400mm² are specified.
Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf
Eskom is tendering for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape, with a contract duration of 6 months. The tender is governed by Eskom's Standard Conditions of Tender (Rev. 12), which outline a structured procurement process emphasizing fairness, transparency, and compliance with South African legislation.
20250206_Muldersvlei 11kV_BRA.pdf
This is an Occupational Health and Safety Baseline Risk Assessment template for the Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover project by Eskom National Transmission Company of South Africa in Western Cape. The document identifies 53 risk scenarios across construction activities including site establishment, earthworks, electrical works, lifting operations, working at heights, concrete works, and mobile plant operations, with detailed controls, legal requirements, and monitoring mechanisms.
8006.pdf
This tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei substation for a 6-month period. The technical specifications detail requirements for heat shrink termination kits for 11kV, 22kV, and 33kV XLPE single-core cables (50-630mm²) for both indoor and outdoor applications, including LCC (Leakage Current Collector) type kits.
ITTFOR~1.PDF
Eskom NTCSA invites tenders for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei Substation, Western Cape, over a 6-month period. The tender process includes mandatory site visits, strict compliance requirements, and a multi-stage technical evaluation.
8010.pdf
Eskom National Transmission Company of South Africa is tendering for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei in the Western Cape for a 6-month period. The tender includes technical specifications for polymer indoor surge arresters (11kV and 22kV, 10kA) compliant with SANS 60099-4 and Eskom specification 34-1622.
E-tendering Help Manual for supplier -.pdf
This tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei for a 6-month period. The tender is managed by Eskom National Transmission Company of South Africa in the Western Cape province. Submissions must be made electronically through Eskom's eTendering portal (https://eTendering.eskom.co.za) by the closing date of August 4, 2026, at 10:00 UTC.
Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf
Eskom's SHEQ Policy document outlines the mandatory safety, health, environmental, and quality management framework that all contractors and suppliers must adhere to when working on Eskom projects, including the Muldersvlei 11kV Switchgear tender. The policy emphasizes a Zero Harm culture, compliance with international standards (ISO 9001, 14001, 45001), and integration of ESG principles.
240-56065202_ Switcgear Training Standard Requirements.pdf
This document is a training requirements standard for switchgear equipment, not the tender document itself. It specifies mandatory training levels (1-4) that Original Equipment Manufacturers (OEMs) and suppliers must provide to Eskom personnel for the entire lifecycle of switchgear equipment, including installation, operation, and maintenance.
8017.pdf
This document is a detailed material specification sheet for separable connectors used in 11kV and 22kV switchgear installations for Eskom. It is not a complete tender document but a technical annex specifying the exact components, standards, and part numbers required for the 'Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover' project. The core requirement is the supply of compliant separable connectors and associated kits as per the listed Eskom and national standards.
240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf
Eskom National Transmission Company of South Africa is tendering for the Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover project in Western Cape, with a 6-month duration. The tender emphasizes rigorous quality management requirements, evaluating suppliers on ISO 9001 certification or documented QMS compliance, operational QMS evidence, contract/project quality plans, inspection/test plans, and specific customer requirements.
ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf
Eskom National Transmission Company (NTCSA SOC Ltd) seeks a contractor for Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover at Muldersvlei Substation in Western Cape. This is a 6-month NEC3 Engineering & Construction Contract (Option B: Priced contract with bill of quantities) running from 01 July 2026 to 30 January 2027. The contract includes performance bond (5%), retention (2.5%), delay damages (0.1%/day up to 10%), and 52-week defects liability period.
Supplier Quality Management Specification (QM 58).pdf
This tender document outlines Eskom's Supplier Quality Management Specification (240-105658000) for the Muldersvlei 11kV Switchgear project, requiring suppliers to demonstrate compliance with ISO 9001 quality standards, submit detailed quality plans, and undergo rigorous quality monitoring throughout the 6-month contract period.
202411~1.PDF
This is a Health and Safety (H&S) Specification document issued by Eskom NTCSA for the 'Muldersvlei 11kV Switchgear' project. It outlines the minimum H&S requirements the principal contractor must meet and incorporate into their own H&S plan. The document is a framework for managing H&S risks during the 6-month construction period, focusing on compliance with South African legislation and Eskom/NTCSA standards.
240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf
This document outlines Eskom Transmission's Environmental Aspects and Management Plans Requirements (Work Instruction 240-78305014, Rev 5) which would apply to the Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover project. It establishes the framework for identifying environmental aspects, assessing significance, and developing Environmental Management Programmes (EMPr) for transmission projects in compliance with ISO 14001:2015 and South African environmental legislation.
SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf
Eskom NTCSA tender for Muldersvlei 11kV Switchgear Supply, Installation, Termination, Commissioning & Handover over 6 months in Western Cape. Includes strict SDL&I (Supplier Development, Localisation & Industrialisation) requirements with penalties for non-compliance.
To download these documents and access AI-powered analysis, visit the main tender page.
Contact Person
Thembi Peter
Phone
011-871-3165
[email protected]
Website
www.eskom.co.za/Pages/Landing.aspx
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
33
Last checked
07 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Key Personnel
Description
Source: 8006.pdfThe document is a detailed specification sheet (Eskom Drawing D-DT-8006) for electrical termination kits.
Evaluation Criteria
Source: 8006.pdf (unknown)Not explicitly stated in the provided document. Typically for Eskom tenders: valid CIDB grading (likely EP or EB grade for electrical works), valid tax clearance, B-BBEE certification, proven experience in MV switchgear installation and cable termination (11kV-33kV), compliance with Eskom vendor registration requirements, and ability to meet SANS 1332 and ESKOM 240-56030619 specifications.
Technical Specifications
Source: 8006.pdf (unknown)The tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei for a 6-month period.
Compliance Requirements
Source: 8006.pdf (unknown)No specific compliance requirements such as CSD, tax, B-BBEE, CIDB, or CIPC are stated in the extracted text.
Health & Safety
Source: 8006.pdfThe extracted text consists of drawing revision metadata and technical specifications for termination kits.
Contractual Terms
Source: 8006.pdfThe extracted text consists of technical specifications for termination kits, not contractual terms.
Requirements
Source: 8006.pdf (unknown)Mandatory identification and certification requirements for all supplied termination kits:
Description
Source: E-tendering Help Manual for supplier -.pdfImportant Dates
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Contact Information
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Submission Guidelines
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Returnable Documents
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Evaluation Criteria
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Suppliers must have a valid CSD (Central Supplier Database) number to access the eTendering system. The tender appears to be for electrical infrastructure work (11kV switchgear), so relevant electrical engineering qualifications, experience with high-voltage switchgear installation/commissioning, and compliance with South African electrical standards (SANS) would be expected, though specific technical criteria are not detailed in the provided document.
Technical Specifications
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Compliance Requirements
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Requirements
Source: E-tendering Help Manual for supplier -.pdf (TENDER)Section
Source: E-tendering Help Manual for supplier -.pdfDescription
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfEvaluation Criteria
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)The standard applies to all OEMs and their agents supplying switchgear to Eskom. Compliance with this training standard is a contractual requirement for suppliers. Bidders must demonstrate the ability to provide the specified four-level training program with OEM-accredited instructors.
Technical Specifications
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)Methodology
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfQuality Management
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfCompliance Requirements
Source: 240-56065202_ Switcgear Training Standard Requirements.pdf (unknown)Health & Safety
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfContractual Terms
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfSection
Source: 240-56065202_ Switcgear Training Standard Requirements.pdfDescription
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfThis is Eskom's Safety, Health, Environment and Quality (SHEQ) Policy (Document 32-727, Revision 5).
Evaluation Criteria
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf (unknown)The policy applies to all external service providers (contractors/suppliers) performing work for Eskom Holdings SOC Ltd and its subsidiaries. There are no explicit financial or experiential thresholds stated in this document, but compliance with the SHEQ framework is a mandatory condition for doing business with Eskom.
Technical Specifications
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf (unknown)This document is Eskom's Safety, Health, Environment and Quality (SHEQ) Policy, not a tender specification. It outlines Eskom's internal policy framework and does not contain technical specifications for the Muldersvlei 11kV Switchgear tender.
Quality Management
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom's SHEQ Policy outlines the following quality management principles:
Compliance Requirements
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf (unknown)The document states Eskom's general SHEQ policy requirements for external service providers (contractors/suppliers):
Health & Safety
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom's SHEQ Policy outlines the following health and safety principles:
Environmental
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdfEskom's SHEQ Policy outlines the following environmental principles:
Requirements
Source: Eskom Holdings Safety, Health, Environment and Quality (SHEQ) Policy.pdf (unknown)The policy states general principles for Eskom's operations:
Description
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdfB.2 Documented information for Control of Externally Provided Processes, Products and Services
Returnable Documents
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)E.1 Form A is completed and signed. 1
Evaluation Criteria
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)Suppliers must demonstrate a certified or documented Quality Management System compliant with ISO 9001, with proven operational evidence including internal audits and management reviews. They must submit project-specific quality plans (Contract Quality Plan and ITP/QCP) aligned with ISO 10005 and Eskom specifications. Certification authority must have recognized international accreditation. All returnable documents per the Supplier Quality Management list (Unique Identifier 240-12248652) must be provided.
Requirements
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdf (TENDER)E.2 Add other requirements (if applicable) as per the scope of work and/ or specification 1 10%
Section
Source: 240-12248652 Category 2- List of Tender Returnables Documents_Rev 6.pdfSupplier Quality Management: Unique Identifier 240-12248652
Category 2: Quality Requirements Deliverables to be evaluated indicator = 1 Weights
SECTION A : Quality Management System Requirements ISO 9001
(Option 1) Valid certification of Quality Management System by an ISO accredited body
Section A Score 4
A.2 Quality Policy Approved by top management. 1
A.3 Quality Objectives Approved by top management. 1
Sub-Section A Score Option 2 7
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
Section B Score 4
SECTION C: Contract Quality Plan Requirements (Ref 240-105658000 and 240-109253698).
Draft Contract Quality Plan specific to the scope of work as described in the tender documents (Ref ISO 10005)
NB! Draft Contract/Project Quality Plan has important QA deliverables Apply (Yes=1)
Section C Score 1
SECTION D: Quality Control Plan Requirements (Ref 240-105658000 or 2
Description
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfSupply, install, termination, commissioning &
Handover
NEC3 Engineering & Construction Contract
Between NTCSA SOC Ltd
(Reg No. 2021/539129/30)
and [Insert at award stage]
(Reg No. ___________ )
for [Muldersvlei 11kV Switchgear Supply, Install,
Termination, Commissioning & Handover ]
Contents: No of
pages
Part C1 Agreements & Contract Data
Part C2 Pricing Data
Part C3 Scope of Work
Important Dates
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)The starting date for the works is 01 July 2026. The period for reply is two weeks. The defects date is 52 weeks after completion of the whole of the works.
Contact Information
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Project Manager: Bulelwa Dziba ([email protected], 021 915 2445). Supervisor: Peter Clifton-Smith ([email protected], 079 835 0774). Adjudicator: Andrew Baird ([email protected], 011 803 3008).
Submission Guidelines
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Tenderers must submit a Form of Offer and Acceptance, including a Schedule of Deviations. Return one copy of the document to the tenderer before the end of the validity period. Required returnables include signatures, capacity, and witness details.
Returnable Documents
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Form of Offer and Acceptance. Signature(s). Name(s). Capacity. For the tenderer: (Insert name and address of organisation). Name & signature of witness. Date. Schedule of Deviations. For the tenderer: For the Employer. On behalf (Insert name and address of organisation) (Insert name and address of organisation). Name & signature of witness. Date.
Evaluation Criteria
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Contractor must be CIDB registered (if applicable), have capacity for 11kV switchgear supply/installation/commissioning, provide proof of insurance coverage per contract requirements, demonstrate B-BBEE compliance, have qualified key personnel with relevant experience, be tax compliant (VAT registered), able to provide 5% performance bond, and accept joint venture liability provisions if bidding as consortium. No specific CIDB grading mentioned but implied for electrical infrastructure work.
Technical Specifications
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)The project involves the supply and installation of 11kV switchgear and cable terminations at Muldersvlei Substation. Specific tasks include: 1) 11kV XLPE outdoor cable terminations for Farmers 1, 2, and 4 feeders (SAP 0184239). 2) Transition trifurcating joint kits for Farmers 3 feeder to transition PILC cables to XLPE (SAP 0580863). 3) Outdoor cable terminations for transformer number 8 (SAP 0635341). Works must adhere to Eskom rules and regulations.
Experience & Qualifications
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf2 Name:
Job
Responsibilities:
CV's (and further key persons data including
CVs) are appended to Tender Schedule entitled.
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Data is
B Priced contract with bill of quantities
11.2(21) The bill of quantities is in
Part c2: pricing data c2 ECC3/B cover
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
Handover
11.2(31) The tendered total of the Prices is (in figures)
(in words), excluding VAT
Note “SCC” means Schedule of Cost Components
Data for Schedules of Cost starting on , and “SSCC” means Shorter
Components Schedule of Cost Components starting on
of ECC3 (April 2013).
B Priced contract with bill of quantities Data for the Shorter Schedule of Cost
Components
41 in The percentage for people overheads is: %
Sscc
21 in The published list of Equipment is the last
SSCC edition of the list published by
The percentage for adjustment for
Equipment in the published list is Minus %
22 in The rates of other Equipment are: Equipment Size or Rate
SSCC capacity
61 in The hourly rates for Defined Cost of
SSCC design outside the Working Areas are Category of employee Hourly rate
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Please insert another schedule if foreign
resources may also be used
62 in The percentage for design overheads is %
Sscc
63 in The categories of design employees
SSCC whose travelling expenses to and from the
Working Areas are included in Defined
Cost are:
Part c2: pricing data c2 ECC3/B cover
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
Handover
Part 2: pricing data
ECC3 Option B
Document Title No of
reference pages
C2.1 Pricing assumptions: Option B
C2.2 The bill of quantities
Part c2: pricing data c2 ECC3/B cover
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
Handover
C2.1 Pricing assumptions: Option B
How work is priced and assessed for payment
Clause 11 in NEC3 Engineering and Construction Contract (ECC3) Option B states:
Identified and 11
defined terms 11.2 (21) The Bill of Quantities is the bill of quantities as changed in accordance
with this contract to accommodate implemented compensation events and for
accepted quotations for acceleration.
(28) The Price for Work Done to Date is the total of
in the Bill of Quantities multiplied by the rate and
by the item which the Contractor has completed.
Completed work is work without Defects which would either delay or be
covered by immediately following work.
(31) The Prices are the lump sums and the amounts obtained by multiplying
the rates by the quantities for the items in the Bill of Quantities.
This confirms that Option B is a re-measurement contract and the bill comprises only items measured using
quantities and rates or stated as lump sums. Value related items are not used. Time related items are items
measured using rates where the rate is a unit of time.
Function of the Bill of Quantities
Clause 55.1 in Option B states, “Information in the Bill of Quantities is not Works Information or Site
Information”. This confirms that specifications and descriptions of the work or any constraints on how it is to
be done are not included in the Bill, but in the Works Information. This is further confirmed by Clause 20.1
which states, “The Contractor Provides the Works in accordance with the Works Information”. Hence the
Contractor does not Provide the Works in accordance with the Bill of Quantities. The Bill of Quantities is
only a pricing document.
Guidance before pricing and measuring
Employers preparing tenders or contract documents, and tendering contractors are advised to consult the
sections dealing with the bill of quantities in the NEC3 Engineering and Construction Contract Guidance
Notes before preparing the bill of quantities or before entering rates and lump sums into the bill.
There is no general provision in Option B for payment for materials on Site before incorporation into the
works. If secondary Option X14 Advanced payment has not been used then the tendering contractor may
obtain the same effect by inserting appropriate items in the method related charges where the method of
measurement allows, or alternatively making allowance in the rates of the bill of quantities for the financing
of Plant and Materials until they are incorporated in the works.
When compensation events arise, the default position is that the Bill of Quantities is not used to calculate
the cost effect of the event. Defined Cost and the resulting Fee is used and Defined Cost includes all
components of cost which the Contractor is likely to incur, including so called P & G items. Rates and
lump sums from the Bill of Quantities, or from any other source, may be used instead of Defined Cost and
the Fee only if the Contractor and Project Manager agree. If they are unable to agree, then Defined Cost
plus Fee is used.
Measurement and payment
Symbols
The units of measurement described in the Bill of Quantities are metric units abbreviated as follows:
Part c2: pricing data c2.1 ECC3/B pricing assumptions
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
Handover
Abbreviation Unit
% percent
h hour
ha hectare
kg kilogram
kl kilolitre
km kilometre
km-pass kilometre-pass
kPa kilopascal
kW kilowatt
l litre
m metre
mm millimetre
m2 square metre
m2-pass square metre pass
m3 cubic metre
m3-km cubic metre-kilometre
MN meganewton
MN.m meganewton-metre
MPa megapascal
No. number
sum Lump sum
t tonne (1000kg)
General assumptions
Unless otherwise stated, items are measured net in accordance with the drawings, and no allowance
has been made in the quantities for waste.
The Prices and rates stated for each item in the Bill of Quantities shall be treated as being fully
inclusive of all work, risks, liabilities, obligations, overheads, profit and everything necessary as
incurred or required by the Contractor in carrying out or providing that item.
An item against which no Price is entered will be treated as covered by other Prices or rates in the
bill of quantities.
The quantities contained in the Bill of Quantities may not be final and do not necessarily represent
the actual amount of work to be done. The quantities of work assessed and certified for payment by
the Project Manager at each assessment date will be used for determining payments due.
The short descriptions of the items of payment given in the bill of quantities are only for the
purposes of identifying the items. Detail regarding the extent of the work entailed under each item is
provided in the Works Information.
Part c2: pricing data c2.1 ECC3/B pricing assumptions
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
Handover
Departures from the method of measurement
Amplification of or assumptions about measurement items
The following is provided to assist in the interpretation of descriptions given in the method of
measurement. In the event of any ambiguity or inconsistency between the statements in the method of
measurement and this section, the interpretation given in this section shall be used.
Part c2: pricing data c2.1 ECC3/B pricing assumptions
NTCSA SOC Ltd CONTRACT NUMBER _____________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination,
Commissioning & handover
C2.2 the bill of quantities
Use this page as a summary page or as a cover page to the bill of quantities.
Part c3: scope of work 28 c3 ecc3 cover page
NTCSA SOC Ltd CONTRACT NUMBER _____________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination,
Commissioning & handover
Part 3: scope of work
Part c3: scope of work 29 c3 ecc3 cover page
NTCSA SOC Ltd CONTRACT NUMBER _____________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination,
Commissioning & handover
C3.1: Employer’s works information
Description of the works
Executive overview
Muldersvlei Substation is situated in the Western Grid and all Eskom rules and regulations shall be adhered
to when working in this area. This station is National Key Point station and must be treated as such.
Scope of Work for the project: Please refer to Document Identifier: 240- 185000522
Scope of Project
Supply and install 11 kV XLPE outdoor cable termination to terminate the installed11 kV, 185mm2, 3 core,
XLPE cable to the existing 11 kV overhead feeder. The 11 kV, 3 core, XLPE outdoor termination shall be in
accordance with SAP number 0184239 of DDT 8006.
Supply and install 11 kV XLPE outdoor cable termination to terminate the installed 11 kV, 185mm2, 3 core,
XLPE cable to the existing 11 kV overhead feeder. The 11 kV, 3 core, XLPE outdoor termination shall be in
accordance with SAP number 0184239 of DDT 8006.
Currently there are 2X 11kV, 185mm2, 3 core, copper, PILC cables installed in this feeder. These feeders
are
currently supplied via the old oil filled indoor switchgear which will be decommissioned once the newly
installed
fixed pattern indoor switchgear is commissioned and energised. The cables will have to be cut transitioned
from PILC (2 X11kV, 185mm2, 3 core, copper, PILC) to XLPE and then trifurcated to (2 X11kV, 185mm2, 1
core, copper, XLPE).
Supply and install transition trifurcating joint kits to transition and trifurcate the two 11 kV, 185mm2, 3
core, copper, PILC cables to 2 X11kV, 185mm2, 1 core, copper, XLPE. Use SAP number 0580863 of
Ddt 8021.
These 2 X11kV, 185mm2, 1 core, copper, XLPE will have to be terminated in the Farm 3 feeder panel
(kindly see scope included in clause 3.6 of this document).
. 4. Farmers 4, 11 kV feeder
Currently there is an existing 11 kV, 185mm2, 3 core XLPE cable installed but was not terminated. Below is
the scope of work
Trace the existing 11 kV, 185mm2, 3 core XLPE cable route and then terminate the 11 kV, 185mm2, 3
core, XLPE cable to the existing 11 kV overhead feeder by using 11 kV, 3 core, XLPE outdoor
termination in accordance with SAP number 0184239 of DDT 8006.
Currently there are 6X11 kV, 630mm2, 1 core, XLPE cables installed and are to be terminated to transformer
number 8, two cables per phase to be installed. Below is the scope of work:
Disconnect old 6X11kV, 630mm2, PILC cables from the sealing end structure of the transformer
number 8.
Supply and install outdoor cable terminations to terminate the already installed 6X11 kV, 630mm2, 1
core, XLPE cables in accordance with SAP nr 0635341 of DDT 8006.
Note: there is cable sealing end structure already installed.
Part c3: scope of work c3.1 Ecc3 employer’s works information
Qualifications:
Experience:
2 Name:
Qualifications:
Experience:
CV's (and further key persons data including
CVs) are appended to Tender Schedule entitled.
11.2(3) The completion date for the whole of the
works is
11.2(14) The following matters will be included in
the Risk Register
11.2(19) The Works Information for the Contractor’s
design is in:
31.1 The programme identified in the Contract
Quality Management
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfhave been discovered on reasonable
inspection by the Employer or the Supervisor
before the defects date, without requiring any
inspection not ordinarily carried out by the
any inspection over and above the reasonable
inspection, this does not place a greater
responsibility on the Employer or the
occupational hygiene inspection body, i.e. a SANAS accredited and Department of
Pricing Schedule
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfPart C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
Part C2 Pricing Data
Part C3 Scope of Work: Works Information
Part C4 Site Information
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
11.2(21) The bill of quantities is in
Part c2: pricing data c2 ECC3/B cover
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
61 in The hourly rates for Defined Cost of
Note: Hourly rates are estimated ‘cost to
company of the employee’ and not selling rates.
Part 2: pricing data
ECC3 Option B
reference pages
C2.1 Pricing assumptions: Option B
C2.2 The bill of quantities
Part c2: pricing data c2 ECC3/B cover
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
C2.1 Pricing assumptions: Option B
Clause 11 in NEC3 Engineering and Construction Contract (ECC3) Option B states:
Identified and 11
defined terms 11.2 (21) The Bill of Quantities is the bill of quantities as changed in accordance
with this contract to accommodate implemented compensation events and for
accepted quotations for acceleration.
(28) The Price for Work Done to Date is the total of
in the Bill of Quantities multiplied by the rate and
by the item which the Contractor has completed.
covered by immediately following work.
(31) The Prices are the lump sums and the amounts obtained by multiplying
the rates by the quantities for the items in the Bill of Quantities.
quantities and rates or stated as lump sums. Value related items are not used. Time related items are items
measured using rates where the rate is a unit of time.
Clause 55.1 in Option B states, “Information in the Bill of Quantities is not Works Information or Site
Information”. This confirms that specifications and descriptions of the work or any constraints on how it is to
be done are not included in the Bill, but in the Works Information. This is further confirmed by Clause 20.1
which states, “The Contractor Provides the Works in accordance with the Works Information”. Hence the
only a pricing document.
sections dealing with the bill of quantities in the NEC3 Engineering and Construction Contract Guidance
works. If secondary Option X14 Advanced payment has not been used then the tendering contractor may
obtain the same effect by inserting appropriate items in the method related charges where the method of
measurement allows, or alternatively making allowance in the rates of the bill of quantities for the financing
of Plant and Materials until they are incorporated in the works.
the cost effect of the event. Defined Cost and the resulting Fee is used and Defined Cost includes all
components of cost which the Contractor is likely to incur, including so called P & G items. Rates and
lump sums from the Bill of Quantities, or from any other source, may be used instead of Defined Cost and
the Fee only if the Contractor and Project Manager agree. If they are unable to agree, then Defined Cost
plus Fee is used.
C2.2 the bill of quantities
Financial Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Pricing is based on NEC3 Option B (re-measurement contract). The Bill of Quantities is a pricing document. Prices must be inclusive of all work, risks, liabilities, overheads, and profit. VAT is 15%. Direct and subcontracted fee percentages are 10%.
Compliance Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)The Contractor must comply with the Construction Regulations 2014 and the Occupational Health & Safety Act. Asbestos handling must follow the Employer's Asbestos Standard 32-303. B-BBEE status changes must be notified within seven days. The site is a National Key Point station. Nuclear liability is governed by the Employer's indemnities regarding nuclear damage.
B-BBEE Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Z3 Change of Broad Based Black Economic Empowerment (B-BBEE) status: Where a change in the Contractor's legal status, ownership or any other change to his business composition or business dealings results in a change to the Contractor's B-BBEE status, the Contractor notifies the Employer within seven days of the change. The Contractor is required to submit an updated verification certificate and necessary supporting documentation confirming the change in his B-BBEE status to the Project Manager within thirty days of the notification. Where the Contractor's B-BBEE status has decreased since the Contract Date the Employer may either re-negotiate this contract or alternatively, terminate the Contractor's obligation to Provide the Works. Failure by the Contractor to notify the Employer of a change in its B-BBEE status may constitute a reason for termination.
Health & Safety
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfsignature of Date
witness
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
no rate is quoted for the currency in question
then the rate for United States Dollars, and if
no such rate appears in The Wall Street
60.6 The method of measurement is Standard System Measurement published by
ASAQS and amended as stated in Part C2.1,
rights, and does not give rise to an estoppel unless the Parties agree otherwise and confirm
such agreement in writing.
Z6 Health, safety and the environment: Add to core clause 27.4
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the works. Without limitation the Contractor:
Part c2: pricing data c2 ECC3/B cover
NTCSA SOC Ltd CONTRACT NO. _________
Muldersvlei refurbishment: muldersvlei 11kv switchgear supply, install, termination, commissioning &
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act ) (“the Construction Regulations”) for the Site;
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of works; and
the regulations published in GNR February 2002, under the Occupational Health
and Safety Act, 1993 (Act ) (“Asbestos Regulations”). The OEL for asbestos is 0.2
regulated asbestos fibres per millilitre of air as a 4-hour TWA, averaged over any continuous
period of four hours, and the short term exposure limit of 0.6 regulated asbestos fibres per
millilitre of air as a 10-minute TWA, averaged over any 10 minutes, measured in accordance
with HSG248 and monitored according to HSG173 and OESSM.
Z15.2 Upon written request by the Contractor, the Employer certifies that these conditions prevail.
and related control measures at the Contractor’s expense. For the purposes of compliance
the results generated from Parallel Measurements are evaluated only against South African
statutory limits as detailed in clause Z15.1. Control measures conform to the requirements
stipulated in the AAIA-approved asbestos work plan.
Z15.3 The Employer manages asbestos and ACM according to the Standard.
Z15.4 In the event that any asbestos is identified while Providing the Services, a risk assessment is
conducted and if so required, with reference to possible exposure to an airborne concentration
of above the AL for asbestos, immediate control measures are implemented and relevant air
monitoring conducted in order to declare the area safe.
Z15.5 The Contractor’s personnel are entitled to stop working and leave the contaminated area
forthwith until such time that the area of concern is declared safe by either Compliance
emergency asbestos work plan, if applicable.
Z15.6 The Contractor continues to Provide the Services, without additional control measures
presented, on presentation of Safe Levels. The contractually agreed dates to Provide the
21 in The published list of Equipment is the last
Equipment in the published list is Minus %
22 in The rates of other Equipment are: Equipment Size or Rate
Environmental
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfguidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the works, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7 Provision of a Tax Invoice and interest. Add to core clause 51
Z7.1 Within one week of receiving a payment certificate from the Project Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
has been made in the quantities for waste.
Contractual Terms
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdfThe contract is governed by the law of the Republic of South Africa and written in English. The defects date is 52 weeks post-completion, with a defect correction period of two weeks (or shorter if performance is jeopardized). Arbitration is the tribunal, following the latest Rules for the Conduct of Arbitrations published by The Association of Arbitrators (Southern Africa), held in Johannesburg. The Contractor is prohibited from ceding, delegating, or assigning rights without written consent. B-BBEE status decreases may lead to contract re-negotiation or termination.
Special Conditions
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Z1 Cession delegation and assignment: The Contractor does not cede, delegate or assign any of its rights or obligations to any person without the written consent of the Employer. The Employer may on written notice to the Contractor cede and delegate its rights and obligations under this contract to any of its subsidiaries or any of its present divisions or operations which may be converted into separate legal entities as a result of the restructuring of the Electricity Supply Industry. Z2 Joint ventures: If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two or more persons or organisations then these persons or organisations are deemed to be jointly and severally liable to the Employer for the performance of this contract. Unless already notified to the Employer, the persons or organisations notify the Project Manager within two weeks of the Contract Date of the key person who has the authority to bind the Contractor on their behalf. The Contractor does not alter the composition of the joint venture without the consent of the Employer. Z12 Ethics: A Committing Party may not take any Prohibited Action during the course of the procurement of this contract or in execution thereof. The Employer may terminate the Contractor's obligation to Provide the Services if a Committing Party has taken such Prohibited Action and the Contractor did not take timely and appropriate action to prevent or remedy the situation. Z14 Nuclear Liability: The Employer does not waive its rights provided for in section 30 (7) of Act, or any replacement section dealing with the same subject matter. The protection afforded by the provisions hereof shall be in effect until the KNPS is decommissioned. The Additional conditions of contract are Z1 to Z15 always apply.
Requirements
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)Tenderer's CIDB registration number (if applicable). The Contractor is (Name): [to be completed]. Address: [to be completed]. Tel No: [to be completed]. Fax No: [to be completed].
Section
Source: ECC3 Muldersvlei 11kV Switchgear Supply Install .pdf (unknown)The Project Manager is: (Name) Bulelwa Dziba. Address: ESKOM TRANSMISSION, 60 VOORTREKKER ROAD, BELLVILLE, 7560. Tel: 021 915 2445. e-mail: [email protected]. The Supervisor is: (Name) Peter Clifton-Smith. Address: ESKOM TRANSMISSION, 60 VOORTREKKER ROAD, BELLVILLE, 7560. Tel No:0. Tel No: 079 835 0774. e-mail: [email protected]. The Adjudicator is Andrew Baird. Address: Gauteng. Tel No: 011 803 3008. Fax No: 011 803 3008. e-mail: [email protected].
Description
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfThis is an Eskom Transmission work instruction for environmental management, not a tender specification for switchgear supply and installation. It describes the standardized process for identifying and managing environmental aspects and impacts across Transmission Business Units. It does not describe the scope of the Muldersvlei 11kV Switchgear project.
Contact Information
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)The document lists several roles and departments but no direct tender contact details:
Evaluation Criteria
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)While not explicitly stated in this document, contractors must typically: 1) Have ISO 14001 certification or equivalent environmental management system, 2) Demonstrate experience with high-voltage transmission projects (11kV+), 3) Provide qualified environmental practitioners registered with SACNASP or equivalent, 4) Show track record of EMPr implementation on Eskom or similar utility projects, 5) Possess valid waste management licenses for hazardous materials handling, 6) Comply with Eskom's Environmental Requirements for Contractors and/or Suppliers (240-180100134), 7) Meet BBBEE and local content requirements per Eskom procurement policy.
Technical Specifications
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)This is an environmental management work instruction, not a technical specification for switchgear. It outlines Eskom's process for managing environmental aspects:
Quality Management
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfThe environmental aspect identification process uses several sources of information which imply quality management inputs:
Compliance Requirements
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)The document sets out environmental management compliance requirements:
Health & Safety
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfHealth and safety requirements are referenced within the environmental management context:
Environmental
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfThis is the core document content. It details Eskom's environmental management requirements:
Requirements
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdf (unknown)A key requirement stated is that 'EMPr requirements should be integrated into inquiries as part of tender documents and subsequent contracts including design specifications, procedures, and work instructions.'
Section
Source: 240-78305014 Environmental Aspects and Management Plans Requirements Rev 5.pdfThe document references procedures and standards that inform evaluation:
Description
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfReturnable Documents
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Evaluation Criteria
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Must meet 90% local content for cable component; valid B-BBEE certification based on annual revenue (EME ≤R10M: sworn affidavit; QSE ≤R50M: sworn affidavit if 51% Black owned else QSE scorecard; >R50M: SANAS certificate); ability to deliver 11kV switchgear supply, installation, termination, commissioning and handover; compliance with all SDL&I obligations including job creation, skills development, and local procurement targets
Technical Specifications
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Methodology
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfFinancial Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Compliance Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)B-BBEE Requirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Contractual Terms
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfRequirements
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdf (TENDER)Section
Source: SDLI Strategy -Strategy Setting Template For Bidders For Muldersvlei 11kV.pdfDescription
Source: 8021.pdfThe document contains detailed specification sheets for cable joint kits. Key points:
Evaluation Criteria
Source: 8021.pdf (unknown)Not explicitly stated in the provided document. Typically for Eskom tenders, suppliers must be registered on Eskom's vendor database, comply with relevant South African standards (SANS/NRS), have appropriate manufacturing/testing capabilities for medium voltage cable accessories, and meet Eskom's quality assurance requirements per specification 34-1622.
Technical Specifications
Source: 8021.pdf (unknown)The tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei over a 6-month period. The technical specifications are defined by detailed material specification sheets for various cable joint kits. Key points:
Health & Safety
Source: 8021.pdfThe extracted text details material specifications for cable joint kits but does not contain explicit health and safety requirements, plans, or HSE compliance instructions. The content is purely technical describing kit components and standards.
Description
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThis content is a duplicate of the first 'description' extended section and contains the same list of abbreviations from the waste management plan.
Important Dates
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)The document states an effective date of 31 March 2023 for the waste management plan. No tender-specific dates (e.g., closing, briefing, site visits) are provided in the extracted content.
Contact Information
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Contact details are provided for the waste management plan consultants, not for tender submissions:
Evaluation Criteria
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Not applicable to the supposed tender. The document defines the plan's 'Applicability' to all Eskom Transmission business areas (Network Service Provider, Systems Operator, Market Operator) and their associated units across South Africa.
Technical Specifications
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)The document is a waste management plan, not the tender for Muldersvlei 11kV Switchgear. Key points from the plan include:
Methodology
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfSite Assessment Details: A physical inspection was conducted at sampled Business Units. The table lists 19 specific sites visited, including Simmerpan facilities, Rotek Tower, Apollo Converter Station, Kusile construction site, Duvha Power Station, and various substations.
Quality Management
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe document lists sites visited during the waste management plan assessment (e.g., Simmerpan Clinic, Rotek Tower Testing Station Laboratory). It references quality management standards like ISO 9001:2015 but does not specify quality requirements for the Muldersvlei switchgear tender.
Compliance Requirements
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)The waste management plan references extensive legislative and standards compliance, but these are not specific to the Muldersvlei tender. Key references include:
Health & Safety
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe document extensively references health, safety, and environmental legislation and standards, including:
Environmental
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe document is fundamentally an environmental waste management plan. Key points include:
Contractual Terms
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe extracted text outlines the business structure and mandates of Eskom Transmission's various units (Network Service Provider, Systems Operator, Market Operator, International Trader). It does not contain contractual terms for the Muldersvlei tender.
Requirements
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdf (unknown)Regulatory Compliance Findings: The waste management plan's gap analysis notes:
Section
Source: 20240226_Transmission Industry Waste Management Plan_2023-2028.pdfThe document lists normative and informative references (e.g., ISO 9001:2015, ISO 14001:2015, various Acts and standards) but does not provide evaluation criteria for scoring bids for the Muldersvlei tender.
Submission Guidelines
Source: 559-66~1.DOC (unknown)Compliance Requirements
Source: 559-66~1.DOC (unknown)Submission Guidelines
Source: Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf (unknown)Compliance Requirements
Source: Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf (unknown)Description
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe project involves the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei. The scope includes associated civil, electrical, and construction works. Key contractor responsibilities include:
Evaluation Criteria
Source: 20250206_Muldersvlei 11kV_BRA.pdf (unknown)Based on this risk assessment document, eligible contractors must have: proven experience in 11kV switchgear projects, registered competent personnel for high-risk activities (crane operators, slingers, blasting service providers, excavation supervisors), capacity to conduct occupational hygiene medical surveillance, ability to develop and implement site-specific safety plans, compliance history with Eskom H&S specifications, and resources for continuous monitoring and auditing per Eskom requirements.
Technical Specifications
Source: 20250206_Muldersvlei 11kV_BRA.pdf (unknown)The project involves the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei. The contractor must comply with extensive health and safety requirements, including:
Quality Management
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe document emphasizes health and safety as part of quality management. Key requirements include:
Compliance Requirements
Source: 20250206_Muldersvlei 11kV_BRA.pdf (unknown)The document does not specify standard compliance requirements (e.g., CSD, tax, B-BBEE, CIDB). It focuses on occupational health and safety compliance, requiring adherence to:
Health & Safety
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe contractor must implement a comprehensive health and safety system, including:
Section
Source: 20250206_Muldersvlei 11kV_BRA.pdfThe document does not specify evaluation criteria for bid selection. The extracted text fragment appears to be a misplaced reference to health and safety controls.
Important Dates
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Contact Information
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Submission Guidelines
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Evaluation Criteria
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Tenderer must meet eligibility criteria stated in the Tender Data, not be restricted from doing business with Eskom or state-owned companies, and cannot subcontract 100% of the scope. Compliance with CIDB grading (if stipulated) is mandatory. Proof of B-BBEE status (certificate/CSD report) is required for evaluation.
Technical Specifications
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Financial Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Compliance Requirements
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdf (TENDER)Contractual Terms
Source: Eskom - Standard Conditions of Tender - 30 January 2025 (1).pdfSubmission Guidelines
Source: Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf (unknown)This document appears to be Annexure D (Imports Declaration) — a supporting schedule to Annexure C. It is likely a returnable form that must be completed and submitted as part of the bid. Bidders should verify the main tender document for the full list of returnable documents, submission method (e.g., email, portal, physical), and any specific formatting or packaging requirements.
Compliance Requirements
Source: Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf (unknown)The file name indicates this annexure covers an Imports Declaration, which typically supports local content verification for designated sectors. Bidders must complete this schedule to declare imported content and calculate local content percentages. The main tender document will specify the minimum local content threshold, designated sectors, and any other compliance requirements (CSD, tax, B-BBEE, CIDB, etc.).
Description
Source: 202411~1.PDFThis Health and Safety (H&S) Specification provides the framework for principal contractors to demonstrate compliance with legal and Eskom/NTCSA H&S requirements and manage H&S risks during contract execution.
Important Dates
Source: 202411~1.PDF (unknown)Contact Information
Source: 202411~1.PDF (unknown)Evaluation Criteria
Source: 202411~1.PDF (unknown)Key eligibility and pre-qualification criteria inferred from the H&S specification: 1. Demonstrated ability to develop and implement a comprehensive H&S Plan meeting NTCSA's stringent requirements. 2. Proven competence in high-voltage electrical construction work, with personnel trained in ORHVS. 3. Must have (or appoint) a Construction Manager and Safety Officer(s) registered with the South African Council for the Project and Construction Management Professions (SACPCMP). 4. Must have a system for appointing competent persons for all statutory OHS functions. 5. Must have a documented OHS Policy authorized by the company's Chief Executive. 6. Financial capacity to cover all H&S costs, as no claims for delays/costs due to non-compliance will be accepted.
Technical Specifications
Source: 202411~1.PDF (unknown)Scope of Work (Muldersvlei 11kV):
Location: GPS Coordinates: -33.817868S 18.808316E.
Methodology
Source: 202411~1.PDFExperience & Qualifications
Source: 202411~1.PDFQuality Management
Source: 202411~1.PDFCompliance Requirements
Source: 202411~1.PDF (unknown)Health & Safety
Source: 202411~1.PDFThis is a comprehensive Health and Safety Specification document outlining NTCSA's minimum requirements for construction work.
Environmental
Source: 202411~1.PDFSection
Source: 202411~1.PDFContact Information
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Project Manager/Responsible Manager: Bulelwa Dziba
Buyer Name: Thembi Peter
Enquiry Number: E3191NTCSAMWP
Submission Guidelines
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Returnable Documents: This appears to be a tender returnable document. The document is an environmental management evaluation form. Bidders must complete and submit this scored document as part of their tender submission. Failure to provide the required objective evidence for each item will result in a lower score.
Evaluation Criteria
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Tenderers must achieve a minimum weighted average score of 80% on the environmental evaluation (Sections A-E). The evaluation assesses documented environmental management systems, programmes, plans, and personnel qualifications. Failure to meet the 80% threshold will result in the tender not being considered further. A qualified environmental representative (National Diploma/Degree in Environmental Sciences/Management/Nature Conservation or relevant Natural Sciences) must be assigned full-time to the project, or for low-risk projects, an environmental representative with two weeks environmental training.
Technical Specifications
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)Scope: Supply, Install, Termination, Commissioning & Handover of Muldersvlei 11kV Switchgear for a period of 6 months.
Purpose: To assess whether the contractor's submitted environmental documentation complies with specified requirements.
Detailed environmental management deliverables are required, as outlined in the evaluation criteria sections (A through E).
Compliance Requirements
Source: Tx Environmental Managemement Tender Returnable .pdf (unknown)The tender requires compliance with specific environmental management standards and documentation.
Environmental
Source: Tx Environmental Managemement Tender Returnable .pdfThe tender has extensive environmental management requirements.
Section
Source: Tx Environmental Managemement Tender Returnable .pdfEach tenderer's scores will serve as a numerical basis for tender comparison. A tenderer must receive a weighted average score of 80% or above to be taken into consideration.
Description
Source: Appendix A - June 2026.docxThis appendix provides the Eskom Holdings (NTCSA) document hierarchy listing Annexures A through N. It serves as a reference index for the full tender documentation; detailed scope and requirements are expected in the individual annexures.
Submission Guidelines
Source: Appendix A - June 2026.docx (unknown)Returnable documents are required; the specific list of returnable documents is not detailed in this appendix.
Evaluation Criteria
Source: Appendix A - June 2026.docx (unknown)Based on typical Eskom NTCSA tenders, eligibility likely includes: CIDB grading (minimum 6EP or higher for electrical works), valid B-BBEE certificate, proof of similar 11kV switchgear projects completed, registered professional engineer/technologist, valid COIDA registration, tax clearance, and compliance with Eskom's vendor registration requirements. Specific criteria would be detailed in Annexures A-N.
Technical Specifications
Source: Appendix A - June 2026.docx (unknown)This appendix outlines the Eskom NTCSA document hierarchy (Annexures A through N). Technical specifications, scope, deliverables, standards, and capacity requirements are likely contained in the referenced annexures; this appendix does not provide detailed technical specifications.
Compliance Requirements
Source: Appendix A - June 2026.docx (unknown)No specific compliance requirements are stated in this appendix; refer to the main tender document for requirements such as CSD registration, tax clearance, B-BBEE certification, CIDB grading, CIPC registration, professional registrations, and local content.
Submission Guidelines
Source: 240-77~1.DOC (unknown)Compliance Requirements
Source: 240-77~1.DOC (unknown)Description
Source: 8017.pdfThe document is a technical specification sheet (Eskom drawing D-DT-8017) detailing separable electrical connectors for 11kV and 22kV systems.
Submission Guidelines
Source: 8017.pdf (unknown)Returnable Documents: The document mentions 'Returnable Documents' but does not specify what these are. Check the full tender package for required forms and returnables.
Evaluation Criteria
Source: 8017.pdf (unknown)Not explicitly stated in this excerpt. Eligibility would typically be defined in the main tender conditions document (e.g., CIDB grading, BBBEE status, financial standing, technical experience). This spec sheet implies eligibility requires proven capability to manufacture or supply components meeting the strict Eskom technical and quality standards outlined.
Technical Specifications
Source: 8017.pdf (unknown)The tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei for a period of 6 months.
SEP SCR CBL 1 connectors for 11kV (cable ranges 25-50, 70-185, 240-400, 630 mm²).
SEP SCR CBL 1 connectors for 22kV (cable ranges 25-50, 70-185, 240-400, 630 mm²).
SEP EXT SCR extensible connectors for 11kV and 22kV (cable ranges 25-50, 70-185, 240-400, 630 mm²).
Connectors with integrated surge arresters for 11kV and 22kV.
Connectors for Mobile Trailer (MT) MV indoor switchgear with surge arresters.
Tri-furcating termination kits for 22kV, 3-core cable (ranges 25-50 and 70-185 mm²).
Pricing Schedule
Source: 8017.pdfThe document references a bill of materials but does not contain a pricing schedule, rates, or payment schedule. This will be in a separate financial submission part of the tender.
Financial Requirements
Source: 8017.pdf (unknown)The document references a bill of materials but does not specify pricing format, bonds, guarantees, or payment terms. Review the full tender package for financial schedules.
Compliance Requirements
Source: 8017.pdf (unknown)The document specifies technical and material standards but does not mention standard bid compliance requirements like CSD, tax, B-BBEE, CIDB, or CIPC. Assume standard government tender compliance rules apply unless stated otherwise in the full tender package.
Health & Safety
Source: 8017.pdfThe document includes requirements for earthing kits and surge arrester safety specifications but does not contain general health and safety plans or OHS requirements. These are likely covered under Eskom's standard safety regulations for electrical work.
Contractual Terms
Source: 8017.pdfThe document specifies detailed technical requirements for each connector type but does not outline general contract terms, duration, or conditions. These are likely in a separate contract document.
Requirements
Source: 8017.pdf (unknown)Contact Information
Source: QM.pdf (TENDER)Submission Guidelines
Source: QM.pdf (TENDER)Returnable Documents
Source: QM.pdf (TENDER)Evaluation Criteria
Source: QM.pdf (TENDER)Suppliers must demonstrate quality system compliance through either ISO 9001 certification from accredited body OR documented QMS meeting ISO 9001. Must provide objective evidence of QMS operation including roles/responsibilities documentation, external provider controls, internal audit reports, and management review records.
Section
Source: QM.pdfImportant Dates
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Contact Information
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Submission Guidelines
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Returnable Documents
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Evaluation Criteria
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Tenderers must have completed self-training through the e-Tendering Noddy Guide, video, or clarification meeting and be satisfied with their ability to operate the E-Tendering Solution. The form must be fully completed and submitted on time.
Compliance Requirements
Source: E-Tenderers E-Tendering Training Acknowledgement.pdf (unknown)Description
Source: Annexures C D E.xlsxThe tender includes a local content declaration summary (Annex C) requiring calculation of total tender value net of exempt imported content (referenced as cell C22 in the schedule). This value feeds into the overall local content percentage calculation for the bid.
Evaluation Criteria
Source: Annexures C D E.xlsx (unknown)Tenderers must be capable of supplying, installing, terminating, commissioning and handing over 11kV switchgear. Must comply with South African local content requirements per SATS 1286.2011. Must provide detailed breakdown of local vs imported content with supporting documentation. Must declare all foreign currency payments. Entity must be registered and capable of operating in South Africa's Western Cape province.
Financial Requirements
Source: Annexures C D E.xlsx (unknown)Compliance Requirements
Source: Annexures C D E.xlsx (unknown)Submission Guidelines
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Evaluation Criteria
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Not explicitly stated in provided document. The document focuses on environmental compliance declarations rather than technical eligibility criteria. Likely requires relevant electrical contracting licenses, 11kV switchgear experience, and Eskom vendor registration.
Technical Specifications
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Compliance Requirements
Source: 20240226_Tx. CONTRACTOR ENVIRONMENTAL REQUIREMENTS PROFORMA.docx (unknown)Description
Source: 8010.pdfScope involves supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei for a period of 6 months.
Detailed technical description includes surge arresters for 11kV and 22kV systems:
Submission Guidelines
Source: 8010.pdf (unknown)Returnable Documents: Not specified in the extracted content.
Evaluation Criteria
Source: 8010.pdf (unknown)Not explicitly stated in the provided document. Typically for Eskom tenders: valid CIDB registration (likely EP or EB grade for electrical works), proven experience in 11kV switchgear projects, compliance with Eskom vendor registration requirements, valid tax clearance, B-BBEE certification, and ability to meet technical specifications including SANS 60099-4 and Eskom 34-1622.
Technical Specifications
Source: 8010.pdf (unknown)The tender is for the supply, installation, termination, commissioning, and handover of 11kV switchgear at Muldersvlei.
Technical specifications include:
Quality Management
Source: 8010.pdf (unknown)Quality marking requirement: All items must have an indelible manufacturer's trademark and part number for identification.
Compliance Requirements
Source: 8010.pdf (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) stated in the extracted content.
Health & Safety
Source: 8010.pdfNo explicit health and safety requirements stated in the extracted content. The document primarily contains technical specifications for electrical equipment.
Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Closing date: 31 May 2024. No other dates (briefings, site visits, clarification deadlines) are stated.
Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Email for fraud reporting: [email protected]. No SCM or technical contact names, phone numbers, or submission addresses provided.
Submission Guidelines
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Returnable Documents: Not specified in the provided document. Submission method, address, and deadline details are not found in the extracted text.
Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)No explicit pre-qualification criteria stated in the provided document. Eligibility is implicitly determined by acceptance of Eskom's General Conditions of Purchase and the ability to meet the contractual obligations described. Suppliers must be willing to contract under South African law and jurisdiction.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Scope: Supply the goods or execute the works/services as described in the agreement. The agreement includes order documents, General Conditions of Purchase, specifications, schedules, and drawings approved by Eskom.
Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfQuality and rejection:
Pricing Schedule
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfPricing: Prices or rates may include an amount for price adjustment, calculated per the formula in the agreement.
Financial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Payment terms: Eskom will pay within 30 days after receipt of a correct Tax invoice. The tax invoice must include Eskom's VAT registration number (4740101508). Prices may include a price adjustment calculated per the agreement. Payment can be in any currency, converted at a single exchange rate to ZAR, but must not exceed amounts stated in the agreement. Eskom's CPA (IG) form must be completed by the Supplier.
Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)General statutory requirements: The Supplier must adhere to all statutory requirements relevant to the agreement, governed by RSA law. No specific mention of CSD, tax clearance, B-BBEE, CIDB, CIPC, or local content.
Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfKey contractual terms:
Description
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfEvaluation Criteria
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Suppliers must: (1) Have formally documented QMS meeting ISO 9001:2015; (2) Foreign manufacturers must hold valid certification from nationally accredited body with mutual recognition agreement with South Africa; (3) Provide successful type test reports per SANS 1332 (or accepted alternatives: CENELEC HD 629.2 S2, IEC 60055-1, SANS 60502-4 at SANS 1332 test voltages or higher); (4) Outdoor terminations must pass KIPTS natural ageing test (or interim per Engineering Instruction 240-170000774); (5) Complete Technical Schedule B in full; (6) Document any deviations with cost-effectiveness justification in Deviation Schedule.
Technical Specifications
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Quality Management
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfCompliance Requirements
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdf (unknown)Health & Safety
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfContractual Terms
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfSection
Source: 240-56030619-ACCESSORIES FOR MEDIUM VOLTAGE POWE.pdfImportant Dates
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)Closing date: 08 November 2024.
Submission Guidelines
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)Returnable Documents: You must complete and submit the Authorisation Form. This includes:
Returnable Documents
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)You must submit the completed Authorisation Form with the following:
Evaluation Criteria
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)Eligibility to submit a compliant bid is contingent upon the correct and complete submission of this Authorisation Form with all required attachments. The tenderer must be a legally constituted entity falling into one of the six listed categories. For Joint Ventures, the agreement must specify joint and several liability, identify a lead member, and detail work/payment ratios. Failure to provide the correctly certified authorization will likely render the tender submission non-compliant.
Compliance Requirements
Source: Authorisation Form - 08 November 2024 (1).pdf (unknown)For Joint Ventures: You must provide a Joint Venture Agreement that includes:
Description
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfProject: Muldersvlei Substation Refurbishment Project for 11kV.
Contact Information
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Eskom's Quality Representative: Nomandla Songanga, Assurance Quality Officer. Date: 23/04/2026.
Submission Guidelines
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Returnable Documents: The tenderer must complete and sign the Form A to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)While specific eligibility criteria are not detailed in this quality requirements form, the document indicates that tenderers must: 1) Qualify under Category 2 assessment per clause 3.5 of 240-105658000, 2) Have a certified ISO 9001:2015 quality management system covering all standard clauses, 3) Demonstrate capability for 11kV switchgear supply, installation, termination, commissioning and handover, 4) Accept Eskom's post-contract quality monitoring and audit regime, 5) Provide a designated quality representative to sign the acceptance form. Additional technical, financial, and safety criteria would be detailed in the full tender documents.
Technical Specifications
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)Scope: Muldersvlei Substation Refurbishment Project for 11kV switchgear supply, installation, termination, commissioning, and handover.
Quality Requirements:
Methodology
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfMethodology aligns with ISO 9001 clauses and principles:
Quality Management
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfQuality management requirements:
Compliance Requirements
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdf (unknown)No specific requirements found
Section
Source: 240-68099512 Form A_Cat 2_ Rev 9.pdfEvaluation includes quality requirements per ISO 9001 and Eskom specification 240-105658000.
Important Dates
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Closing date: 21 February 2025 at 12:00.
Contact Information
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Fraud and corruption reporting email: [email protected].
Evaluation Criteria
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Only bids offering goods/services with at least 90% local content for cables (the designated sector specified) will be considered. Bidders must not sub-contract in a manner that reduces overall local content below the 90% threshold. The bidder must be able to verify local content claims per SATS 1286:2011 requirements.
Technical Specifications
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Minimum local content threshold for cables is 90%. Bidders must declare if any portion of goods/services has imported content. If yes, use SARB exchange rates at 12:00 on the date of advertisement. Submit proof of SARB rates used.
Pricing Schedule
Source: SBD 6.2 Declaration Certificate.pdfLocal content percentage must be calculated using the formula in SATS 1286:2011, using SARB exchange rates and information from Declarations D and E consolidated in Declaration C.
Financial Requirements
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)Local content percentage must be calculated using the formula LC = [1 - x / y]
Compliance Requirements
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)This tender is for a designated sector. Only locally produced goods with stipulated minimum local content thresholds will be considered. Minimum threshold for cables is 90%. Must submit SBD 6.2 Declaration Certificate and Annex C (Local Content Declaration: Summary Schedule) by stipulated deadlines. Non-submission may lead to disqualification. Bidders must study and comply with SATS 1286:2011. Declaration must be signed by CFO or legally responsible person. Keep Declarations D and E for verification for at least 5 years.
B-BBEE Requirements
Source: SBD 6.2 Declaration Certificate.pdf (TENDER)This is a designated sector tender. Only locally produced goods with minimum local content thresholds will be considered. Minimum threshold for cables is 90%. Must submit SBD 6.2 Declaration Certificate and Annex C by deadlines. Non-submission may lead to disqualification. Comply with SATS 1286:2011. Declaration must be signed by CFO or legally responsible person. Keep Declarations D and E for verification for at least 5 years.
Contractual Terms
Source: SBD 6.2 Declaration Certificate.pdfLocal content must be calculated using SATS 1286:2011. A bid may be disqualified if the SBD 6.2 Declaration Certificate and Annex C are not submitted by the stipulated deadlines.
Section
Source: SBD 6.2 Declaration Certificate.pdfThe awarding of the bid is dependent on the accuracy of the information furnished in the local content declaration. Submission of incorrect or unverifiable data may result in remedies as provided for in Regulation 9.1 of the Preferential Procurement Regulations, 2022.
Description
Source: ITTFOR~1.PDF (TENDER)1.1.26 a) Scope of Work Refer to the
Technical Refer to Rev 1
240-185000522
Important Dates
Source: ITTFOR~1.PDF (TENDER){"closingDate":"07 July 2026","closingTime":"10:00AM","briefingSession":"{"date":"16 July 2026","time":"14:00","venue":"e: 16 July 2026","is_compulsory":true}"}
Briefing Session
Source: ITTFOR~1.PDF (TENDER)Date: 16 July 2026
Time: 10:00-12:30
Venue: MS Teams
must ensure that they access the clarification meeting
link in the clarification documentation on the NTCSA’s
(Please check the NTCSA Tender Bulletin, post
clarification meeting, for any additional document
questions etc).
appointment they must contact Thembi Peter: via
email on [email protected] who will be Co-
ordinating this virtual meeting.
than 15 July 2026 to avoid any misunderstandings.
in time, which could result in the supplier not receiving
the meeting link before the scheduled meeting.
for Proposal Effective Date July 2024
Review Date July 2027
can access the appointment well before 16 July 2026,
allowing sufficient time to resolve any technical issues
before the virtual meeting.
Date: 16 July 2026
Time: 14:00-16:00
Venue: Muldersvlie Substation-Face to Face
of what will be expected in terms of the deliverables
of the contract, such as
they must work on and all the installation points and
all the outstanding work/equipment.
site clarity which will simplify the process in terms
of submit all the required information within the
tender stipulated time.
will be expected to have knowledge and expertise
to complete all the outstanding work, terminate,
commission and handover.
R101, Old Paarl Road, Klapmuts, Cape Town
(Traveling on the N1 from Cape Town to Paarl.
Take the Stellenbosch turn-off R304 to Stellenbosh.
After the weighbridge, turn left on the R101.
Proceed for about 1 km and turn left to the station.)
GPS coordinates, -33.817868S 18.808316E
address or GPS coordinates they must contact:
Peter Clifton-Smith: via Tel:
0798350774......Eskom Site Supervisor for Site
for Proposal Effective Date July 2024
Review Date July 2027
Meeting (Face To Face meeting)
Contact Information
Source: ITTFOR~1.PDF (TENDER){"name":"MS Team-Meeting","email":"[email protected]","phone":"0798350774","department":null,"address":"ill be expected to have knowledge and expertise"}
Submission Guidelines
Source: ITTFOR~1.PDF (TENDER)Returnable Documents: The 5 working days period does not apply to CIDB proof of grading. Refer to the returnable table, the prescribed period for CIDB proof of grading. (The contractor will be afforded the benefit of the
Returnable Documents
Source: ITTFOR~1.PDF (TENDER)closing date 04 August 2026 and time: 10:00
https://tenderadmin.ntcsa.co.za/Tenders/Docs?TENDERID
=80351Please note it is the responsibility of the
supplier to ensure that the tender submission
is submitted before the closing time
Evaluation Criteria
Source: ITTFOR~1.PDF (TENDER)Tenderers must not be on international sanctions lists, National Treasury restricted lists, or Tender Defaulters lists; must not have conflicts of interest; must not submit multiple tenders (except for system limits); must have valid CIDB grading; must not subcontract 100% of work; and must not be 'flagged suppliers' implicated in misconduct. Joint ventures must provide JV agreement, confirm single business entity operation, and designate a single bank account.
Technical Specifications
Source: ITTFOR~1.PDF (TENDER)Refer to the
Health & Safety
Folder
1.1.39 Environmental √
Refer to the
Environmental
Folder
1.1.40 Due √
Diligence/financia
l analysis Audited
Financial
Statements of the
tenderer for the
previous 18
months, or to the
extent that such
statements are
not available, for
the last year.
In the case of a
joint venture or
special purpose
vehicle (SPV)
specially formed
for this tender,
audited financial
statements for
each participant
in the JV / SPV
must be
submitted.
Start-up
enterprises
formed within the
last 12 months
are not required
to submit audited
financial
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
statements, but if
successful in this
enquiry; will be
required to
furnish
statements for the
first year once
available.
Documents required under functionality/techinical criteria
1.1.41 Functionality/ Technical √
Stage1 Stage 2(a): Mandatory Requirements (i.e. ✓
Tender returnable) - 100% Compliance. Refer
to Annex B of 240-185000522 Rev 1.
The Technical Gatekeepers/Mandatory
Requirements Are Listed Refer to Annex B,
Table -185000522 Rev 1.
Failure to provide all the required
documentation will result in the tender
application being disqualified immediately.
requirements. Only “Yes” or “No” answers will
be allocated, and the required outcome is for
the tenderer to have “Yes” for all mandatory
requirements listed in order to achieve 100%
compliance.
Compliance with all mandatory requirements
is 100% compulsory for all suppliers. Any
supplier who fails to comply with the
mandatory requirements will be deemed
non-responsive and will not qualify for
further evaluation.
Stage 2 Step 2 (b) Evaluation of Tenders on functionality ✓
Technical evaluation shall be performed in
accordance with the Technical Evaluation Criteria
as stated in Refer to Annex B, Table -
185000522 Rev 1. Scoring technical evaluation
criteria.
Threshold for Step 2(a) Technical Evaluation:
Tenderers must achieve a minimum score of 90%
in the Technical Evaluation to qualify for further
evaluation.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
Any supplier who fails to achieve the minimum
threshold of 90% will not be considered for the
subsequent stages of the evaluation process.
Step 2(c) Site Compliance Technical Evaluation: ✓
Step 2(c) Only suppliers who have successfully passed
Step 2(b) by achieving the required minimum technical
evaluation threshold of 90 will qualify and be eligible for
evaluation in Step 2(c).
The weight for the Site Compliance Technical Review will
be 100 points and will be based on:
Tenderers who do not meet minimum threshold of 80
points for technical Site Compliance scoring will be
disqualified
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
1.2. Tender Data
The Tender Data makes several references to the Standard Conditions of Tender and in those instances,
the clause numbers are referenced hereunder. If the Standard Conditions of Tender are not attached to
the enquiry, then tenderers are required to download this from www.ntcsa.co.za. The “Tender Data” as
detailed herein shall take precedence over the Standard Conditions of Tender in the event of any
ambiguity or inconsistency between the two documents.
Clause Number from Standard
Tender Data
Conditions of Tender
1.1 Parties The Employer is NTCSA SOC Ltd
The NTCSA Representative is:
Name: Thembi Peter
Tel: 021 980 7509
E-mail: [email protected]
1st Escalation: Procurement Manager
Name: Ayanda Velani
Email: [email protected]
2nd Escalation: Middle Manager Procurement
Name: Esther Seshabela
Email address: [email protected]
1.3 Enquiry documents The Invitation to tender number is E3191NTCSAMWP
See the content list above for the enquiry documents.
1.4 Type of enquiry This enquiry is:
1.6 NTCSA's rights to accept or reject The tender shall be for the whole of the contract.
any tender
2.1 Eligibility Tenderers (whether a single company or an incorporated or
unincorporated joint venture or consortium) must meet the eligibility
criteria stated in the Tender Data. The tenderer, or any of its principals,
must not be under any restriction to do business with NTCSA or State-
Owned Companies.
Tenderers are ineligible to submit a tender if:
sanctions list. A tenderer shall be found to have the nationality of
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size (The
upload size per document is 500 megabytes and total submission
is restricted to 4 gigabytes).
JV/consortium agreement does not explicitly state that the parties
of the JV or consortium shall be jointly and severally liable for the
execution of the Contract in accordance with the Contract terms.
to have a conflict of interest shall be disqualified. Prima facie
evidence that a tenderer has a conflict of interest with one or more
parties in this [tendering/RFP] process is:
(a) they have a controlling partner or majority shareholder in
common; or
(b) they have a relationship with each other, directly or through
common third parties, that puts them in a position to have
access to information about or influence on the tender of another
tenderer, or to influence the decisions of the Employer regarding
this bidding process;
Ineligible of the flagged suppliers/tenderers will be due to the
following reasons:
a) Those suppliers implicated in serious misconduct by the Zondo
Report or the SIU pending the finalisation of supplier disciplinary
measures against these suppliers; and
b) Other suppliers implicated in serious misconduct and a breach of
the Eskom Supplier Integrity Pact by a forensic report or other
source of credible information, such as the SAPS, the NPA, the
SIU or other related source.
c) List of Restricted Suppliers and Defaulters as per PRECCA as
issued by National Treasury
The implications of this “flag” are as follows:
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
o No new contracts or extension of existing contracts may be
awarded to the supplier pending finalisation of supplier disciplinary
processes against the supplier. Where a As such, the supplier’s bid
should be removed from any tender evaluation at the “eligibility” or
“compliance” assessment stage of the evaluation.
NTCSA will disqualify tenderers that are found not to have met
the eligibility criteria.
2.2 -2.5 Tender Closing The deadline for tender submission is:
Date :04 August 2024
Time10:00AM
Late Tenders will not be accepted.
Tenders are uploaded via NTCSA Tender bulletin site on the
Eskom E- tendering page
TenderBulletin NTCSA
2.9 Submitting a tender -For
Electronic Tender For Electronic Tender Submissions
The tenderer must upload the tender via NTCSA Tender bulletin site
on the Eskom E- tendering page. The documents need to be upload
under the following folders
Technical, Commercial, Financial, and other.
❖ Technical (NEC3, Evaluations and (BOQ)
❖ Commercial, ( SDL&I, BOQ)
❖ Financial, and
❖ Other (Environmental, Health & Safey, and Quality)
All documents need to be submitted in a PDF format (The upload size
per document is 500 megabytes and total submission is restricted to 4
gigabytes). The price list needs to be submitted in PDF and a copy
in excel format. If supplier submitted BOQ either in excel or PDF, the
supplier won’t be disqualified.
No Zip/condense files can be uploaded
No hard copy will be accepted
If for some reason you resubmit your tender, then the latest
version of the tender submitted will only be accepted and all
previous submission/s will be null and void.
Please ensure that the submission status is indicated as
complete.
Supplier Help Manual guide and video can be found on Eskom E-
Tendering page
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
2.12 Tender Validity Period The tender validity period is 12 weeks: From the date of the closing.
[Note: For construction-related work the initial tender validity
must not exceed 12 weeks]
NTCSA may extend the validity period for a specified additional
period. Should extension of validity be required by NTCSA,
tenderers agreeing to the request will not be required or
permitted to modify a tender. If a tenderer modifies a tender, such
a tender will be disqualified from the evaluation process.
2.15 Site visit and/or clarification Two Clarification Meetings are required.
meeting 1st - Non-Compulsory Meeting will be conducted Virtual via MS
Team-Meeting.
Date: 16 July 2026
Time: 10:00-12:30
Venue: MS Team
1st meeting will be conducted via MS Teams meeting. Tenderers who
are interested in attending this session must ensure that they access
the clarification meeting link in the appointment on the NTCSA’s
Tender Bulletin in the “Clarification Meeting folder”. (Please check the
Tender Bulletin, Post Clarification Question etc.
Tenderers must confirm their intention to attend with the NTCSA
Representative, Thembi Peter: via email on [email protected]
Suppliers must report any access issues no later than 15 July 2026
to avoid any misunderstandings. Emails received after this date may
not be attended to in time, which could result in the supplier not
receiving the meeting link before the scheduled meeting.
It is therefore important for suppliers to check that they can access the
appointment well before 16 July 2026, allowing sufficient time to
resolve any technical issues before the virtual meeting.
Compulsory Site visit meeting:
Date: 16 July 2026
Time: 14:00-16:00
Venue: Muldersvlie Substation-Face to Face Compulsory
Meeting
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
It is required so that contractors have understanding of what will be
expected in terms of the deliverables of the contract, such as
must work on and all the installation points and all the
outstanding work/equipment.
which will simplify the process in terms of submit all the
required information within the tender stipulated time.
expected to have knowledge and expertise to complete all
the outstanding work, terminate, commission and handover.
Street address Muldersvlei Substation
R101, Old Paarl Road, Klapmuts, Cape Town. (Traveling on the
N1 from Cape Town to Paarl. Take the Stellenbosch turn-off R304
to Stellenbosh. After the weighbridge, turn left on the R101.
Proceed for about 1 km and turn left to the station.)
GPS coordinates, -33.817868S 18.808316E
Should the supplier not be able to access the above address or
GPS coordinates they must contact: Peter Clifton-Smith: Via
Email/ Tel ...0798350774......Eskom Site Supervisor for Site
Meeting (Face To Face meeting).
Please note that tenderers that do not attend compulsory
meetings will be disqualified and will not be evaluated.
2.16 Seeking clarification The tenderer will notify NTCSA of any clarifications required before
closing time for clarification queries, which is 10 working days before
the deadline for tender submission. This includes the requests for
extension for tender closing date. In this case it’s the 20th of July
Any addenda or clarifications to the Invitation to Tender (ITT) will be
posted on the e-tender portal and the Tender Bulletin. Tenderers must
review these platforms for updates before finalizing their bid
submissions. NTCSA will not be responsible for any disadvantages or
disqualifications resulting from Tenderers not accessing the latest ITT
information.
2.22 Alternative tenders Alternative tenders are not allowed.
If alternative tender(s) are allowed, it may be based only on the
following criteria and subject to acceptance by NTCSA:
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
secondary option clauses, acceptable to NTCSA as the
Employer, selected from the NEC Engineering and
Construction Contract.
2.33 Cataloguing The successful tenderer may be required to provide the cataloguing
information per item after contract award, and in that instance, will
need to ensure that all materials delivered to NTCSA are labelled in
line with NTCSA’s labelling specifications as may be stipulated.
Where cataloguing is a requirement, the Pricing Schedule must
also include a line item for cataloguing, which tenderers are required
to quote for. NTCSA will pay for the cataloguing.
2.34 Provision of Security for The following forms of security are required for this enquiry:
Performance If the provision of security for performance in the form of a
performance bond or a demand guarantee is a requirement, the
tenderer must select a minimum of two (2) financial institutions that it
is likely to approach.
3.4 Tender Opening Due to the tender closing Electronically via NTCSA E-tendering. For
E-tendering. There will be no public opening of tenders. Tenders will
be downloaded electronically.
3.5 Prices to be read out or not Prices will not be read out
3.9 Basic Compliance Basic compliance with this enquiry requires a tenderer to meet all the
following requirements:
Basic compliance for this invitation to tender are:
technical information
As At Stipulated Deadlines.
For E-Tendering, a tenderer’s failure to have submitted /
uploaded tender documents will render the tender
non-responsive.
3.10 Mandatory Tender Returnables Tender will be Evaluated on Commercial and Technical which
are Mandatory Stages
a) Commercial Mandatory Requirements:
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
copy in excel format.
Failure by the supplier to submit the Bill of Quantities (BOQ)
in PDF or in Excel Format will result in the supplier being
disqualified and excluded from further evaluation.
If supplier submitted BOQ either in excel or PDF, the supplier
won’t be disqualified.
b) Step 2 (a) Mandatory Requirements (i.e. Tender returnable) -
100% Compliance. Refer to Annex B of 240-185000522 Rev 1
In Refer to Annex B, Table -185000522 Rev 1.
tender application being disqualified immediately.
or “No” answers will be allocated, and the required outcome is for
the tenderer to have “Yes” for all mandatory requirements listed
in order to achieve 100% compliance.
Compliance with all Mandatory Requirements is 100%
Compulsory for all suppliers. Any supplier who fails to comply
with the mandatory requirements will be deemed non-
responsive and will Not Qualify For Further Evaluation.
Mandatory technical criteria have been stipulated in Annexure B
of 240-185000522 Rev 1 this section Is a Mandatory Requirement.
Should the supplier fail to meet the 100% Compliance. The tender
will be disqualified and excluded from further evaluation.
3.13 Functionality requirements Functionality requirements are Applicable
The following criteria will be applicable for this transaction under
functionality criteria:
capability (Setting of minimum qualifying score for Functionality
(Threshold) (Technical evaluation stated below.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
Technical evaluation shall be performed in accordance with the
Technical Evaluation Criteria as stated in Refer to Annex B,
Table -185000522 Rev 1. Scoring Technical Evaluation
Criteria.
Threshold for Step 2(b) Technical Evaluation:
Tenderers must achieve a minimum score of 90% in the
Technical Evaluation to qualify for further evaluation.
Any supplier who fails to achieve the minimum threshold of
90% will not be considered for the subsequent stages of the
evaluation process.
Step 2(c) Only suppliers who have successfully passed Step
2(b) by achieving the required minimum technical evaluation
threshold of 90%will qualify and be eligible for evaluation in
Step 2(c).
The weight for the step 2 (c) Site Compliance Technical review
will be 100 points and will be based on:
TECHNICAL EVALUATION CRITERIA Scores Comments Total
ORHVS: The Responsible Person
/Site Supervisor must have Modules 25
1-6 (Responsible Persons). Must be
able to accept a Permit & Supervise
his/her team within a High Voltage
(HV) Substation. NB! The Site
Supervisor is a stand-alone
resource, who must be competent,
that is, he/she must not be part of
the hands-on workforce. The person
must have a valid (Transmission)
authorised ORHVS.Should the
supplier not provide this requirement
the supplier will score 0 points
SACPCMP Construction Site 20
Supervisor Certification must be
provided: This is a legal
requirement for a site supervisor.
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
Should the supplier not provide this
requirement the supplier will score
0 points and please note that
application letter is not acceptable
Record of similar work completed in 15
the past and reference contact
details of such contracts, e.g. no
outstanding NCR’s
5 years -15
3 years-10
2 years- 5
Schedule of scope to be executed 20
giving the timelines of scheduled
activities. NB! Use of MS Projects
is mandatory not MS Xcel Should
supplier not submit MS Project the
supplier will score 0.
Contractor to ensure that all 20
relevant artisans are appointed in
writing. Competency certificates
and CV’s must be provided at
tender stage. Should supplier not
submit the required proof at the
tendered stage the supplier will
score 0
Total Minimum Threshold 80
Tenderers who do not meet minimum threshold of 80 point for
technical scoring will be disqualified.
Tenderers who do not meet the threshold for functionality
scoring will be disqualified.
(NTCSA reserves the right to reduce the functionality threshold to a
predetermined lower threshold in the event that no tenderer meets the
stipulated functionality threshold. If this possibility is reasonably
anticipated, the reservation of right must be stated clearly in the
Enquiry together with the predetermined lower threshold)
3.14 Evaluation of Price Prices will be evaluated as follows:
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Quality Management
Source: ITTFOR~1.PDF (TENDER)1.1.37 Quality Refer to √
the Quality
Compliance Requirements
Source: ITTFOR~1.PDF (TENDER)A certified copy of a tax clearance certificate is required from Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 foreign tenderers (with a footprint in South Africa but that are not registered on CSD and have not provided a SARS pin number) and local tenderers (that have not provided their SARS e- filing PIN number for verification by NTCSA and/or their CSD profile / CSD number). Foreign suppliers with no footprint in South Africa must complete the SBD1 document; however, no proof of tax compliance is required. 1.1.11 Tax Evaluation √ questionnaire to determine whether a company, close corporation (CC) or Trust is a personal service provider for purposes of PAYE [only to be attached for services type of contracts]. Not Applicable 1.1.12 *SBD 6.1 Annexure Y √ Preference Points I Claim Form in terms of PPPFA 2022 regulations Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 1.1.13 # Specific Goals √ A tenderer’s failure to submit proof that it meets the specific goals will not result in its disqualification. The tenderer will, however, be scored zero for Specific Goals for purposes of PPPFA scoring and ranking. 1.1.14 Compliance with √ Employment Equity Act To the extent that the tenderer falls within the definition of a “designated Employer” as contemplated in the Employment Equity Act , the tenderer is required to furnish the Employer with proof of compliance with the Employment Equity Act, including proof of submission of the Employment Equity report to the Department of Labour. (South African tenderers only) Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 1.1.15 **SBD 4 – Annexure Y √ Bidders J Disclosure 1.1.16 Additional Documents required in event of JV:- 1.1.16. Letter of intent to √ 1 form a JV/consortium or Valid joint venture agreement confirming the rights and obligations of each of the joint venture partners and their profit- sharing ratios. 1.1.16. Separate written √ 2 confirmation that the joint venture will operate as a single business entity (incorporated) for the duration of the contract, or this may be included as an obligation within the JV agreement. 1.1.16. Details and √ 3 confirmation of a single designated bank account in the name of the JV and independent of the individual JV partners, as set out in the joint venture agreement. 1.1.17 Reverse e- [To be √ auction training uploaded acknowledgemen from t form (Not Open Applicable) Text] Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 Reverse E- auction Training Acknowledg ement Form.docx - Content Suite Platform CE 21.3 (ntcsa.co.za) 1.1.18 Reverse e- [To be auction process uploaded (Not Applicable) from Open Text] Reverse E- auction Process Template - Content Suite Platform CE 21.3 (ntcsa.co.za) 1.1.19 E-tendering Help [To be √ Manual uploaded acknowledgemen by the Buyer from t form OpenText and attached to the enquiry] 1.1.20 E-tendering Help [To be Manual for uploaded supplier by the Buyer from OpenText and attached to the enquiry] 1.1.21 CIDB Electrical √ Engineering Works (Infrastructure) (Grade 3EP) or Higher. CIDB Valid proof of the required Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 CIDB grading designation for the main contractor; JV and /or sub- contractor as may be required in the tender data at tender closing deadline or within 21 working days from the closing date of submission of tenders if this is agreed with the Employer CIDB- 1.1.22 CIDB Contract √ Skills Development Goals (CSDG) (Not Applicable) [CSDG is applicable to a contract or an order issued in terms of a framework agreement that has a duration of 12 months or more, and to
a contract of R5 million or more, in the case of a professional service or service contract or an order issued in terms of such a contract; or
a cidb grading Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 designation of grade 7 or higher, in case of an engineering and construction works, or design and build contract or an order issued in terms of such a contract. The contractor shall achieve in the performance of the contract the CSDG established in the CIDB Standard for Developing Skills through Infrastructure contracts published in GN 1779, Government Gazette No. April 2023]. Not Applicable 1.1.23 Building/Civil: To be Y √ Contract Skills downloade Development d from NTCSA Goals (CSDG) tender documents and/or CIDB Standard for Webside, developing Skills Th CSDG Standard Guide Form A1 (Form A1 Recognised Skills De List of Recognised Skills Developme nt Agencies, Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 Form A2 Baseline Form A2 Baseline Training Training Plan PSP.do Plan, Form A3 Project Interim Report, Form A2 Baseline Training Plan Versio Form A4 Supervisor Agreement, Form A5 Form A3 Interim Project Compliance Training Completion Report Form A4 Supervisor Not Agreement.docx Applicable Form A5 Final Training Report.xlsx 1.1.24 CIDB: Indirect To be Y √ Targeting for downloade Enterprise d from CIDB Enterprise (Annexure Development A-Targeted Through Works. Enterprise project duration of 6 months; and (c) construction works contracts in which at least 25% of the main contract could reasonably be expected to be subcontracted out in one or more of the following CIDB Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 classes of construction works
Civil Engineering (CE) ii) Electrical Engineering Work (EB) iii) General Building Works (GB) iv) Mechanical Engineering (ME) 1.1.26 a) Scope of Work Refer to the Technical Refer to Rev 1 Folder 240-185000522 1.1.27 NEC3 Refer to the √ Engineering and Technical Construction Folder (ECC3) Contract (ECC3) 1.1.28 BOQ (is not Refer to the √ contained in Technical Contract) Folder 1.1.29 Additional √ documents required (ECSA/ SACPCMP/CVs/ permits/licenses/ specific registration documents (if applicable to scope of work) 1.1.30 Standard Terms √ and Conditions 1.1.31 Supplier Non- √ Disclosure Agreement 1.1.32 SD&L √ Undertaking 1.1.33 Insurance √ Deductibles Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 1.1.34 List of Acceptable √ Guarantors (where applicable) MANDATORY CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE [applicable to all tenders] 1.1.35 Mandatory √ Contractual Proof of valid and current CSD Registration CSD number/CSD Report) [applicable to all tenderers of local origin and foreign tenderers with local footprint SDL&I- SDL&I- Contractual Contractu Requirements al Requirem ents-Refer to the SDL&I Folder ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE 1.1.36 Safety √ COIDA - Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) 1.1.37 Quality Refer to √ the Quality Folder Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 86 File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Invitation to Tender/ Request Identifier for Proposal Effective Date July 2024 Review Date July 2027 1.1.38 Other √ safety/quality documents as required per
B-BBEE Details: rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Invitation to Tender/ Request Identifier
for Proposal Effective Date July 2024
Review Date July 2027
1.1.13 # Specific Goals √
A tenderer’s
failure to submit
proof that it meets
the specific goals
will not result in
its
disqualification.
The tenderer will,
however, be
scored zero for
Specific Goals for
purposes of
PPPFA scoring
and ranking.
1.1.14 Compliance with √
Employment
Equity Act
To the extent that
the tenderer falls
within the
definition of a
“designated
Employer” as
contemplated in
the Employment
Equity Act , the
tenderer is
required to
furnish the
Employer with
proof of
compliance with
the Employment
Equity Act,
including proof of
submission of the
Employment
Equity report to
the Department of
Labour. (South
African tenderers
only)
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
B-BBEE Requirements
Source: ITTFOR~1.PDF (TENDER)for Proposal Effective Date July 2024
Review Date July 2027
1.1.13 # Specific Goals √
A tenderer’s
failure to submit
proof that it meets
the specific goals
will not result in
its
disqualification.
however, be
scored zero for
and ranking.
Health & Safety
Source: ITTFOR~1.PDFshall achieve in
the performance
of the contract
the CSDG
established in
the CIDB
contracts
published in GN
1779,
for Proposal Effective Date July 2024
Review Date July 2027
1.1.38 Other √
safety/quality
documents as
required per
scope of works
resource, who must be competent,
that is, he/she must not be part of
the hands-on workforce. The person
must have a valid (Transmission)
authorised ORHVS.Should the
supplier not provide this requirement
the supplier will score 0 points
SACPCMP Construction Site 20
Contractual Terms
Source: ITTFOR~1.PDFfor Proposal Effective Date July 2024
Review Date July 2027
National transmission company south africa soc ltd (ntcsa)
Invitation to tender (ITT)
For
Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning & Handover
for a period of 6 months.
Tender number E3191NTCSAMWP
Issue date 07 July 2026
Closing date and time 04 August 2026 at 10:00AM
Tender validity period 12 weeks from the closing date and time
Clarification meeting Two (2) Clarification Meetings are required.
1st Non-Compulsory Meeting will be conducted
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
National Transmission Company South Africa SOC Ltd (hereinafter “NTCSA”) invites you to submit a
tender for the Muldersvlei 11kV Switchgear Supply, Install, Termination, Commissioning &
Handover for a period of 6 months.
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
for Proposal Effective Date July 2024
Review Date July 2027
a country if the tenderer is a national or is constituted,
incorporated, or registered and operates in conformity with the
provisions of the laws of that country. This criterion shall also
apply to the determination of the nationality of proposed
subcontractors or suppliers for any part of the Contract including
related services.
individually or as a partner in a joint venture (JV) or consortium,
except on an E-Tendering system where there is a limit size (The
upload size per document is 500 megabytes and total submission
is restricted to 4 gigabytes).
measures against these suppliers; and
b) Other suppliers implicated in serious misconduct and a breach of
the Eskom Supplier Integrity Pact by a forensic report or other
source of credible information, such as the SAPS, the NPA, the
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
performance bond or a demand guarantee is a requirement, the
tenderer must select a minimum of two (2) financial institutions that it
is likely to approach.
3.4 Tender Opening Due to the tender closing Electronically via NTCSA E-tendering. For
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, © copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 86
File name: 559-235050781 ITT For Muldersvlei 11kV Switchgear Supply Install Termination Commissioning Final
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Requirements
Source: ITTFOR~1.PDF (TENDER)1.1.14 Compliance with √
the tenderer falls
within the
definition of a
“designated
Employer” as
contemplated in
the Employment
tenderer is
required to
furnish the
proof of
compliance with
the Employment
including proof of
submission of the
the Department of
Labour. (South
for Proposal Effective Date July 2024
Review Date July 2027
1.1.15 **SBD 4 – Annexure Y √
Section
Source: ITTFOR~1.PDFwill score zero.
Documents required under functionality/techinical criteria
1.1.41 Functionality/ Technical √
Stage1 Stage 2(a): Mandatory Requirements (i.e. ✓
further evaluation.
Stage 2 Step 2 (b) Evaluation of Tenders on functionality ✓
Technical evaluation shall be performed in
accordance with the Technical Evaluation Criteria
185000522 Rev 1. Scoring technical evaluation
Threshold for Step 2(a) Technical Evaluation
Tenderers must achieve a minimum score of 90%
in the Technical Evaluation to qualify for further
evaluation.
subsequent stages of the evaluation process.
1.1.37 Quality Refer to √
the Quality
safety/quality
1.1.13 # Specific Goals √
the specific goals
scored zero for
Specific Goals for
PPPFA scoring
t Qualify For Further Evaluation.
will be disqualified and excluded from further evaluation.
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Data conflicts
None detected
Lake Street, Germiston, Johanessburg, 1401, South Africa
Get deep intelligence on Specialised construction activities. Unlock full pricing strategies, bid frequency, and historical win rates.