25 Queen Victoria Street - Cape Town - Cape Town - 8001
Organization Type
GOVERNMENT
Published
20 Jul 2026
OCDS Reference
ocds-9t57fa-162852
Summary
This tender is a request for quotation (RFQ) for the professional removal, relocation, and reinstallation of the gaia sphere artwork at the iziko south african museum in cape town. IT is intended for contractors with the expertise and equipment to handle delicate museum artefacts, ensuring compliance with health and safety standards and museum protocols. The successful bidder will be responsible for the complete project, from safe de-installation to final handover.
The scope involves de-installing, relocating approximately 20 metres, and reinstalling the Gaia Sphere in accordance with museum and health and safety standards.
Mandatory documents include a CSD report, B-BBEE certificate/affidavit, COIDA letter of good standing, proof of insurance, and signed SBD forms (4 & 6.1).
Evaluation uses the 80/20 preference point system (80 points for price, 20 for specific goals based on B-BBEE/black ownership).
A detailed pricing breakdown for de-installation, relocation/rigging, and installation must be submitted; only these costs will be evaluated.
A site visit is highly recommended (by appointment) to assess access, lifting requirements, and the installation area.
The contractor must protect all museum property, repair any damage at their own cost, and leave the work area clean.
25 Queen Victoria Street - Cape Town - Cape Town - 8001
Construction & Civil Engineering Industry Profile
Critical Requirements
CIDB Contractor Grading
Regulatory Bodies
ECSASACPCMPCIDBSAIA
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Review in progress · 0 of 1 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
RFQIziko RFQ for Removal and Relocation of Gaia-sphere.pdfReview complete
Description
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
Important Dates
20 Jul
2026
PUBLICATION
Tender Published
Tender was published
31 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
Iziko Museums of South Africa seeks a contractor to remove, relocate approximately 20 meters, and reinstall the Gaia-sphere artwork at the Iziko South African Museum in Cape Town. The work involves careful de-installation, transport, and secure reinstallation following museum standards and health and safety legislation.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Removal and relocation of the Gaia Sphere at Iziko South African Museum, 25 Queen Victoria Street, Cape Town.
Iziko Museums is a Schedule 3A public entity and non-profit organisation, partly subsidised by the National Department of Sport, Arts and Culture.
Important Dates
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Closing date and time for submission: 31 July 2026 at 11h00.
Site visit: Not compulsory, but highly advisable. Arrange an appointment with the technical representative to inspect the site, access routes, lifting requirements, ceiling heights, installation points, and working space.
Contact Information
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Required returnable documents include: Central Supplier Database (CSD) report with supplier number and tax status verification pin; detailed pricing structure on company letterhead (inclusive of VAT); valid B-BBEE certificate or sworn affidavit; signed RFQ document; valid certified copy of COIDA letter of good standing/certificate; proof of insurance covering the de-installation, relocation and re-installation period.
False declarations will lead to disqualification. All declared information will be verified against available documents, including CSD reports.
Any alteration to the RFQ document, other than completing bidder details and tendered price, may render the submission non-responsive.
Returnable Documents
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Mandatory documents: CSD report; detailed pricing; B-BBEE certificate/affidavit; signed RFQ; COIDA letter; proof of insurance.
Complete and sign Annexure A (SBD 4 - Bidder’s Disclosure) and Annexure B (SBD 6.1 - Preference Points Claim Form).
SBD forms require declarations regarding state employment, relationships with institution staff, and interests in other enterprises.
False declarations lead to disqualification.
Evaluation Criteria
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Must be registered on the Central Supplier Database (CSD); must comply with all mandatory administrative document submissions; must not be listed in the Register for Tender Defaulters or List of Restricted Suppliers; must submit a fully completed and signed bid.
Technical Specifications
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Scope: Removal, relocation (approx. 20 metres), and reinstallation of the Gaia Sphere at Iziko South African Museum.
The contractor is responsible for: dismantling (where required), lifting, transporting, repositioning, and securely reinstalling the Gaia Sphere in accordance with museum standards and all applicable health and safety legislation.
Key tasks include: de-installation; relocation and rigging to new allocated space; re-installation.
The contractor must maintain sufficient personnel, facilities, and equipment to ensure proper performance.
The contractor must inspect the installation area before commencing work.
During removal: safely disconnect the sphere, remove supporting brackets where necessary, protect the artwork, ensure no damage occurs.
During reinstallation: reinstall, level and align, ensure secure fixing, test the installation, hand over to Iziko.
Protect all museum property throughout the works; any damage caused must be repaired at the contractor's cost.
On completion, remove all waste, packaging, and debris, leaving the work area clean and ready for use.
The value of the Gaia Sphere is R68,603.09.
Methodology
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Key considerations for the site visit: access routes, lifting requirements, ceiling heights, installation points, working space.
Removal steps: safely disconnect, remove supporting brackets where necessary, protect artwork, ensure no damage.
Relocation: move the sphere approximately 20 metres to the new location identified by Iziko.
Reinstallation steps: reinstall, level and align, ensure secure fixing, test, hand over to Iziko.
Quality Management
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
The value of the Gaia Sphere is R68,603.09.
The contractor must inspect the site before commencing work.
Pricing Schedule
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
Complete the pricing schedule with items: De-installation; Relocation and rigging; Installation.
The total evaluated bid price (sum of items 1-3) is used for price evaluation under the 80/20 system.
No extra costs will be paid unless disclosed and pre-approved in writing.
Attach a breakdown of assumptions, resource categories, and rates.
Financial Requirements
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Complete the provided pricing schedule. The total evaluated bid price (sum of items 1 to 3) will be used for price evaluation under the 80/20 system.
Pricing schedule items: 1. De-installation of Gaia-sphere; 2. Relocation and rigging; 3. Installation to new space.
Pricing notes:
Only amounts captured on the pricing table will be considered.
Standardised provisional items are included for fair comparison.
No additional costs, disbursements, or incidental charges will be paid unless disclosed in the bid and approved in writing by Iziko before being incurred.
Attach a breakdown of assumptions, resource categories, and rates used to prepare your pricing.
Compliance Requirements
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Mandatory documents: Central Supplier Database (CSD) report with supplier number, company details, and tax status verification pin.
Valid B-BBEE certificate or sworn affidavit.
Valid certified copy of a Compensation for Occupational Injuries and Diseases Act (COIDA) letter of good standing/certificate.
Proof of insurance covering the period of de-installation, relocation, and re-installation.
Bidders must complete and sign Annexure A (Bidder’s Disclosure - SBD 4) and Annexure B (Preference Points Claim Form - SBD 6.1).
False declarations will lead to disqualification; all information will be verified.
The 80/20 preference point system applies. Specific goals points are awarded for B-BBEE status and black ownership.
B-BBEE Requirements
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
Points for Specific Goals are awarded based on B-BBEE status and black ownership.
Proof required: B-BBEE certificate, company registration, identification, CSD report.
Scoring: 50% or more black ownership = 20 points; less than 50% = 10 points; 0% = 0 points.
Health & Safety
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
Work must be performed in accordance with all applicable health and safety legislation.
The contractor must supply a compliant Health and Safety file.
A valid certified copy of a COIDA letter of good standing/certificate is required.
Contractual Terms
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
The bidder must declare company details, registration number, and type (e.g., Pty Ltd, sole proprietorship).
The bidder certifies that information and preference points claimed are true and correct.
Iziko may require documentary proof to substantiate claims.
If claims are fraudulent or conditions not fulfilled, Iziko may: disqualify the bidder; recover costs; cancel the contract; recommend restriction from public sector business for up to 10 years; forward for criminal prosecution.
Requirements
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf (RFQ)
The contractor must maintain sufficient personnel, facilities, and equipment to ensure adequate performance.
Section
Source: Iziko RFQ for Removal and Relocation of Gaia-sphere.pdf
The 80/20 preference point system applies. Price: 80 points; Specific Goals: 20 points.
The Total Evaluated Bid Price is used for price point calculation.
General principles: Iziko reserves the right to accept/reject any quotation, withdraw the RFQ, and is not obliged to accept the lowest or only quote.
A formal contract requires a written agreement/project charter; a mere offer and acceptance is insufficient.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
25 Queen Victoria St, Gardens, Cape Town, 8001, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
20 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.