Tender Type
Sole source bidding
Delivery Location
Grootvlei Power Station - Grootvlei - Grootvlei - 2024
Organization Type
GOVERNMENT
Published
10 Jul 2026
OCDS Reference
ocds-9t57fa-161965
This tender is a specification document from ESKOM outlining the mandatory quality management system (qms) requirements for all current and potential suppliers. IT is intended for suppliers and sub-suppliers bidding on ESKOM contracts, requiring them to develop, implement, and maintain a qms based on iso 9001. The document defines the quality criteria for supplier selection, evaluation, and auditing across all ESKOM procurement processes.
Date & Time
Friday, 14 August 2026 - 10:00
Venue
null
Categories
Sole source bidding
Grootvlei Power Station - Grootvlei - Grootvlei - 2024
10 Jul
2026
Tender Published
Tender was published
14 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
ALTMP_PFS_24.pdf
This is an Eskom evaluation form template (GVLF 0183 Rev 1) for assessing supplier/contractor capabilities to provide FFP Compressor Plant Service and maintenance at Grootvlei Power Station. The evaluation focuses on Safety, Health, and Environmental (SHE) compliance requirements.
Median Estimate
R 960 000
Range
Based on SITA benchmarks. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A technical guide to municipal electrical tenders. Covers CIDB EB grading, electrification projects (INEP), and maintenance of substations and mini-subs.
How mechanical and electrical engineers, contractors, and consultants can win public sector contracts in South Africa — HVAC, plumbing, fire systems, electrical infrastructure, ECSA registration, CIDB ME designation, and tender documentation essentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
A meticulously organised tender submission can be the difference between a winning bid and one that hits the rejection pile. Learn how to package, structure, and present your tender response for maximum evaluator impact on South African government contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogAI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: FFP Compressors.xlsx. You don’t need to refresh — this page will pick up the updated review automatically.
Contact Information
Source: ALTMP_PFS_28.pdf (unknown)Eskom representative: Mmaphuti Moloto.
Date issued: 2025-06-13.
Submission Guidelines
Source: ALTMP_PFS_28.pdf (unknown)Returnable Documents:
Returnable Documents
Source: ALTMP_PFS_28.pdf (unknown)Required returnable document:
Evaluation Criteria
Source: ALTMP_PFS_28.pdf (unknown)While not explicitly stated in the provided document, eligibility likely requires: proven experience in FFP compressor/dryer maintenance at power stations; valid ISO 9001-aligned QMS; access to compliant workshop/warehousing facilities; ability to provide certified materials and calibrated equipment; and capacity to manage project risks. The tender appears targeted at Atlas Copco (Pty) Ltd or similar specialized compressor service providers.
Technical Specifications
Source: ALTMP_PFS_28.pdf (unknown)Scope: Inspection and maintenance of FFP compressors and dryers at Grootvlei Power Station for a period of 5 years.
Compliance Requirements
Source: ALTMP_PFS_28.pdf (unknown)No specific requirements found.
Section
Source: ALTMP_PFS_28.pdfQuality Requirements Deliverables evaluation indicator = 1.
Section A: Quality Management System Requirements ISO 9001 (Score option 2-3):
Section B: Evidence of QMS in operation (Score 5):
Section E: User-defined additional requirements (Score 1):
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
ALTMP_PFS_28.pdf
Eskom tender for Inspection and Maintenance of FFP Compressors and Dryers at Grootvlei Power Station for a 5-year period. The document outlines quality management requirements for tender evaluation, focusing on ISO 9001-aligned QMS documentation, control of external providers, material/equipment compliance, preservation facilities, and risk management. Tender issued 2025-06-13, closing 2026-08-14.
ALTMP_PFS_22.pdf
This is an Eskom OHS (Occupational Health and Safety) Tender Evaluation Template for a high-risk project involving the provision of FFP Compressor Plant Service and maintenance by Atlas Copco (Pty) Ltd. The scope covers maintenance and reliability improvement of FFP compressors and dryers. The template outlines mandatory OHS documentation and compliance requirements that tenderers must submit for evaluation.
ALTMP_PFS_25.pdf
Eskom tender for FFP Compressor Plant Service and maintenance by Atlas Copco (Pty) Ltd. This is a Method Statement Template (240-43921804 Rev 6) that outlines the required structure for supplier submissions under NEC contract framework. The tender is national in scope with closing date August 14, 2026.
ALTMP_PFS_23.pdf
This is an Eskom OHS (Occupational Health and Safety) Acknowledgement Form (Annexure B) that forms part of a tender for FFP Compressor Plant Service and maintenance by Atlas Copco (Pty) Ltd. The form requires suppliers/contractors to acknowledge understanding and compliance with Eskom's OHS legal and other requirements.
ALTMP_PFS_27.pdf
Eskom tender for Inspection and Maintenance of FFP Compressors and Dryers at Grootvlei Power Station for a 5-year period. The tender requires compliance with ISO 9001 quality management standards and Eskom's specific quality requirements (Document 240-68099512 Rev 9). Category 4 pre-contract award quality requirements apply, with comprehensive post-contract quality monitoring.
Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf
Eskom seeks a 60-month service and maintenance contract for FFP Compressor Plant at Grootvlei Power Station, using an 80/20 preferential procurement system. The tender emphasizes B-BBEE compliance, mandatory subcontracting for contracts over R30 million, and strong Supplier Development, Localisation, and Industrialisation (SDL&I) obligations, including local content, job creation, and skills development.
Invitation to Tender (ITT).pdf
Eskom Holdings SOC Ltd invites tenders for a 60-month service and maintenance contract at Grootvlei Power Station. The scope includes refurbishment of sampling conditioning panels, supply and delivery of spares and consumables, and maintenance/service of online analysers, water treatment plants, and reverse osmosis plants for Units 1-3. The tender is managed electronically, with a non-compulsory clarification meeting via MS Teams.
ALTMP_PFS_26.pdf
This tender document outlines Eskom's Supplier Quality Management Specification (240-105658000) for the provision of FFP Compressor Plant Service and maintenance by Atlas Copco. It defines mandatory quality management system requirements based on ISO 9001 that all potential suppliers must meet. The specification establishes a framework for supplier selection, evaluation, and ongoing quality monitoring throughout the contract lifecycle.
FFP Compressors.xlsx
GVL 0685 SOW - Atlas copco.pdf
This is a sole-source tender for the provision of FFP (Fabric Filter Plant) Compressor Plant Service and Maintenance at Grootvei Power Station by Atlas Copco (Pty) Ltd as the Original Equipment Manufacturer (OEM). The scope covers scheduled maintenance (minor, major, overhaul), monthly inspections, and once-off projects for 4 ZT250 oil-free screw compressors, 2 FD1000 refrigerant dryers, 2 CD850+ desiccant dryers, filters, and 4 air receivers. The contract includes installation of Equalizer 4.0 PRO control system and employee training.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Nsukuzonke Buthelezi
Phone
017-749-9561
[email protected]
Address
Grootvlei Power Station - Grootvlei - Grootvlei - 2024
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
11
Last checked
10 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Submission Guidelines
Source: ALTMP_PFS_22.pdf (unknown)Returnable Documents:
Returnable Documents
Source: ALTMP_PFS_22.pdf (unknown)Additional OHS tender returnables may be populated if applicable to the scope and evaluated prior to contract award. This section should be deleted if not applicable.
Evaluation Criteria
Source: ALTMP_PFS_22.pdf (unknown)Applicants must demonstrate: Valid COIDA compliance (Letter of Good Standing), CEO commitment via signed OHS policy, qualified Safety Officer (3-year diploma minimum), capability to conduct baseline risk assessments, ability to provide detailed OHS costing, and alignment with Eskom's OHS legal requirements. The tender appears specific to Atlas Copco (Pty) Ltd as the named service provider.
Technical Specifications
Source: ALTMP_PFS_22.pdf (unknown)Scope: Maintenance and improvement of reliability for FFP compressors and dryers.
Financial Requirements
Source: ALTMP_PFS_22.pdf (unknown)Costing for OHS must be detailed and broken down, not provided as a lump sum.
Compliance Requirements
Source: ALTMP_PFS_22.pdf (unknown)OHS Compliance Requirements:
Health & Safety
Source: ALTMP_PFS_22.pdfOHS policy must be signed by the CEO and comply with OHS Act Section 7.
Requirements
Source: ALTMP_PFS_22.pdf (unknown)For explanatory notes on OHS requirements, refer to document 240-77433139 Annexure A: Supplier Risk Category.
Section
Source: ALTMP_PFS_22.pdfEvaluation uses Annexure C 1: OHS Tender Evaluation Template (High risk).
Description
Source: ALTMP_PFS_25.pdfOutline the scope of work as detailed in the Works Information of the NEC contract, noting the relevant discipline.
Contact Information
Source: ALTMP_PFS_25.pdf (RFQ)Department: as per tender Number/ Contract. Address: relationships with interested parties.
Submission Guidelines
Source: ALTMP_PFS_25.pdf (RFQ)Returnable Documents: Submit all required returnable documents as specified in the tender.
Evaluation Criteria
Source: ALTMP_PFS_25.pdf (RFQ)Not explicitly stated in template. Likely requires: Atlas Copco (Pty) Ltd as specified service provider or authorized partner, relevant compressor plant maintenance experience, NEC contract compliance capability, quality management system (QM Category 4), South African operations capability, and valid safety/technical certifications for compressor plant service.
Technical Specifications
Source: ALTMP_PFS_25.pdf (RFQ)Methodology
Source: ALTMP_PFS_25.pdfExperience & Qualifications
Source: ALTMP_PFS_25.pdf (RFQ)Detail the skills, competencies, training, and human resources required to deliver the tender/order scope of work.
Quality Management
Source: ALTMP_PFS_25.pdfCompliance Requirements
Source: ALTMP_PFS_25.pdf (RFQ)No specific compliance requirements found. Risks affecting SOW outputs must be identified and managed with actions to minimise and mitigate them.
Health & Safety
Source: ALTMP_PFS_25.pdf (RFQ)Identify and manage risks that affect the outputs of the processes and overall outcomes of the SOW, with actions to minimise and mitigate identified risks.
Section
Source: ALTMP_PFS_25.pdfThe primary focus of quality personnel in the organisation is to meet customer requirements and strive to exceed customer expectations.
Description
Source: GVL 0685 SOW - Atlas copco.pdfEvaluation Criteria
Source: GVL 0685 SOW - Atlas copco.pdf (unknown)This is a sole-source tender specifically for Atlas Copco (Pty) Ltd as the Original Equipment Manufacturer of the FFP compressors and dryers. No other bidders are eligible. The contractor must have OEM expertise, certified technicians, access to genuine OEM parts, and capability to service ZT250 compressors, FD1000 refrigerant dryers, and CD850+ desiccant dryers per manufacturer specifications.
Technical Specifications
Source: GVL 0685 SOW - Atlas copco.pdf (unknown)Methodology
Source: GVL 0685 SOW - Atlas copco.pdf (unknown)Quality Management
Source: GVL 0685 SOW - Atlas copco.pdfCompliance Requirements
Source: GVL 0685 SOW - Atlas copco.pdf (unknown)Health & Safety
Source: GVL 0685 SOW - Atlas copco.pdfContractual Terms
Source: GVL 0685 SOW - Atlas copco.pdfRequirements
Source: GVL 0685 SOW - Atlas copco.pdf (unknown)Section
Source: GVL 0685 SOW - Atlas copco.pdfDescription
Source: ALTMP_PFS_24.pdfSubmission Guidelines
Source: ALTMP_PFS_24.pdf (unknown)Evaluation Criteria
Source: ALTMP_PFS_24.pdf (unknown)Service providers must demonstrate comprehensive SHE management systems including documented policies, site-specific environmental plans, legal compliance with NEMA 107 of 1998, qualified SHE personnel, and trained workforce. All documentation must be current and signed by appropriate management levels.
Technical Specifications
Source: ALTMP_PFS_24.pdf (unknown)Experience & Qualifications
Source: ALTMP_PFS_24.pdf (unknown)Compliance Requirements
Source: ALTMP_PFS_24.pdf (unknown)Health & Safety
Source: ALTMP_PFS_24.pdfSpecial Conditions
Source: ALTMP_PFS_24.pdf (unknown)Section
Source: ALTMP_PFS_24.pdfImportant Dates
Source: FFP Compressors.xlsx (unknown)Closing date for submissions: 14 August 2026 at 10:00.
Submission Guidelines
Source: FFP Compressors.xlsx (unknown)Returnable Documents: The tender document indicates that returnable documents are required, but specifics are not provided. Bidders should prepare all standard bid submission forms and any supporting documents as per the tender type.
Technical Specifications
Source: FFP Compressors.xlsx (unknown)Scope: Provision of FFP Compressor Plant Service and maintenance by Atlas Copco (Pty) Ltd. This appears to be a sole source bidding process, indicating a specific supplier is intended.
Compliance Requirements
Source: FFP Compressors.xlsx (unknown)Failed to open XLSX workbook. Bidders must ensure they meet all standard compliance requirements for Eskom tenders, including CSD registration, tax clearance, and B-BBEE status, but specific details are unavailable from the document.
Description
Source: ALTMP_PFS_26.pdfImportant Dates
Source: ALTMP_PFS_26.pdf (unknown)Contact Information
Source: ALTMP_PFS_26.pdf (unknown)Submission Guidelines
Source: ALTMP_PFS_26.pdf (unknown)Returnable Documents
Source: ALTMP_PFS_26.pdf (unknown)Evaluation Criteria
Source: ALTMP_PFS_26.pdf (unknown)Eligibility is contingent on demonstrating compliance with the Supplier Quality Management Specification. Key criteria include: 1) Possession of a valid ISO 9001 certificate (for Category 1) or evidence of a developed QMS (Categories 2-4). 2) Ability to submit all required 'tender returnables' as per the selected category and Eskom's List of Tender Returnables (240-12248652). 3) Acceptance of Eskom's standard conditions, including rights of access, audit, and oversight of sub-suppliers. 4) For critical work, successful completion of a pre-contract capability and capacity assessment.
Technical Specifications
Source: ALTMP_PFS_26.pdf (unknown)Methodology
Source: ALTMP_PFS_26.pdfExperience & Qualifications
Source: ALTMP_PFS_26.pdfQuality Management
Source: ALTMP_PFS_26.pdfCompliance Requirements
Source: ALTMP_PFS_26.pdf (unknown)Health & Safety
Source: ALTMP_PFS_26.pdfContractual Terms
Source: ALTMP_PFS_26.pdfRequirements
Source: ALTMP_PFS_26.pdf (unknown)Section
Source: ALTMP_PFS_26.pdfDescription
Source: ALTMP_PFS_27.pdfSubmission Guidelines
Source: ALTMP_PFS_27.pdf (unknown)Returnable documents must be completed as part of the tender submission. Ensure all required forms are filled out and submitted.
Returnable Documents
Source: ALTMP_PFS_27.pdf (unknown)Evaluation Criteria
Source: ALTMP_PFS_27.pdf (unknown)ISO 9001:2015 certification mandatory. Proven capability and capacity as Main Supplier with sub-supplier management systems. Experience with FFP compressor plant maintenance. Ability to operate at Grootvlei Power Station. Compliance with Eskom's quality audit and monitoring requirements. Financial and technical capacity for 5-year contract.
Methodology
Source: ALTMP_PFS_27.pdfQuality Management
Source: ALTMP_PFS_27.pdfCompliance Requirements
Source: ALTMP_PFS_27.pdf (unknown)No specific compliance requirements stated in the provided document.
Section
Source: ALTMP_PFS_27.pdfDescription
Source: ALTMP_PFS_23.pdfSubmission Guidelines
Source: ALTMP_PFS_23.pdf (unknown)Evaluation Criteria
Source: ALTMP_PFS_23.pdf (unknown)The form must be signed by an authorized person (CEO/Director/Managing Director) of the company/supplier with two witnesses. The company must demonstrate ability to comply with all listed OHS acts, standards, and Eskom-specific requirements, including management of sub-contractor OHS compliance.
Technical Specifications
Source: ALTMP_PFS_23.pdf (unknown)Compliance Requirements
Source: ALTMP_PFS_23.pdf (unknown)Health & Safety
Source: ALTMP_PFS_23.pdfa) Eskom Contractor Health and Safety Requirements Standards (32-136)
b) OHS specifications/requirements provided by Eskom
c) Occupational Health and Safety Act
d) Compensation for Occupational Diseases and Illnesses Act
Contractual Terms
Source: ALTMP_PFS_23.pdfa) Demonstrate to Eskom the process and selection criteria applied when appointing contractors and suppliers.
b) Provide notification to Eskom prior to appointment of contractors or suppliers for commencement of work.
c) Ensure contractors/suppliers have adequate resources and competencies.
d) Remain accountable for management of contractors/suppliers to ensure compliance with applicable legal and Eskom requirements during contract execution.
e) Monitor contractors/suppliers through audits and assessments for OHS compliance during work execution.
f) Define grounds for termination of work done by contractors/suppliers.
g) Handle all non-conformances/non-compliance by contractors/suppliers (all tiers) directly with the main contractor/supplier via performance and penalty processes.
h) Allow Eskom to verify compliance; may be instructed to provide copies of testimonials/references and contact details of clients (including Eskom) for whom the company has done previous similar work.
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdfContact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Returnable Documents
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Tenderers must meet objective criteria for contract award: B-BBEE compliance (certificate/affidavit), and if contract > R30 million, mandatory subcontracting to EME/QSE (51% black-owned in rural/township areas). Failure to meet these may lead to disqualification or award to the next-ranked tenderer. CIDB skills development is not applicable here. Financial thresholds determine B-BBEE submission type: ≤R10M (affidavit), ≤R50M (QSE scorecard/affidavit), >R50M (full certificate).
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Methodology
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdfQuality Management
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Pricing Schedule
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdfFinancial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)B-BBEE Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Contractual Terms
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdf (TENDER)Section
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy.pdfDescription
Source: Invitation to Tender (ITT).pdfImportant Dates
Source: Invitation to Tender (ITT).pdf (TENDER)Contact Information
Source: Invitation to Tender (ITT).pdf (TENDER)Submission Guidelines
Source: Invitation to Tender (ITT).pdf (TENDER)Evaluation Criteria
Source: Invitation to Tender (ITT).pdf (TENDER)Tenderers must not be on international sanctions lists, submit only one tender, have no conflict of interest, and not subcontract 100% of the work. They must not be restricted by National Treasury or on Eskom's Tender Defaulters list. Joint ventures must provide an agreement with joint and several liability. Tenderers from sanctioned countries or with unauthorized signatures are ineligible. Eligibility is strictly enforced; non-compliance leads to disqualification.
Technical Specifications
Source: Invitation to Tender (ITT).pdf (TENDER)Quality Management
Source: Invitation to Tender (ITT).pdfPricing Schedule
Source: Invitation to Tender (ITT).pdfFinancial Requirements
Source: Invitation to Tender (ITT).pdf (TENDER)Compliance Requirements
Source: Invitation to Tender (ITT).pdf (TENDER)Health & Safety
Source: Invitation to Tender (ITT).pdfEnvironmental
Source: Invitation to Tender (ITT).pdfContractual Terms
Source: Invitation to Tender (ITT).pdfSection
Source: Invitation to Tender (ITT).pdfSets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Data conflicts
None detected
Get deep intelligence on Services: Electrical. Unlock full pricing strategies, bid frequency, and historical win rates.