Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
20 Paul Kruger Street, ABSA Square Building, Mbombela,1200 - Mbombela - Nelspruit - 1200
Organization Type
GOVERNMENT
Published
22 Jul 2026
OCDS Reference
ocds-9t57fa-163178
Date & Time
Friday, 14 August 2026 - 12:00
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Venue
null
None
Categories
Request for Bid(Open-Tender)
20 Paul Kruger Street, ABSA Square Building, Mbombela,1200 - Mbombela - Nelspruit - 1200
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: SAPVP Registration, REBOSA Membership
AI Document Analysis Stages
Important Dates
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf (TENDER)22 Jul
2026
Tender Published
Tender was published
14 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Not enough data available to generate an estimate for this tender type.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"14 AUGUST 2026","closingTime":"12h00","briefingSession":"{"date":null,"time":null,"venue":null,"is_compulsory":false}"}
Contact Information
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"SUPPLY CHAIN MANAGEMENT","address":"’S INFORMATION"}
Submission Guidelines
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf (TENDER)20.1. The information contained in this document are of a confidential nature and
should only be used for bidding for this tender.
20.2. In addition to the information contained herein, the appointed Bidder will be
required to sign special conditions of contract with the IDT.
20.3. Bids submitted must be in line with detailed specification. Failure to bid
accordingly will result in the disqualification of bids.
20.4. Bidders are requested to bid for the complete tender and not part thereof,
incomplete bids will be disqualified.
20.5. The IDT reserves the right to award the bid to one service provider
20.6. Bidders are required to quote per item and show a complete price breakdown
where necessary, failure to do so may disqualify the bid.
20.7. All prices quoted must be fully inclusive of all costs and Value Added Tax.
No additional costs other than agreed amounts will be paid by IDT.
20.8. Bidders might be subject to security assessment at the discretion of IDT.
entity.
Contract between IDT and the service provider; and No-Disclosure
Agreement.
Successful bidder will be required to enter into a valid lease agreement for 36 months.
(1, 4& 6.1).
The Tender shall be submitted as original, failure to comply will result in
disqualification of the tender. The tender document must be divided as follows:
a) Returnable documents.
b) Proposal.
c) Financial / pricing information
Bid documents to be placed in the IDT tender box located in the reception area
of our (Regional office at 20 Corner Paul Kruger and Samora Machel, ABSA
SQUARE BUILDING NELSPRUIT, MPUMALANGA Province. It should be placed
on or before the closing date.
NO late bids will be considered or accepted
This Tender closes on 14 August 2026 at 12h00.
Further enquiries can be directed in writing to Ms. L. Mkhabela Email:
of 58
processes.
part of the evaluation process or as a condition to contract award.
comply strictly with the requirements as set out in this tender and/or which does
not meet one or more of the pre-requisites.
on the information received in response to this tender.
Standard conditions of tender
1 general
Actions 1. The Independent Development Trust, Independent
Development Trust's Representative and each tenderer
submitting a tender shall act as stated in these Conditions of
Tender and in a manner which is fair, equitable, transparent,
competitive and cost effective.
The Conditions of Tender and the Tender Data shall not form
part of any contract arising from this invitation to tender.
Communication 2. Each communication between the Independent Development
Trust and a tenderer shall be to or from Independent
Development Trust's Representative only, and in a form that
can be read, copied and recorded. Communication shall be
in the English language. The Independent Development Trust
takes no responsibility for non-receipt of communications
from or by a tenderer.
Independent 3. The Independent Development Trust may accept or reject any
Development variation, deviation, tender, or alternative tender, and may
Trust's rights to cancel the tender process and reject all tenders at any time
accept or reject prior to the formation of a contract. The Independent
any tender Development Trust or Independent Development Trust's
Representative will not accept or incur any liability to a
tenderer for such cancellation and rejection, but will give
reasons for the action. The Independent Development Trust
reserves the right to accept the whole of any part of any
tender.
of 58
tenders the Independent Development Trust may abandon
the proposed work and services, have it performed in any
other manner, or re-issue a similar invitation to tender at any
time.
2 tenderer’s obligations
The tenderer shall comply with the following obligations when
submitting a tender and shall:
Eligibility 1 Submit a tender only if the tenderer complies with the criteria
stated in the Evaluation Criteria.
Cost of 2 Accept that the Independent Development Trust will not
tendering compensate the tenderer for any costs incurred in the preparation
and submission of a tender.
Check 3 Check the tender documents on receipt, including pages within
documents them, and notify the Independent Development Trust's
Representative of any discrepancy or omissions.
Copyright of 4 Use and copy the documents provided by the Independent
documents Development Trust only for the purpose of preparing and
submitting a tender in response to this invitation.
Standardised 5 Obtain, as necessary for submitting a tender, copies of the latest
specification s revision of standardised specifications and other publications,
and other which are not attached but which are incorporated into the tender
publications documents by reference.
Site visit and 6 Attend a site visit and/or clarification briefing meeting at which
/ or clarification tenderers may familiarise themselves with the proposed work,
meeting services or supply, location, etc. Details of the meeting are stated
in the Tender Advert.
Seek 7 Request clarification of the tender documents, if necessary, by
clarification notifying Independent Development Trust's Representative
earlier than the closing time for clarification of queries.
of 58
Pricing the 8 Include in the rates, prices, and the tendered total of the prices
tender (if any) all duties, taxes (except VAT), and other levies payable
by the successful tenderer. Such duties, taxes and levies are
those applicable 14 days prior to the deadline for tender
submission.
9 Show Value Added Tax (VAT) payable by Independent
Development Trust separately as an addition to the tendered total
of the prices.
10 Provide rates and prices that are fixed for the duration of the
contract and not subject to adjustment except as provided for in
the conditions of contract.
11 State the rates and Prices in South African Rand unless
instructed otherwise as an additional condition in the Tender
Data. The selected conditions of contract may provide for part
payment in other currencies.
Alterations to 12 Not make any alterations or additions to the tender documents,
documents except to comply with instructions issued by the Independent
Development Trust's Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be
initialled by all signatories to the tender. Corrections may not be
made using correction fluid, correction tape or the like.
Submitting a 13 Submit a tender for providing the whole of the works, services or
tender supply identified in the Terms of Reference unless stated
otherwise as an additional condition.
14 Submit the tender as an original plus and provide an English
translation for documentation submitted in a language other than
English. Tenders may not be written in pencil but must be
completed in ink.
15 Sign the original and all copies of the tender where indicated.
Independent Development Trust will hold the signatory duly
authorised and liable on behalf of the tenderer.
16 Accept that Independent Development Trust will not assume any
responsibility for the misplacement or premature opening of the
tender if the outer package is not sealed and marked as stated.
of 58
Note:
Where tenders are sent via courier, Independent Development
Trust takes no responsibility for tenders delivered to any other
site than the tender office.
Independent Development Trust employees are not permitted to
deposit a tender into the Independent Development Trust tender
box on behalf of a tenderer.
Closing time 17 Ensure that Independent Development Trust has received the
tender at the address and in the tender box.
18 Accept that, if Independent Development Trust extends the
deadline for tender submission for any reason, the requirements
of these Conditions of Tender apply equally to the extended
deadline.
Tender 19 Hold the tender(s) valid for acceptance by Independent
validity Development Trust at any time within the validity period after the
deadline for tender submission.
20 Extend the validity period for a specified additional period if
Independent Development Trust requests the tenderer to extend
it. A tenderer agreeing to the request will not be required or
permitted to modify a tender, except to the extent Independent
Development Trust may allow for the effects of inflation over the
additional period.
Clarification of 21 Provide clarification of a tender in response to a request to do so
tender from Independent Development Trust's Representative during
after the evaluation of tenders. This may include providing a
submission breakdown of rates or Prices. No change in the total of the Prices
or substance of the tender is sought, offered, or permitted except
as required by Independent Development Trust's Representative
to confirm the correction of arithmetical errors discovered in the
evaluation of tenders. The total of the Prices stated by the
tenderer as corrected by Independent Development Trust's
Representative with the
concurrence of the tenderer, shall be binding upon the tenderer
Submit bonds, 22 If instructed by Independent Development Trust's
policies etc. Representative (before the formation of a contract), submit for
Independent Development Trust's acceptance, the bonds,
guarantees, policies and certificates of insurance required to be
provided by the successful tenderer in terms of the conditions of
contract.
of 58
23 Undertake to check the final draft of the contract provided by
Independent Development Trust's Representative, and sign the
contract all within the time required by these Conditions of
Tender.
The Independent Development Trust to sign and issue the
contract.
Fulfil BEE 24 Comply with Independent Development Trust’s requirements
requirements regarding B-BBEE, Youth-owned, Disabled-owned and Black
Women-owned Suppliers.
3 independent development trust's undertakings
Independent Development Trust, and Independent Development
Trust's Representative, shall:
Respond to 1 Respond to a request for clarification received earlier than the
clarification closing time for clarification of queries. The response is notified
to all tenderers.
Issue Addenda 2 If necessary, issue to each tenderer from time to time during the
period from the date of the Invitation until the closing time for
clarification of queries, Addenda that may amend, amplify, or add
to the tender documents. If a tenderer applies for an extension
to the deadline for tender submission, in order to take Addenda
into account in preparing a tender, Independent Development
Trust may grant such an extension and Independent
Development Trust's
Representative shall notify to all tenderers of the extension.
Return late 3 Tenders will be deemed late if they are not in the designated
tenders tender box at the date and time stipulated as the deadline for
tender submission.
Tender opening 4 Open the tenders in the presence of the tenderers’ representatives
who choose to attend at the time and place stated in the Tender
Data.
Non-disclosure 5 Not disclose to tenderers, or to any other person not officially
concerned with such processes, information relating to the
evaluation and comparison of tenders and recommendations for
the award of a contract.
of 58
Disqualification 7 Instantly disqualify a tenderer (and his tender) if it is established
that the tenderer offered an inducement, gift or bribe to any
person with a view to influencing the placing of a contract arising
from this invitation to tender. Such tenderer may be restricted
from doing business with the IDT and/or the State.
Test for 8 Determine before detailed evaluation, whether each tender
responsiveness properly received
9 Judge a responsive tender as one which conforms to all the
terms, conditions, and specifications of the tender documents
without material deviation or qualification.
A material deviation or qualification is one which, in Independent
Development Trust's opinion would:
works, services or supply identified in the Contract Data,
risks and responsibilities under the contract, or
responsive tenders, if it were to be rectified.
Non-responsive 10 Reject a non-responsive tender.
tenders
Arithmetical 11 Check responsive tenders for arithmetical errors, correcting them
errors as follows:
and in words, the amount in words shall govern.
decimal point in the rate, the line item total as quoted shall
govern, and the rate will be corrected.
result of other corrections required by this checking process
or in the tenderer's addition of prices, the total of the Prices, if
any, will be corrected.
12 Reject a tender if the tenderer does not accept the corrected total
of the Prices (if any).
Grounds for 6 Consider rejecting a tender if there is any effort by a tenderer to
rejection influence the processing of tenders or contract award.
of 58
Evaluation Criteria
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf (TENDER)The bid will be evaluated on the following three phases:
20.1. Phase 1: Responsive criteria
All bids will be evaluated on the responsive criteria to determine compliance with
the following mandatory documents:
agreement (refer to item 6 above).
of 58
documents on behalf of the bidder, with the exception of sole proprietors.
➢ GPS Location
➢ Physical Address
➢ Minimum of 428 sqm for office space
➢ Minimum of 15 parking bays
➢ Minimum of 5 customer bays
➢ and disabled parking
structure
structure
➢ Fire requirements
➢ Universal access in relation to accommodate people with disability;
internally and externally in compliance with relevant Acts.
ink.
20.2 Phase 2: Functionality Criteria
The functionality criteria will be evaluated as follows:
Detailed breakdown of quality points
Details total item
Max max
Points points
Criteria 1: approach
1.1 Property letting and management experience (client reference 20
Letter)
a. The letter must be in the letter head of the Client and signed by authorised person.
b. The reference letter(s) must indicate start and end date of the previous or current lease.
c. The reference letter must indicate client physical address, landline and email of the client
for verification purpose
d. The Client reference must be for office or corporate lease contract in order to be considered.
Client reference letter(s) which does not meet any of the above-mentioned requirements
will not be considered and no points will be allocated. Bidder to complete the compliance
checklist.
Experience point allocation
1.1.1 Five (5) valid signed Client Reference letters 20
1.1.2 Four (4) valid signed Client Reference letters 15
of 58
1.1.3 Three (3) valid signed Client Reference letters 10
1.1.4 Two (2) valid signed Client Reference letters 00
Criteria 2: approach
2.1 Office location 20
2.1.1 0km to 1km from Mbombela Civic Centre (municipal office) 20
2.1.2 1km to 5km from Mbombela Civic Centre (municipal office) 15
2.1.3 5km to 10km from Mbombela Civic Centre (municipal office) 10
2.1.4 10km to15km from Mbombela Civic Centre (municipal office) 05
2.1.5 15km to 20km from Mbombela Civic Centre (municipal office) 03
2.1.6 20km and above from Mbombela Civic Centre (municipal office) or non-submission of 00
source document
a. Bidder must submit proof of physical address for the proposed building.
b. The central CBD point is Mbombela Civic Centre (municipal office).
c. The proposed building must comply with a set minimum specification in order to be
allocated office location point.
Criteria 3: approach
2.3. Facility management team 20
In order to ensure optimal functioning of the proposed office facility that will enable the IDT to
perform its daily functions, the bidder is expected to provide support in a form of facility
management team.
Management team is expected to ensure that the following minimum functions linked to
proposed positions are performed.
outsourcing agreement.
2.3.1. Facility manager (overall responsible for strategic and operational 10
functions of the facility)
contracted by the bidder through outsourced services.
2.3.2. Administrative assistant (responsible for accounts and general administration of the 5
contract and other related functions in facility management)
or contracted by the bidder through outsourced services.
2.3.3. Maintenance officer (responsible for handyman services and general maintenance of the 5
facility)
or contracted by the bidder through outsourced services.
Criteria 4: approach
2.4. Project methodology/development implemention plan 20
The bidder is required to provide detailed project implementation plan including timelines from
date of appointment to the date IDT take occupancy of offices and management of the office
space.
2.4.1 Project implementation timelines (Day to day process during moving to the new offices) 10
Include the following aspects:
2.4.2 How the offices/facility will be managed 4
2.4.3 How the service provider will deal with crisis management ensuring IDT Business 4
Continuity
2.4.4 Resources i.e. Detailed list of Professional team 2
of 58
Criteria 5: approach
2.5 Safety & security plan 20
The bidder must submit safety and security plan covering the following key safety and security
key features.
2.5.1. CCTV 05
2.5.2. External alarm monitoring 05
2.5.3. Smoke detection 05
2.5.4. Evacuation 05
Total evaluation points score for quality 100
Tenderers with a score of less than 70% will be rejected as non-responsive. Bidders must score
Minimum points in each criteria
Phase 2b: Site inspection Criteria
Bidders who score 70 and above on functionality criteria (Phase 2) will be considered for site
inspection.
The site inspection will be evaluated as follows:
Technical Specifications
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf (TENDER)The Independent Development Trust (IDT) is a Schedule 2 Public Entity governed by its
Deed of Trust, the Public Finance Management Act (Act No. ), as amended by
Act of No. (PFMA) and other relevant legislative frameworks. The IDT is
mandated to support government in development programmes implementation across
the three spheres of government. Its primary focus is on social infrastructure programme
delivery management, i.e. schools, hospitals, courts, etc.
Legislative Framework
All bidders must comply with applicable South African legislation, including but not limited
to:
Occupational Health and Safety Act
Public Finance Management Act
Construction Regulations 2014 (where applicable)
National Building Regulations and SANS 10400
Applicable municipal by-laws and fire safety regulations
The IDT is a Schedule 2 State owned entity which manages the implementation and
delivery of critically social infrastructure programmes on behalf of government. The IDT
is committed to ensuring the implementation of the Codes of Good Practice. The IDT
reports to the Minister of Public Works and Infrastructure who is a Shareholder
representative and its Executive Authority. The IDT’s national office is located in Pretoria
and has regional offices in all of the country’s nine provinces
The purpose of this bid is to find suitable Office space for the IDT MPUMALANGA
Regional Office based in NELSPRUIT.
4.1 Office location
of 58
The bid shall include costing for both common areas specification requirement and
lettable space requirement and parking bays as listed below: -
Nelspruit.
Mbombela Civic Centre (municipal office).
4.2. Premises Accessibility
The premises must be within the vicinity of Public Transport amenities.
4.3 Office Space Requirements
comply with accessibility requirements of SANS 10400 and all South African
Legislation.
measured by the SAPOA method of measuring and calculating spaces, with
at least 15 covered parking bay for staff and at least 5 visitors parking spaces
number of 30 staff members.
and females and 1 separate ablution facility to make a provision for disabled
persons as per part P and Part S of SANS 10400: (2 seats and 2 urinals for
males. 2 seats for females)
tendered space.
line with labour legislations.
network system and telephone lines).
the building
for negotiation with IDT for Tenant Installation Allowance.
adequate parking away from the CBD, industrial and retail outlets.
conducive working environment.
serviced lift (where applicable) if not on the ground floor.
parking areas.
of 58
house where applicable)
extension.
the following documents:
a) Floorplans of the building or space being offered.
b) Commitment letter to refurbish the building as per the tenant specification with
a Tenant Installation amount.
c) Partitioning as per IDT’s specification
d) Air-conditioning (preferably split units)
e) Adequate floor covering and painting - with corporate colours
f) Power skirtings - with two power plugs per workstation
g) Network and telephone points
h) Blinds - with corporate colours
i) Space plan
j) UPS facility integrated into specific plug points
4.4 Price schedules including VAT detailing: -
The price inclusive of VAT for the duration of contract must be inclusive of:
be separated from the monthly utility fee. The total rental amount
for the 36 months must be carried to form of offer section which will
be used for price and specific goal evaluation.
IDT decide to extend the lease contract for further 24 months. The
additional 24 months’ total amount MUST NOT be included in the
form of offer section.
year.
equipment.
by further 24 months.
of 58
Rental Deposit / Security
Rental Deposit and Security Requirements
Bidders are hereby informed that, in line with public sector procurement
frameworks and leasing practices applicable to government institutions, the
inclusion of a rental deposit is not a standard requirement for this tender.
In this regard:
The Independent Development Trust (IDT), as a public entity, operates within
the procurement framework prescribed by the National Treasury and the
Department of Public Works and Infrastructure (DPWI), including the Public
Finance Management Act, 1999 (Act No. ) and applicable Supply
Chain Management (SCM) prescripts.
In terms of these frameworks, all material commercial terms must be clearly
defined at the tender stage to ensure a procurement system that is fair,
equitable, transparent, competitive, and cost-effective.
Accordingly:
No rental deposit shall be payable under this tender unless explicitly stated
otherwise in the bid documentation.
Bidders are required to price and submit their proposals on the basis that no
deposit will be claimed or payable by IDT.
Any proposal submitted with conditions relating to a rental deposit, not provided
for in this tender, may be deemed non-responsive.
Notwithstanding the above, the IDT reserves the right to incorporate
appropriate risk mitigation measures within the lease agreement, including but
not limited to:
Clearly defined payment terms aligned to government payment processes;
Interest on overdue payments, where applicable;
Maintenance, damages, and reinstatement obligations; and
Dispute resolution and escalation mechanisms.
Bidders are further advised that no material changes to the commercial terms,
including the introduction of a rental deposit, will be permitted post-award, as
this may constitute a deviation from the approved Terms of Reference and may
not be compliant with applicable procurement prescripts.
of 58
Bidders must provide physical address of the office space tendered for inspection
purposes before the evaluation process is finalized.
The proposed leased property must be made available and to be in good condition and
clean at least 21 days before occupation.
The bidder must be the owner of the property and proof of ownership of the proposed
properties must be submitted together with the bid documents. In case where the agent
has been appointed to manage the property and to submit the bid, the power of
attorney or any acceptable written proof of appointment as an agent must be provided
with the bid together with the proof of ownership with the proposed property.
All bidders must provide details of all pending litigations (especially interdicts) relating to
the proposed property and land if any.
Partitioning of the offices in line with the requirement of the IDT will be the responsibility
of the landlord as per the requirement provided for by the IDT. The partition should be
completed before the IDT takes occupation.
Post-Award / Pre-Occupation Requirements
The successful bidder will be required, prior to occupation, to submit the following:
OHS Compliance File
A comprehensive OHS file, which should include:
Compliance Electrical Certificate of the Property
Valid Electrical Compliance Certificate must be submitted together with the Bid
Document
The building should be completed and ready for occupation by 01 October 2026
Specific office space requirements:
a) Require a minimum of 428 sqm for Administration Offices a total of between 428 sqm is
required.
of 58
Category Quantity Sqm Total sqm
RGM’s office 1 18 m2 18 m2
Program Manager 3 12m2 36 m2
Admin and Finance Manager 1 12 m2 12 m2
(Afm)
Supply Chain Specialist 1 12 m2 12 m2
Total 78 m2
Project Management 220m2
Open plan workstations 3 Programme 7m2 is the minimal
(Shared Spaces) Implementation allowable space
Managers (PIM per open plan desk.
Techs) Add 20% Additional
space extra over for
70 m2 allowance of
2 Programme circulation space.
Implementation Add additional 10%
Administrators
for structural area,
(PIAs)
and occidental
furniture 1 Project
(10 m2 each) Accountant
1 Performance
Manager
2 x Programme 7m2 is the minimal 40 m2
Implementation allowable space
Managers - per open plan desk.
Social Add 20% Additional
space extra over for
2 x EPWP allowance of
Social circulation space.
Facilitators
Add additional 10%
for structural area,
and occidental
furniture
(10 m2 each)
of 58
4 x EPWP Data 7m2 is the minimal 40 m2
Capturers allowable space
per open plan desk.
Add 20% Additional
space extra over for
allowance of
circulation space.
Add additional 10%
for structural area,
and occidental
furniture
(10 m2 each)
1 x Project 7m2 is the minimal
Financial allowable space
Controllers per open plan desk.
10 m2 Add 20% Additional
space extra over for
allowance of
circulation space.
Add additional 10%
for structural area,
and occidental
furniture
(10 m2 each)
6 Graduate 7m2 is the minimal 60m2
Trainee allowable space
per open plan desk.
Add 20% Additional
space
extra over for
allowance of
circulation space.
Add additional 10%
for structural area,
and occidental
furniture
(10 m2 each)
Filing cabinet space 10m2 10m2
Boardroom 30- Seater 1 60 m2 60 m2
of 58
Cleaner’s change room 1 6 m2 6 m2
Server Room (air- 1 6 m2 6 m2
conditioned)
Disabled toilet. 1 4 m2 4 m2
Usually Unisex for
disabled.
Staff Female Toilets as Building regs will 12 m2 12 m2
per require 2 WC, and 2
WHB’s
SANS 10400-part P
Staff Male toilets as per Building regs 10 m2 10 m2
will require 2
SANS 10400-part P
WC,
2 UR, and 2
WHB’s
Reception area 1 12 m2 12 m2
Fully Fitted Kitchenette 1 12 m2 12 m2
Storeroom 1 1 8 m2 8 m2
TOTAL 428m2
Total = 428 sqm
This m2 and other requirements as indicated above are approximate sizes, if the office
space that will be offered is different in layout and size, it must be indicated as such on
the proposal.
b) Require at least 15 Parking Bays for staff motor vehicles and clients.
Category Quantity Sqm Total sqm
the zoned corporate office park, away from retail shops, Industrial and Central
Business District (CBD) with accessible public transport system.
01st October 2026 or as and from when the agreement is concluded. The IDT
reserves the right to extend the contract for further 24 months and bidders will
be required to provide monthly rental for year 4 and 5 in case IDT decide to
exercise right to extend.
of 58
The service provider will be required to:
structural related issues such as the conditions of the building, roof leakages,
structural defects and any building maintenance required etc.
bill invoice by the 25th day of each month to be paid end of the month.
term of structural challenges etc.
The bidder is required to confirm that it will hold its proposal valid for 90 days from the
closing of the tender, during which time it will maintain without changing their proposed
rates and prices.
The successful bidder must indicate annual escalations adjustments in the bid
document if any. Industry range requires between 6% to 8% increase annually. NB.
The increase will only apply from the second year of the lease agreement.
The successful bidder must submit a detailed breakdown of service fees per month.
(rental, utility bills, parking, sewerage, refuse removal, rates and taxes). An indication
of Value Added Tax (VAT) must be explicitly clear on the fees. The costing structure
must be clearly indicated.
Mandatory documents submitted
Yes NO
Property ownership
Bidder must be the owner of the property. Certified copy of
deed registration ownership/Power of Attorney/ Subletting
agreement (refer to item 6 above)
Letter of authority by the Legal Entity, authorizing a person
dedicated to sign documents on behalf of the bidder, with
the exception of sole proprietors
All bidders must be registered with CSD (to supply the
MAAA number)
Fully completed and signed SBD1; SBD 4 and SBD 6.1
of 58
Property size / site of the premises
Minimum of 428 sqm for office space
Minimum of 15 parking bays
Minimum of 5 customer parking bays
Minimum of 1 disabled parking bays
Property prospectus to be attached which must
highlight the following:
a) GPS Location
b) Physical Address
Condition / requirements of the property
The premises must meet all relevant legislative
requirements. Bidders must provide certification of
compliance in relation to the following:
a) Electrical
b) Mechanical
c) Fire requirements
d) Universal access, it must accommodate people with
disability; internally and externally in compliance with
relevant Acts.
e) Proof of Compliance with the Occupational Health and
Safety Act (OHSA)
NB: IDT have a right to verify all COC
NB: All the above will be required prior occupation
and signing of the Lease.
The bidder must undertake to maintain compliance for the
full lease period.
Valid Third-Party liability insurance and SASRIA insurance
for the building structure
Occupancy Certificate (applicable if the building is new) A
valid Occupation Certificate issued by the relevant local
authority confirming that the building is approved for use as
office accommodation.
Zoning certificate obtainable from Municipality
The bid document must be completed by hand using the
black permanent ink.
Building support service
The following services must be available on occupation
with back-up facilities for business continuity:
of 58
NB: All relevant documentation from the relevant
municipality confirming that all services are fully paid prior
occupation (municipal clearance).
Compliance requirement:
The bidder is required to submit a letter of
undertaking/commitment to comply with all the listed
requirements on submission of the bid.
Non-mandatory documents submitted
Yes NO
CIPC Certificate (proof of company ownership)
Tax Clearance Certificate with SARS pin
Pictures of the office building in colour include parking,
basement if any, the inside of the building
14.1. Make a presentation to the IDT when required to do so;
14.2. Demonstrate professionalism in letting management, as well as flexibility
in accommodating the IDT’s specific needs
14.3. Demonstrate and confirm the ability to deal with emergency situations
within 24 hours in terms of serious structural defects such as roof
leakages, roof tile replacement, blocked toilet, burst water pipes, burst
geysers etc.;
14.4. Prompt response to all maintenance related issues;
14.5. Access control and external 24/7 security guarding services with reputable
and experience security company.
The shortlisted bidder must arrange relevant site inspection of the property; however
the IDT reserves the right to conduct such visits in the absence of the successful
bidder; this will be noted and collated to a formal snag list and kept for record purposes.
16.1. The service provider must have proficient knowledge and experience in the
following areas: -
16.1.1 Knowledge and understanding of corporate office space and contemporary
space planning methodologies;
16.1.2 Understanding of National Building regulations.
17.1 The required services shall be procured through a Bidding Process, as per
the IDT SCM policy and procedures.
of 58
17.2. Bids submitted by means of e-mail, facsimile, electronic or similar means
shall not be considered. Only bids submitted in hard copies will be
accepted.
17.2 Bidders who meet the requirements for submission of mandatory
documents may be invited to make presentations to the Bid Evaluation
Committee (BEC).
In accordance with the National Treasury Implementation Guide: Preferential
Procurement Regulations, the estimated contract value for the provision of office
accommodation under this tender is R 4 285 300.00 (VAT inclusive) for the
contract period of 36 months, with an option to extend for a further 24 months,
subject to organisational requirements and approval.
19.1. Bid/Tender will be evaluated in accordance with the IDT’s Supply Chain
Management Policy, which conforms to the provisions of the Preferential
Procurement Policy Framework Act and its Regulations.
19.2. The tender evaluation criteria, in line with the IDT Supply Chain Management
Policy, will be as follows:
100;
points is for price and 20 points is for Specific Goals as cited above. A bidder
that scores less than 70% of total functionality points will not be further
evaluated.
19.3. Preference points for Specific Goals as stipulated as per SBD 6.1.
19.4. For purposes of comparison and in order to ensure a meaningful evaluation, bidders
are requested to furnish detailed information to substantiate their bid.
Experience & Qualifications
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf16.1. The service provider must have proficient knowledge and experience in the
following areas: -
16.1.1 Knowledge and understanding of corporate office space and contemporary
space planning methodologies;
16.1.2 Understanding of National Building regulations.
Quality Management
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdfThe shortlisted bidder must arrange relevant site inspection of the property; however
the IDT reserves the right to conduct such visits in the absence of the successful
bidder; this will be noted and collated to a formal snag list and kept for record purposes.
100;
points is for price and 20 points is for Specific Goals as cited above. A bidder
that scores less than 70% of total functionality points will not be further
evaluated.
19.3. Preference points for Specific Goals as stipulated as per SBD 6.1.
19.4. For purposes of comparison and in order to ensure a meaningful evaluation, bidders
are requested to furnish detailed information to substantiate their bid.
Phase 2b: Site inspection Criteria
Bidders who score 70 and above on functionality criteria (Phase 2) will be considered for site
inspection.
Pricing Schedule
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdfbe separated from the monthly utility fee. The total rental amount
for the 36 months must be carried to form of offer section which will
be used for price and specific goal evaluation.
IDT decide to extend the lease contract for further 24 months. The
additional 24 months’ total amount MUST NOT be included in the
form of offer section.
year.
equipment.
by further 24 months.
of 58
The Independent Development Trust (IDT), as a public entity, operates within
the procurement framework prescribed by the National Treasury and the
Department of Public Works and Infrastructure (DPWI), including the Public
Finance Management Act, 1999 (Act No. ) and applicable Supply
Chain Management (SCM) prescripts.
The bidder is required to confirm that it will hold its proposal valid for 90 days from the
closing of the tender, during which time it will maintain without changing their proposed
rates and prices.
(rental, utility bills, parking, sewerage, refuse removal, rates and taxes). An indication
of Value Added Tax (VAT) must be explicitly clear on the fees. The costing structure
must be clearly indicated.
Specific goals 100 100
of 58
Sbd 3.1 Pricing
Schedule – firm prices (purchases)
Note: price adjustments will be allowed at the periods and times specified in the bidding documents.
Name of bidder: .......................................................................................................... Bid NO: IDTMPU2026/OFFICELEASE/ADM01-REV
CLOSING TIME: 14 August 2026@12:00
Pricing schedule for the 36 months duration
01 October 2026 - 30 September 2027
01 October 2027 – 30 September 2028
01 October 2028 – 30 September 2029
Total bid amount for 36 months to be carried to form of offer section
Pricing schedule for optional additional 24 months
disqualification of the tender. The tender document must be divided as follows:
a) Returnable documents.
b) Proposal.
c) Financial / pricing information
Copyright of 4 Use and copy the documents provided by the Independent
documents Development Trust only for the purpose of preparing and
submitting a tender in response to this invitation.
Standardised 5 Obtain, as necessary for submitting a tender, copies of the latest
specification s revision of standardised specifications and other publications,
and other which are not attached but which are incorporated into the tender
publications documents by reference.
Site visit and 6 Attend a site visit and/or clarification briefing meeting at which
/ or clarification tenderers may familiarise themselves with the proposed work,
meeting services or supply, location, etc. Details of the meeting are stated
in the Tender Advert.
Seek 7 Request clarification of the tender documents, if necessary, by
clarification notifying Independent Development Trust's Representative
earlier than the closing time for clarification of queries.
of 58
Pricing the 8 Include in the rates, prices, and the tendered total of the prices
tender (if any) all duties, taxes (except VAT), and other levies payable
by the successful tenderer. Such duties, taxes and levies are
those applicable 14 days prior to the deadline for tender
submission.
9 Show Value Added Tax (VAT) payable by Independent
additional period.
Clarification of 21 Provide clarification of a tender in response to a request to do so
tender from Independent Development Trust's Representative during
after the evaluation of tenders. This may include providing a
submission breakdown of rates or Prices. No change in the total of the Prices
or substance of the tender is sought, offered, or permitted except
as required by Independent Development Trust's Representative
to confirm the correction of arithmetical errors discovered in the
evaluation of tenders. The total of the Prices stated by the
tenderer as corrected by Independent Development Trust's
Compliance Requirements
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdf (TENDER)No Site Inspection Checklist Points Check YES NO N/A 1 Safety & General Condition 20
The building accommodates persons living with disabilities. 2
Does the building have facilities and amenities (Kitchen, Restrooms, Parking and accessibility)
Building does not have rising damp or visible structural defects or wall cracks exceeding 5mm.
Is there proper light/illumination? 1
Lighting at conducive for office environment 1
Energy saving building 1
Does the building have safety and security measures ( Fire safety equipment and security in place) controlled 2 access system, secured office park)
Is electrical wiring properly installed? 2
Is the server room 2 hours fire rated? 2
Server Room AC to maintain 18-20°C 2
All external doors should be fitted with security graded strike locks and door closers 2 Functional Requirements 20
Is the office space clean, tidy, and well-maintained? 2
Are workspaces adequate, comfortable, and well- equipped for the intended use?
Are there suitable storage and filing systems in place? 3
Are restrooms clean, well-maintained, toilets flush properly, and equipped with necessary amenities (e.g., 2 Basins, Toilet Paper Holder, etc?)
Are phone lines, internet access, and other communication systems functioning correctly? is there 3 power skirting of 58
Are utilities (e.g. electricity, water, etc.) functioning correctly and safely?
is there a backup generator? 3
Are there regular maintenance schedules in place for fire equipment and mechanical fixtures e.g. aircons 2 infrastructure? 3 Compliance & Legal Requirements 20
Does the office space comply with local building codes, safety regulations, and accessibility standards?
Are fire extinguishers, alarms, and other fire safety equipment in good working order and compliant with 5 regulations?
Is there an occupancy certificate for the building to ensure compliance with facilities regulations? 4 Accessibility & Inclusivity 05
Is signage clear, legible, and accessible to all users? 3
Is the emergency signage visible? 2 5 Functional Checks 15
Can the blinds be opened, closed, and tilted without any resistance or sticking?
Are the blinds effectively controlling the amount of natural light entering the room?
Are the cords intact, not frayed, and functioning correctly? 1
Blinds are not broken or chipped slats, no signs wear and tear on blinds?
There are no cracks, chips, missing parts, or signs of wear and tear on the door itself, including the door frame.
Points Allocation: 80 points
B-BBEE Details: of a contract), submit for
Independent Development Trust's acceptance, the bonds,
guarantees, policies and certificates of insurance required to be
provided by the successful tenderer in terms of the conditions of
contract.
of 58
23 Undertake to check the final draft of the contract provided by
Independent Development Trust's Representative, and sign the
contract all within the time required by these Conditions of
Tender.
The Independent Development Trust to sign and issue the
contract.
Fulfil BEE 24 Comply with Independent Development Trust’s requirements
requirements regarding B-BBEE, Youth-owned, Disabled-owned and Black
Women-owned Suppliers.
3 independent development trust's undertakings
Independent Development Trust, and Independent Development
Trust's Representative, shall:
Respond to 1 Respond to a request for clarification received earlier than the
clarification closing time for clarification of queries. The response is notified
to all tenderers.
Issue Addenda 2 If necessary, issue to each tenderer from time to time during the
period from the date of the Invitation until the closing time for
clarification of queries, Addenda that may amend, amplify, or add
to the tender documents. If a tenderer applies for an extension
to the deadline for tender submission, in order to take Addenda
into account in preparing a tender, Independent Development
Trust may grant such an extension and Independent
Development Trust's
Representative shall notify to all tenderers of the extension.
Return late 3 Tenders will be deemed late if they are not in the designated
tenders tender box at the date and time stipulated as the deadline for
tender submission.
Tender opening 4 Open the tenders in the presence of the tenderers’ representatives
who choose
Health & Safety
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdfredrafted. Photocopies of the original bid documentation may be used, but an
original signature must appear on such photocopies.
will be published on IDT website.
requirements. Bidders must provide certification of
compliance in relation to the following:
a) Electrical
b) Mechanical
c) Fire requirements
d) Universal access, it must accommodate people with
disability; internally and externally in compliance with
relevant Acts.
e) Proof of Compliance with the Occupational Health and
Safety Act (OHSA)
NB: IDT have a right to verify all COC
NB: All the above will be required prior occupation
and signing of the Lease.
14.1. Make a presentation to the IDT when required to do so;
14.2. Demonstrate professionalism in letting management, as well as flexibility
in accommodating the IDT’s specific needs
14.3. Demonstrate and confirm the ability to deal with emergency situations
within 24 hours in terms of serious structural defects such as roof
leakages, roof tile replacement, blocked toilet, burst water pipes, burst
geysers etc.;
14.4. Prompt response to all maintenance related issues;
14.5. Access control and external 24/7 security guarding services with reputable
and experience security company.
2.4.4 Resources i.e. Detailed list of Professional team 2
of 58
Criteria 5: approach
2.5 Safety & security plan 20
1 Safety & General Condition 20
The building accommodates persons living with disabilities. 2
Restrooms, Parking and accessibility)
defects or wall cracks exceeding 5mm.
Fire safety equipment and security in place) controlled 2
access system, secured office park)
strike locks and door closers
2 Functional Requirements 20
equipped for the intended use?
properly, and equipped with necessary amenities (e.g., 2
Basins, Toilet Paper Holder, etc?)
communication systems functioning correctly? is there 3
power skirting
of 58
correctly and safely?
equipment and mechanical fixtures e.g. aircons 2
infrastructure?
3 Compliance & Legal Requirements 20
safety regulations, and accessibility standards?
equipment in good working order and compliant with 5
regulations?
compliance with facilities regulations?
4 Accessibility & Inclusivity 05
5 Functional Checks 15
resistance or sticking?
light entering the room?
tear on blinds?
and tear on the door itself, including the door frame.
smoothly.
operation
building codes and safety regulations.
6 Floor Condition 10
health and safety.
7 Roof Condition 10
the roof structure
Total 100
To qualify for the next evaluation phase, the bidder must achieve a score of 70% or above.
Non-disclosure 5 Not disclose to tenderers, or to any other person not officially
concerned with such processes, information relating to the
evaluation and comparison of tenders and recommendations for
the award of a contract.
of 58
Disqualification 7 Instantly disqualify a tenderer (and his tender) if it is established
that the tenderer offered an inducement, gift or bribe to any
person with a view to influencing the placing of a contract arising
from this invitation to tender. Such tenderer may be restricted
from doing business with the IDT and/or the State.
Test for 8 Determine before detailed evaluation, whether each tender
responsiveness properly received
Contractual Terms
Source: IDTMPU2025ADM01 - OFFICE LEASE - BID DOCUMENT_2026_Updated_22.07.2026.pdfmeasured by the SAPOA method of measuring and calculating spaces, with
at least 15 covered parking bay for staff and at least 5 visitors parking spaces
number of 30 staff members.
and females and 1 separate ablution facility to make a provision for disabled
persons as per part P and Part S of SANS 10400: (2 seats and 2 urinals for
males. 2 seats for females)
tendered space.
line with labour legislations.
network system and telephone lines).
the building
for negotiation with IDT for Tenant Installation Allowance.
adequate parking away from the CBD, industrial and retail outlets.
conducive working environment.
serviced lift (where applicable) if not on the ground floor.
parking areas.
of 58
house where applicable)
extension.
the following documents:
a) Floorplans of the building or space being offered.
b) Commitment letter to refurbish the building as per the tenant specification with
a Tenant Installation amount.
c) Partitioning as per IDT’s specification
d) Air-conditioning (preferably split units)
e) Adequate floor covering and painting - with corporate colours
f) Power skirtings - with two power plugs per workstation
g) Network and telephone points
h) Blinds - with corporate colours
i) Space plan
j) UPS facility integrated into specific plug points
4.4 Price schedules including VAT detailing: -
the following mandatory documents:
agreement (refer to item 6 above).
of 58
documents on behalf of the bidder, with the exception of sole proprietors.
➢ GPS Location
➢ Physical Address
➢ Minimum of 428 sqm for office space
➢ Minimum of 15 parking bays
➢ Minimum of 5 customer bays
➢ and disabled parking
structure
structure
➢ Fire requirements
➢ Universal access in relation to accommodate people with disability;
internally and externally in compliance with relevant Acts.
ink.
20.2 Phase 2: Functionality Criteria
01 October 2029 – 30 September 2030
01 October 2030 – 30 September 2031
Name of the Bidder ................................................. Signature of Bidder: .....................................
▪ Please fill in the amounts including VAT clearly and legibly.
▪ Only firm prices will be accepted.
▪ The above Transaction fees will be used for purposes of evaluation and contracting.
▪ Volumes shown above are only estimates based on a 36 months with an option to extend for further 24 months’ period.
▪ No minimum or maximum volumes or values of work/ transactions are guaranteed during the contract period.
▪ Bid Validity - The offer must be valid for 90 days from the closing date of the bid.
▪ Offer to be valid for 90 days from the closing date of bid
of 51
19.4. Preference point system
guarantees, policies and certificates of insurance required to be
provided by the successful tenderer in terms of the conditions of
contract.
of 58
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Block B, Glenwood Office Park, 294 Sprite Ave, Faerie Glen, Pretoria, 0043, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
22 Jul 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
012-845-2000[email protected]www.idt.org.zaBlock B, Glenwood Office Park, 294 Sprite Ave, Faerie Glen, Pretoria, 0043, South Africa
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Rental and leasing activities. Unlock full pricing strategies, bid frequency, and historical win rates.