Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Nuclear Energy Corporation LimitedLocation
North West
Closing Date
23 Jun 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Organization Type
GOVERNMENT
Published
09 Jun 2026
OCDS Reference
ocds-9t57fa-158556
This request for quotation (RFQ) seeks suppliers to collect, modify, and install lagging on the furnace off-gas extraction ducting for furnace 1 and furnace 2 as part of the area 26 smelter project. The work includes reducing lagging thickness, installing modified materials, and fitting protective covers, with all materials provided on-site by necsa.
AI Document Analysis Stages
Description
Categories
Request for Quotation
1 TAU DR - Broederstroom - Hartbeespoort - 0216
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf
The South African Nuclear Energy Corporation (Necsa) is requesting quotations for the collection, modification, and installation of lagging on the furnace off-gas extraction ducting for Furnace 1 and Furnace 2 as part of the Area 26 Smelter Project. The work includes reducing existing 50 mm lagging to 25 mm, installing the modified lagging, and fitting protective galvanized covers. The RFQ closes on 23 June 2026, and submissions must comply with Necsa’s procurement policies, including B-BBEE requirements and technical specifications.
Date & Time
Tuesday, 23 June 2026 - 17:00
Venue
null
09 Jun
2026
Tender Published
Tender was published
23 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 148 529
Range
Based on 14 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Made in SA: Explore the strategic importance of localization in manufacturing tenders and learn how your fabrication SMME can qualify for high-value industrial contracts.
A masterguide to the legal and policy frameworks that mandate the use of South African products in Gauteng's government procurement.
A guide for local manufacturers to secure contracts for school uniforms, hospital linens, and protective clothing for Gauteng's public sector.
Win government goods supply contracts including furniture, stationery, uniforms, and equipment. Local content requirements and NRCS certification.
💡 Want more tendering tips and strategies?
Explore Our BlogWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Necsa (South African Nuclear Energy Corporation Limited) is a state-owned company (SOC) registered under the Companies Act (Reg. No. 2000/003735/06). It operates through subsidiaries NTP Radioisotopes SOC Ltd and Pelchem SOC Ltd, supplying radiation-based and fluorine-based products globally. Necsa complies with ISO 14001, OHSAS 18001, RD 0034, ISO 9001, and ISO 17025 standards. Scope: Collect, modify, and install lagging on furnace off-gas extraction ducting for Furnace 1 and Furnace 2 (Area 26 Smelter Project).
Important Dates
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Closing date: 23 June 2026 at 17:00. Quotation validity: 90 days from closing date. Compulsory site briefing: Not required, but can be arranged if additional information is needed.
Contact Information
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Contact person: Catherine Matima. Email: [email protected]. All queries must be submitted in writing to this email.
Submission Guidelines
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Submit your quotation via email to [email protected] on or before 23 June 2026 at 17:00. Quotation validity period: 90 days from closing date. Incomplete quotations may be disqualified. Do not deliver goods/services without an official Necsa Purchase Order. Direct all queries in writing to the provided contact; approaching other Necsa employees may result in disqualification.
Returnable Documents
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Required documents:
Evaluation Criteria
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Mandatory
Preferential
Disqualification Risks
Technical Specifications
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Scope of work:
Quality Management
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdfNecsa’s quality management system aligns with ISO 9001, ISO 17025, ISO 14001, OHSAS 18001, and RD 0034 (Quality and Safety Management for Nuclear Installations). Top management commits to regulatory compliance.
Financial Requirements
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Pricing must include all applicable taxes. Prices must be fixed and firm. Include additional costs such as freight, insurance until acceptance, duty (where applicable), and disbursements. Payment terms follow Necsa’s General Conditions of Purchase. Pre-payment is not allowed. Incomplete pricing may result in disqualification.
Compliance Requirements
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf (RFQ)Required documents:
Health & Safety
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdfA safety file is required for this project. Compliance with Necsa’s OHSAS 18001 and RD 0034 standards is mandatory.
Section
Source: RFQ to collect modify and install lagging on the two furnace off-gas extraction ducting of furnace 1 and furnace (002).pdf4.1. Phase 1- Functionality Evaluation / Technical Evaluation
Where functional or technical evaluation criterion is applicable, assessment will be performed
in terms of the criterion listed below and the criterion may include Technical, Performance,
Quality and Risk.
If the Bidder’s response to the Technical templates does not indicate that the Bidder can
support an acceptable technical solution, the Bidder’s response will be rejected and not
evaluated further.
Doc. No
NLM-QUO-26/101
Request for Quotation
Revision 3
of 4
Together the Technical, Performance & Quality and Risk criteria make up the functionality
criterion and a Bidder’s Proposal will be evaluated for functionality out of a possible 100 points.
Only RFQ responses achieving an evaluation score of greater than the set threshold points
out of the possible 100 points and which score a number of points for functionality that is
greater than or equal to the set threshold points of the number of points achieved by the
highest scoring Bid for functionality will be selected to progress to the second stage.
The quotations will be evaluated according to the following selection criteria (based on
information requested above):
4.2. Phase 2 - Evaluation In Terms Of Preferential Procurement Policy Framework
Act, 2022
This bid will be evaluated and adjudicated according to the 80/20 point system, in terms of
which a maximum of 80 points will be awarded for price and 20 points will be allocated based
on the specific goals (B-BBE status level).
Points
Price 80
SPECIFIC GOALS ( B-BBEE status level) 20
Total points for Price and SPECIFIC GOALS 100
Preference goal
B-BBEE status level contributor
B-BBEE Status Level of Number of points
Contributor (80/20 system)
1 20
2 18
3 14
4 12
5 8
6 6
7 4
8 2
Doc. No
NLM-QUO-26/101
Request for Quotation
Revision 3
of 4
Non-compliant contributor 0
5. Required Documentation
▪ Tax Clearance Certificate ( Tax pin issued by SARS)
▪ Declaration of interest ( SBD 4)
▪ BEE Certificate / Applicable Affidavit if classified as EME
▪ Letter of Good Standing (COID)
▪ Cibd 1me
▪ Any other document or certification that might have been requested on this RFQ
6. Important
6.1. Quotation must be submitted on or before the RFQ closing date and time stated above.
6.2. Orders above R 30 000 will be evaluated according to the PPPFA 80/20-point system and
a functionality scorecard where applicable and the ones above R 1 Million will be
subjected to the tender process.
6.3. This RFQ is subjected to the Necsa’s General Conditions of Purchase, Preferential
Procurement Policy Framework Act 2000 and the Preferential Procurement Regulations,
2022, the General Conditions of Contract (GCC) and, if applicable, any other legislation
or special conditions of contract
6.4. Failure on the part of a bidder to submit proof of B-BBEE Status level of contributor
together with the bid, will be interpreted to mean that preference points for specific goals
are not claimed.
6.5. The purchaser reserves the right to require of a bidder, either before a bid is adjudicated
or at any time subsequently, to substantiate any claim in regard to specific goals, in any
manner required by the purchaser.
6.6. For a Bidder to obtain clarity on any matter arising from or referred to in this document,
please refer queries, in writing, to the contact details provided above. Under no
circumstances may any other employee within Necsa be approached for any
information. Any such action might result in a disqualification of a response submitted
in competition to this RFQ.
6.7. No goods and/or services should be delivered to Necsa without an official Necsa
Purchase order.
6.8. Necsa reserves the right to; cancel or reject any quote and not to award the RFQ to the
lowest Bidder or award parts of the RFQ to different Bidders, or not to award the RFQ at
all.
6.9. The supplier shall under no circumstances offer, promise or make any gift, payment,
loan, reward, inducement, benefit or other advantage, which may be construed as being
made to solicit any favour, to any Necsa employee or its representatives. Such an act
shall constitute a material breach of the Agreement and the Necsa shall be entitled to
terminate the Agreement forthwith, without prejudice to any of its rights
6.10. By responding to this request, it shall be construed that: the bidder, hereby acknowledge
to be fully conversant with the details and conditions set out in the Necsa’s General
Conditions of Purchase, Preferential Procurement Policy Framework Act 2000 and the
Preferential Procurement Regulations, 2022, the General Conditions of Contract (GCC),
Doc. No
NLM-QUO-26/101
Request for Quotation
Revision 3
of 4
Technical Information and Specifications attached, and hereby agree to supply, render
services or perform works in accordance therewith
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
South African Nuclear Energy Corporation LimitedContact Person
Catherine Matima
Phone
012-305-3027
[email protected]
Address
1 TAU DR - Broederstroom - Hartbeespoort - 0216
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
09 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
NECSA is South Africa's nuclear technology corporation, responsible for nuclear energy research and production.
Key Personnel
Data conflicts
None detected
Get deep intelligence on Other manufacturing. Unlock full pricing strategies, bid frequency, and historical win rates.