Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Dennysville road - Viljoensdrift - Vereeniging - 1930
Organization Type
GOVERNMENT
Published
06 Aug 2026
OCDS Reference
ocds-9t57fa-164909
This tender invites bids for the supply and delivery of a 1mva mini substation (rmu) to lethabo power station in the free state, on a once-off basis. The procurement is an open tender (request for bid) under the supplies: electrical equipment category. NO briefing session is scheduled, and the closing date is 20 august 2026.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 20 August 2026 - 10:00
Venue
null
Tenders are uploaded via ESKOM tender bulletin site on the ESKOM e- tendering page.
Categories
Request for Bid(Open-Tender)
Dennysville road - Viljoensdrift - Vereeniging - 1930
Recommended Certifications
Having these can improve your winning chances: SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Description
Source: Quality.zip06 Aug
2026
Tender Published
Tender was published
20 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Quality.zip
Safety.zip
Commercial.zip
Technical.zip
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 422 698
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Supply and delivery of a 1MVA Mini Substation at Lethabo Power Station
Signature
Section (tenderer)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Clause 3 pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
CLAUSE 4 Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000)
Post-contract award (ESKOM)
Contact Information
Source: Quality.zip (unknown){"name":null,"email":null,"phone":null,"department":"ies (Risk register and action plan or template).","address":"nd evaluated here"}
Evaluation Criteria
Source: Quality.zip (unknown)A.3 Quality Objectives Approved by top management. 1
Section A Score 3
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection, monitoring of
performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 5
Section E Score 1
Supplier Quality Management: Revision 7
Category 4 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.1 QMS Manual or a document that defines and describes the QMS and its scope or Quality Method statement. 1
A.2 Quality Policy Approved by top management. 1
Technical Specifications
Source: Quality.zip (unknown)Supply and delivery of a 1MVA Mini Substation at Lethabo Power Station
Signature
Section (tenderer)
Clauses of 240- clause description indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Clause 3 pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
CLAUSE 4 Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000)
Post-contract award (ESKOM)
Compliance Requirements
Source: Quality.zip (unknown)No specific requirements found
Section
Source: Quality.zipA.3 Quality Objectives Approved by top management. 1
Section A Score 3
SECTION B : Evidence of QMS in operation (Tender Quality Requirements -Ref 240-105658000)
quality management function/role) 1
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection, monitoring of
performance, and re-evaluation of external providers (Clause 8.4 of ISO 9001:2015)
Section B Score 5
Section E Score 1
Supplier Quality Management: Revision 7
Category 4 : Quality Requirements Deliverables to be evaluated indicator = 1
SECTION A : Quality Management System Requirements ISO 9001
A.1 QMS Manual or a document that defines and describes the QMS and its scope or Quality Method statement. 1
A.2 Quality Policy Approved by top management. 1
Description
Source: Safety.zipCell A3: Occupational Health and Safety Baseline risk assessment template
Tenderer’s / Supplier’s name: ………………………………………………. Tender Ref number: ………………………………….
Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its
Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations.
This OHS specification is Eskom Generation's minimum requirements which are required to be
met for the duration of the contract period by contractors/suppliers and, where required, the
delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom in no
way assumes the contractor’s legal responsibilities and liabilities. The contractor is and remains
accountable for the quality and execution of their health and safety programme for their
employees and appointed contractor employees. This OHS specification reflects minimum
requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that
must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Eskom Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
2.2.2 Informative
2.3 Definitions
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety risks
associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division
and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also
referred to as the contract administrator/custodian or agent or project
manager (as defined in the contract). He/she is the person
responsible for ensuring that the works or services are executed in
terms of the contract, as well as adherence to legislation pertaining to
the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works under
the direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (ex labour broker) as defined
in section 1(1) of the Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
the land, water, and atmosphere of the earth;
micro-organisms and plant and animal life; and
any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic, and
cultural properties and conditions of the foregoing that influence
human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work undertaken,
and setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form, containing
safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Occupational Health and means comprehensive health and safety requirements for a contract,
safety requirements project, site, and scope of work. This specification is intended to
ensure the health and safety of persons, both workers and the public,
and the duty of care to the environment. The health and safety
requirements must be specific to each contract, project, site, and
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of fitness (OHS Act) means a certificate valid for one year, issued by an
occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Medical surveillance (OHS Act) means a planned programme or periodic examination
(which may include clinical examinations, biological monitoring, or
medical tests) of employees by an occupational health practitioner or,
in prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
National Enquiries/contracts sourcing of services providers/contractors at the divisional level and
not at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of
the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in
section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and
Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building,
specific project, work site, or the site where agents, clients, Main
contractors, contractors, suppliers, vendors, and service providers
provide a service to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to
Eskom for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the
identified risks, and the control measures with all his/her team
members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure common
understanding of the tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement
services – Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file
for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the
project manager/end user who will facilitate the signing of the document by Eskom and contractor
representatives.
3.1 Scope of work
Supply, delivery and Supply and delivery of a 1MVA Mini Substation at Lethabo Power Station
(Once Off)
Mini Substation: Type: Type B; Voltage: 11 Kvac; Operating Range: 1732a Lv Bushbar; Phase:
3; Mounting Method: Base Mount; Enclosure Rating: Ip55; Enclosure Type: 3cr12-Power Coated;
Cooling Method: Natural Cooling; Width: 1650 Mm; Length: 3000 Mm; Special Features: Rmu;
Standard: 240-56062752; 1 Mva Maniature Substation With Rmu; Base Width; 1200mm Supplier
To Complete Schedule B 34 1621
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed
contractor"
3.2 Legal compliance
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.2.1 Section 37(2) (Legal) Agreement & Appointment of the Contractor
A section 37(2) agreement must be signed between Eskom and the main contractor at the time
of submitting the safety file. The main contractor must ensure that a section 37(2) agreement is
compiled between the main contractor and all their appointed contractors for the contract. The
original copy of the section 37(2) agreement must be retained by the contractor, and a copy must
be retained by the responsible project manager/end user. A copy of all the agreements must form
part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom does not condone the use of child labour and, therefore, all effort must be
exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to
this project being:
Rights).
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their
strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of
the policy must be filed in the contractor's OHS files and attached as an annexure to the OHS
Plan.
3.5 Hazardous biological agents
3.5.1 Severe Acute Respiratory Syndrome (SARS-CoV- 2)
The Main Contractor and all appointed contractors shall ensure that a Baseline risk assessment
is conducted and communicated with all employees. All the requirements of RHBA 10,11,12 are
met.
3.6 Coid act
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing
(LoG) from such commissioner. The obligation lies with the contractors to ensure that the LoG
remain valid throughout the contract period. A copy of the LoG must be filed in the contractor
OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases etc.
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will
comply with the OHS Act for the duration of the contract. Before requiring appointees to accept
an appointment, the employer must ensure that they have received appropriate training and/or
information about their responsibilities. The relevant statutory appointments must be made in
compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles. The following should be included in the statutory appointments, but not limited
to:
3.8.1 Non statutory appointments
3.9 ESKOM life-saving rules
work for Eskom to do the same.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
consultants, and contractors. Any Eskom employee or employee of a Main Contractor or
appointed contractor who fails to follow these rules would be deemed a serious violation. These
rules are in place to protect any employee, labour broker, or contractor working from significant
injury or death.
premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a person puts
himself/herself in a position where he/she exposes himself/herself to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5
Where an authorisation limitation exists, no person shall work without the required permit to work.
Ensure safe live working
To ensure safe live work, each live worker shall:
a) Ensure all live work basic principles are adhered to, as outlined (for the method being used) in
the High Voltage Live Working Standard for the respective division.
Rule 6 b) Observe and maintain the minimum approach distance (MAD).
c) Only perform live work (never mix live and dead work on the same site at the same time – Refer
to ORHVS Section 7 and 5 handouts respectively
Perform tasks they are authorised for and only undertake tasks that are documented in the respective
Task Manual (TM). Only work on one potential (voltage) at a time.
Rule 7
Use of cellphones on site
Site
Use of cell phones (either texting or talking) when walking or driving is strictly prohibited.
Specific
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded as a serious misconduct and will result in serious
disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home to their
families safely.
3.10 Substance abuse
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the company.
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and
anyone entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has
self-alcohol testing equipment.
alcohol on a regular basis.
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the
supervisors responsible for the contract. List the relevant positions held, names of appointees,
legal appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement. The
Main contractor is responsible for keeping copies of all the organograms’ as well as submitting
them with the OHS plan. All organograms shall be updated timeously when appointments are
changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
on the company’s letter head, listing the reporting structure from their CE down to their
project supervisors. The diagram must list the names, positions held, any appointments
made and must be signed off by the company's 16(1) or 16 (2).
contractor and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved in
the day to day operations, in particular the Occupational Health and Safety aspects of any project
/ contract. Legislation requires that each employee must take reasonable care of themselves and
their fellow workers, from management level down to the lowest employee level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will
be listed and titled. The contractors shall:
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
form part of the OHS Act and Regulation 7 of the Construction Regulations.
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act;
including date of induction, relevant skills and licenses and be able to produce this list at
the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
complied with on all work sites.
participation and cooperation.
safety records must be kept for each work site.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The
letter of good standing shall reflect the name of the contractor’s company. Similarly, the
Main contractor must provide the Eskom project manager with all the valid letters of
good standing from their appointed contractors.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The
letter of good standing shall reflect the name of the contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
health;
provision for the cost of safety and health measures throughout the project.
the health and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors who
are competent to do work, have satisfied the OHS compliance requirements and
satisfied that the contractor has the necessary competencies and resources to perform
the work safely.
specified work throughout the contract period.
site for which such supervisor has been appointed for.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
safety information or suspecting such information has been divulged, in the interests of
health and safety requirements.
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
include site or emerging risks. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
the starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
site, they will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
his/her approval prior to them commencing work.
3.12.2 Contractor Management and site supervisor requirements
The contractor site supervisor must be trained in the following:
liability
Must:
and Eskom project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action
is in place.
results
the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
inspection reports.
incident statistics report etc.
meetings.
to perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full time
3.13 RISK ASSESSMENT (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out
risk assessments, to establish which risks and hazards are attached to the health and safety of
persons due to any work which is performed, any article or substance which is, handled, stored,
transported. A risk assessment is defined as an identification of the hazards present in the
activity, work, site, and an estimate of the extent of the risks involved, considering whatever
precautions are already being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a
process or activity, or any new process or activity should be subjected to a risk assessment and
that if new hazards become known during the work process, then these should also be subjected
to risk assessments. Risk assessments for long-term processes should be periodically reviewed
and updated. Method statements or written safe work procedures are an effective method as
information and record of the way jobs / tasks must be performed. Daily or issue based or task
specific or on the job risk assessments must be conducted at the place where work is to be
performed/ conducted to allow managers and employees to assess any inherent risks that could
have been overlooked during the initial risk assessment or any changes that might have occurred
in a period of absence. For example if a job / task is extended over a day or halted due to
inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
work procedures exist for ladders.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
taken to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
observation must be nominated.
representative for comment and approval.
the Supervisor nominated as the responsible person; and the names of workmen who
have received instruction on the work content and the sequence of the activities listed in
the risk assessment shall be recorded, and their competence established. This
instruction shall be done through an interpreter if required and recorded on the Pre-Job
Brief (Daily Safe Task Instructions), with reference to applicable Risk Assessments.
NB: Full Baseline Risk Assessment is attached separately from this document.
Consequence criteria
Consequence rating Description
Important Dates
Source: Safety.zip (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion reports to the relevant management.","is_compulsory":false}"}
Contact Information
Source: Safety.zip (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"26/11/21"}
Evaluation Criteria
Source: Safety.zip (unknown)for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the
Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations.
accountable for the quality and execution of their health and safety programme for their
Technical Specifications
Source: Safety.zip (unknown)Cell A3: Occupational Health and Safety Baseline risk assessment template
Tenderer’s / Supplier’s name: ………………………………………………. Tender Ref number: ………………………………….
Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements
Eskom’s responsibility and commitment is to ensure a safe working environment is in line with its
Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations.
This OHS specification is Eskom Generation's minimum requirements which are required to be
met for the duration of the contract period by contractors/suppliers and, where required, the
delivery organisation. The contractor is expected to develop an OHS plan that meets these
requirements as well as all the relevant applicable legislation that they conform to. Eskom in no
way assumes the contractor’s legal responsibilities and liabilities. The contractor is and remains
accountable for the quality and execution of their health and safety programme for their
employees and appointed contractor employees. This OHS specification reflects minimum
requirements and should not be construed as all-encompassing.
Note 1: All the requirements listed hereunder are in relation to the contract and do not supersede
or replace any organizational OHS requirements.
Where requirements listed are already in place, then the organizational requirements must be
taken cognisance of and listed in the respective OHS plans. If there are any additional Eskom
and/or legislative requirements listed in the OHS specification, then these must be addressed.
2.1 Scope
This OHS specification lists the legislative and Eskom requirements and, where applicable, any
requirements pertaining to local authorities, municipal by-laws, or environmental legislation that
must be met by the contractor.
2.1.1 Purpose
This document will provide a standardised approach to the compilation of OHS specifications
throughout Eskom Generation business for contracts, standards, and NEC 3.
2.1.2 Applicability
This OHS specification is applicable to any contracting organisation that intends to respond to
Eskom Generation's tender/enquiry with the intention of entering into a contract.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
2.2.2 Informative
2.3 Definitions
Definition Explanation
Appointed contractor Means a contractor appointed by the Main contractor
Baseline risk assessment (32-520) baseline operational risks refer to the health and safety risks
associated with all standard processes and routine activities in the
business
Business unit (BU) (32-296) means any defined unit within the Eskom environment,
operating as a business under a particular cost-centre number. In the
context of this document and in terms of health and safety, any
reference to a BU includes a defined unit within any Eskom division
and its subsidiaries
Client (OHS Act) Eskom representative (Internal – Asset Owner), also
referred to as the contract administrator/custodian or agent or project
manager (as defined in the contract). He/she is the person
responsible for ensuring that the works or services are executed in
terms of the contract, as well as adherence to legislation pertaining to
the contract.
Competent person (OHS Act) means any person having the knowledge, training,
experience, and qualifications, specific to the work or task being
performed, provided that, where appropriate, qualifications and
training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. )
Contractor (OHS Act) means an employer as defined in section 1 of the Act who
performs contracted work and includes Main contractors
Contract’s Manager/End Contract’s Manager/End User
User
Consultant means a person providing professional advice
Controlled disclosure controlled disclosure to external parties (either enforced by law or
discretionary)
Duty of care to the (32-136) anybody who causes or has caused or may cause significant
environment pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring,
continuing, or recurring. If such harm to the environment is authorised
by law or cannot reasonably be avoided or stopped, such person must
minimise and rectify such pollution or degradation of the environment
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Employee (OHS Act) means, subject to the provisions of subsection (2), any
person who is employed by or works for an employer and who
receives or is entitled to receive any remuneration or who works under
the direction or supervision of an employer or any other person
Employer (OHS Act) means, subject to the provisions of subsection (2), any
person who employs or provides work for any person and
remunerates that person or expressly or tacitly undertakes to
remunerate him/her, but excludes a TES (ex labour broker) as defined
in section 1(1) of the Labour Relations Act 1956 (Act No. )
Environment (32-94) means:
the land, water, and atmosphere of the earth;
micro-organisms and plant and animal life; and
any part or combination of (a) and (b) and the interrelationships
among and between them, and the physical, chemical, aesthetic, and
cultural properties and conditions of the foregoing that influence
human health and well-being
Eskom requirements Eskom requirements flowing from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals
Fall protection plan (OHS Act) means a documented plan of all risks relating to working
from an elevated position, considering the nature of work undertaken,
and setting out the procedures and methods to be applied in order to
eliminate the risk
Hazard (OHS Act) means a source of, or exposure to, danger
Hazard identification (OHS Act) means the identification and documenting of existing or
expected hazards to the health and safety of persons, which are
normally associated with the type of construction work being executed
or to be executed
Occupational Health and (OHS Act) means a file or other record in permanent form, containing
safety file the information required in relation to the contract.
Health and safety plan (OHS Act) means a document plan that addresses hazards identified
and includes safe work procedures to mitigate, reduce, or control
hazards identified
Occupational Health and (OHS Act) means a document specification of all health and safety
safety specification requirements pertaining to associated to a contract, so as to ensure
the health and safety of persons.
Occupational Health and means comprehensive health and safety requirements for a contract,
safety requirements project, site, and scope of work. This specification is intended to
ensure the health and safety of persons, both workers and the public,
and the duty of care to the environment. The health and safety
requirements must be specific to each contract, project, site, and
Lifesaving Rules (240-62196227) a rule that, if not adhered to, has the potential to
cause serious harm to people
Medical Certificate of fitness (OHS Act) means a certificate valid for one year, issued by an
occupational health practitioner, issued in terms of the regulations,
whom shall be registered with the Health Professions Council of South
Africa
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Medical surveillance (OHS Act) means a planned programme or periodic examination
(which may include clinical examinations, biological monitoring, or
medical tests) of employees by an occupational health practitioner or,
in prescribed cases, by an occupational medicine practitioner
Method statement (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the
hazards identified in any risk assessment
National Enquiries/contracts sourcing of services providers/contractors at the divisional level and
not at BU level thorough tendering, request for price etc
Organisation may be defined as a group of individuals (large of small) that is
cooperating under the direction of executive leadership in
accomplishment of certain common objects
Pre-job meetings (34-227) means a meeting that is held prior to the commencement of
the day’s work and that is attended by all the relevant employees
associated with the work task
Main contractor (In the text of this document) Means an employer, as defined in
section 1 of the OHS Act, who intends to tender for or has signed a
contract with Eskom for services rendered.
Provincial director (OHS Act) means the provincial director as defined in Regulation 1 of
the General Administrative Regulations under the Act
Responsible Manager Is a Manager of a department, section or operating/business unit who
has been appointed as part of the Eskom delegation of authority
process with the aim to assist the applicable 16(2) assigned person in
executing his/her duties in terms of the Occupational Health and
Safety Act
Risk assessment (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps needed
to be taken to remove, reduce, or control such hazard.
Site (34-228) means an Eskom department, unit, complex, building,
specific project, work site, or the site where agents, clients, Main
contractors, contractors, suppliers, vendors, and service providers
provide a service to Eskom, directly or indirectly
Service provider any private person or legal entity that provides any service(s) to
Eskom for compensation
Subsidiary (32-94) an enterprise controlled by another (called the parent) through
the ownership of greater than 50% of its voting stock
Supplier (32-1034)means a natural or legal person who renders a service and
may include the following current or potential supplier vendor,
contractor, consultant
Task (34-227) a segment of work that requires a set of specific and distinct
actions for its completion
Toolbox talks (34-227) where the team leader, after conducting pre-task planning,
shares all the tasks at hand and discusses task allocation, the
identified risks, and the control measures with all his/her team
members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure common
understanding of the tasks, risks, and control measures required.)
The Act (OHS Act) means the Occupational Health and Safety Act No. , as amended, and the Regulations thereto
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
Definition Explanation
Visitor any person visiting a workplace with the knowledge of, or under the
supervision of, an employer.
2.4 Abbreviations
Abbreviation Description
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act
DMR Driven Machinery Regulations
DEL Department of Employment and Labour ( Inspection and Enforcement
services – Provincial office)
EP Emergency Preparedness
EAP Employee Assistance Program
ERfW Environmental Regulations for Workplaces
GAR General Administrative Regulations
GSR General Safety Regulations
HCS Hazardous Chemical Substances
LDV Light Delivery Vehicle
MSDS Material Safety Data Sheets
OHS Act Occupational Health and Safety Act and Regulations,
O&M Operating and Maintenance
LoG (COID) Letter of Good Standing
SABS South African Bureau Standard
SANS South African National Standard
2.5 Related/supporting documents
Section 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file
for evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the
project manager/end user who will facilitate the signing of the document by Eskom and contractor
representatives.
3.1 Scope of work
Supply, delivery and Supply and delivery of a 1MVA Mini Substation at Lethabo Power Station
(Once Off)
Mini Substation: Type: Type B; Voltage: 11 Kvac; Operating Range: 1732a Lv Bushbar; Phase:
3; Mounting Method: Base Mount; Enclosure Rating: Ip55; Enclosure Type: 3cr12-Power Coated;
Cooling Method: Natural Cooling; Width: 1650 Mm; Length: 3000 Mm; Special Features: Rmu;
Standard: 240-56062752; 1 Mva Maniature Substation With Rmu; Base Width; 1200mm Supplier
To Complete Schedule B 34 1621
Note: The contractor who will be awarded this contract will be known as the “Main contractor” and
any contractor appointed by the Main contractor will be known as the “Appointed
contractor"
3.2 Legal compliance
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
3.2.1 Section 37(2) (Legal) Agreement & Appointment of the Contractor
A section 37(2) agreement must be signed between Eskom and the main contractor at the time
of submitting the safety file. The main contractor must ensure that a section 37(2) agreement is
compiled between the main contractor and all their appointed contractors for the contract. The
original copy of the section 37(2) agreement must be retained by the contractor, and a copy must
be retained by the responsible project manager/end user. A copy of all the agreements must form
part of the respective contractor’s OHS file.
3.2.2 Hazardous Work by Children (Child Labour)
The constitution of the Republic of South Africa, in the "Bill of Rights", is clear on the rights of
children, especially when it comes to:
spiritual, moral, or social development and the Basic Conditions of Employment Act,
Chapter six, Section 43, "Prohibition of employment of children."
Before resorting to the use of child labour, due consideration must be given to the child's
constitutional rights. Where work is being performed which is not prohibited in terms of the
constitution, then such work must be conducted in terms of the OHS Act "Regulations on
Hazardous Work by Children in South Africa" with emphasis on paragraph 2: Purpose and
Interpretation. Eskom does not condone the use of child labour and, therefore, all effort must be
exercised, and child labour should not be used.
3.2.3 OHS Act
The main contractor and appointed contractors shall have an up-to-date copy of the OHS Act and
regulations which will be available to all employees.
3.2.4 Legislative Compliance
All contractors will comply with all the legislation pertaining to this contract being:
The Main contractor and all appointed contractors will comply with all the legislation pertaining to
this project being:
Rights).
3.3 ESKOM requirements
All contractors shall, before commencement of the project ensure that all their employees are
familiar with the relevant Eskom OHS documentation that is applicable to contract services.
3.4 Sheq policy
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
A SHEQ policy is a statement of intent and a commitment by the organization’s CE and senior
management in relation to the relevant OHS roles and responsibilities, the achievement of their
strategic objectives, and values of integrity, customer satisfaction, excellence, and
innovation. The main contractor and all appointed contractors, if not already in place, will be
required to compile an organisational SHEQ policy in line with their OHS responsibilities. The
policy must be signed by the organisation’s CE or the appointed assistant to the CE, OHS Act
Section 16(2). The policy must be displayed in a prominent place within the workplace. A copy of
the policy must be filed in the contractor's OHS files and attached as an annexure to the OHS
Plan.
3.5 Hazardous biological agents
3.5.1 Severe Acute Respiratory Syndrome (SARS-CoV- 2)
The Main Contractor and all appointed contractors shall ensure that a Baseline risk assessment
is conducted and communicated with all employees. All the requirements of RHBA 10,11,12 are
met.
3.6 Coid act
The Main contractor and all his/her appointed contractors shall be registered with an appropriate
employment compensation commissioner and have available a valid letter of good standing
(LoG) from such commissioner. The obligation lies with the contractors to ensure that the LoG
remain valid throughout the contract period. A copy of the LoG must be filed in the contractor
OHS files.
3.7 Costing for OHS within the project
The costing for OHS must be itemised based on the overall scope of the project (i.e.) Training,
provision of PPE, safety equipment purchases etc.
3.8 Statutory appointments
The Main contractor and all appointed contractors must appoint competent workers who will
comply with the OHS Act for the duration of the contract. Before requiring appointees to accept
an appointment, the employer must ensure that they have received appropriate training and/or
information about their responsibilities. The relevant statutory appointments must be made in
compliance with the OHS Act's criteria, which include appointing a qualified individual to the
appropriate roles. The following should be included in the statutory appointments, but not limited
to:
3.8.1 Non statutory appointments
3.9 ESKOM life-saving rules
work for Eskom to do the same.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
consultants, and contractors. Any Eskom employee or employee of a Main Contractor or
appointed contractor who fails to follow these rules would be deemed a serious violation. These
rules are in place to protect any employee, labour broker, or contractor working from significant
injury or death.
premises, the rules shall be obeyed by any contractor and their employees.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
( That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a person puts
himself/herself in a position where he/she exposes himself/herself to a fall from or into.
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5
Where an authorisation limitation exists, no person shall work without the required permit to work.
Ensure safe live working
To ensure safe live work, each live worker shall:
a) Ensure all live work basic principles are adhered to, as outlined (for the method being used) in
the High Voltage Live Working Standard for the respective division.
Rule 6 b) Observe and maintain the minimum approach distance (MAD).
c) Only perform live work (never mix live and dead work on the same site at the same time – Refer
to ORHVS Section 7 and 5 handouts respectively
Perform tasks they are authorised for and only undertake tasks that are documented in the respective
Task Manual (TM). Only work on one potential (voltage) at a time.
Rule 7
Use of cellphones on site
Site
Use of cell phones (either texting or talking) when walking or driving is strictly prohibited.
Specific
Eskom will take a zero-tolerance approach to these policies.
Noncompliance to Life-saving rules is regarded as a serious misconduct and will result in serious
disciplinary action, which may include dismissal.
This is to ensure that everyone who works on or visits an Eskom facility returns home to their
families safely.
3.10 Substance abuse
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
comes to workplace accidents and car driving. As a result, Eskom has the right to take
reasonable procedures to identify and prohibit drunk people from entering the company.
taking into account that this is an Eskom Life-saving Rule number 4: (BE SOBER"), and
anyone entering the Eskom site will be subjected to ad hoc alcohol testing if the BU has
self-alcohol testing equipment.
alcohol on a regular basis.
commencement of work.
3.11 Contractor organisational structure
3.11.1 Main Contractor Organogram
The Main contractor must provide an organisational organogram on the company’s letter head
related to this contract, depicting all the levels of responsibility from the CE down to the
supervisors responsible for the contract. List the relevant positions held, names of appointees,
legal appointments and the Organogram must be signed off by the company's 16(1) or 16 (2).
The Main contractor must ensure that all appointed contractors comply with this requirement. The
Main contractor is responsible for keeping copies of all the organograms’ as well as submitting
them with the OHS plan. All organograms shall be updated timeously when appointments are
changed.
This diagram must be kept up to date and filed in the project OHS files.
3.11.2 Appointed Contractor/s Organogram
on the company’s letter head, listing the reporting structure from their CE down to their
project supervisors. The diagram must list the names, positions held, any appointments
made and must be signed off by the company's 16(1) or 16 (2).
contractor and a copy filed in the relevant project OHS files.
3.12 Roles and responsibilities
Commitment
Visible commitment is essential to providing a safe work environment. Managers, supervisors
and employees at all levels must demonstrate their commitment by being proactively involved in
the day to day operations, in particular the Occupational Health and Safety aspects of any project
/ contract. Legislation requires that each employee must take reasonable care of themselves and
their fellow workers, from management level down to the lowest employee level.
3.12.1 Main contractors and appointed contractors
Note 1: Most of the roles and responsibilities listed apply to both Main contractors and any appointed
contractors. Where some of the listed do not apply to both, then the specific responsibilities will
be listed and titled. The contractors shall:
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
form part of the OHS Act and Regulation 7 of the Construction Regulations.
their appointed contractors within their working area, as contemplated by section 37(2)
of the OHS Act;
including date of induction, relevant skills and licenses and be able to produce this list at
the request of the Eskom Project Manager.
responsibilities in terms of their appointment and that they advise and assist these
appointees in the execution of their duties.
complied with on all work sites.
participation and cooperation.
safety records must be kept for each work site.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The
letter of good standing shall reflect the name of the contractor’s company. Similarly, the
Main contractor must provide the Eskom project manager with all the valid letters of
good standing from their appointed contractors.
Commissioner’s valid letter of good standing before the commencement of work and any
future renewal letters obtained during the contract for record-keeping purposes. The
letter of good standing shall reflect the name of the contractor’s company.
trained in the health and safety aspects relating to such work and that the employees
understand the hazards associated with all other work being carried out on the project.
they adhere to such procedures. Similarly (without removing the appointed contractors’
responsibilities), ensure that their appointed contractors and their employees are
conversant with all relevant work procedures and that they adhere to such procedures.
health;
provision for the cost of safety and health measures throughout the project.
the health and safety of persons or a risk of degradation to the environment.
evaluate, and assess the appointed contractors OHS files. Only appoint contractors who
are competent to do work, have satisfied the OHS compliance requirements and
satisfied that the contractor has the necessary competencies and resources to perform
the work safely.
specified work throughout the contract period.
site for which such supervisor has been appointed for.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
safety information or suspecting such information has been divulged, in the interests of
health and safety requirements.
contractor employees have transgressed any of the requirements of the health and
safety specification, safety and health plans, site rules or any other requirements.
include site or emerging risks. This should be done by a competent person appointed in
writing with a view to identify hazardous and potentially hazardous work operations.
the starting of any new task, irrespective of whether it is a repetitive task or not.
contract is in place and maintained.
person/man job specifications must be compiled and handed to the occupational health
practitioner.
their employees, inspect such equipment regularly and ensure recipients of PPE are
trained in the proper use, care and where necessary, the maintenance of PPE;
site, they will be held responsible for the provision and wearing PPE.
investigators as and aligned with 32-95 requirements.
his/her approval prior to them commencing work.
3.12.2 Contractor Management and site supervisor requirements
The contractor site supervisor must be trained in the following:
liability
Must:
and Eskom project requirements;
Inspect all work done by the contractors to ensure adherence to Eskom’s standards and
Conduct follow-up inspections to ensure findings are closed out and preventative action
is in place.
results
the first instance and thereafter the Eskom project manager in the second instance
relating to procedure requirements, non-conformances identified, corrective actions,
audits and inspection schedules.
procedures, work instructions and safety regulations issued by Eskom:
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
inspection reports.
incident statistics report etc.
meetings.
to perform the tasks assigned.
contractors deviate from safety requirements.
3.12.3 Contractor Health and Safety officer full time
3.13 RISK ASSESSMENT (refer to 32-520)
It is a legal requirement in terms of Section 8 (2)(d) of the OHS Act for an employer to carry out
risk assessments, to establish which risks and hazards are attached to the health and safety of
persons due to any work which is performed, any article or substance which is, handled, stored,
transported. A risk assessment is defined as an identification of the hazards present in the
activity, work, site, and an estimate of the extent of the risks involved, considering whatever
precautions are already being taken.
It is essentially a three-stage process:
Risk assessments are required to be maintained. This means that significant changes to a
process or activity, or any new process or activity should be subjected to a risk assessment and
that if new hazards become known during the work process, then these should also be subjected
to risk assessments. Risk assessments for long-term processes should be periodically reviewed
and updated. Method statements or written safe work procedures are an effective method as
information and record of the way jobs / tasks must be performed. Daily or issue based or task
specific or on the job risk assessments must be conducted at the place where work is to be
performed/ conducted to allow managers and employees to assess any inherent risks that could
have been overlooked during the initial risk assessment or any changes that might have occurred
in a period of absence. For example if a job / task is extended over a day or halted due to
inclement weather.
Guidelines for actual steps involved in a job/task specific risk assessment are:
work procedures exist for ladders.
Controlled disclosure
When downloaded from the Document Management System, this document is uncontrolled and the responsibility
rest with the user to ensure it is in line with the authorised version on the system
No part of this document may be reproduced without the expressed consent of the copyright holder,
Eskom Holdings SOC Ltd Req No 2002/015527/30.
of 29
Template Identifier 240-43921804 Rev 6
Lethabo Power Station
Document Identifier LFMS048 Rev 00 OHS SPECIFICATION FOR
HIGH RISK Effective Date 2023/11/21
ACTIVITIES / SERVICES Review Date 2026/11/21
taken to rectify this shall be recorded, and safe working procedures drawn up.
nominated and duly assigned.
observation must be nominated.
representative for comment and approval.
the Supervisor nominated as the responsible person; and the names of workmen who
have received instruction on the work content and the sequence of the activities listed in
the risk assessment shall be recorded, and their competence established. This
instruction shall be done through an interpreter if required and recorded on the Pre-Job
Brief (Daily Safe Task Instructions), with reference to applicable Risk Assessments.
NB: Full Baseline Risk Assessment is attached separately from this document.
Consequence criteria
Consequence rating Description
Compliance Requirements
Source: Safety.zip (unknown)completion certificate and final payment
B-BBEE Minimum Level: 2
Section
Source: Safety.zipfor evaluation prior to the start of work. OHS department will issue the 37(2) agreement to the
Safety, Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations.
accountable for the quality and execution of their health and safety programme for their
Description
Source: Technical.zipSupply and delivery of a 1mva mini substation (rmu) to lethabo power station on a once-off basis
NEC3 Supply Contract (SC3)
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and
(Reg No. ___________)
for Supply and delivery of a 1MVA Mini Substation
(RMU) to Lethabo Power Station on a once-off basis
Contents: No of
pages
Part C1 Agreements & Contract Data 2
Part C2 Pricing Data 20
Part C3 Scope of Work
This document clarifies the technical evaluation strategy for the Lethabo Power Supply for 1MVA Miniature
Substation Scope of Work.
2.1 Scope
This document discusses the different technical aspects that will be evaluated and scored by the multidisciplinary Technical Evaluation Team (TET) to complete the technical evaluation for the Lethabo Power
Supply for 1MVA Miniature Substation Scope of Work. The team members who will be involved in the
evaluation are listed and appointed in this document along with their responsibilities. This document also
describes the acceptable and unacceptable risks and qualifications and/or conditions that will be applicable
to the Scope of Contract. Once the Technical Evaluation Strategy is authorised, no changes will be made
to the evaluation criteria without the appropriate revision process and authorisations.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document applies to Lethabo Power Station.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-48929482: Tender Technical Evaluation Procedure
[2] ISO 9001 Quality Management Systems
[3] IS0 14001 Safety Management Systems
2.2.2 Informative
[4] Occupational Health and Safety Act; 1993
[5] Environmental Regulations for Workplaces, 1987
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A
Station For 1MVA Miniature Substation Revision: 00
Page:
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
TET Technical Evaluation Team
TS Technical Specifications
2.5 Roles and responsibilities
As per 240-48929482: Tender Technical Evaluation Procedure.
2.6 Process for monitoring
The document is reviewed by Engineering, to ensure alignment of the scope for the respective contract.
2.7 Related/supporting documents
[5] 240-53716712: Tender Technical Evaluation Results Form
[6] 240-53716726: Tender Technical Evaluation Scoring Form
3.1 Technical evalaution threshold
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall not be
weighted or point scored but shall be assessed on a Yes/No basis as to whether or not the criteria are
met. An assessment of ‘No’ against any criterion shall technically disqualify the tenderer and shall not be
further evaluated against Qualitative Criteria.
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been met.
The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The
minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 80%.
3.2 Tet members
TET number TET Member Name Designation
TET 1 NC Maidi O & M Engineer
TET 2 GV Chauke Senior Engineer
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A
Station For 1MVA Miniature Substation Revision: 00
Page:
3.3 Mandatory technical evauation criteria
Mandatory Technical Criteria Reference to Technical Specification/Tender Motivation for use of Criteria
Contact Information
Source: Technical.zip (unknown){"name":null,"email":null,"phone":"011 803 3008","department":null,"address":"n the conditions of contract identified in"}
Submission Guidelines
Source: Technical.zip (unknown)Returnable Documents: 1 Proof of Registration: Legal DOL Tender returnable To ensure compliance of the registration as an Electrical Contractor. OHS Act and regulations 3.4 QUALITATIVE TECHNICAL EVALUATION CRITERIA The following technical assessment criteria will be used to assess suppliers’ technical submissions. A weighted score-card approach will be used to evaluate technical compliance of tenders against the specifications. Failure to achieve a weighted scoring of 80% evaluated based on the technical requirements below and associated scoring will deem the supplier disqualified from participating further in this tender. Note: Failure to submit and/ or adhere to the below stated mandatory technical requirements disqualifies the supplier from participating further in this tender. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: WEIGHTED REQUIREMENT REMARKS SCORING GUIDELINE SCORE (%) No Submissions (0% NON-COMPLIANT) The supplier meets the 2 Datasheet does not fully meet the specifications by providing specification per standard datasheets of the mini (40% NON-COMPLIANT) 20 substation in accordance withSupplier 240-56062752 4 Datasheet meets key specifications perRequirements standard (80% - COMPLIANT) 5 Datasheet meets all specification per standard (100% - COMPLIANT) The supplier has completed Schedule B not filled in or no submission. 35 schedule A and B. (0% NON-COMPLIANT) Schedule B Partially filled in (40% NON-COMPLIANT) 4 Schedule B filled with key requirements, but some elements omitted (80% - COMPLIANT) Schedule B fully filled in. (100% - COMPLIANT) No submissions (0% NON-COMPLIANT) 10 The supplier has provided details with regards to costs 2 Lead time greater than 6 weeks associated with deliveries and (40% NON-COMPLIANT) lead time for delivery. Lead time of 4 weeks to 6 weeks (80% - COMPLIANT) Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 5 Lead time of 4 weeks or less (100% - COMPLIANT) No Submission The supplier has provided (0% NON-COMPLIANT) 25 relevant Type Test Certificate for the Mini Sub. 5 Type Test Certificate submitted (100% - COMPLIANT No Submissions (0% NON-COMPLIANT) Suppliers to provide three or 2 Only 1 treatable reference order more treatable references of 10 (40% NON-COMPLIANT) previous Purchase Orders on supply and delivery of 4 2 treatable refences submitted Miniature Substation. (80% - COMPLIANT) 3 or more treatable reference orders (100% - COMPLIANT) Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 3.5 CONCLUSIONS AND RECOMMENDATIONS Both Mandatory and Qualitative Technical Evaluation Criterions must be adhered to., AUTHORISATION This document has been seen and accepted by: Name Designation Dikeledi Sihlangu Electrical Engineering Manager Thuli Njapha Engineering Manager, REVISIONS Date Rev. Compiler Remarks May 2026 0 NC Maidi Guideline for Technical Evaluation criteria. July 2026 1 GV Chauke Alignment to 240-53716726, DEVELOPMENT TEAM The following people were involved in the development of this document, ACKNOWLEDGEMENTS None CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page, 11 KV TYPE B 1000KVA MINIATURE SUBSTATION (WITH RMU) SCHEDULE A & B The supplier to fill in Schedule B for compliance Schedule A: Purchaser's specific requirements Schedule B: Particulars of equipment to be supplied 1 2 3 4 5 Item Subclause Description Schedule A Schedule B 1 2.1.1 Standard operating conditions 1.1 NRS 004 a) Altitude m 1800 XXXXXXXX 4.2.1.3 1.2 SANS60694 b) Ambient air temperature oc -5 to +40 XXXXXXXX 2.1.2 1.3 c) Lightning ground flash density Flashes/ High XXXXXXXX km2/year 1.4 SANS60694 d) Maximum solar radiation W/m2 1000 XXXXXXXX 2.1.2 1.5 e) Ultraviolet radiation High XXXXXXXX 1.6 NRS 004 f) Relative humidity % 98 XXXXXXXX 4.2.1.3, Pollution level (inland - low- corrosive / 1.7 NRS 004 "very heavy" XXXXXXXX coastal- corrosive) 4.2.1.3 & for coastal DSP 34-1621 "medium" for 3.1.1.1 inland 1.8 SANS60694 wind pressure Pa 700 XXXXXXXX 2.1.2 1.9 DSP 34-1621 Pollution conditions inside mini-sub Pollution XXXXXXXX 3.1.1.1 Degree 3 2 Ratings 2.1 DSP 34-1621 Transformer power rating kVA 1000 ________ 3.1.1.2.2.a 2.2 DSP 34-1621 Nominal voltage of system (Un) kVrrns 11 ________ 3.1.1.2.2.b 2.3 NRS 004 System frequency Hz 50 ________ 4.1.4 & SANS 7801.3 2.4 NRS 004 Number of phases 3 ________ 4.1.4 2.5 SANS 780 Transformer rated no-load secondary voltage Vrrns 420 ________ 8.26 2.6 SANS 1019 Rated power-frequency voltage (Urn) kVrrns 12 ________ CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 5.4.2 2.7 SANS 1019 Rated short-duration power frequency kVrrns 28 ________ 5.4.2 withstand voltage [50Hz: 1 min] Rated lightning impulse withstand voltage 2.8 DSP 34-1621 kVpeak 95 ________ (SANS 1019 5.4.2 List 3) 3.1.1.2.a Transformer induced voltage withstand level 2.9 SANS 780 kVrrns 22 ________ (see Table 2 - SANS 780) 3 Design & construction 3.1 DSP 34-1621 Layout (Type AlType B) Type B ________ 3.1.1.3.1.c 3.2 NRS 004 Enclosure IP rating IP35 ________ 4.2.2.3.1 3.3 DSP 34-1621 Removable base sections adjacent to YES ________ 3.1.1.3.1.d MV compartment (sections to lap bolted with ________ ________ nuts on the inside of the channel and housing) 3.4 NRS 004 Concealed door hinges YES ________ 4.4.2.5 3.5 DSP 34-1621 Compartment fastening/locking (pad YES - three ________ 3.1.1.3.1.e lockable) point locking with 1 additional 10 mm sunken captive Allen cap screw 3.6 DSP 34-1621 "Heavy-duty" stainless steel door locks YES ________ 3.1.1.3.1.f 3.7 DSP 34-1621 Compartment lock protection facility YIN YES ________ 3.1.1.3.1.g required? 3.8 Total mass of mini-substation kg XXXXXXXX ________ 3.9 Overall dimensions, MV compartment length mm XXXXXXXX ________, LV compartment length mm XXXXXXXX ________ NRS 004 c) Overall length mm 3000 ________ 4.2.2.1.2 NRS 004 d) Overall width mm 1650 ________ 4.2.2.1.2, Overall height mm XXXXXXXX ________ NRS 004 f) Base width mm 1200 ________ 4.2.2.1.2 CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: Provision for lifting of complete mini-sub onto 3.10. NRS 004 YES ________ a 4.2.2.5 concrete plinth without need for dismantling (except for roof removal if required) 3.11 NRS 004 Provision of shear-off lifting lugs on roof YES ________ 4.2.2.4.2 for ease of roof removal (where roof removal is required prior to lifting mini- sub) 3.12 NRS 004 Mini-sub housing sections/doors bonded YES sub) 6.1.2 4 Transformer unit 4.1 NRS 004 Electrical requirements As per SANS sub) sub) 6.4.1 780 4.2 NRS 004 Vector group Dyn11 6.4.4 4.3 MV system earthing Non-effective XXXXXXXX (Effective/Non- effective) 4.4 MV system fault level kA 20 XXXXXXXX 4.5 DSP 34-1621 LV transformer neutral earthing Solid- ________ 3.1.1.2.3.f connection to insulated LV neutral bar 4.6 DSP 34-1621 Temperature rise limits As per DSP 3.2.2.1 34-1621 5.2.1 4.7 SANS 780 Secondary voltage regulation (Off-load) +5,0, + 2,5, ________ 8.5.2 0,, 2,5, -5,0 4.8 SANS 780 No-load losses XXXXXXXX ________ 5.6.1 4.9 SANS 780 Load losses XXXXXXXX ________ 5.6.1 Impedance voltage (see Table 9 of SANS 4.1 SANS 780 SANS 780 ________ 780) 8.27 4.11 DSP 34-1621 X/R ratio XXXXXXXX ________ 3.1.5 4.12 DSP 34-1621 Cost IkW of no-load losses ________ XXXXXXXX 3.1.5 4.13 DSP 34-1621 Cost IkW of load losses ________ XXXXXXXX 3.1.5 Audio-sound level- maximum (see table .14 SANS 780 ________ SANS 780) 56 8.5.3 4.15 DSP 34-1621 Sealed transformer unit YES- ________ CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 3.1.1.2.2.d welded cover 4.16 NRS 004 Transformer MV bushings (NB internal EN 50180 ________ 6.4.7 screen to be earthed) Type C with ________ M16x2 thread 4.17 DSP 34-1621 MV bushing-centre clearances 90 ________ 3.1.3.1.1.d (minimum) 4.18 DSP 34-1621 Clearances between outer bushing- centres 50 ________ 3.1.3.1.1.d and mini-sub metal enclosure (minimum) 4.19 DSP 34-1621 Transformer overload protection facility YES ________ 3.1.2.1.2 4.2 Winding material (AI I Cu) XXXXXXXX ________ XXXXXXXX ________ 4.21 Manufacturer XXXXXXXX ________ 4.22 DSP 34-1621 Top-oil thermoelectric temp-sensing YES ________ 3.1.2.1.2.b element 5 MV compartment 5.1 DSP 34-1621 Equipment in MV compartment RMU ________ 3.1.3.1.1 5.2 Ring Main Unit manufacturer XXXXXXXX ________ 5.3 Incoming I outgoing MV cable
Evaluation Criteria
Source: Technical.zip (unknown)Title: Tender Technical Evaluation Unique Identifier: N/A
Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A
o define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
[1] 240-48929482: Tender Technical Evaluation Procedure
[2] ISO 9001 Quality Management Systems
TET Technical Evaluation Team
As per 240-48929482: Tender Technical Evaluation Procedure.
[5] 240-53716712: Tender Technical Evaluation Results Form
[6] 240-53716726: Tender Technical Evaluation Scoring Form
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall not be
weighted or point scored but shall be assessed on a Yes/No basis as to whether or not the criteria are
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been met.
The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The
minimum weighted final score (threshold) required for a tender to be considered from a technical
Technical Specifications
Source: Technical.zip (unknown)Supply and delivery of a 1mva mini substation (rmu) to lethabo power station on a once-off basis
NEC3 Supply Contract (SC3)
Between ESKOM HOLDINGS SOC Ltd
(Reg No. 2002/015527/30)
and
(Reg No. ___________)
for Supply and delivery of a 1MVA Mini Substation
(RMU) to Lethabo Power Station on a once-off basis
Contents: No of
pages
Part C1 Agreements & Contract Data 2
Part C2 Pricing Data 20
Part C3 Scope of Work
This document clarifies the technical evaluation strategy for the Lethabo Power Supply for 1MVA Miniature
Substation Scope of Work.
2.1 Scope
This document discusses the different technical aspects that will be evaluated and scored by the multidisciplinary Technical Evaluation Team (TET) to complete the technical evaluation for the Lethabo Power
Supply for 1MVA Miniature Substation Scope of Work. The team members who will be involved in the
evaluation are listed and appointed in this document along with their responsibilities. This document also
describes the acceptable and unacceptable risks and qualifications and/or conditions that will be applicable
to the Scope of Contract. Once the Technical Evaluation Strategy is authorised, no changes will be made
to the evaluation criteria without the appropriate revision process and authorisations.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document applies to Lethabo Power Station.
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-48929482: Tender Technical Evaluation Procedure
[2] ISO 9001 Quality Management Systems
[3] IS0 14001 Safety Management Systems
2.2.2 Informative
[4] Occupational Health and Safety Act; 1993
[5] Environmental Regulations for Workplaces, 1987
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A
Station For 1MVA Miniature Substation Revision: 00
Page:
2.3 Definitions
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
TET Technical Evaluation Team
TS Technical Specifications
2.5 Roles and responsibilities
As per 240-48929482: Tender Technical Evaluation Procedure.
2.6 Process for monitoring
The document is reviewed by Engineering, to ensure alignment of the scope for the respective contract.
2.7 Related/supporting documents
[5] 240-53716712: Tender Technical Evaluation Results Form
[6] 240-53716726: Tender Technical Evaluation Scoring Form
3.1 Technical evalaution threshold
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall not be
weighted or point scored but shall be assessed on a Yes/No basis as to whether or not the criteria are
met. An assessment of ‘No’ against any criterion shall technically disqualify the tenderer and shall not be
further evaluated against Qualitative Criteria.
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been met.
The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The
minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 80%.
3.2 Tet members
TET number TET Member Name Designation
TET 1 NC Maidi O & M Engineer
TET 2 GV Chauke Senior Engineer
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A
Station For 1MVA Miniature Substation Revision: 00
Page:
3.3 Mandatory technical evauation criteria
Mandatory Technical Criteria Reference to Technical Specification/Tender Motivation for use of Criteria
Financial Requirements
Source: Technical.zip (unknown)Payment Terms: payment certificate from the Supply Manager in terms of core clause
51.1, the Supplier provides the Purchaser with a tax invoice in accordance with the Purchaser's
procedures stated in the Goods Information, showing the amount due for payment equal to that stated
in the payment certificate.
Z7.2 If the Supplier does not provide a tax invoice in the form and by th
Compliance Requirements
Source: Technical.zip (unknown)No specific requirements found
DSP 34-1621 a) 3 x single core I 1 x three core 1 x 3 core ________ 3.1.3.1.1.d
Cable support (clamping) required (NRS DSP 34-1621 YES (Size ________ 012 & D-DT-8019) all cables 3.1.3.1.1.d expect 11 kV paper insulated. 75 -100 mm OD) DSP 34-1621 11 kV paper insulated cables YES (Size ________ 3.1.3.1.1.d 50 -75 mm OD)
Minimum distance from cable clamp to mm 800 ________ centre-line of RMU bushings
Type of connection (NRS 012) to RMU Type 3 ________ (unscreened separable connectors)
Interconnection arrangement between Single core ________ RMU and transformer MV bushings screened CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: cable 5.4 DSP 34-1621 Make (product) connector used on XXXXXXXX ________ 3.1.3.1.3 transf. bushings (SSC) 5.5 DSP 34-1621 Make (product) of connector used on XXXXXXXX ________ 3.1.3.1.3 RMU T-off (USC/SSC) 5.6 NRS 004 Mini-sub (MV) earth bar (accessible in YES ________ 6.1.3 front of RMU) 5.7 DSP 34-1621 Make (product) of mains powered earth XXXXXXXX ________ 3.1.1.2.7.f fault indicator (DSP 34-1080) 6 LV Compartment 6.1 NRS 004 LV ASSEMBLY complies with SANS YES ________ 6.3.3.1 Jan-73 6.2 DSP 34-1621 Busbar-rating (see Table 1) A Rated at 1.2 ________ 3.1.1.2.5.a transformer secondary rated current 6.3 Busbar-insulation Air insulated 6.4 DSP 34-1621 Busbars 0 3 + one ________ 3.1.1.2.3.b identical neutral busbar + earth bus bar (insulated from frame) 6.5 NRS 004 Current density of busbars A/mm2 SANS 1973- ________ 6.3.3.1 1 6.6 NRS 004 Rated short-time withstand current of kArms XXXXXXXX ________ 4.1.2.5 main circuit - 1 s 6.7 NRS 004 Min clearance to earth and between mm XXXXXXXX ________ 6.3.3.2.6 phases 6.8 DSP 34-1621 Provision of a LV neutral surge arrester YES ________ 3.1.1.2.3.d (as per D-DT-3088) fitted between mini- sub (MV) earth bar and LV neutral-earth bus bar 6.9 DSP 34-1621 LV neutral-earth busbar to be earthed YES ________ 3.1.1.2.3.c (via a 70mm2 Cu electrical bridge to the mini-sub earth bar) CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: LV neutral busbar to be bridged to the YES ________ LV earth bar (see Figure 2) 6.1 4.1.2.5.2 Stainless Steel M12 set screws provided YES ________ 6.11 DSP 34-1621 Provision of main LV circuit-breaker YES ________ 3.1.3.1.5 6.12 DSP 34-1621 Make (product) of circuit breaker SANS 556-1 ________ 3.1.3.1.5 6.13 NRS 004 Minimum fault current interrupting kA 4.1.2.6 capacity XXXXXXXX ________ 6.14 DSP 34-1621 Number of outgoing LV feeder bays to 9 ________ 3.1.3.2 be provided for (drill busbar 014mm holes) NRS 004 Spacing between LV feeder bays (see mm 110 ________ 6.3.3.2.6 Figure 1 of DSP 34-1621) 6.15 DSP 34-1621 LV panel designed for vertical fuse- FH/CB ________ 3.1.1.2.4.b bases (FH) or MCCBs (CB) 6.16 NRS 004 Spacing (vertical): Between phase Mm 185 ________ 6.3.3.2.6 and busbars DSP 34-1621 Between lowest LV busbar and LV mm 300 ________ 3.1.1.2.3.b neutral Between LV neutral and LV earth mm 200 (min) ________ Between LV earth and gland plates mm 200 (min) ________ (see Figure 2 of DSP 34-1621) 6.17 DSP 34-1621 LV maximum demand ammeters Required on ________ 3.1.1.2.7.a all three phases 6.18 NRS 004 Ammeter type Thermal ________ 6.3.3.5.1 integrating over 15 min period 6.19 DSP 34-1621 LV indicating voltmeter (with a selector YES 3.1.1.2.7.b switch) (YES/NO) 6.2 NRS 004 Ammeter and voltmeter size and display mm 96 x 96, 90° ________ 6.3.3.5.3 6.21 NRS 004 Ammeter and voltmeter position LV ________ 6.3.3.5.3 compartment (high as practicable) 6.22 NRS 004 Provision of removable barrier to YES - non ________ 6.3.1.2 separate LV end compartment and front flammable LV compartment 7 LV outgoing feeder bay gland plates 7.1 DSP 34-1621 Number of gland plates to be provided 6 ________ CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 3.1.1.2.4.e (Figure C.9 of NRS 004) NRS 004 Number of gland holes per feeder 2 ________ 6.3.3.3.10 bay NRS 004 Size of holes per feeder bay: mm 1 x 65 mm ________ 6.3.3.3.10 mm 1 x 52 mm ________ NRS 004 Clearances for each hole per mm 1 x 98 mm ________ 6.3.3.3.10 feeder bay: mm 1 x 65 mm ________ 7.2 NRS 004 Distance between gland plate center lines. mm 110 ________ 6.3.3.3.10 (Figure C.9 of NRS 004) 8 LV auxiliaries 8.1 OSP 34-1621 Provision of three point socket outlet in YES ________ 3.1.1.2.7.c LV compartment (with instantaneous-trip ________ ________ earth leakage unit [20 A; 5 kA rupturing capacity; 30 rnA sensitivity] and 20 A HRC fuse with neutral fuse link) (YES/NO) 8.2 OSP 34-1621 Provision of a tamperproof compartment NO ________ 3.1.1.2.7.d for the installation of a photo-cell (YES/NO) 8.3 OSP 34-1621 300 mm x 300 mm blank plate for PECU YES ________ 3.1.1.2.7.d 8.4 OSP 34-1621 Numbering ferrules for auxiliary wiring YES ________ 3.1.1.2.7.e 9 Materials and corrosion protection 9.1 OSP 34-1621 Mini-sub enclosure, LV ASSEMBLY and ________ ________ 3.1.1.3.2.d transformer tank: OSP 34-1621 Inland: mild steel XXXXXXXX ________ 3.1.1.3.2.e Coastal:3CR12 or zinc sprayed mild XXXXXXXX ________ steel or stainless steel OS-6 / OS-7 OSP 34-1621 Corrosion protection detailed ________ / 3.1.1.3.2.g specification number (OSP 34-1658) OS-8 offered for inland applications OSP 34-1621 Corrosion protection detailed OS-11 /OS- ________ 3.1.1.3.2.i specification number (OSP 34-1658) 12/ (OS-14 + offered for coastal applications OS-16) / (OS-14 + OS-17) / OS- CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 9.2 OSP 34-1621 Transformer radiator: 3.1.1.3.2.f Inland: mild steel XXXXXXXX ________ Coastal: hot-dipped galvanized / zinc XXXXXXXX ________ metal sprayed (if corrugated) mild steel OS-6 / OS-7 OSP 34-1621 Corrosion protection detailed ________ / 3.1.1.3.2.i specification number (OSP 34-1658) OS-8 offered for inland applications OSP 34-1621 Corrosion protection detailed (OS-13 + ________ 3.1.1.3.2.j specification number (OSP 34-1658) OS-16) / offered for coastal applications (OS-13 + OS-17) / (OS-14 + OS-16) / (OS-14 + OS-17) 9.3 NRS 004 Tinned copper busbars (YES/NO) YES ________ 6.3.3.2.2 9.4 OSP 34-1621 Mini-sub base: Material Steel ________ 3.1.1.3.2.g OSP 34-1621 Corrosion protection detailed (OS-13 + ________ 3.1.1.3.2.i specification number (OSP 34-1658) OS-16) / offered (OS-13 + OS-17) 9.5 Gland plates and support structure: XXXXXXXX ________ DSP 34-1621 Coastal: Material: 3 mm (min) 3.1.1.3.2.h stainless steel NRS 004 Inland Material: 3 mm (min) mild XXXXXXXX ________ 6.3.3.3.8 steel I 3CR12 I stainless steel DSP 34-1621 Corrosion protection detailed DS-13 I DS- ________ 3.1.1.3.2.i specification number (DSP 34-1658) 14 offered if mild steel (Hot-dip. galv. to OR zinc sprayed) - for inland only 9.7 DSP 34-1621 5 mm cork packing (between ends and YES ________ 3.1.1.3.2.k tank, base and ends, and base and tank)(yES/NO) Avocado 9.8 DSP 34-1621 Final colour ________ C12 3.1.1.3.2.l (SANS 1091) CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A Station For 1MVA Miniature Substation Revision: 00 Page: 10 Notices, signs and labels 10.1 NRS 004 Transformer rating plate YES ________ 8.2.1 10.2 DSP 34-1621 Treatment and Full First Aid Instructions YES ________ 3.3.1.2 on inside of MV and LV compartment doors 10.3 DSP 34-1621 Elec. warning signs on all doors and YES ________ 3.3.1.2 barriers 10.4 NRS 004 Transformer phase labels below YES ________ 8.4.11 bushings 10.5 NRS 004 Colour-coded LV busbars YES ________ 6.3.3.2.5 10.6 DSP 34-1621 Labelling of MV and LV compartment YES ________ 3.3.1.2 doors (sign - D-DT-3202 sheet 5 and 4) 10.7 NRS 004 Primary voltage, secondary voltage and YES ________ 8.4.3 kVA rating stencilled on the front, centre. 10.8 NRS 004 Mini-sub mass and stock number YES ________ 8.4.4 stencilled on side or rear. 10.9 NRS 004 ID markings linking roof to body per YES ________ 8.4.6 batch 10.10. NRS 004 Provision for the safe-keeping of YES ________ 4.2.2.3.9 documents 11 Documentation 11.1 DSP 34-1621 Type test certificates (provide ref. Sets 1 ________ 3.3.2.3 numbers of reports) 11.2 DSP 34-1621 Routine test certificates Sets 1 ________ 3.3.2.3 11.3 DSP 34-1621 Drawings (Mini-sub GA, LV ASSEMBLY, Sets 1 ________ 3.3.2.2 Operating procedure label for RMU tee- off) 11.4 DSP 34-1621 Diagrams (Mini-sub schematic - Sets 1 ________ 3.3.2.2 including the LV ASSEMBLY, Rating Plates) 12 Accessories 12.1 DSP 34-1621 Type of sealant provided XXXXXXXX ________ 3.4.1.2 CONTROLLED DISCLOSURE When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system.
B-BBEE Minimum Level: 2
Section
Source: Technical.zipTitle: Tender Technical Evaluation Unique Identifier: N/A
Tender Technical Evaluation Strategy for Lethabo Power Unique Identifier: N/A
o define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
[1] 240-48929482: Tender Technical Evaluation Procedure
[2] ISO 9001 Quality Management Systems
TET Technical Evaluation Team
As per 240-48929482: Tender Technical Evaluation Procedure.
[5] 240-53716712: Tender Technical Evaluation Results Form
[6] 240-53716726: Tender Technical Evaluation Scoring Form
Mandatory Technical Evaluation Criteria (gatekeepers) are ‘must meet’ criteria. These criteria shall not be
weighted or point scored but shall be assessed on a Yes/No basis as to whether or not the criteria are
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been met.
The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The
minimum weighted final score (threshold) required for a tender to be considered from a technical
Description
Source: Commercial.zipprovisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
one (1) item at a time. Each item must have will have it’s own
supply identified in the
specification and/or works
payment terms initiative of Eskom, and its aim is to explore the extent to which Eskom can
benefit financially from either extending the supplier payment terms or offering an early
settlement discount.
payment terms, and further guidance will come on early settlement discounts. The document
provides an update on the thresholds on which the 60-day payment term is applicable and
provides guidance on compliance reporting and the applicability of the Policy.
Threshold
of VAT. This means that all contracts exceeding this threshold must be established on the
60-day payment term.
Applicability of policy
However, the Policy is applicable to contracts concluded between subsidiaries and their own
suppliers.
of an extended payment term must be applied as a lever.
Monitoring of compliance
Committee (“Cost Steerco”) on a monthly basis. Divisional Procurement Senior Managers shall
provide reasons for non-compliance to the oCPO on request and shall present these to the
Cost Steerco. This arrangement shall continue until the end of the 2022/23 financial year.
Compiled by: ms reshma maghoo
Contract advisor
Date: 28/9/2022
Guidance note: implementation of supplier payment term policy
Recommended: mr godfrey quickfall
Senior manager: contract management (acting)
Date: 2022-09-28
Supported: ms jainthree sankar
Chief procurement officer
DATE: 5 October 2022
Approved: mr calib cassim
Chief financial officer
DATE: 05 October 2022
Eskom Holdings SOC Ltd Reg No 2002/015527/30
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *Sbd 6.
Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
income-generating contracts)
of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicable box)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published
by SARB for the specific currency at 12:00 on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.reservebank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dtic must be informed accordingly in order for the
DTIC to verify and in consultation with the AO/AA provide directives in this regard.
Local content declara
supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to
act against the supplier named above or me personally in terms hereof, should this declaration prove to be
false.
Eskom employees and directors that engage in private work
Important Dates
Source: Commercial.zip (TENDER){"closingDate":"17 June 2025","closingTime":"10:00 am","briefingSession":"{"date":null,"time":null,"venue":"ion For any clarity send emails to: Keneilwe Makoele","is_compulsory":false}"}
Contact Information
Source: Commercial.zip (TENDER){"name":null,"email":"[email protected]","phone":"016 457 5294","department":null,"address":"r which may be"}
Submission Guidelines
Source: Commercial.zip (TENDER)Returnable Documents: Proof of Registration: Legal Tender returnable To ensure compliance of the DOL registration as an OHS Act and regulations Electrical Contractor. QUALITATIVE TECHNICAL EVALUATION CRITERIA The following technical assessment criteria will be used to assess suppliers’ technical submissions. A weighted score-card approach will be used to evaluate technical compliance of tenders against the specifications. Failure to achieve a weighted scoring of 80% evaluated based on the technical requirements below and associated scoring will deem the supplier disqualified from participating further in this tender. Note: Failure to submit and/ or adhere to the below stated mandatory technical requirements disqualifies the supplier from participating further in this tender. REQUIREMENT WEIGHTED REMARKS SCORING GUIDELINE SCORE (%) The supplier meets the 0 No Submissions specifications by providing (0% non- 20 datasheets of the mini compliant) substation in accordance 2 Datasheet does with 240-56062752 (40% non- not fully meet the compliant) specification per standard 4 Datasheet meets (80% compliant) key specifications per standard 5 Datasheet meets (100% compliant) all specification per standard 35 The supplier has completed 0 Schedule B not schedule A and B. (0% non- filled in or no compliant) submission. 2 Schedule B (40% non- Partially filled in compliant) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Clause Number from Standard Tender Data Conditions of Tender 4 Schedule B filled (80% compliant) with key requirements, but some elements Supplier omitted requirements 5 Schedule B fully (100% compliant) filled in. 10 The supplier has provided 0 No submissions details with regards to costs (0% non- associated with deliveries compliant) and lead time for delivery. 2 Lead time greater (40% non- than 6 weeks compliant) 4 Lead time of 4 (80% compliant) weeks to 6 weeks 5 Lead time of 4 (100% compliant) weeks or less 25 The supplier has provided 0 No Submissions relevant Type Test (0% non- Certificate for the Mini Sub. compliant) 5 Type Test (100% compliant) Certificate submitted 10 Suppliers to provide three 0 No Submissions or more treatable (0% non- references of previous compliant) Purchase Orders on supply 2 Only 1 treatable and delivery of Miniature (40% non- reference order Substation. compliant) 4 2 treatable (80% compliant) refences submitted 5 3 or more treatable (100% compliant) reference orders 3.15 Evaluation of Price Prices will be evaluated as follows, Inclusive of VAT;, Corrected for arithmetical errors;, Excluding contingencies in any bill of quantities or activity schedule’, Adjusted for any other acceptable variations, deviations, or alternative tenders submitted; and Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Clause Number from Standard Tender Data Conditions of Tender, Making a comparison of the Net Present Value of each adjusted tender based on the tendered programme (if provided) and prices, on the estimated effect of Price Adjustment Factors and rate of exchange fluctuations (if applicable) and on other evaluation parameters relating to uncertainty and risk, where applicable., Unconditional discounts will be taken into account for evaluation purposes., Conditional discounts will not be taken into account for evaluation purposes but will be implemented when payment is effected. Prices will be scored out of [80/90] points 3.18 Evaluation of Specific Goals Specific goals will be scored out of [10/20] points in accordance with the PPPFA. If a tenderer fails to submit evidence of its points claim for a Specific Goal, it will not be disqualified. However, it will be awarded 0 points for that Specific Goal. Section 1: Specific Goals A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender. The points scored for the specific goal must be added to the points scored for price and the total must be rounded off to the nearest two decimal places. Subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points. B-BBEE Status Level of Number of points Number of points Contributor (80/20 system) (90/10 system) 1 20 10 2 18 9 3 14 6 4 12 5 5 8 4 6 6 3 7 4 2 8 2 1 Non-compliant contributor 0 0 Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Clause Number from Standard Tender Data Conditions of Tender NB: The following documents are required to claim preference points,, Valid B-BBEE certificate issued by a SANAS accredited verification agency / sworn affidavit / CIPS affidavit, Proof of ownership / shareholding (preferably CIPC documentation) inclusive of shareholding breakdown, Certified ID copies of shareholder(s), Proof of Disability (where applicable), In a case of a trust, consortium or joint venture (including incorporated consortia and joint ventures), a consolidated B-BBEE status level verification certificate. Note: Eskom will not accept a Sworn Affidavit with an electronic signature Tenderer failing to provide documentation for the allocation of preference points will not be disqualified, but’, May only score point out of 90/80 for price, Scores 0 points out of 10/20 for specific goals Section 2: Objective criteria The inclusion of objective criteria is not mandatory but a condition for contract award. If the tenderer does not meet objective criteria; it may lead to the second-ranked tenderer being recommended for award. 2.1. Designated Sectors When applicable the following stipulated minimum threshold for Local Production and Content must be achieved in full by the tenderer Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Clause Number from Standard Tender Data Conditions of Tender YES NO, Is this Commodity or part of it a Designated X Sector? Please indicate below Designated Components Commodity Components Local Content Threshold Transformer, Stunt Reactors and Associated 100% Equipment Cables 90% NOTE: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are therefore mandatory and must be tender returnable. 2.2 CIDB Skills Development Continuation of Mandatory Requirements YES NO, Is there CIDB compulsory training? ☐ If Yes, what is the% of the Construction Skills Not applicable Development Goal % (CSDG) If the answer above is Yes, it will then be mandatory for the supplier to match Eskom’s targets Criteria Eskom Target Tenderer Commitment CSDG Percentage N/A Description N/A NOTE: Failure by the Contractor/Service Provider/Supplier to meet the CIDB CSDG mandatory % will render their tender non-responsive. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Clause Number from Standard Tender Data Conditions of Tender Section 3: SDL&I Objectives in line with Reconstruction and Development Programme (RDP) Goals Tenderers who complete and submit the objectives as required, but who do not meet Eskom’s targets, will not be disqualified. SDL&I objectives do not form part of scoring but commitments will form part of
Evaluation Criteria
Source: Commercial.zip (TENDER)1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N/A
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
A two stage Technical Evaluation Strategy is set out in the technical folder, consisting of the
evaluation of a mandatory gatekeeper, followed by qualitative evaluation of the tenders that passed the
Qualitative technical evaluation criteria
weighted score-card approach will be used to evaluate technical compliance of tenders against the
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender.
The points scored for the specific goal must be added to the points scored for price and the total must be
Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (80/20 system) (90/10 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
ut of [10/20] points in accordance with
the PPPFA.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
Quality ISO 9001:2015 Quality Management System √
ISO10005 – Quality Management System Guidelines
Technical Specifications
Source: Commercial.zip (TENDER)provisions above, please complete the table hereunder with all required
Annexure a – integrity declaration form)
information.
Full Name & Capacity/ Identity Confirm and provide Full Names & To your
Position within tenderer (e.g. Number details (including Capacity/Position of knowledge
employee/Director/member/ employee number) if Eskom employee/ is thi
one (1) item at a time. Each item must have will have it’s own
supply identified in the
specification and/or works
payment terms initiative of Eskom, and its aim is to explore the extent to which Eskom can
benefit financially from either extending the supplier payment terms or offering an early
settlement discount.
payment terms, and further guidance will come on early settlement discounts. The document
provides an update on the thresholds on which the 60-day payment term is applicable and
provides guidance on compliance reporting and the applicability of the Policy.
Threshold
of VAT. This means that all contracts exceeding this threshold must be established on the
60-day payment term.
Applicability of policy
However, the Policy is applicable to contracts concluded between subsidiaries and their own
suppliers.
of an extended payment term must be applied as a lever.
Monitoring of compliance
Committee (“Cost Steerco”) on a monthly basis. Divisional Procurement Senior Managers shall
provide reasons for non-compliance to the oCPO on request and shall present these to the
Cost Steerco. This arrangement shall continue until the end of the 2022/23 financial year.
Compiled by: ms reshma maghoo
Contract advisor
Date: 28/9/2022
Guidance note: implementation of supplier payment term policy
Recommended: mr godfrey quickfall
Senior manager: contract management (acting)
Date: 2022-09-28
Supported: ms jainthree sankar
Chief procurement officer
DATE: 5 October 2022
Approved: mr calib cassim
Chief financial officer
DATE: 05 October 2022
Eskom Holdings SOC Ltd Reg No 2002/015527/30
Annexure Attached (Y /
N / n/a)
1.1.1 *Authorisation Form Annexure A Y
1.1.2 *Acknowledgement form Annexure B Y
1.1.3 *Tenderer’s particulars Annexure C Y
1.1.4 *Integrity Declaration Form (Suppliers are required to Annexure D Y
download and read the Supplier Integrity Pact. It is
accessible on the Eskom Tender Bulletin via Eskom
Supplier Integrity Pact (eskom.co.za) link)
1.1.5 *CPA Requirements for Local Goods/Services Annexure E Y
1.1.6 *CPA(IG) for Foreign Goods/Services (if applicable) Annexure F Y
1.1.7 SBD 6.2 Declaration Certificate for Local Production Annexure G1 Y
and Local Content (only applicable if designated
materials are included and then Tenderers will be
required to complete and submit Annexures G1 to
G4 as evidence of compliance with this
requirement).
Annexure C Local Content Declaration- Summary Annexure G2
Schedule
Annexure D Imported Content Declaration – Supporting Annexure G3
Schedule to Annexure C
Annexure E Local Content Declaration- Supporting Annexure G4
Schedule to Annexure C
1.1.8 *SBD 1 Invitation to Bid must be filled out by all Annexure H Y
tenderers and submitted with the tender at tender
submission deadline
1.1.9 *Sbd 6.
Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
income-generating contracts)
of services, works or goods Stipulated minimum threshold
_______________________________ _______%
_______________________________ _______%
_______________________________ _______%
have any imported content?
(Tick applicable box)
Yes NO
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published
by SARB for the specific currency at 12:00 on the date of advertisement of the bid.
The relevant rates of exchange information is accessible on www.reservebank.co.za
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
Currency Rates of exchange
US Dollar
Pound Sterling
Euro
Yen
Other
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
minimum threshold for local content the dtic must be informed accordingly in order for the
DTIC to verify and in consultation with the AO/AA provide directives in this regard.
Local content declara
supplying entity AND their company registration
number] ......................................................................., certify under oath that, to the best of my
knowledge, the information furnished herein is true and correct. I accept that Eskom reserves its right to
act against the supplier named above or me personally in terms hereof, should this declaration prove to be
false.
Eskom employees and directors that engage in private work
Financial Requirements
Source: Commercial.zip (TENDER)Bid Bond: Performance Guarantee (if a supplier is not financially sound)
If the provision of security for performance in the form of a
performance bond or a demand guarantee is a requirement, the
tenderer must select a minimum of two (2) financial institutions that it
Controlled Disclosure
Anonymously report fraud, corrupti
Payment Terms: payment terms as stipulated hereunder when
submitting tenders and concluding contracts with Eskom:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed to paying
Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, Eskom is committed
Compliance Requirements
Source: Commercial.zip (TENDER)Insufficient searchable text - AI extraction recommended
No specific requirements found
joint venture agreement which incorporates a statement that all partners are
ADDITIONAL CONTRACTUAL REQUIREMENTS √ SUPPORTING EVIDENCE Safety Contractual requirements mean the suppliers will √ submit the tender returnable during the tender close- out. The evaluation will take place once the mandatory and Functionality evaluation have been completed. The service provider will be given only ONE opportunity to submit the outstanding documents within 7 working days. Failure to submit the outstanding documents within the stipulated time; may result in the tenderer being regarded as non- responsive and ineligible for contract award. These OHS requirements will form part of the procurement process and must be complied with prior to signing the contract (Note: these requirements are applicable to the tender phase only). The service provider shall comply with the OHS Safety file requirements which will be issued to the successful bidder, and no work may commence until the Safety file is approved by the Contract custodian together with the OHS professional. The following will form part of the tender evaluation criteria and must be complied with: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable
Acknowledgement of Eskom's SHE rules, and requirements form (Annexure B) signed and submitted by the tenderer
National driver's license (applicable to drivers)
Valid Letter of Good Standing (COIDA or equivalent)
The OHS Act 37(2) agreement which will be signed with the contract
Subcontractor management – Management commitment to ensure that the delivery company complies with Eskom and legal requirements as amended (formal letter on the company letter head),
The sub-contractor shall comply with the following
National driver's license
OHS Act 37(2) agreement signed by the CE/MD
Valid letter of good standing Quality ISO 9001:2015 Quality Management System √ requirements. ISO10005 – Quality Management System Guidelines for Quality Plans ISO10006 – Quality Management Systems Guidelines for Quality Management in Projects ISO10007 – Quality Management Systems Guidelines for Configuration Management ISO31000 – Risk Management Principles & Guideline Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Reference Returnable From Suppliers at at ** closing (Non- prior Award. required required closing. required Tender (disqualifiable)* Contract disqualifiable) to Tender Returnable Returnable Returnable Other safety/quality √ documents as required per scope of works Environmental No EIA needed, however, to ensure compliance to √ environmental requirements, ISO14001, Lethabo environmental procedures will be provided with tender documents. Due Audited Financial Statements of the tenderer for the √ Diligence/financial previous 18 months, or to the extent that such analysis statements are not available, for the last year. In the case of a joint venture or special purpose vehicle (SPV) specially formed for this tender, audited financial statements for each participant in the JV / SPV must be submitted. Start-up enterprises formed within the last 12 months are not required to submit audited financial statements, but if successful in this Invitation to Tender, they will be required to furnish statements for the first year once available. DOCUMENTS REQUIRED UNDER √ FUNCTIONALITY/TECHINICAL CRITERIA Functionality (Technical Evaluation Criteria) The following technical assessment criteria will be used to assess suppliers’ technical submissions. A weighted score-card approach will be used to evaluate technical compliance of tenders against the specifications. Failure to achieve a weighted scoring of 80% evaluated based on the technical requirements below and associated scoring will deem the supplier disqualified from participating further in this tender. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 ANNEXURE A AUTHORISATION FORM Indicate the status of the tenderer by ticking the appropriate box below. A B C D E F COMPANY CLOSE PARTNERSHIP JOINT SOLE TRUST CORPORATION VENTURE PROPRIETOR The tenderer must complete the appropriate certificate set out below for its category of organisation. If the tenderer is a company, close corporation, joint venture, or trust the tenderer must attach a certified copy the document that is proof of the contents of the certificate (resolution of the board of directors of a company, members’ resolution of a close corporation, power of attorney in the case of a joint venture, or resolution of the board of trustees of a trust). Note further that, in addition to completing the relevant certificate for category of organisation, the authorised representative of the tenderer is also required to complete and sign the table at the end of this Authorisation Form.
Certificate for company I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of directors of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the company, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the company. A certified copy of the resolution of the board is annexed to this Form. Signed: Date: Name: Position: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030
Certificate for close corporation I,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as member of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by majority vote of the members taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the close corporation, and to sign all documents in connection with this tender and any contract that may result from it on behalf of the close corporation. A certified copy of the members’ resolution is annexed to this Form. Signed: Date: Name: Position
Certificate for partnership We, the undersigned, being the key partners in the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, to submit this tender on behalf of the partnership, and to sign all documents in connection with the tender and any contract that may result from it on behalf of the partnership. Name Address Signature Date NOTE: This certificate is required to be completed and signed by the full number of Partners necessary to commit the Partnership. Attach additional pages if more space is required. Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030
Certificate for Joint Venture We, the undersigned, are submitting this tender offer in Joint Venture and hereby authorise Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, an authorised signatory of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , being the lead member in the Joint Venture, to sign all documents in connection with the tender and any contract that may result from it on behalf of all the members in the Joint Venture. This authorisation is evidenced by the attached power of attorney signed by the legally authorised signatories of all the members in the Joint Venture. We attach to this Form a certified copy of the Joint Venture Agreement which incorporates a statement that all members in the Joint Venture are liable jointly and severally for the execution of the contract, a term that indicates which member will be the lead member, and terms that indicate the ratios according to which work and payment will be divided amongst the members. Name of JV member Address Authorised signature, name and capacity Lead member Member Member Member NOTE: This certificate is required to be completed and signed by all members of the joint venture. Attach additional pages if more space is required.
Certificate for sole proprietor I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , hereby confirm that I am the sole proprietor of the business trading as _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Signed: Date: Name: Position: (Sole Proprietor) Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Certificate for trust I, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , in my capacity as _ _ _ _ _ _ _ _ _ _ _ of the board of trustees of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereby confirm that by resolution of the board of trustees taken on _ _ _ __ _ _ _ _ (date), Mr/Ms _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , acting in his/her capacity of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, is authorised to submit this tender on behalf of the trust and to sign all documents in connection with this tender and any contract that may result from it on behalf of the trust. A certified copy of the resolution of the board of trustees is annexed to this Form. Signed: Date: Name: Position: NOTE: The table below must also be fully completed by all tenderers in addition to the certificate that was selected and completed above. Name of tenderer: Full names of authorised signatory: Designation and capacity: Signature of authorised signatory Date of signature: Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 ANNEXURE B ACKNOWLEDGEMENT FORM We are in receipt of the Invitation to Tender/Proposal from Eskom Holdings SOC Ltd and the following addenda issued by Eskom: We confirm that the documentation received by us is: (Indicate by ticking the box) Correct as stated in the Invitation to Tender / RFP Content List, and that each document is complete. Or: Incorrect or incomplete for the following reasons: Cataloguing Acknowledgement: Please select the relevant statement by ticking the appropriate box below
We agree to provide the cataloguing information as described in the Invitation to Tender
We have already supplied Eskom with the cataloguing information pertaining to this Invitation to Tender in a previous contract/order [insert previous contract/order number] __________
We do not intend to provide the required cataloguing information for the reasons stated hereunder:
We are a Distributor/Importer/Agent and our Principal, being the Original Equipment Manufacturer (OEM), is or is not [delete whichever is not applicable] in the position to supply cataloguing information for items. We attach the letter from the OEM confirming its position. Invitation to Tender/Request for Proposal No: ____________________ Controlled Disclosure Anonymously report fraud, corruption at 0800 11 2722/ [email protected] When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30 of 65 File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 240-114238630 Rev 26 Identifier Invitation to Tender Effective Date 17 June 2025 Review Date June 2030 Name of Tenderer: ___________ _ _ Country of registration: _______________________________________ Full names of contact person: __________________________________ Contact details: Tel (landline): Cell phone: e-mail address: Name of tenderer: Full names of authorised signatory
B-BBEE Details: “Local Content” refers to value added in South Africa by South African resources. Where a single
contract involves a combination of local and imported goods and/or services, the tender response
must be separated into its components as per the Price Schedule included with the tender documents.
Local content is total spending minus the imported component.
Tenderers are required to submit their proposals in the table below.
Local Content Eskom target Tenderer Proposal
100%
The winning tenderer is encouraged to procure/spend on designated groups on the following paid
invoices for both:
by designated groups; and
of work.
Activities, as a proportion of the local procurement content, which may be subcontracted to designated
black owned enterprises must be submitted in a table below.
Procurement from Designated Group Eskom Target Tenderer Proposal
Black Youth Owned 4%
Controlled Disclosure
Anonymously report fraud, corruption at 0800 11 2722/ [email protected]
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced in any manner or form by third parties without the written consent of Eskom
Holdings SOC Ltd, © copyright Eskom Holdings SOC Ltd, Reg No 2002/015527/30
of 65
File name: Invitation to Tender (ITT) - Supply and delivery of 1MVA MINI SUBSTATION
Template ID: 240-43921804 (Rev 7) Header and
Section
Source: Commercial.zip1.1.9 *SBD 6.1 Preference Points Claim Form in terms of Annexure I Y
PPPFA 2022 regulations
1.1.11 Tax Evaluation questionnaire to determine whether a N/A
3.13 Functionality requirements Functionality requirements are applicable
functionality criteria
A two stage Technical Evaluation Strategy is set out in the technical folder, consisting of the
evaluation of a mandatory gatekeeper, followed by qualitative evaluation of the tenders that passed the
Qualitative technical evaluation criteria
weighted score-card approach will be used to evaluate technical compliance of tenders against the
Section 1: Specific Goals
A maximum of 10/20 points may be awarded to a tenderer for the specific goal specified for the tender.
The points scored for the specific goal must be added to the points scored for price and the total must be
Policy Framework Act, the contract must be awarded to the tenderer scoring the highest points.
B-BBEE Status Level of Number of points Number of points
Contributor (80/20 system) (90/10 system)
NB: The following documents are required to claim preference points,
Tenderer failing to provide documentation for the allocation of preference points will not be
ut of [10/20] points in accordance with
the PPPFA.
If a tenderer fails to submit evidence of its points claim for a Specific
Goal, it will not be disqualified. However, it will be awarded 0 points
Quality ISO 9001:2015 Quality Management System √
ISO10005 – Quality Management System Guidelines
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Act 46 of 2000
Relevant where professional engineering services or regulated engineering work may be required.
Relevant because this tender appears to involve engineering, technical design, maintenance, or regulated built-environment work.
Address
Dennysville road - Viljoensdrift - Vereeniging - 1930
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
06 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Supplies: Electrical Equipment. Unlock full pricing strategies, bid frequency, and historical win rates.