Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
Nantes Substation - Polokwane - Polokwane - 0699
Organization Type
GOVERNMENT
Published
29 Jul 2026
OCDS Reference
ocds-9t57fa-163865
ESKOM is disposing of a vandalized 5 mva transformer (serial number 73151) located at the nantes substation in limpopo through its eauction platform. The tender is open to prospective bidders who must register on the ESKOM eauction portal and compete on price and b-bbee rating. The winning bidder will be responsible for purchasing, collecting, and removing the transformer from the substation.
["Register on the Eskom eAuction portal at https://eauction.eskom.co.za using the unique company code provided via email to the primary user; each user must have individual login credentials with a password longer than 8 characters including mixed case, numbers, and special characters.", "Maintain a valid B-BBEE score rating — auction awards are evaluated on a point-based system considering both Price and B-BBEE rating, and final bids remain subject to Eskom review.", "Item for disposal: 5 MVA vandalized transformer, serial number 73151, located at Nantes Substation in Limpopo — the winning bidder is responsible for collection and removal from the site.", "All bids are financially binding commitments to purchase at the offered price; bids cannot be changed once the auction closes.", "Auction end times may auto-extend if bids are placed near the closing time to ensure fair competition — bidders should refresh the screen regularly to monitor competing bids.", "Starting bids begin at Eskom's reserve value and must follow fixed bid increments displayed on the bidding screen; in a standard auction each bid must be higher than the previous.", "Closing date: 6 August 2026 at 11:00 (SAST) — late bids will not be accepted, and the procurement officer will contact the winning bidder directly to finalise the contract."]
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Thursday, 06 August 2026 - 11:00
Venue
null
Inspection and viewing should you be interested in viewing the site or need more technical information send an email to medupe matsapola at email address : [email protected] Or 081 258 5842 before end of business on the 03 august 2026. For commercial clarification send an email to [email protected] PPE to be worn on all ESKOM sites on viewing/ visits. You will not be granted access to the site if the minimum PPE is not worn
Categories
Request for Proposal
Nantes Substation - Polokwane - Polokwane - 0699
AI Document Analysis Stages
Important Dates
29 Jul
2026
Tender Published
Tender was published
06 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
eAuction User Guide for Prospective Bidders.pdf
This tender requires the purchase, collection, and removal of a 5 MVA vandalized transformer with serial number 73151 from the Nantes Substation in Limpopo Province. The tender is conducted through the Eskom eAuction system, and applicants must register and participate in the auction to submit their bids.
Picture of Vandalized 5MVA Nantes Station Transfomer.pdf
ESKOM is inviting tenders for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at the Nantes Substation in Limpopo. The tender closes on August 6, 2026, at 11:00 UTC.
Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf
Eskom is inviting tenders for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at Nantes Substation in Limpopo. The tender process includes a mandatory Reverse E-auction training or self-training requirement for applicants.
Eskom life-saving rules.pdf
The tender is for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at the Nantes Substation in Limpopo, issued by Eskom. The closing date is August 6, 2026. The tender is governed by Eskom's Life-Saving Rules, which emphasize strict adherence to safety protocols, including electrical isolation, working at heights, seatbelt use, sobriety, and permit-to-work requirements. Non-compliance with these rules may result in disciplinary action or contract termination.
ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf
The tender is for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at Nantes Substation in Limpopo, issued by ESKOM. The closing date is August 6, 2026. The document emphasizes strict compliance with Eskom's Occupational Health and Safety (OHS) legal and procedural requirements.
Contractor Health and Safety Requirements.pdf
The tender is for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at Nantes Substation, Limpopo, by ESKOM. The document emphasizes strict adherence to Eskom's Contractor Health and Safety (H&S) Requirements (Standard 32-136, Rev 4), which outline comprehensive safety, health, and environmental (SHE) obligations for contractors. The goal is to ensure Zero Harm through compliance with legislative and organizational SHE standards, risk assessments, and proper documentation.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf
Eskom is inviting tenders for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at Nantes Substation in Limpopo. The tender follows Eskom's Standard Conditions of Tender (Rev 12), with a closing date of 06 August 2026 at 11:00 UTC. The process is open, competitive, and governed by strict compliance, ethical, and procedural requirements.
Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf
Eskom is inviting tenders for the purchase, collection, and removal of a vandalized 5 MVA transformer (Serial No. 73151) located at Nantes Substation in Limpopo. The successful bidder will be responsible for safe handling, transportation, site cleanup, and compliance with all legal, safety, and environmental requirements. The tender closes on 06 August 2026 at 11:00 AM UTC, with submissions via email to [email protected]. Pricing will be conducted via an e-auction process, and the transformer is sold 'voetstoots' (as-is).
SECTION 37.2 AGREEMENT.pdf
The tender is for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at Nantes Substation in Limpopo, issued by ESKOM. The closing date is August 6, 2026. The document includes a Section 37(2) Occupational Health and Safety (OHS) Agreement, mandating compliance with the OHS Act, 1993, and Eskom's SHE (Safety, Health, and Environment) specifications.
Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf
ESKOM is inviting bids for the purchase, collection, and removal of a vandalized 5 MVA transformer (serial number 73151) located at Nantes Substation in Limpopo. The bid closes on August 6, 2026, at 11:00 UTC. The tender requires strict adherence to ethical, transparent, and legal standards, including disclosures of conflicts of interest and compliance with South African procurement laws.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness Hub💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 350 000
Range
Based on Municipal avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Disposals: General. Unlock full pricing strategies, bid frequency, and historical win rates.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"06 AUGUST 2026","briefingSession":"{"date":null,"time":null,"venue":"e their technical capability to perform the","is_compulsory":false}"}
Contact Information
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf (unknown){"name":null,"email":"[email protected]","phone":"+27 15 299 0035","department":null,"address":"VIEWING"}
Returnable Documents
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf (unknown)Your tender returnable, as submitted by you together with this “Offer to Purchase” document shall be submitted.
Evaluation Criteria
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf (unknown)Mandatory
Disqualification
Technical Specifications
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf (unknown)Purchase, collect and removal of 5 MVA vandalized transformer, serial number 73151 located at
Nantes substation.
The purchaser must assure the site be left clean at completion of their collection and removal of the
goods.
The scope of work will include the purchase, collect and removal of 5 MVA vandalized transformer,
serial number 73151 at Nantes Substation. Buyers must show their interest to participate by
submitting all tender returnable specified on the tender enquiry.
The purchaser will be responsible for the safe collection, handling, removal, and transportation of
the scrap.
It remains the responsibility of the buyer to be fully familiar with the condition of the 5 MVA vandalized
transformer before tendering. The 5 MVA Transformers has been vandalized all winding on both
transformers are completely removed, the winding of the transformer was stripped, the only
remaining parts are transformer shell.Disputes regarding the condition of the items after
tender closing will not be accepted or allowed.
The purchaser will be responsible for the safe collection, handling, removal, and transportation of the
used transformer oil as well as to clean the site, qualified labour and suitable certified plant,
machinery, equipment and transport for this purpose.
Payment shall be made to Eskom no later than five days after the date of the sale. The release of the
equipment/scrap to the new buyer will take place after receipt of payment to Eskom and the buyer
acquiring a permit to remove and transport the equipment/scrap.
The goods on sale will be identified by Eskom.
Notes
a. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment incurred while working on this project arising from theft, damage or personal injury.
b. You will be required to adhere to the condition as laid out by the Eskom site agent with regards
to site access etc.
c. Littering is prohibited at all times. Facilities will have to be made available on site during
dismantling operations for the collection of disposal waste material. No rubble whatsoever is to be
left on site.
d. Additional precautions must be taken when using cutting equipment. Portable fire fighting
equipment must be available on site during all stages of the work programme.
e. You will be required to be put on an Eskom permit, prior to commencement of and work. After
completion of the work, it is imperative that you notify the Eskom site agent, so that the job can be
signed off.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
f. All work must comply with the OHSA Act no . All Safety requirements and
documentation shall be available on the site.
g This is a open tender
h. No accommodation will be allowed on site.
i. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment/scrap incurred while working on this project arising from theft, damage or personal injury.
j. You will be required to adhere to the condition as laid out by the Eskom site agent with regards to
site access etc.
a. The following criteria and their individual weight in % will be used for the evaluation of price.
Evaluation Criteria Weighting
Financial – Best price 80%
B-bbee 20%
Note:
Eskom’s commercial process will be followed and this process is dependent on the decisions made
by the different Eskom Adjudicating authorities.
Methodology
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdfan inherent requirement for each tenderer to demonstrate their technical capability to perform the
requirement of the contract.
Technical evaluation criteria (100%) Weight
Approach and Methodology 100%
and have the acumen to manage and process the project quantities for
the project?
ethical track record in line with the Second-Hand Good Act?
contract effectively, efficiently, timeously, and economically?
Total 100%
The following criteria and their individual weight in % will be used for the evaluation of technical
proposal.
Questions – Evaluation of a Scrap Dealer
(Rate companies 1-5, 1 – poor, 2 – fair, 3 – avarage, 4 – good and 5 – excellent)
Scrap Dealer’s Name:__________________________________________
Location: __________________________________________
1 2 3 4 5
Pricing Schedule
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdfFor costing purposes the following table and text messages have been compiled. Please bear in
mind that each material classification is for a type of scrap and you must factor your costs into your
prices.
Companies/ Buyers must show their interest to participate on the e-Auction by completing and
submitting the attached Forms, (ACKNOWLEDGEMENT FORM FOR E-AUCTION TRAINING)
Pricing will be conducted via e-AUCTION
Submission of this document confirms the tenderer is fully aware of the condition of the tender
and that their offer price will be submitted through the e-Auction process. The tenderer proofs
their full intention and will to purchase the vandalized 5MVA transformer at Nantes Substation
Serial No. 73151 IS “VOETSTOOTS” “AS IS” for their price as will be offered via e-Auction.
Item description total offer price
NO (ex VAT)
1 5MVA vandalized transformer, serial number Prices will be submitted through
73151 located at Nantes Substation the e-Auction process
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
hereafter referred to as the total offer prices, excluding VAT, remittances in
respect of the agreement are to be made payable to Eskom Holdings SOC Limited,
and are to be paid within five (5) working days after sale, All payments due and payable to
Eskom shall be by bank cheque or electronic bank transfer only.
Value Added Tax Act no 89 0f 1991 and VAT invoices will be issued on request.
Declaration (by tenderers) of good standing regarding tax
IT is a condition of tenderers that:
8.1 It is an absolute requirement that the taxes of the successful tenderer must be in
order, or that suitable arrangement is made with the Receiver of Revenue to
satisfy them.
8.2 The tenderer must include with his tender documents a copy of a Tax Clearance
Certificate (in respect of Tenders)
8.3 If the certificate is not included or found to be incorrect, Eskom may, in addition to
any other remedy it may have:
8.4 Recover from the contractor all costs, losses or damage incurred or sustained by
Eskom as a result of the award of the disposal agreement: and/or
8.5 Cancel the disposal agreement and claim any damages, which Eskom may suffer
by having to make less favourable arrangements after such cancellation.
8.6 Each party to Consortium/Sub-contractor must complete a separate declaration.
8.7 The onus will be on the tenderer to obtain “Tax Clearance Certificate (in respect of tenders)”,
from the office of the South African Revenue Services (SARS) and submit the same with their
tenders.
Closing closing (non- Award
(Disqualified) disqualified)
schedule attached and comments to
price schedule)
2 Valid SARS Tax Clearance ✓
Certificate
3 Affidavit (on DTI Template) ✓
confirming that the B-BBEE
Financial – Best price 80%
B-bbee 20%
Note:
Eskom’s commercial process will be followed and this process is dependent on the decisions made
by the different Eskom Adjudicating authorities.
Date:
(A copy of the joint venture agreement which incorporates a statement that all partners are liable
jointly and severally for the execution of the contract and that the lead partner is authorised to incur
liabilities, receive instructions and payments and be responsible for the entire execution of the contract
for and on behalf of any and all the partners is attached to the invitation to tender/Request for
proposal).
Compliance Requirements
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf (unknown)3 Affidavit (on DTI Template) ✓ confirming that the B-BBEE Contribution level of the entity. B- BBEE Verification Certificate from Accredited verification agency 4 Second hand goods certificate from ✓ SAPS/Licensee 5 SBD 4 Form-Bidders Disclosure ✓ 6 Integrity Pact Declaration Form ✓ 7 CIPRO Registration Documents ✓ Copies of ID Documents of Directors ✓
Proof of the registration on National ✓ Treasury’s Central Supplier Database (except Foreign Suppliers / Central Supplier Database (CSD) or number MAAA (.....................) 9 Valid Letter of good standing with ✓ COID) 10 Authority to Submit a Tender ✓ 11 Safety Requirements ✓ 12 Environmental Requirements ✓ Public When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. of 25 File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205 Template Investment Recovery 240-75978567 Rev 2 Identifier Offer to Purchase Template Effective Date 01 June 2021 OLT2128205 Review Date June 2027
B-BBEE Minimum Level: 2
B-BBEE Details: DITIONS AGREEMENT 37.2 Contractor Health and Safety
OF TENDER Requirements
Eskom_Standard_Co Microsoft Word 97 - Contractor Health
nditions_of_Tender_-_ 2003 Document and Safety Requireme
4.LIST Of tender returnables:
No. Returnable From Suppliers Returnable Returnable Returnable
required at required at required prior
Tender Tender to Contract
Closing closing (non- Award
(Disqualified) disqualified)
schedule attached and comments to
price schedule)
2 Valid SARS Tax Clearance ✓
Certificate
3 Affidavit (on DTI Template) ✓
confirming that the B-BBEE
Contribution level of the entity. B-
BBEE Verification Certificate from
Accredited verification agency
4 Second hand goods certificate from ✓
SAPS/Licensee
5 SBD 4 Form-Bidders Disclosure ✓
6 Integrity Pact Declaration Form ✓
7 CIPRO Registration Documents ✓
Copies of ID Documents of Directors ✓
Treasury’s Central Supplier
Database (except Foreign Suppliers
/ Central Supplier Database (CSD)
or number MAAA (.....................)
9 Valid Letter of good standing with ✓
Coid)
10 Authority to Submit a Tender ✓
11 Safety Requirements ✓
12 Environmental Requirements ✓
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effect
Health & Safety
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdfSecurity
Storage facilities
Dismantling & Demolition
Machinery/plant
Type of trucks
Number of Trucks
Do they process or agent only
Do they buy off the street
Total 100%
Comments: ____________________________________________________
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Annexure g
Section 37(2) agreement
Concluded between
Eskom Holdings SOC Limited
And
..................................................................................................................................................
(Name of contractor/supplier)
I, .........................................[(insert name of person representing contractor/supplier
company)representing ............................................. [insert name of contractor/supplier], do hereby
acknowledge that ............................................................... [insert name of contractor/supplier]
is an employer in his/her own right, with duties as prescribed in the Occupational Health and Safety
Act No. (“the Act”), as amended, and agree to ensure that all work will be performed and/or
machinery or plant used in accordance with the provisions of the Act.
I undertake that ......................................................... [insert name of contractor/supplier] shall
strictly adhere to, and ensure that his/her employees adhere to, the provisions of the Occupational
Health and Safety Act, 1993 (Act ).
I have been provided with SHE specifications for project/service ....................................[insert
brief details of project/service, for example, name, contract/project number] ...............................
and will comply with the requirements set out in these.
I accept and agree that the SHE specifications constitute arrangements and procedures between
.................................................................... (insert name of contractor/supplier) and [insert
name of subsidiary or Eskom Holdings SOC Limited] which will ensure compliance by
.......................................... [insert name of contractor/supplier] with the provisions of the Act, as
contemplated in section 37(2) of the Act.
This agreement constitutes the sole agreement between the parties, and no variation, modification,
or waiver of any of the provisions of this agreement or consent to any departure from these shall, in
any manner, be of any force or effect, unless confirmed in writing and signed by both parties, and
such variation, modification, waiver, or consent shall be effective only in the specific instance and for
the specific purpose and to the extent for which it was made or given.
This agreement is signed on behalf of the parties, each signatory to this warranting that he/she has
the requisite authority to do so.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Signed this .......................... day of .................................... 20 ............... at
...................................................... (Place)
(Full Name)...................................................... (Signature) .......................................on
behalf of .............................................................. (Contractor/supplier)
Contractor Responsible Manager (responsible for signing the contract
on behalf of the contractor/supplier)
Witnesses
......................................................
........................................................
Signed this ........................... day of ........................... 20 .................. at ......... (Place)
(Full name.................................................. (Signature) .......................................... on
behalf of [insert name of subsidiary or Eskom Holdings SOC Limited]
(Contracts and/or Project Manager or Representative)
Witnesses
......................................................
.......................................................
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Invitation to submit an offer for the purchase, collect and remove 5 mva
Vandalized transformer serial number 73151 located at nantes substation.
Issue Date: Ref: Enquiry: Sylvia Maluleke
29/07/2026 olt2128205 +27 15 299 0035
TENDER ENQUIRY No. OLT2128205
Eskom is the owner of the listed scrapped purchase, collect and removal of 5 MVA vandalized
transformer, serial number 73151 located at located at the Nantes Substation.
You are kindly invited to submit an offer to purchase, collect and removal of 5 MVA vandalized
transformer, serial number 73151 located at the Nantes substation as detailed in the Scope of
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
STANDARD CONDITIONS AGREEMENT 37.2 Contractor Health and Safety
Eskom_Standard_Co Microsoft Word 97 - Contractor Health
nditions_of_Tender_-_ 2003 Document and Safety Requireme
5 SBD 4 Form-Bidders Disclosure ✓
6 Integrity Pact Declaration Form ✓
7 CIPRO Registration Documents ✓
Copies of ID Documents of Directors ✓
Treasury’s Central Supplier
Database (except Foreign Suppliers
/ Central Supplier Database (CSD)
or number MAAA (.....................)
9 Valid Letter of good standing with ✓
Coid)
10 Authority to Submit a Tender ✓
11 Safety Requirements ✓
12 Environmental Requirements ✓
the scrap.
It remains the responsibility of the buyer to be fully familiar with the condition of the 5 MVA vandalized
transformer before tendering. The 5 MVA Transformers has been vandalized all winding on both
transformers are completely removed, the winding of the transformer was stripped, the only
remaining parts are transformer shell.Disputes regarding the condition of the items after
tender closing will not be accepted or allowed.
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
f. All work must comply with the OHSA Act no . All Safety requirements and
documentation shall be available on the site.
g This is a open tender
h. No accommodation will be allowed on site.
i. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment/scrap incurred while working on this project arising from theft, damage or personal injury.
j. You will be required to adhere to the condition as laid out by the Eskom site agent with regards to
site access etc.
I, the undersigned, (name)............................................................................... in
submitting the accompanying bid, do hereby make the following statements that I certify to be
true and complete in every respect:
3.1 I have read and I understand the contents of this disclosure;
3.2 I understand that the accompanying bid will be disqualified if this disclosure is found not to be
true and complete in every respect;
3.3 The bidder has arrived at the accompanying bid independently from, and without consultation,
communication, agreement or arrangement with any competitor. However, communication
between partners in a joint venture or consortium2 will not be construed as collusive bidding.
3.4 In addition, there have been no consultations, communications, agreements or arrangements
with any competitor regarding the quality, quantity, specifications, prices, including methods,
factors or formulas used to calculate prices, market allocation, the intention or decision to
submit or not to submit the bid, bidding with the intention not to win the bid and conditions or
delivery particulars of the products or services to which this bid invitation relates.
3.4 The terms of the accompanying bid have not been, and will not be, disclosed by the bidder,
directly or indirectly, to any competitor, prior to the date and time of the official bid opening or
of the awarding of the contract.
3.5 There have been no consultations, communications, agreements or arrangements made by
the bidder with any official of the procuring institution in relation to this procurement process
prior to and during the bidding process except to provide clarification on the bid submitted
where so required by the institution; and the bidder was not involved in the drafting of the
specifications or terms of reference for this bid.
3.6 I am aware that, in addition and without prejudice to any other remedy provided to combat any
restrictive practices related to bids and contracts, bids that are suspicious will be reported to
the Competition Commission for investigation and possible imposition of administrative
penalties in terms of section 59 of the Competition Act No and or may be reported
to the National Prosecuting Authority (NPA) for criminal investigation and or may be restricted
from conducting business with the public sector for a period not exceeding ten (10) years in
terms of the Prevention and Combating of Corrupt Activities Act No or any other
applicable legislation.
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE
information furnished herein is correct, that it is understood that the tenderer's
tender/proposal may be rejected, and that Eskom will act against the tenderer should any
aspect of this this declaration prove to be false, and
information furnished herein is correct, that it is understood that the JV's tender/proposal may
be rejected, and that Eskom will act against the JV should any aspect of this declaration prove
to be false; and
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Annexure d: safety requirements
form (Annexure B) . Acknowledgement form must be fully
completed, i.e. MD/CEO signature and the two witnesses
(compulsory
issued by the Occupational Medical Health Services/practitioner
you manage Substance Abuse during working hours
or FEMA,
e.g. Scrap Metal Dealer etc. Copy must be certified not older than
3 months at the date and time of the tender closing
collecting scraps.)
preparedness emergencies, with emergency contact details
plan (EPP)
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
PPE
Security
(Name of contractor/supplier)
I, .........................................[(insert name of person representing contractor/supplier
company)representing ............................................. [insert name of contractor/supplier], do hereby
acknowledge that ............................................................... [insert name of contractor/supplier]
is an employer in his/her own right, with duties as prescribed in the Occupational Health and Safety
Act No. (“the Act”), as amended, and agree to ensure that all work will be performed and/or
machinery or plant used in accordance with the provisions of the Act.
I undertake that ......................................................... [insert name of contractor/supplier] shall
strictly adhere to, and ensure that his/her employees adhere to, the provisions of the Occupational
Health and Safety Act, 1993 (Act ).
I have been provided with SHE specifications for project/service ....................................[insert
brief details of project/service, for example, name, contract/project number] ...............................
and will comply with the requirements set out in these.
Environmental
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdfIn terms of the National Environmental Management Act, section 28 “Every person who causes has
caused or may cause significant pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring, continuing or recurring.
Eskom Holdings SOC Limited gives no guarantee or warranty to the workability or condition of the
equipment for sale, other than allow each buyer to familiar themselves at the site prior to tendering in
terms of the Consumer Protection Act. All equipment will be sold “Voetstoots”.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Offers received for this tender will be deemed valid for a period of THREE (3) months (90 days)
from tender closing date.
Eskom reserves the right not to accept the lowest or any tender / offer or withdraw any item it
wishes to retain.
The successful purchaser will be notified.
The onus will be on the tenderer to obtain “Tax Clearance Certificate (in respect of tenders)”, from the
office of the South African Revenue Services (SARS) and submit the same with their tenders.
No variation or modification of the proposed agreement shall be in force, unless the same is confirmed
in writing.
Yours Faithfully
Sylvia Maluleke
Investment Recovery
Procurement & Supply Chain Management
Enquiry NO: olt2128205
Closing date: 06 july 2026
CONTACT PERSON: Sylvia Maluleke
Email: [email protected]
NB! A bidder who has an existing or expired contract with Eskom and has defaulted in terms of that
contract will be disqualified and not be awarded a new contract.
A bidder who has an open non-conformance will be disqualified and not awarded a new contract.
This tender proof the tenderer is fully aware of the condition of the tender and the price they
have offered on the tender proofs their full intention and will to purchase the scrap
“VOETSTOOTS” as is for their price as offered.
Please provide full and proper details according to the requirements below. Incomplete or
unclear Tender Documentation can be rejected.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Offer submitted by - name : .......................................SIGNATURE:..................
Date: ......................................... CELL: ...................................... E-mail.................................
Who are legally authorized to provide this tender on behalf of:
Business name:......................................................CSD Number:........................
Business adress:...............................................................................................
Tel:.............................................
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Annexure a: sbd4
Bidder’s disclosure
Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In
line with the principles of transparency, accountability, impartiality, and ethics as enshrined in
the Constitution of the Republic of South Africa and further expressed in various pieces of
legislation, it is required for the bidder to make this declaration in respect of the details required
hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted
Suppliers, that person will automatically be disqualified from the bid process.
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any
person having a controlling interest1 in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state
employee numbers of sole proprietor/ directors / trustees / shareholders / members/ partners
or any person having a controlling interest in the enterprise, in table below.
Full Name Identity Number Name of State institution
2.2 Do you, or any person connected with the bidder, have a relationship with any person who is
employed by the procuring institution? YES/NO
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any
person having a controlling interest in the enterprise have any interest in any other related
enterprise whether or not they are bidding for this contract? YES/NO
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
1 the power, by one person or a group of persons holding the majority of the equity of an enterprise, alternatively, the
person/s having the deciding vote or power to influence or to direct the course and decisions of the enterprise.
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
Safety File
Coida
Site/ Yard Cleanliness
Oil spills Kit
Suitable Fire Fighting Equipment
Hazardous & Non-Hazardous
separated
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with
the user to ensure it is in line with the authorised version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC
Ltd, Reg No 2002/015527/30.
of 25
File name: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205
Template Investment Recovery 240-75978567 Rev 2 Identifier
Offer to Purchase Template Effective Date 01 June 2021
OLT2128205 Review Date June 2027
a. Eskom will not be responsible for any damages or losses suffered during the removal of the
equipment incurred while working on this project arising from theft, damage or personal injury.
b. You will be required to adhere to the condition as laid out by the Eskom site agent with regards
to site access etc.
c. Littering is prohibited at all times. Facilities will have to be made available on site during
dismantling operations for the collection of disposal waste material. No rubble whatsoever is to be
left on site.
d. Additional precautions must be taken when using cutting equipment. Portable fire fighting
equipment must be available on site during all stages of the work programme.
e. You will be required to be put on an Eskom permit, prior to commencement of and work. After
completion of the work, it is imperative that you notify the Eskom site agent, so that the job can be
signed off.
8.1 It is an absolute requirement that the taxes of the successful tenderer must be in
order, or that suitable arrangement is made with the Receiver of Revenue to
satisfy them.
8.2 The tenderer must include with his tender documents a copy of a Tax Clearance
Certificate (in respect of Tenders)
8.3 If the certificate is not included or found to be incorrect, Eskom may, in addition to
any other remedy it may have:
8.4 Recover from the contractor all costs, losses or damage incurred or sustained by
Eskom as a result of the award of the disposal agreement: and/or
8.5 Cancel the disposal agreement and claim any damages, which Eskom may suffer
by having to make less favourable arrangements after such cancellation.
8.6 Each party to Consortium/Sub-contractor must complete a separate declaration.
8.7 The onus will be on the tenderer to obtain “Tax Clearance Certificate (in respect of tenders)”,
from the office of the South African Revenue Services (SARS) and submit the same with their
tenders.
9.ENVIRONMENTAL Requirements
In terms of the National Environmental Management Act, section 28 “Every person who causes has
caused or may cause significant pollution or degradation of the environment must take reasonable
measures to prevent such pollution or degradation from occurring, continuing or recurring.
standard 12481 sling loads
Annexure e: environmental requirements
Number Environmental Management System (EMS) Requirements
Policy director), dated and version controlled.
Environmental Policy
Special Conditions
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdf (unknown)All offers to purchase are treated as confidential! NO late offers will be accepted!
Section
Source: Offer to Purchase for Disposal of 5MVA vandalized transformer, Serial Number 73151- OLT2128205.pdfa. The following criteria and their individual weight in % will be used for the evaluation of price.
Evaluation Criteria Weighting
with any competitor regarding the quality, quantity, specifications, prices, including methods,
Description
Source: Eskom life-saving rules.pdfEskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment. Eskom is committed to preventing all work-related injuries. In fulfilling this
commitment to protect people, the environment and property, management will provide and
maintain a safe and healthy work environment, in accordance with industry standards and in
compliance with legislative requirements.
At-risk behaviour leads to incidents. Life-saving Rules are safety rules that have been created to
enforce zero tolerance for serious at-risk behaviours. These rules have been determined in terms
of the consequences of the behaviours they describe, that is, if a particular set of behaviours or
actions has a very high probability of causing disabilities or fatalities when performed.
The Eskom Life-saving Rules complement our existing safety best practices and are safety rules to
be followed at all locations.
The Life-saving Rules apply to all Eskom employees, agents, consultants, and contractors. Visitors
to Eskom should also respect and adhere to these rules as applicable and could be instructed to
leave the Eskom premises with immediate effect should they refuse to do so.
2.1 Scope
This standard shall apply at all Eskom sites with the intention to promote a safe working
environment for all Eskom employees, agents, consultants, and contractors. Visitors to Eskom
should also respect and adhere to these rules, as applicable.
2.1.1 Purpose
This standard clarifies the five most prominent causes of serious injuries and fatalities within
Eskom, and Eskom’s intention to enforce “ZERO TOLERANCE” with respect to non-adherence to
these rules, due to the potential consequences of serious injury or fatality at the workplace.
2.1.2 Applicability
This standard shall apply throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and
entities wherein Eskom has a controlling interest and/or Eskom contractors, unless specifically
exempted by Sustainability Systems, where the business transacted may be of a completely
different nature to the core business of Eskom.
2.1.3 Effective date
This document will be effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employees’ Right of Refusal to Work in an Unsafe Situation
Procedure
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskom’s business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
Abbreviation Explanation
OHS Occupational Health and Safety
ORHVS Operational Regulations for High Voltage Systems
PPE Personal Protective Equipment
PSR Plant Safety Regulations
PTW Permit to Work
SHEQ Safety, health, environment and quality
2.5 Roles and Responsibilities
2.5.1 Sustainability Systems Department
The sustainability Systems Department shall:
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
c) Ensure that the rules are communicated throughout the business;
d) Ensure compliance is monitored; and
e) Ensure that violations and sanctions are consolidated and communicated by Sustainability
Systems to the organisation.
2.5.2 All Groups/Divisions/Operating Units/Business Units
The management at Group/Divisional/Operating Unit/Business Unit level shall be responsible for:
a) Implementing the Eskom Life-saving Rules in their Groups/Divisions/Operating
Units/Business Units.
b) Communicating to all their employees, contractors, contractor employees and visitors the
importance of compliance with the Eskom Life-saving Rules and the consequences of non-
compliance therewith. This includes communicating Life-saving Rules to all new
employees and new contractors.
c) Ensuring that the awareness material is made available, distributed and displayed at all
units.
d) Ensuring all employees sign confirmation that the rules have been discussed with them,
that they understand the rules and the consequences of violating these rules, and retain
copies thereof.
e) Investigating any violation of a Life-saving rule and initiate the disciplinary process within
five (5) working days.
f) Ensuring consistency in the application of appropriate sanctions on employees, contractors
and contractor employees.
2.5.3 All employees (Eskom and contractors)
a) Always observe and adhere to the Life-saving Rules.
b) Avoid taking shortcuts when executing tasks. Always do the right thing even when no-one
is watching.
c) Only perform work that you are authorised to do.
d) All employees to exercise the right to refuse to perform work in an unsafe situation, or when
required to ignore a Life-saving rule.
2.6 Process for Monitoring
Groups/Divisions/Operating Units/Business units are responsible for ensuring the understanding
of, and compliance with, Life-saving Rules. Line management shall monitor compliance and report
on analysis and trending through performance reporting. The amendments to the revised standard
shall be implemented with immediate effect and may be audited after a period of six (6) months
from date of implementation.
2.7 Related/Supporting Documents
[1] 240-62196227 - Life-saving Rules – revision 5 (superseded).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
[2] 240–63942960 - Life-saving Rule Acknowledgement Form Document Content.
Life-saving Rules are safety rules that, if not adhered to, have the potential to cause serious harm
to people. The consequences of a person knowingly and wilfully violating these rules will result in a
disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
The objective of this standard is to clarify Eskom’s intention to enforce “ZERO TOLERANCE” with
respect to behaviour resulting in serious risk to an individual at the workplace.
It must be noted that the content of this standard does not detract from the requirements for safe
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
Touch
With the aim to ensure a safe electrical work environment, no person may work/operate on, around
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
INSULATE BEFORE TOUCH, correctly based on applicable/related standards, procedures
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-risk
activity, and as a result all precautions must be taken to prevent incidents while working at height.
Wherever reasonably practicable, preference must be given to the performance of work at ground
level as opposed to work in an elevated position. Where work in an elevated position is necessary,
the requirements in this document shall apply.
No person may work at height where there is a risk of falling unless:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business purposes.
The driver is obligated to ensure that he/she as well as all passengers are properly seated and
wearing their seatbelts at all times while being transported in the vehicle, as per Eskom
specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when the
vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
No person who is under the influence or who appears to be under the influence of intoxicating
liquor or drugs will be permitted to enter, or remain on an Eskom site or conduct Eskom business
or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances, and/or
illegal substances in the body that impairs or could impair mental and physical functioning,
irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
Where an authorisation limitation exists, no person shall work without the required Permit to Work
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
No plant is to be returned to service without the cancellation of all permits on that plant in
accordance with procedure, unless permission is granted for a particular plant to be returned to
service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a “live work declaration form” is to be completed by the authorised
person, who is the person responsible for the safe execution of work according to relevant
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
standards and procedures. Outline the key principles or rules to support the implementation of the
standard statement.
3.2 Consequences of violating a Life-Saving Rule
In terms of general health and safety in Eskom, if any of the Life-saving Rules are violated, it will
be treated as a serious misconduct, and result in a disciplinary process in accordance with the
Eskom Disciplinary Code and Procedure.
It must be highlighted that Eskom takes a ZERO TOLERANCE stance to violation of these rules.
Depending on the circumstances, Eskom reserves the right, where a contractor
manager/supervisor allows the violation of a Life-saving Rule, to suspend the contractor’s activities
while determining an appropriate sanction.
In the light of a contractor employee allegedly violating a Life-saving Rule, the contractor shall
immediately remove the employee from site and initiate the disciplinary process. The contractor
shall investigate any violation of a Life-saving Rule and initiate the disciplinary process within five
(5) working days of the violation. The contractor shall after the disciplinary process furnish Eskom
with a copy of the sanction.
This document has been seen and approved by:
Name Designation
Thava Govender Group Executive – Generation and (Acting) Risk and Sustainability
Divisions
Kerseri Pather General Manager – Sustainability Systems
Jace Naidoo Senior Manager – Sustainability Systems – OHS
Alex Stramrood Senior Manager – Sustainability Systems – OHS
Risk and Sustainability Members of the Risk and Sustainability Management Committee
Management Committee
HR Policies and Procedures Members of the HR Policies and Procedures Committee
Committee
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
January 2017 6 A Stramrood Substituted the words “Disciplinary
hearing” with Disciplinary process.
Updated the Purpose and
Applicability to specify that this
Standard is applicable to
contractors. Updated Normative
and Informative References.
Updated Definition section by
removing Agent and Consultant as
these have been incorporated into
the definition of Contractor.
Updated the definition of Work at
Height and Zero Tolerance.
Reviewed and updated the Roles
and Responsibilities section and
Process for Monitoring. Added
permit requirement to Rule 1,
updated Rule 2 - Removed the
words “psychologically fit to work”
as this is no longer a requirement
in terms of the Construction
Regulations, 2014 and updated
Rule 3 – Removed the words “(for
example transporting people on
the back of trucks in a cabin)”
Updated Consequences of
violating a Life-saving Rule with
regard to contractors.
October 2015 5 A Stramrood Revision date needed to be
extended. Content still valid and
same.
May 2012 4 S Govender Amended Section 3.6
Consequences of Violating a Life-
saving Rule to align with EXCO
decision.
March 2013 3 S Govender Changed Cardinal Rules to Life-
saving Rules, and amended
content to ensure better
understanding of the intent and
requirements.
September 2010 2 K Terblanche Content of Rev 1 was incorporated
into the new Policy template.
Content was revised and updated.
December 2008 1 K Terblanche Annexure 1: Acknowledgement of
Eskom Life-saving Rules of this
document was removed. The
references made to Annexure 1 in
paragraphs 3.5.2 and 3.8 were
also removed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
August 2008 0 K Terblanche The document with reference
number 32-421 was developed
and approved.
The following people were involved in the development of this document:
Alex Stramrood
Kerseri Pather
Loraine Smit
Marc Lebea
Mike Townsend
Nosipho Noveve
Sheryl Isaacs
Sivi Govender
SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contact Information
Source: Eskom life-saving rules.pdf (unknown){"name":null,"email":null,"phone":null,"department":"....................................................................... 5","address":null}
Evaluation Criteria
Source: Eskom life-saving rules.pdf (unknown)General
Technical
Safety
Technical Specifications
Source: Eskom life-saving rules.pdf (unknown)Eskom and its subsidiaries will conduct business with respect and care for people to ensure that no
operating condition or urgency of service endangers the life of anyone or causes injury or damage
to the environment. Eskom is committed to preventing all work-related injuries. In fulfilling this
commitment to protect people, the environment and property, management will provide and
maintain a safe and healthy work environment, in accordance with industry standards and in
compliance with legislative requirements.
At-risk behaviour leads to incidents. Life-saving Rules are safety rules that have been created to
enforce zero tolerance for serious at-risk behaviours. These rules have been determined in terms
of the consequences of the behaviours they describe, that is, if a particular set of behaviours or
actions has a very high probability of causing disabilities or fatalities when performed.
The Eskom Life-saving Rules complement our existing safety best practices and are safety rules to
be followed at all locations.
The Life-saving Rules apply to all Eskom employees, agents, consultants, and contractors. Visitors
to Eskom should also respect and adhere to these rules as applicable and could be instructed to
leave the Eskom premises with immediate effect should they refuse to do so.
2.1 Scope
This standard shall apply at all Eskom sites with the intention to promote a safe working
environment for all Eskom employees, agents, consultants, and contractors. Visitors to Eskom
should also respect and adhere to these rules, as applicable.
2.1.1 Purpose
This standard clarifies the five most prominent causes of serious injuries and fatalities within
Eskom, and Eskom’s intention to enforce “ZERO TOLERANCE” with respect to non-adherence to
these rules, due to the potential consequences of serious injury or fatality at the workplace.
2.1.2 Applicability
This standard shall apply throughout Eskom Holdings SOC Limited, its divisions, subsidiaries, and
entities wherein Eskom has a controlling interest and/or Eskom contractors, unless specifically
exempted by Sustainability Systems, where the business transacted may be of a completely
different nature to the core business of Eskom.
2.1.3 Effective date
This document will be effective from the date of authorisation.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employees’ Right of Refusal to Work in an Unsafe Situation
Procedure
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskom’s business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
Abbreviation Explanation
OHS Occupational Health and Safety
ORHVS Operational Regulations for High Voltage Systems
PPE Personal Protective Equipment
PSR Plant Safety Regulations
PTW Permit to Work
SHEQ Safety, health, environment and quality
2.5 Roles and Responsibilities
2.5.1 Sustainability Systems Department
The sustainability Systems Department shall:
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
c) Ensure that the rules are communicated throughout the business;
d) Ensure compliance is monitored; and
e) Ensure that violations and sanctions are consolidated and communicated by Sustainability
Systems to the organisation.
2.5.2 All Groups/Divisions/Operating Units/Business Units
The management at Group/Divisional/Operating Unit/Business Unit level shall be responsible for:
a) Implementing the Eskom Life-saving Rules in their Groups/Divisions/Operating
Units/Business Units.
b) Communicating to all their employees, contractors, contractor employees and visitors the
importance of compliance with the Eskom Life-saving Rules and the consequences of non-
compliance therewith. This includes communicating Life-saving Rules to all new
employees and new contractors.
c) Ensuring that the awareness material is made available, distributed and displayed at all
units.
d) Ensuring all employees sign confirmation that the rules have been discussed with them,
that they understand the rules and the consequences of violating these rules, and retain
copies thereof.
e) Investigating any violation of a Life-saving rule and initiate the disciplinary process within
five (5) working days.
f) Ensuring consistency in the application of appropriate sanctions on employees, contractors
and contractor employees.
2.5.3 All employees (Eskom and contractors)
a) Always observe and adhere to the Life-saving Rules.
b) Avoid taking shortcuts when executing tasks. Always do the right thing even when no-one
is watching.
c) Only perform work that you are authorised to do.
d) All employees to exercise the right to refuse to perform work in an unsafe situation, or when
required to ignore a Life-saving rule.
2.6 Process for Monitoring
Groups/Divisions/Operating Units/Business units are responsible for ensuring the understanding
of, and compliance with, Life-saving Rules. Line management shall monitor compliance and report
on analysis and trending through performance reporting. The amendments to the revised standard
shall be implemented with immediate effect and may be audited after a period of six (6) months
from date of implementation.
2.7 Related/Supporting Documents
[1] 240-62196227 - Life-saving Rules – revision 5 (superseded).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
[2] 240–63942960 - Life-saving Rule Acknowledgement Form Document Content.
Life-saving Rules are safety rules that, if not adhered to, have the potential to cause serious harm
to people. The consequences of a person knowingly and wilfully violating these rules will result in a
disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
The objective of this standard is to clarify Eskom’s intention to enforce “ZERO TOLERANCE” with
respect to behaviour resulting in serious risk to an individual at the workplace.
It must be noted that the content of this standard does not detract from the requirements for safe
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
Touch
With the aim to ensure a safe electrical work environment, no person may work/operate on, around
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
INSULATE BEFORE TOUCH, correctly based on applicable/related standards, procedures
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Working at height is a significant part of work in Eskom Holdings and is regarded as a high-risk
activity, and as a result all precautions must be taken to prevent incidents while working at height.
Wherever reasonably practicable, preference must be given to the performance of work at ground
level as opposed to work in an elevated position. Where work in an elevated position is necessary,
the requirements in this document shall apply.
No person may work at height where there is a risk of falling unless:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
Where required, the proper wearing of seat belts for any driver, operator and passenger is
mandatory in all vehicles/equipment when driving and/or travelling for Eskom business purposes.
The driver is obligated to ensure that he/she as well as all passengers are properly seated and
wearing their seatbelts at all times while being transported in the vehicle, as per Eskom
specifications.
Note: This rule is applicable on any road or parking lot, irrespective of the speed, and when the
vehicle moves in a forward or backward direction.
3.1.4 Rule 4: be sober
No person who is under the influence or who appears to be under the influence of intoxicating
liquor or drugs will be permitted to enter, or remain on an Eskom site or conduct Eskom business
or drive/operate a vehicle/equipment for Eskom business purposes.
This includes any level of alcohol or the presence of any drugs, controlled substances, and/or
illegal substances in the body that impairs or could impair mental and physical functioning,
irrespective of when the substance was used.
3.1.5 Rule 5: ensure that you have a permit to work
Where an authorisation limitation exists, no person shall work without the required Permit to Work
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
No plant is to be returned to service without the cancellation of all permits on that plant in
accordance with procedure, unless permission is granted for a particular plant to be returned to
service with permits still open, like in the case of redundant systems.
NOTE: In the case of live work, a “live work declaration form” is to be completed by the authorised
person, who is the person responsible for the safe execution of work according to relevant
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
standards and procedures. Outline the key principles or rules to support the implementation of the
standard statement.
3.2 Consequences of violating a Life-Saving Rule
In terms of general health and safety in Eskom, if any of the Life-saving Rules are violated, it will
be treated as a serious misconduct, and result in a disciplinary process in accordance with the
Eskom Disciplinary Code and Procedure.
It must be highlighted that Eskom takes a ZERO TOLERANCE stance to violation of these rules.
Depending on the circumstances, Eskom reserves the right, where a contractor
manager/supervisor allows the violation of a Life-saving Rule, to suspend the contractor’s activities
while determining an appropriate sanction.
In the light of a contractor employee allegedly violating a Life-saving Rule, the contractor shall
immediately remove the employee from site and initiate the disciplinary process. The contractor
shall investigate any violation of a Life-saving Rule and initiate the disciplinary process within five
(5) working days of the violation. The contractor shall after the disciplinary process furnish Eskom
with a copy of the sanction.
This document has been seen and approved by:
Name Designation
Thava Govender Group Executive – Generation and (Acting) Risk and Sustainability
Divisions
Kerseri Pather General Manager – Sustainability Systems
Jace Naidoo Senior Manager – Sustainability Systems – OHS
Alex Stramrood Senior Manager – Sustainability Systems – OHS
Risk and Sustainability Members of the Risk and Sustainability Management Committee
Management Committee
HR Policies and Procedures Members of the HR Policies and Procedures Committee
Committee
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
January 2017 6 A Stramrood Substituted the words “Disciplinary
hearing” with Disciplinary process.
Updated the Purpose and
Applicability to specify that this
Standard is applicable to
contractors. Updated Normative
and Informative References.
Updated Definition section by
removing Agent and Consultant as
these have been incorporated into
the definition of Contractor.
Updated the definition of Work at
Height and Zero Tolerance.
Reviewed and updated the Roles
and Responsibilities section and
Process for Monitoring. Added
permit requirement to Rule 1,
updated Rule 2 - Removed the
words “psychologically fit to work”
as this is no longer a requirement
in terms of the Construction
Regulations, 2014 and updated
Rule 3 – Removed the words “(for
example transporting people on
the back of trucks in a cabin)”
Updated Consequences of
violating a Life-saving Rule with
regard to contractors.
October 2015 5 A Stramrood Revision date needed to be
extended. Content still valid and
same.
May 2012 4 S Govender Amended Section 3.6
Consequences of Violating a Life-
saving Rule to align with EXCO
decision.
March 2013 3 S Govender Changed Cardinal Rules to Life-
saving Rules, and amended
content to ensure better
understanding of the intent and
requirements.
September 2010 2 K Terblanche Content of Rev 1 was incorporated
into the new Policy template.
Content was revised and updated.
December 2008 1 K Terblanche Annexure 1: Acknowledgement of
Eskom Life-saving Rules of this
document was removed. The
references made to Annexure 1 in
paragraphs 3.5.2 and 3.8 were
also removed.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
Date Rev. Compiler Remarks
August 2008 0 K Terblanche The document with reference
number 32-421 was developed
and approved.
The following people were involved in the development of this document:
Alex Stramrood
Kerseri Pather
Loraine Smit
Marc Lebea
Mike Townsend
Nosipho Noveve
Sheryl Isaacs
Sivi Govender
SN Middel
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Compliance Requirements
Source: Eskom life-saving rules.pdf (unknown)No specific requirements found
Health & Safety
Source: Eskom life-saving rules.pdffollowing paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-37: Substance Abuse Procedure
[3] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[4] 32-136 Contractor Health and Safety Requirements
[5] 32-345 Eskom Vehicle Safety Specification
[6] 32-407 Behavioural Safety Observations
[7] 32-418: Working at Heights Standard
[8] 32-477 Safety, Health and Environment Training and Development Procedure
[9] 32-520 Occupational Health and Safety Risk Assessment Procedure
[10] 32-524 Developing a SHE Specification
[11] 36-681: Plant Safety Regulations
[12] 32-726 SHE requirements for Eskom Commercial Process
[13] 32-727: Safety, Health, Environment and Quality Policy
[14] 32-848: Operating Regulations for High Voltage Systems
[15] 32-1112: Disciplinary Code
[16] 32-1113: Disciplinary Procedure
[17] 240-44175132 Eskom Personal Protective Equipment Specification
[18] 240-62946386: Vehicle and Driver Safety Management Procedure
[19] 240-43848327: Right to Refuse Employees’ Right of Refusal to Work in an Unsafe Situation
[20] 240-84733329: Medical Surveillance Procedure
[21] 240-100979499 Personal Protective Equipment for Working at Heights Specification
2.2.2 Informative
[22] National Road Traffic Act
[23] Occupational Health and Safety Act
[24] 34-104 Earthing Standard
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
2.3 Definitions
2.3.1 Contractor: Any person (juristic/individual) formally contracted (directly or indirectly) by
Eskom and who performs work; supplies a service, product, equipment or material for the
purposes of advancing Eskom’s business and other interests. This includes consultants,
and third party contractors i.e. vendors, suppliers, agents, joint ventures, fixed term
contractors, principal contractors and subcontractors.
2.3.2 Life-saving Rule: Rules that, if not adhered to, have the potential to cause serious harm to
people. The consequences of a person knowingly and wilfully violating this rule will result in
a disciplinary process in accordance with the Eskom Disciplinary Code and Procedure.
2.3.3 Visitors: Any person who visits an Eskom site/office during working hours to attend a
meeting or for any reason whatsoever. This could include a minor.
2.3.4 Work at height: Means any work performed above a stable work surface or where a
person puts himself/herself in a position where he/she exposes himself/herself to a fall from
or into. Work at height is, as a result, work in any place (except a staircase in a permanent
workplace ), including a place at, above or below ground level, where a person could be
injured if he/she fell from that place. Access and egress that present a risk of fall can also
be classified as work at height.
2.3.5 Zero Tolerance: The standard that provides for the imposition of severe consequences for
a proscribed offence or behaviour without making exceptions for the extenuating
circumstances.
2.4 Abbreviations
a) Compile and review the Life-saving Rules for Occupational Health and Safety;
b) Develop awareness material;
behaviour for all other work-related activities or other safety requirements, but emphasises the
importance thereof.
3.1 Eskom Life-Saving Rules
3.1.1 Rule 1: open, isolate, test, earth, bond, and/or insulate before
or near any electrical network, line or apparatus, electrically connected to the power system and/or
electrically charged and/or not electrically charged unless:
a) He/she is trained and authorised as competent for the task to be done;
b) There is a valid permit to work, where required;
c) A pre-task risk assessment to identify all risks and hazards has been conducted prior to any
work commencing;
d) He/she follows the requirements on OPEN, ISOLATE, TEST, EARTH, BOND and/or
and outcome of risk assessment fit for the type of work or task to be performed;
e) The authorised person (team leader) has certified and physically shown all team members that
the apparatus is safe to work on;
f) He/she makes the specific electrical environment safe prior to performing the work; and
g) All the appropriate PPE (including face shield and insulated gloves for low voltage work) are
worn.
3.1.2 Rule 2: hook up at heights
Reg No 2002/015527/30.
Life Saving-Rules Unique Identifier: 240-62196227
Revision: 6
Page:
a) He/she is medically fit to work at height;
b) A pre-task risk assessment to identify all risks and hazards has been conducted prior to
commencing any work of this nature;
c) He/she is appropriately trained as determined by the risk assessment;
d) He/she is appropriately secured during ascending and descending; and
e) He/she is using an Eskom approved fall arrest system where applicable.
3.1.3 Rule 3: buckle up
(PTW), which is governed by for example the:
a) Plant Safety Regulations; or
b) Operating Regulations for High Voltage Systems (ORHVS); or
c) Any other activity where a permit is required.
Alex Stramrood
Kerseri Pather
Loraine Smit
Marc Lebea
Mike Townsend
Nosipho Noveve
Sheryl Isaacs
Sivi Govender
Section
Source: Eskom life-saving rules.pdf[1] ISO 9001 Quality Management Systems
[13] 32-727: Safety, Health, Environment and Quality Policy
Important Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER){"closingTime":"2.2","briefingSession":"{"date":null,"time":null,"venue":"tend a site visit and/or clarification meeting that is stipulated as being","is_compulsory":true}"}
Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":"g time 2.2 Ensure that Eskom has received the complete original tender and one (1) complete hard"}
Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)General
Legal
Financial
SHEQ
Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Invitation to Tender documents.
Communication 1.5 Every communication between Eskom and a tenderer shall be made to or from the Eskom
Representative only, in w
Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfof a tenderer.
Cost of tendering 2.6 Accept that Eskom will not compensate the tenderer for any costs incurred in the preparation
and submission of a tender, including the costs of any testing necessary to demonstrate that
aspects of the tender satisfy the evaluation criteria, or the negotiation of any contract.
Submitting a tender 2.7 Check the Invitation to Tender documents on receipt and notify the Eskom representative of
any discrepancy or omitted documents. The Acknowledgement Form must be completed
and submitted with the tender and must clearly state if the tender is for the whole or part of
the works, services or supply identified in the specification and/or works information by
Pricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfreasonable time for tenderers to make consequential adjustments to their tenders before
the closing date and time for submission.
In writing’ means hand-written, typed, type-written, printed or electronically made, and that
results in a permanent record.
Insurance 2.17 The extent (if any) of insurance provided by Eskom may not be for the full cover required in
the conditions of contract. The tenderer is advised to seek qualified advice regarding
insurance.
Pricing the tender 2.18 Include in the rates, prices, and the tendered total of the Prices all duties, taxes (including
VAT), and other levies payable by the tenderer if successful. Such duties, taxes and levies
are those applicable 14 (fourteen) days prior to the closing date and time for tender
submission.
2.19 Provide rates and Prices that are fixed for the duration of the contract and are not subject to
contract price adjustment except as provided for in the Invitation to Tender.
2.20 State the rates and Prices in South African Rand unless instructed otherwise in the Invitation
to Tender. The selected conditions of contract may provide for part payment in other
currencies. Therefore, submit Rates/Prices in Rands in accordance with the exchange rate
and base date as stipulated in the Invitation to tender.
Alterations to 2.21 May not make any alterations or additions to the tender documents, other than for purposes
documents of complying with instructions issued by the Eskom Representative or if necessary to correct
errors made by the tenderer. All such alterations shall be initialed by all signatories to the
tender. Corrections may not be made using correction fluid, correction tape or the like.
Alternative tenders 2.22 Submit alternative tenders only if a main tender is also submitted, and only if the submission
of alternative tenders is permitted by the Invitation to Tender. Accept that an alternative
tender may be based only on the criteria stated in the Tender Data.
Clarification and 2.23 Provide clarification and documents as may be required by the Eskom Representative
correction of Prices during the evaluation of tenders. However, documents identified as mandatory tender
after tender returnables that are required to be submitted at the closing date and time for tender
submission submission will not be requested and may not be submitted after the closing date and time.
phases, as this is regarded as ‘double dipping’.
Designated 3.12 Tenderers are also required to submit information on designated material and
materials and thresholds no later than contract award. If this information is not completed and
thresholds submitted as indicated in the Invitation to Tender, your tender will not be considered for
contract award
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
requirements will be required meet the minimum threshold stated in the Tender Data to proceed to
further evaluation.
Financial analysis 3.14 Eskom has to determine the risk of doing business with a supplier who may pose a
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
financial statements, Eskom will attempt to identify mitigating factors or requirements for
the tenderer to meet, if such factors/requirements exist in the tender’s context. However,
should suitable mitigating factors not exist in the tender’s context or should mitigating
factors exist but be insufficient or if the risk is considered to be too high or should the
tenderer not agree with the mitigating factors, the tenderer will not be considered for
award.
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
such as CPA, FOREX, commodity exposure, unconditional discounts, technical
adjustment, PV and forecasted rates of invoicing are taken into account when determining
the evaluation Price.
Arithmetical errors 3.16 Check responsive tenders for arithmetical errors. If there is a discrepancy between an
amount in figures and the amount in words, the amount in words shall prevail.
Check the highest-ranked tenders for the following errors or omissions: -
(a) the misplacement of the decimal point in any unit rate; or
(b) omissions in completing the pricing schedule or bill of quantities, or
(c) arithmetical errors in line-item totals that are the result of the incorrect multiplication
of a unit rate and a quantity in a bill of quantities or schedule of prices; or
(d) arithmetical errors that are the result of the incorrect addition of the prices.
will request the tenderer to either confirm the prices as tendered or to accept the
corrected prices.
Where the tenderer elects to confirm the prices as tendered; Eskom will correct the error
as follows: -
(a) If a bill of quantities or pricing schedule applies and there is an error in the line-item
total that is the result of an error in multiplying the unit rate and the quantity, the line-
item total shall prevail, and the rate shall be corrected.
(b) Where there is a misplacement of the decimal point in the unit rate, the line-item total
as quoted shall prevail, and the unit rate shall be corrected.
(c) Where there is an error in the total of the prices that is the result either of other
corrections required by the checking process or in the tenderer’s addition of prices,
the total of the prices shall prevail, and the tenderer shall be asked to revise the
selected item prices (and their rates if a bill of quantities applies) to result in the
tendered total of the prices.
documentation by closing date and time of tender submission, the tenderer will not be
disqualified if otherwise evaluated as acceptable in all other criteria; however, the tenderer
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
together and rank the suppliers from the highest to the lowest.
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
accordance with Section 2(1) (f) of the Preferential Procurement Policy Framework Act,
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf (TENDER)CSD report or as per certificate/affidavit provided
CSD number/CSD report) must be provided at the closing date and time for
CSD number or B-BBEE certificate/affidavit will need to be
B-BBEE Details: kom Representative and
Agreement to sign the contract documents.
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Environment and closing date and time for tender submission stipulated in the Invitation to Tender and/or
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated
Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdftenderers that Eskom has identified. A sole source and a single source are regarded as a
tenderer that meets the requirements stated in the Eskom Procurement and Supply Chain
Management Procedure 32-1034. Any addenda to an issued Invitation to Tender will be
published or issued in the same way as the Invitation to Tender was and will form part of the
Proof of authority 2.25 Where an agent submits a tender on behalf of a principal, an authenticated copy of the
to act as agent authority to act as an agent of the tenderer must be submitted as a tender returnable.
Compliance with 2.26 Comply with relevant legislation and regulatory instruments such as Instruction Notes issued
relevant legislation by National Treasury, CIDB Regulations for construction works; materials designated for local
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
applicable legislation or regulatory instruments indicated in the Invitation to Tender.
Proof of Safety, 2.27 Tenderers are required to provide proof to the satisfaction of Eskom that safety, health,
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
requirements tender.
CIDB 2.28 Where the Tender Data has stipulated CIDB grading/s as a qualification criterion, tenderers
are required to be registered with the Construction Industry Development Board at the
closing date and time for submission of tenders or to be capable of being so registered
within twenty-one (21) working days from the closing date and time for submission of
tenders.
Where CIDB is applicable; proof of registration on CIDB is mandatory at the closing date
and time for tender submission. Should this not be received as stipulated in the Invitation to
Tender; the tender will be disqualified. However, in the event that, at the closing date and
time for tender submission, only proof of application for registration on CIDB is available,
then this must be submitted by the closing date and time for tender submission, while the
actual proof of CIDB registration (printout from CIDB database) must be submitted by
contract award
Contract Skills 2.29 If the tenderer is awarded a contract, it, as Contractor, shall achieve in the performance of
Development Goal the contract the Contract Skills Development Goals (CSDG) established in the CIDB
(CSDG) Standard for Developing Skills through Infrastructure Contract (published in GN 1779,
Government Gazette No. April 2023)
that has a duration of 12 months or more, and to:
a contract of R5 million or more, in the case of a professional service or service contract
or an order issued in terms of such a contract; or
a CIDB grading designation of grade 7 or higher, in case of an engineering and
construction works, or design and build contract or an order issued in terms of such a
contract.
Contract 2.30 The Contractor shall achieve in the performance of the contract the Contract Participation
Participation Goals Goals (CPG) relating to the engagement of targeted enterprises as established in the CIDB
(CPG) standard for indirect targeting for enterprise development through Construction works
contracts (published in Government Gazette No. February 2013).
enterprises as established in the aforesaid standard applies to:
construction works contracts in the General Building (GB) and to Civil Engineering (CE)
classes of construction works;
construction works contracts of an estimated minimum project duration of 6 months; and
construction works contracts in which at least 25% of the main contract could reasonably
be expected to be subcontracted out in one or more of the following CIDB classes of
construction works:
Civil Engineering (CE)
Electrical Engineering Work (EB)
) General Building Works (GB)
) Mechanical Engineering (ME)
2.31 Eskom may disqualify a tender if it is found that the tenderer has misrepresented or
falsified any information, certificate, affidavit or document. Eskom will report any fraud
in relation to a tenderer’s B-BBEE certificate/affidavit, or evidence of ‘fronting’ as
defined in the B-BBEE Act , as amended, to the B-BBEE Commission. The
tenderer will be suspended from business with any State-Owned Company for up to 10
years and may even be sentenced to jail.
2.32 Tenderers are also required to complete fully and submit the SDL&I Undertaking
(annexure to the Invitation to Tender) by no later than contract award. If the SDL&I
Respond 3.1 Respond to a request for clarification that Eskom receives before the closing date for
clarification clarification or queries. Eskom’s responses will be published to all tenderers in the same
manner the Invitation to Tender documents were issued. It is the tenderers’ responsibility
to check the Eskom Tender Bulletin and NT e-Tender Portal regularly for updated
responses to clarifications.
Issue Addenda 3.2 If necessary and prior to the closing date and time for tender submission, amend, amplify, or
add to the Invitation to Tender documents by way of Addenda published in the same
platform that the Invitation to Tender was issued. It is the tenderers’ responsibility to
check the Eskom Tender Bulletin and NT e-Tender Portal regularly for Addenda.
electronically. The Eskom Representative will publish the names of all tenderers received
on the Eskom Tender Bulletin and NT e-Tender Portal.
Tender Prices 3.5 Eskom will announce the names of the tenderers. Prices may be announced if so, stated
in the Tender Data.
Non-disclosure 3.6 Unless required by law, Eskom will not disclose information relating to the evaluation and
comparison of tenders and recommendations for the award of a contract to tenderers or to
any other person not officially concerned with the tender process until after the tender
award.
Grounds for 3.7 Reject a tender if Eskom establishes that there is proof that the tenderer influenced the
rejection processing of tenders or the awarding of the contract, the existence of collusion and/or bid
rigging, and/or that the tenderer has participated in any fraudulent/illegal activity in
connection with the Invitation to Tender.
Clarification of a 3.8 Obtain clarification from a tenderer in respect of any matter in the tender that may not be
tender clear or that could give rise to ambiguity in a contract arising from this tender if the matter
were not to be clarified. A document that the Invitation to Tender identifies as a mandatory
tender returnable that is required to be submitted at the closing date and time for tender
submission will not be requested, but Eskom may seek clarity on it.
may utilise reverse e-auction in certain Enquiries. Where reverse e-auction will be utilised,
this will be indicated in the respective Invitation to Tender and the reverse e-auction
supporting documents will be issued in the Invitation to Tender. Tenderers will be required
to submit a complete tender that does not contain Prices. If a tenderer has included prices
in its tender, the prices will not be considered.
Acceptance of 3.22 Notify Eskom's acceptance to the successful tender before the expiry of the validity period
tender or agreed additional validity period. Inform the successful and unsuccessful tenderers only
once approval has been granted by the Eskom Adjudication Authority. For open tenders,
this notification must be published on the Eskom Tender Bulletin and NT e-Tender Portal
Prepare contract 3.23 Revise the contract documents issued by Eskom in the Invitation to Tender documents to
documents take account of:
Addenda issued during the tender period;
inclusion of returnables stipulated in the Invitation to Tender;
inclusion of changes agreed in contract negotiations; and
Other revisions or documents agreed to between Eskom and the successful
tenderer during negotiations,
Sign Form of 3.24 Arrange for authorised signatories of both parties to complete and sign the original and one
Contractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfincluding the Eskom Representative shall not be liable for any losses, claims or damages of
whatsoever nature or howsoever arising that may be sustained by a tenderer or any other
person as a result of its participation in the tender or from any amendment, termination or
suspension of the process set out in the Invitation to Tender or from its exclusion from
participating in the tender process at any point.
Eskom’s right to 1.7 Eskom reserves the right to enter into mandated negotiations with any, one or more selected
negotiate tenderer(s) in accordance with Eskom’s approved procurement policies and procedures.
240-62044728 Rev 12 Eskom Standard Identifier
Conditions of Tender Effective Date 01 February 2025
Review Date January 2030
Disclaimer 1.8 While Eskom takes all reasonable measures to ensure that all information contained in the
regarding accuracy tender documents is correct and complete, Eskom does not, however, make any
of tender representations or warranties, express or implied, as to the accuracy or completeness of
documents such information and Eskom expressly disclaims any, and all liability for such
representations, warranties or statements.
Tenderer’s 2. The tenderer shall comply with the following obligations when submitting a tender and shall:
Tender validity 2.12 Hold the tender(s) valid for acceptance by Eskom at any time within the validity period after
the closing date and time for tender submission. Extend the validity period for a specified
additional period if Eskom requests the tenderer to do so. A tenderer that agrees to extend
the validity of its tender will not be required or permitted to modify its tender. A tenderer that
does not agree to extend the validity of its tender will be excluded from further
consideration. Tenderers will be requested to extend the validity of their tenders until a
contract(s) have been concluded with one or more tenderers. A request that a tenderer
extend the validity of its tender is not a representation that the tender is an acceptable
tender or that Eskom will seek to negotiate or conclude a contract with the tenderer. If the
validity of tenders expires before contracts have been concluded, the procurement process
is deemed to have concluded without an award.
Confidentiality and 2. 13 Treat as confidential all matters that arise in connection with the procurement. Use and copy
copyright of the documents provided by Eskom only for the purpose of preparing and submitting a tender
documents in response to this Invitation to Tender.
Standardised 2.14 Obtain and familiarise themselves with, if required for the purposes of submitting a tender,
specifications and the latest revision of standardised specifications and/or other documents that have been
other publications incorporated by reference into the Invitation to Tender documents by reference.
Site visit and / or 2.15 Tenderers must attend a site visit and/or clarification meeting that is stipulated as being
clarification compulsory in order to familiarise themselves with the proposed work, services, supply,
meeting location or similar. Failure to attend a clarification meeting or site visit that is identified as
compulsory will result in disqualification from participation.
Details of the meeting(s) are stated in the Tender Data. Tenderers are entitled to ask
correction of errors as required above.
Evaluation of 3.17 Score the B-BBEE level as stated on the CSD report or as per certificate/affidavit provided.
B-BBEE If the B-BBEE level is a pre-qualification criterion; then the proof of the B-BBEE level
(certificate/CSD number/CSD report) must be provided at the closing date and time for
tender submission; or the tender will be disqualified. If sub-contracting to designated groups
pre-qualification criteria are utilized (selected/mandatory) in terms of the PPPFA
Regulation, then Eskom will apply the PPPFA requirements for sub-contractors’ B-BBEE
status and the sub-contractors’ CSD number or B-BBEE certificate/affidavit will need to be
provided at the closing date and time for tender submission. Should the
information/documents provided indicate that the level is in dispute (fraudulent/ expired)
then the tender will be disqualified.
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
provided at Tender closing date and time for tender submission, or the
information/documents provided are fraudulent or have expired; then the tenderer will not
be disqualified (if otherwise deemed to be responsive and acceptable in all other aspects)
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdfare submitted and accessible for downloading/evaluation without any challenges as well as
It must be noted that Eskom will not measure a criterion twice in the different evaluation
Functionality 3.13 If functionality is a criterion, tenderers will be scored against the functionality criteria and
further evaluation.
(if applicable) financial risk to Eskom in the execution of the contract. During evaluation of a tenderer’s
Evaluation of Price 3.15 Evaluate the Price in accordance with the criteria/requirements in the Tender Data. Factors
the evaluation Price.
but will score zero under PPPFA point allocation.
Evaluation of 3.18 Score the Specific Goals with reference to the supporting documentation in the tender. If a
Specific Goals tenderer fails to meet Specific Goals and/or to submit the required proof/supporting
will score zero points for Specific Goals within the 90/10 or 80/20 allocation of points.
Ranking of tenders 3.19 According to the PPPFA, Eskom will add the score for Pricing and the Specific Goals
Objective criteria 3.20 A contract may be awarded to a tenderer that did not score the highest points only in
must stipulate the Objective Criteria in the Invitation to Tender. Functionality and any
element of the B-BBEE scorecard may not be used as Objective Criteria.
Reverse e-Auction 3.21 Reverse e-auction is an electronic system that utilises the 90/10 and 80/20 Price and
Preference point systems, and which is intended to achieve competitive pricing. Eskom
(NT instructions, content and/or production by the dtic, PPPFA Regulations; Amended B-BBEE Codes, COIDA;
CIDB, PPPFA etc) OHS Act; Eskom’s requirements for Safety, Health, Environment and Quality (SHEQ) and any other
Health, environmental and quality (SHEQ) systems, policies and capabilities are in place at the
Quality Contract Award. All costs and personnel associated with SHEQ must be reflected in the
However, for the purposes of PPPFA point allocation: if no B-BBEE certificate/affidavit is
Submission Guidelines
Source: Picture of Vandalized 5MVA Nantes Station Transfomer.pdf (unknown)Returnable Documents: Not specified in the provided document or extracted text.
Evaluation Criteria
Source: Picture of Vandalized 5MVA Nantes Station Transfomer.pdf (unknown)General
Applicants must be registered vendors or capable of meeting ESKOM's procurement standards.
Technical
Experience in handling, transporting, and disposing of high-voltage transformers may be required.
Legal
Compliance with South African regulations for electrical equipment and environmental disposal.
Technical Specifications
Source: Picture of Vandalized 5MVA Nantes Station Transfomer.pdf (unknown)Scope: Purchase, collect, and removal of a vandalized 5 MVA transformer (Serial Number 73151) located at Nantes Substation.
Important Dates
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Training/clarification meeting date: To be specified by bidder in Acknowledgement Form. Review date for this document: February 2027.
Briefing Session
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Self-training option: Bidders may confirm understanding of Reverse E-auction system via uploaded video without attending clarification meeting.
Submission Guidelines
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Required returnable documents: Signed Acknowledgement Form (Annexure A.1) confirming attendance of Reverse E-auction training or self-training via uploaded video. Form must include: company/JV name, contact person details (landline, cellphone, email), supplier name, signature, designation, and date.
Returnable Documents
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Signature, designation, and date fields must be completed on the Acknowledgement Form.
Evaluation Criteria
Source: Annexure A (1).1 Acknowledgement Form - Reverse E-auctioning Training.pdf (RFP)Training Compliance
Must have attended Reverse E-auction training or completed self-training via provided video.
System Capability
Must confirm ability to operate the Reverse E-auction system if selected as the recommended supplier.
Submission
Valid company/JV details, contact information, and signed acknowledgment must be provided.
Evaluation Criteria
Source: Contractor Health and Safety Requirements.pdf (unknown)Legal
Experience
Financial
Safety
Technical Specifications
Source: Contractor Health and Safety Requirements.pdf (unknown)Eskom is committed to safeguarding its contractors (principal contractors, appointed contractors,
suppliers, vendors, service providers and consultants) and the environment against undesired
exposure to its operations, which is in line with its Safety, Health, Environmental and Quality
Policy. Therefore, as an organisation, processes have to be in place to identify all possible
practical occupational health and safety risks to which contractors are exposed and to take the
appropriate measures that are necessary to prevent any incidents, injuries or environmental
damage resulting from accidental exposure.
The term “contractor requirements” means a comprehensive documented prerequisite of the
imperative safety, health and environmental requirements for a contract or project.
Contractors have the crucial responsibility for executing work safely on a site or project, including
taking measures to ensure contractor health, safety and environment during their activities/services
to prevent any injury to employees and/or other people and members of the public, or damage to
the environment. Each contractor is responsible for ensuring that its employees and the
employees of any appointed contractors comply with all the applicable occupational health and
safety legislative requirements and the policies and procedures of Eskom.
2.1 Scope
The aim of this standard is to standardise the health and safety requirements applicable to the
activities of contractors throughout Eskom Holdings SOC Limited and its subsidiaries, with a view
to achieving a common goal, namely Zero Harm.
This standard sets out the minimum legislative and organisational requirements for contractors.
Each project and situation may contain additional unique activities, challenges, needs and
requirements that must be considered and incorporated, over and above the minimum
requirements already contained in this standard.
This standard may not thoroughly address all the hazards and factors associated with any
specialised activity or operation. In such a situation, contractors shall be responsible for
developing their safety, health and environmental plans/procedures/manuals/work instructions to
adequately address these specialised activities and scope of operation.
2.1.1 Purpose
The purpose of this document is to stipulate essential information on significant safety and health
aspects for the purposes of contractor health and safety conformity and standardisation.
Eskom’s contractors have the fundamental accountability and responsibility for the on-site safety
and health of people, and environmental protection in their activities, services, products and work.
Each contractor is responsible for ensuring that its employees and the employees of all appointed
contractors comply with all the occupational safety, health, and environmental (SHE) statutory
requirements and the policies and procedures of Eskom Holdings SOC Limited.
The contractor’s SHE management system must demonstrate compliance with the level
appropriate to the service provided and with the applicable legal requirements. The contractor and
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
its employees must be able to carry out their work safely, using the correct procedures for the
safety of plant, equipment and substances, by employing safe systems of work, and providing
adequate instruction, training and supervision for all employees.
In addition to the legislative requirements governing health, safety and the environment,
contractors shall comply with all the Eskom Holdings SOC Limited policies, procedures and
standards.
NOTE: this standard (or any project-specific version of it) does not replace legislative requirements.
2.1.2 Applicability
This standard applies to Eskom Holdings SOC Limited, its divisions, subsidiaries, and entities in
which Eskom has a controlling interest.
This standard shall apply to all Eskom and Eskom subsidiary employees carrying out any form of
contract work for or on behalf of Eskom, that is, agents, clients and contractors.
NOTE: the client or agent is responsible for ensuring that the contractors are informed of any
revisions to any of the documents listed, which they are required to adhere to while performing
work for Eskom Holdings SOC Limited.
2.1.3 Effective date
This document will be effective from the date of signature. The implementation of this standard
shall be monitored after a period of six months from the authorisation date.
2.2 Normative/Informative references
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
NOTE: where the date for revision of a document on the Eskom Document Centre website has
passed, the document still remains current, irrespective of having passed its revision date.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems
[2] 32-296: Integrated SHE Organisation, Roles and Responsibilities, and Statutory Appointments
Procedure
[3] 32-727: Safety, Health, Environment, and Quality Policy
[4] 32-726: SHE Requirements for the Eskom Commercial Process
[5] 240-62196227: Life-Saving Rules Standard
[6] 32-245: Waste Management Procedure
[7] 32-477: Safety, Health, and Environment Training and Development
[8] 32-524 Developing Health & Safety Specifications
[9] 32-529: Occupational Health and Safety Risk Management Process
[10] 32-407: Behavioural Safety Observations
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
[11] 32-123: Emergency Planning
[12] 32-124: Eskom Fire Risk Management
[13] 32-108: Firefighting Organisation
[14] 32-37: Substance Abuse Procedure
[15] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[16] 32-418: Working at Heights Standard
[17] 32-520: Occupational Health & Safety Risk Assessment Procedure
[18] 32-345: Eskom Vehicle Safety Specification
[19] 32-1112: Eskom Disciplinary Code (Standard)
[20] 32-1113: Eskom Disciplinary Procedure
[21] 32-1034: Eskom Procurement and Supply Chain Management Procedure
[22] 240-62946386: Vehicle and Driver Safety Management Procedure
[23] 240-44175038: Control of Non-Conforming Product or Service Procedure
[24] 240-46569633: Professional and Statutory Registration for Construction Project Managers and
Supervisors with SACPCMP
[25] Project and Construction Management Professions Act, 2000 (Act No. )
[26] National Environmental Management Act, 1998 (Act No. )
[27] National Environmental Management: Waste Act, 2008 (Act No. )
[28] All relevant South African legislation (at national, provincial and municipal level)
[29] Occupational Health and Safety Act, 1993 (Act No. ), and regulations.
2.2.2 Informative
NOTE: the following is a list of documents that can be used as a guide in order to meet legal and Eskom requirements.
[1] 240-84520108: Public Safety Standard
[2] 32-726: SHE Requirements for the Eskom Commercial Process
[3] 32-303: Requirements for the Safe Processing, Storage, Removing and Handling of Asbestoscontaining Materials, Equipment and Articles Procedure
[4] 240-46569633 Professional and Statutory Registration for Construction Project Managers and
Supervisors with SACPCMP
2.3 Definitions
NOTE: where there are no listed Eskom definitions, the definitions listed in the Occupational
Health and Safety Act, 1993 (Act No. ) (OHS Act), or its regulations should be referred
to.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.1 Agent: (OHS Act) means any person who acts as a representative for a client.
2.3.2 Baseline risk assessment: means the OHS hazards and risks that are identified and
assessed before the inception of a new project and the commencement of operations. The
baseline risk assessment shall include both routine and non-routine tasks.
2.3.3 Client: means the Eskom representative (Internal – Asset Owner), also referred to as the
contract administrator/custodian or agent or project manager (as defined in the contract).
He/she is the person responsible for ensuring that the works or services are executed in
terms of the contract, as well as for adherence to legislation pertaining to construction
works.
2.3.4 Competent person: means any person having the knowledge, training, experience and
qualifications specific to the work or task being performed, provided that, where appropriate,
qualifications and training are registered in terms of the South African Qualifications
Authority Act, 1995 (Act No. ).
2.3.5 Contractor: means a current or potential supplier, vendor, contractor, consultant or service
provider. A supplier may be a natural or legal person. Definition is per the 32-726 SHE
Requirements for the Eskom Commercial Process.
2.3.6 Contract custodian: means the person defined in a contract as the Eskom representative,
for example the project manager/end-user, that is, the person responsible for managing the
contract and ensuring that the works or services are executed in terms of the contract.
2.3.7 Construction work: means any work in connection with –
a) the construction, erection, alteration, renovation, repair, demolition or dismantling of or addition
to a building or any similar structure;
b) the construction, erection, maintenance, demolition or dismantling of any bridge, dam, canal,
road, railway, runway, sewer or water reticulation system, or any similar civil engineering structure;
or type of work.
2.3.8 Construction vehicle: means a vehicle used as a means of conveyance for transporting
persons or material or both such persons and material, as the case may be, both on and off
the construction site for the purpose of performing construction work.
2.3.9 Consultant: means a person providing professional advice.
2.3.10 Controlled disclosure: controlled disclosure to external parties (either enforced by law or
discretionary).
2.3.11 Design: in relation to any structure, includes drawings, calculations, design details and
specifications.
2.3.12 Designer: means –
a) a competent person who –
i. prepares a design;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
ii. checks and approves a design;
iii arranges for a person at work under his or her control to prepare a design, including an
employee of that person where she or he is the employer; or
iv designs temporary work, including its components;
b) an architect or engineer contributing to, or having overall responsibility for a design;
c) a building services engineer designing details for fixed plant;
d) a surveyor specifying articles or drawing up specifications;
e) a contractor carrying out design work as part of a design and building project; or
f) an interior designer, shop-fitter or landscape architect.
2.3.13 Duty of care to the environment: anyone who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.14 Employee: means, subject to the provisions of subsection (2), any person who is employed
by or works for an employer and who receives or is entitled to receive any remuneration or
who works under the direction or supervision of an employer or any other person.
2.3.15 Employer: means, subject to the provisions of subsection (2), any person who employs or
provides work for any person and remunerates that person or expressly or tacitly
undertakes to remunerate him/her, but excludes a TES (ex labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. ).
2.3.16 Environment: means –
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships among and between them,
and the physical, chemical, aesthetic and cultural properties and conditions of the foregoing
that influence human health and well-being.
2.3.17 Eskom requirements: mean the Eskom requirements flowing from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals.
2.3.18 Fall protection plan: means a documented plan of all the risks relating to working from an
elevated position, considering the nature of the work undertaken, and setting out the
procedures and methods to be applied in order to eliminate the risk.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.19 Hazard: means a source of, or exposure to, danger.
2.3.20 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
2.3.21 Health and safety file: means a file or other record in permanent form, containing the
information required as contemplated in these regulations (the Construction Regulations).
2.3.22 Health and safety specification: means a document specification of all health and safety
requirements pertaining to associated works on a construction site, so as to ensure the
health and safety of persons.
2.3.23 Health and safety requirements: mean the comprehensive health and safety
requirements for a contract, project, site and scope of work. This specification is intended
to ensure the health and safety of persons, both workers and the public, and the duty of
care to the environment. The health and safety requirements must be specific to each
contract, project, site and scope of work.
2.3.24 Internal: means an Eskom department that performs work for another Eskom department.
2.3.25 Joint venture: means a strategic alliance between two or more parties to undertake
economic activity together. The parties agree to create a new entity (incorporated or
unincorporated) by each party’s contribution of equity, and they then share in the profits,
losses and control of the enterprise. The venture may be for one specific project only or a
continuing business relationship.
2.3.26 Life-Saving Rules: mean the set of Eskom safety rules that, if not adhered to, have the
potential to cause serious harm to people.
2.3.27 Maintenance: (maintenance management) means the schemes that can be based on a
number of techniques to focus on those parts which deteriorate and need to be maintained,
such as the following:
a) Preventive – planned maintenance which involves replacing parts and consumables or
making necessary adjustments at pre-set intervals, so that no hazards are created by
component deterioration or failure.
b) Condition-based –involves monitoring the condition of critical parts and carrying out
maintenance whenever necessary to prevent hazards which could otherwise occur.
c) Breakdown-based –the maintenance carried out when faults or failures have occurred. This
is acceptable if the failure does not present an immediate hazard and can be corrected
before the risk is increased.
2.3.28 Mandatary: includes an agent, a contractor, or an appointed contractor for work, but
without derogating from his/her status in his/her own right as an employer or user.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.29 Medical Certificate of Fitness: (OHS Act) means a certificate valid for one year, issued in
terms of the regulations by an occupational health practitioner who shall be registered with
the Health Professions Council of South Africa.
2.3.30 Medical surveillance: (OHS Act) means a planned programme of periodic examination
(which may include clinical examinations, biological monitoring or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by an
occupational medicine practitioner.
2.3.31 Method statement: (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards identified in any
risk assessment.
2.3.32 Mine
a) when used as a noun, means –
i. any borehole or excavation, in any tailings on or in the earth, including the portion of the
earth that is under the sea or other water, made for the purpose of searching for or winning
a mineral, whether it is being worked or not; or
ii. any other place where a mineral deposit is being exploited, including the mining area and
all buildings, structures, machinery, mine dumps, access roads or objects situated on or in
that area that are used or intended to be used in connection with searching, winning,
exploiting or processing of a mineral, or for health and safety purposes. But, if two or more
excavations, boreholes or places are being worked in conjunction with one another, they
are deemed to comprise one mine, unless the Chief Inspector of Mines notifies their
employer in writing that those excavations, boreholes or places comprise two or more
mines; or
iii. a works; and
(b) when used as a verb, the making of any excavation or borehole referred to in paragraph (a)(i),
or the exploitation of any mineral deposit in any other manner, for the purpose of winning a
mineral, including prospecting in connection with the winning of a mineral.
2.3.33 Organisation: may be defined as a group of individuals (large of small) which is co-
operating under the direction of executive leadership in the accomplishment of certain
common objects.
2.3.34 Project: means an activity or a group of activities which has a defined start and end date, a
defined scope and a defined sum of money allocated to complete the activities.
2.3.35 Project manager/leader: means the person who has the responsibility for the successful
planning and execution of a project. The project manager must satisfy the certification
requirements set by the South African Council for the Project and Construction
Management Professions. Note: the project manager is the duly authorised Eskom
representative who acts on Eskom’s behalf as the administrating officer for the purposes of
the contract. (The term “project manager” in the context of this procedure should be used in
its broader sense and should not be restricted to the designation of project manager in any
specific work environment.)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.36 Risk assessment: (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps that have to be taken to
remove, reduce or control such hazard.
2.3.37 Service provider: means any private person or legal entity that provides any service(s) to
Eskom for compensation.
2.3.38 Subsidiary: means an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock.
2.3.39 Task: means a segment of work that requires a set of specific and distinct actions for its
completion.
2.3.40 Toolbox talks: where the team leader, after conducting pre-task planning, shares all the
tasks at hand and discusses task allocation, the identified risks and the control measures
with all his/her team members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure a common understanding of the tasks,
risks and control measures required.)
2.3.41 The Act: (OHS Act) means the Occupational Health and Safety Act, 1993 (Act No. ), as amended, and the regulations made under it.
2.3.42 Visitor: means any person visiting a workplace with the knowledge of, or under the
supervision of, an employer or who is not providing a specific service to Eskom.
2.4 Abbreviations
Abbreviation Explanation
BU Business Unit
CE Chief Executive
COID Act Compensation for Occupational Injuries and Diseases Act, 1993 (Act No. )
HIRA Hazard Identification and Risk Assessment
MHS Act Mine Health and Safety Act, 1996 (Act No. )
NEMA National Environmental Management Act, 1998 (Act No. )
OHS Act Occupational Health and Safety Act, 1993 (Act No. )
OHS Occupational Health and Safety
H&S Health and Safety
ORHVS Operating Regulations for High Voltage Systems
SACPCMP South African Council for the Project and Construction Management Professions
SHE Safety, health, and environment
NRTA National Road Traffic Act, 1996 (Act No. )
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.5 Roles and responsibilities
The Group Chief Executive (GCE) of Eskom, as the employer in terms of the OHS Act and in
general terms, has the overall responsibility and liability for the health and safety of all persons
involved at all Eskom sites. Within the framework of the OHS Act, the GCE may discharge these
duties as far as is reasonably practicable. These duties may be delegated to section 16(2)
appointees and to responsible managers in the various Eskom divisions.
Eskom and its subsidiaries must take all reasonably practicable steps to prevent constructionrelated incidents and harm to any person, including members of the public, and damage to
property and the environment.
The contractor, being an employer in his/her own right, is still required to abide by Eskom’s SHE
requirements, as well as the relevant safety, health and environmental legislation.
The appointed managers are responsible for health, safety and the environment on sites under
their control.
2.5.1 Project management
Project management is the discipline of planning, organising, motivating and controlling resources
to achieve specific goals. A project is a temporary endeavour with a defined beginning and end
(usually time-constrained, and often constrained by funding or deliverables), undertaken to achieve
unique goals and objectives, typically to bring about beneficial change or added value. The
temporary nature of projects contrasts with business as usual (or operations), which are repetitive,
permanent or semi-permanent functional activities to produce products or services. In practice, the
management of these two systems is often quite different, and as such requires the development
of distinct technical skills and management strategies.
The primary challenge of project management is to achieve all of the project goals and objectives
while honouring the preconceived constraints. The primary constraints are scope, time, quality and
budget. The secondary and more ambitious challenge is to optimise the allocation of the necessary
inputs and integrate them to meet pre-defined objectives.
2.5.2 Project managers
Project managers manage the activities and resources allocated to projects in a cohesive, efficient
manner and also administer and execute engineering and technology projects (including control
plant) within cost, quality and time.
Eskom: Project health and safety manager/practitioner
The responsibility of the health and safety manager/practitioner is to provide assurance, as well as
to advise, assist and support the project manager, supervisor and project engineer with managing
the health and safety issues on the project, which include ensuring proper co-ordination among the
various contractors. The health and safety manager/practitioner shall also be responsible for
assisting with the development of site- and project-specific health and safety specifications and for
ensuring that health and safety specifications are issued with the enquiry documents and that the
contractor’s health and safety plans are submitted, evaluated and approved. He/she shall be
responsible for auditing these plans and ensuring they comply with legal requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.5.3 Contractor health and safety officer
Where appointed, a contractor’s health and safety officer shall be competent to perform the
required duties contemplated in the OHS Act and contained in the project requirements.
2.5.4 MHS Act
In terms of the MHS Act, the appointment of a health and safety officer is required for the duration
of the contracted work. The contractor’s health and safety officer shall assist and support the
contractor’s construction manager to ensure that the organisation’s health and safety
responsibilities are fulfilled and that there is compliance with the health and safety specifications
and the health and safety plan.
In determining the number of appointed competent health and safety officers, the nature and scope
of work being performed shall be taken into consideration.
All contractor health and safety officers must liaise closely with Eskom’s OHS departments for the
Divisions/BUs in the area where they are working.
2.5.5 OHS Act
In terms of Construction Regulation 8(5) a contractor must, after consultation with the client and
having considered the size of the project, the degree of danger likely to be encountered or the
accumulation of hazards or risks on the site, appoint in writing a full-time construction health and
safety officer to assist with controlling the health and safety-related matters on the site: provided
that, where the question arises as to whether a construction health and safety officer is necessary,
the inspector makes thedecision.
The appointed safety officer must have the necessary competencies and resources to enable
him/her to carry out his/her tasks efficiently, and must be registered with a statutory body approved
by the Chief Inspector.
The contractor’s health and safety officer shall assist with the control of all safety-related matters at
the sites, and give inputs at the design stage.
In determining the number of appointed competent health and safety officers, the nature and scope
of the work being performed shall be taken into consideration.
All contractor health and safety officers must maintain constant liaison with Eskom’s divisional
health and safety departments and co-operate with the health and safety managers/practitioners
responsible for providing a health and safety service.
2.5.6 Contractors
Eskom, as the client, has duties to the contractor, and the contractor, in turn, has duties to all its
appointed contractors. It must be noted that the contractor remains accountable and responsible
for his/her appointed contractors.
The relationship between the contractor and its appointed contractors shall be governed by the
contractual arrangements entered into between them.
Contractors shall carry out the duties contemplated in sections 8 and 9, and the relevant
regulations and duties listed in regulation 7 of the Construction Regulations of the OHS Act.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
All Eskom contractors have to ensure their compliance with the legislative requirements and any
further requirements contained in the contractual agreements they enter into with Eskom.
Where subsidiaries of Eskom, such as Rotek Industries, serve in the capacity of an Eskom
contractor, they must comply with any further contractual requirements.
Construction supervisors shall be appointed in writing for the duration of the construction project,
with the primary responsibility of supervising the construction work. Where required, contractors
may appoint additional employees as assistant construction supervisors. Persons so appointed
must be competent and have extensive knowledge of the type of work they are required to
supervise.
Assistant construction supervisors have the same responsibilities as construction supervisors.
This appointment does not relieve the construction supervisors of any of their accountabilities
and/or responsibilities.
2.5.7 Employees
Section 14 of the OHS Act has reference; contractor employees are responsible for their own
health and safety, as well as the health and safety of their colleagues while at work. The
client/employer/contract manager cannot be expected to be totally responsible if any of their
employees do not comply with legislative and Eskom health and safety requirements. Employees
will be held jointly responsible where situations so require. In their own interests, contractor
employees must be aware of the responsibilities of their contractor management.
2.5.8 Construction professional registration
The legislation and the SACPCMP’s publications direct that all persons assuming responsibility for
construction project management, construction management and construction health and safety
should be registered as professionals in the appropriate category with the SACPCMP in order to
comply with the legal and statutory requirements in South Africa.
2.5.9 Joint ventures
Where the work is to be managed jointly with a joint venture partner, the requirements imposed on
the contractors shall also apply to the joint venture partner, therefore each contractor shall be
responsible and accountable for its own organisation’s health and safety. All organisations shall be
signatories to the required section 37(2) agreement of the OHS Act.
Where a joint venture operates as separate entities, each partner must fulfil the SHE requirements.
If the joint venture operates as a single entity which has been registered and through mutual
agreement, the single business entity must fulfil all the SHE requirements.
Each company shall be liable for its own contraventions and could, therefore, be prosecuted in its
own right without reference to any of the other companies involved.
2.6 Process for monitoring
This document will be reviewed five-yearly or if required.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.7 Related/Supporting documents
Not applicable.
2.8 Statutory/Non-Statutory appointment
All statutory appointments shall comply with legislative requirements and any Eskom non-statutory
appointments must be made using Eskom Standard 32-296: Integrated SHE Organisation, Roles
and Responsibilities, and Statutory Appointments.
Where BUs require contractors to make additional non-statutory appointments, these are permitted
(in terms of the BU’s Legal Appointments Manual, where compiled). All appointments/copies made
by the contractor shall be included in the health and safety file, and be available to the client/agent.
Where construction work is conducted on sites governed by mining legislation, the appropriate
equivalent appointments and assignments shall be made. Depending on the nature of the
contract, the assignations shall be expanded.
3.1 Material and equipment
Material and equipment used or purchased must conform to the health and safety requirements of
the manufacturer and legislative requirements. Where reclaimed material is authorised to be used,
it shall meet the manufacturer’s safety requirements, as if it were new.
Cognisance of the health and safety factor during work: the health and safety of such
material/equipment shall be factored in, to ensure that it remains safe for use by others at a time
after the completion of the contract. Eskom and/or the designer/agent/client shall determine the
acceptability of workmanship.
3.2 Risk assessments
In terms of section 8(2)(d) of the OHS Act and section 9 of the CR for an employer, it is a legal
requirement to carry out risk assessments to establish what hazards to the health and safety of
persons are attached to any work which is performed, any article or substance which is produced,
processed, used, handled, stored or transported, and any plant or machinery which is used in
his/her business and he/she shall, as far as is reasonably practicable, further establish what
precautionary measures should be taken with respect to such work, article, substance, plant or
machinery in order to protect the health and safety of persons and shall provide the necessary
means to take such precautionary measures.
A risk assessment is defined as an identification of the hazards present in an organisation and an
estimate of the extent of the risks involved, taking into account whatever precautions are already
being taken.
Risk assessment is essentially a three-stage process to –
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Risk assessments must be kept updated. This means that significant changes to a process or
activity, or any new process, activity or operation, should be subjected to a risk assessment and, if
new hazards come to light during the work process, these should also be subjected to risk
assessments.
Contractors/suppliers conducting high-risk and critical work/tasks/activities must have written safe
work procedures for the work/tasks/activities to be performed. This shall also apply to the
contractor’s contractor.
Risk assessments for long-term processes should be periodically reviewed and updated. Method
statements or written safe work procedures are an effective method for recording information and
keeping a record of the way that jobs or tasks must be performed.
Before work commences, risk assessments must be conducted for every job or task to allow
supervisors and employees to assess any inherent risks which might have been overlooked during
the initial risk assessment or any changes which might have occurred in a period of absence, in
particular if a job or task is extended over a day or halted owing to inclement weather.
3.3 Record keeping
Record keeping is a system where relevant documentation is kept for auditing or inspection
purposes and may be referenced to at any stage during or after a project.
All records pertaining to the project shall be kept in terms of legislative and Eskom requirements.
The SHE files shall be kept for the duration of the project. They shall be open to audit or inspection
by any party who is entitled to audit or inspect the project. SHE files should be handed over by the
contractor to the client or asset owners for archiving on completion of the project.
3.4 Disciplinary process
A disciplinary process is a structured organisational procedure to deal with employees who have
transgressed the organisation’s rules or requirements. This is a method of changing behaviour. It is
essential for an organisation to have such a process.
3.5 Life-Saving Rules
Life-Saving Rules are a set of Eskom safety rules which, if not adhered to, have the potential to
cause serious harm to people.
describe, i.e. if a particular set of behaviours or actions have a very high probability of
causing disabilities or fatalities when performed.
These rules are created to enforce “zero tolerance” of serious at-risk behaviours.
Violation of these rules will be viewed in a serious light and the consequences will be dealt with in
accordance with the respective disciplinary processes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
The Life-Saving Rules apply to all Eskom employees, agents and contractors. Visitors to Eskom
should also respect and adhere to these rules as applicable and could be instructed to leave the
Eskom premises with immediate effect should they refuse to do so.
3.6 Health and safety behaviour observations
The objective of behaviour safety observations is to assess and address the actual safe and
unsafe behaviour of people in the workplace, as well as the workplace conditions that are caused
by the actions or omissions of employees and contractors.
3.7 Incident investigation
All incidents shall be investigated in terms of OHS Act General Administrative Regulations 8 and 9,
using Eskom Procedure 32-95 as a reference, and where injuries as contemplated in sections 24
and 25 have been sustained, be reported to the Department of Labour.
Contractors shall use the standard General Administrative Regulation Annexure 1 “Recording of an
Incident” form as a minimum for all incident investigation reports.
The objective of incident investigation, not only being a legal requirement, is to establish why and
how the incident occurred; and to find out the real causes of the incident and to decide on the
precautionary measures that are required to address the causes to prevent any recurrences of the
same or similar incidents.
3.8 Training
Appropriate training must be given to employees so that they are competent to perform the tasks
assigned to and expected of them. Training also gives an employee an opportunity to develop
additional skills which will benefit any organisation.
The contractor shall have a training matrix for its organisation.
3.8.1 Induction training
All contractors, their employees and visitors are required to attend formal induction training
courses. Such training shall be conducted by contractor management, construction safety officers
or construction supervisors.
Induction training is an opportunity to inform persons of the organisation’s health and safety
requirements, not only in the organisation’s offices but also at the workplaces.
3.8.2 Site-specific awareness training
Over and above induction training, contractors are required to ensure, before an employee
commences work on the project, that the supervisor in control with responsibility for the employee
has informed the employee of his/her scope of authority for that site/workplace.
3.9 Health and safety representative
The requirements of sections 17 and 18 of the OHS Act shall be complied with. Where contractors
perform operational work, they shall appoint health and safety representatives for each workplace.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Contractor managers shall permit their appointed health and safety representatives to carry out
their functions as required by legislation and support them in performing these functions.
The client may require a contractor safety representative to be appointed and trained on the basis
of the nature and risk level of work in terms of sections 17 and 18 of the OHS Act.
3.10 Health and safety communication
Communication is a two-way tool to enhance awareness and knowledge with the main aim of
changing behaviour or influencing decision-making. Communication is a process which allows
information to be shared and exchanged, using different methods that sometimes require
feedback.
3.10.1 SHE Committees
Statutory SHE Committees shall be established in terms of sections 19 and 20 and General
Administrative Regulation 5 of the OHS Act and Eskom’s requirements.
SHE Committees are forums for discussing health and safety-related matters, with specifics such
as making recommendations to an employer on health and safety matters, incident investigations
and any other health and safety-related matters as such committees may prescribe.
Project managers shall include safety and health as a standing agenda item for all their project
meetings, and the minutes of these meetings must be available on site at all times.
NOTE: this project meeting does not replace or act as a substitute for the required SHE Committee
meeting.
3.10.2 Toolbox talks
Toolbox talks are short, targeted meetings and/or awareness sessions to inform and/or educate
employees about the hazards and risks they will be exposed to when they perform work. Use
toolbox talks to create awareness among the employees to recognise and avoid unsafe conditions.
Use toolbox talks to teach employees to correct or report health and safety hazards so that
management and other employees can take actions to correct them. Employees will learn to avoid
the potentially hazardous situations discussed during toolbox talks as well as become able to
identify hazards and correct those hazards prior to starting a task/job if there are hazards present.
Toolbox talks are an effective way of fulfilling one’s legal requirements.
3.10.3 General SHE communication
Constant communication with employees creates an interest and feeling of being part of the team.
Various methods could be in the form of, but not limited to –
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Such methods are learning aids and also send a message or act as a reminder of a SHE topic
without having to hold specific forums or training sessions.
3.11 Contractor’s site facilities
Where required, contractors, unless otherwise specified in the contract or negotiated with Eskom to
use their facilities, must ensure that adequate facilities are provided for their employees on the
site/project.
When such facilities are provided, they must comply with the Facilities Regulations, SANS 10400
standard A to XA and CR 30.
3.12 Public safety
Eskom upholds the rights of members of the public and has an awareness and educational
programme to protect the public against the risks that may arise out of, and in the course of,
Eskom’s activities. Similarly, contractors shall demonstrate the same respect for the public.
Contractors shall include in their SHE plan how they intend controlling or safeguarding any
members of the public against their activities during the project, without damaging Eskom’s name
and reputation.
3.13 Emergency preparedness
Emergency situations threaten, or may cause harm to, the lives of employees and members of the
public, may cause damage to property, infrastructure and equipment as well as degradation to the
environment, and may disrupt production and the rendering of services.
The contractor shall have an emergency preparedness plan that will address all the identified risks
of the organisation so as to achieve a quick response and recovery and return the situation to
normal in the shortest possible time and the most cost-effective way.
3.13.1 Fire safety
Fire safety is an integral part of the general safety and protection of an organisation, its employees
and members of the public from the effects of fire, heat and smoke. As a minimum, this is ensured
by complying with and fulfilling the legislative and policy requirements.
Fire safety requirements are covered in the Construction Regulations and the National Building
Regulations, SANS 10400 (T regulations).
3.13.2 First-aid planning and emergency care
Every person at a workplace should be given appropriate and prompt medical treatment or
assistance.
In the event of an incident and to receive post-incident rehabilitation, organisations are required to
meet the first-aid requirements of General Safety Regulation 3:
“An employer shall take all reasonable steps that are necessary under the circumstances, to
ensure that persons at work receive prompt first aid treatment in the case of injury or emergency.”
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Eskom has established a contract with Netcare 911 for all its employees, contractors and their
employees for emergency medical assistance while on duty anywhere in South Africa. The
telephone number is 086 1237 566 (0861 2ESKOM).
3.13.3 Emergency escape routes
The SANS 10400 T regulations provide that escape routes have to be incorporated in buildings.
Far too often, when there are fires inside a building, employees die or are injured because they
were unable to evacuate the burning building. This is attributed to there being no escape routes
and/or, if there were such routes in the building, egress was restricted because the routes were
being used as storage areas.
3.14 Occupational health and hygiene
3.14.1 Medicals
Medical surveillance is based on the occupational risk exposure of employees. It is a statutory
requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) and is
an essential component of an Occupational Health and Safety programme.
The purpose of medical surveillance is to comply with statutory requirements to determine a
person’s fitness for duty by assessing whether or not the prospective candidate or employee is
physically/mentally/psychologically fit and able to fulfil the inherent requirements of the prospective
or current job without any ill effects or limitations, and to provide a baseline health status against
which future changes can be measured. Job specifications are required for each individual person
so that job-specific fitness can be measured.
The contractor shall have a medical surveillance programme.
3.14.2 Occupational hygiene
Occupational hygiene is the identification, evaluation and control of those environmental factors,
arising in or from the workplace, that may cause illness, injury or discomfort to the employees or
the surrounding communities.
Occupational hygiene stressors include chemical, physical, biological and ergonomic stressors.
Where there is a possibility of occupational hygiene stressors (for example noise, dust,
illumination, heat and cold stressors, ergonomics, vibration (hand, arm and whole body, etc.),
health risk assessments must be carried out to determine whether there is any possible worker
exposure. Records of all these assessments should be documented and kept up to date.
Contractors shall monitor the extent to which their employees are exposed to the occupational
hygiene stressors. These assessments should be performed by a SANAS-accredited and DOLapproved inspection authority.
3.14.3 Protection against thermal conditions
The requirements listed in the OHS Act Environmental Regulations for Workplaces, Regulation 2,
are precise. The human body will only survive if its core temperature does not exceed the
medically accepted limits of the WBGT Index of 30 for heat, and dry bulb (DB) temperature of not
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
less than 6 oC for cold. Any exposure beyond these limits can lead to organ damage/failure and
death.
3.14.4 Asbestos control management
The exposure of employees to asbestos-containing materials is a serious health risk. The
management and disposal of asbestos-containing materials also pose significant environmental
impacts and consequent legal and financial risks. Where the handling of asbestos and/or asbestosrelated products is required, this shall only be carried out in terms of the Asbestos Regulations of
the OHS Act.
3.14.5 Noise
Noise and vibration are both fluctuations in the pressure of air (or other media) which affect the
human body. Vibrations that are detected by the human ear are classified as sound. Noise is an
unwanted sound.
Where the value of the 8-hour rating level is 85 dBA, above which hearing impairment is likely to
result, the contractor shall have an effective hearing conservation programme.
3.15 Auditing
To maintain an organisation’s efficiency and statutory observance, regular audits must be
conducted throughout the organisation.
Internal auditing is an independent, objective assurance and consulting activity designed to add
value and improve an organisation's operations. It helps an organisation accomplish its objectives
by bringing a systematic, disciplined approach to evaluating and improving the effectiveness of risk
management, control and governance processes.
3.16 Inspections
Regular inspections on health and safety matters highlight problem areas and enable action to be
taken before an incident occurs. Safety inspections can be either reactive or proactive.
Reactive inspections are those that occur after the fact, i.e. the incident has already occurred, or is
a response to reports which highlight that something is not according to plan.
The proactive approach endeavours to identify, evaluate and control hazards and risks before they
develop to the stage of causing an incident.
Safety inspections are the common method employed to identify potential hazards before they
manifest, where the work area is inspected for any hazards and these are recorded, and after the
inspection the hazards are assessed and a plan of action is formulated to rectify such hazards.
A surprise inspection tends to have different results from those of an announced inspection.
Leaders wanting to know how others in their organisation perform can drop in without warning, to
see directly what happens. If an inspection is announced in advance, it can give people a chance
to cover up or to fix mistakes. This could lead to distorted and inaccurate findings. This is why a
surprise inspection gives inspectors a better picture of the typical state of the inspected object or
process than an announced inspection.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.17 Transport/Mobile plant equipment
The use of vehicles accounts for a large number of injuries and fatalities due to motor vehicle
accidents in South Africa. Construction sites account for a number of construction-related
accidents involving construction vehicles and mobile equipment.
The National Road Traffic Act regulates vehicle usage, the roadworthiness of vehicles and the
competency of vehicle drivers.
There is a misconception about carrying passengers in the back of vehicles. The Act does not
permit passengers to be transported in the back of light delivery vehicles. Carrying passengers at
the back of trucks is only permitted if such a truck is fitted by the manufacturer or manufacturer’s
appointed fitment centre with a specifically designed crew cab and appropriate seating and seat
belts for each passenger.
Eskom does not approve the conveying of passengers in the back of vehicles designed to carry
equipment/loads (any truck/trailer), irrespective of whether or not crew cabs are fitted and seating
with four-point seat belts has been fitted.
Construction vehicles and mobile equipment, when driven or towed on a public road, fall under the
requirements of the Act.
All construction vehicles and equipment shall meet the legislative requirements pertaining to the
OHS Act Construction Regulation 23, NRTA, the Mine Health and Safety Act and the National
Environmental Act.
3.18 Management of hazardous materials/chemicals
The handling and use of hazardous materials have a major impact on the health and wellbeing of
all persons and the environment. Various requirements for the handling and storage of hazardous
materials and chemicals are listed in the OHS Act.
When purchasing hazardous materials and/or chemicals, buying departments can fulfil the
legislative requirements by ensuring that purchases are made only from suppliers and
manufacturers that comply with the requirements of section 10 (General duties of manufacturers
and others regarding articles and substances for use at work) and section 22 (Sale of certain
articles prohibited) of the OHS Act.
Any hazardous materials and chemicals, including gases, must be stored in compliance with the
legislative requirements, local municipal by-laws and SANS building standards.
3.19 Machinery, tools and equipment
Machinery is considered as any article or a combination of articles assembled, arranged or
connected and which is used or intended to be used for converting any form of energy to perform
work, or which is used, or intended to be used, whether incidental thereto or not, for developing,
receiving, storing, containing, conforming, transmitting, transferring or controlling any form of
energy.
The requirements for the use of machinery are covered in the various regulations of the
Occupational Health and Safety Act.
There are strict requirements regarding the supervision and use of machinery. Since incorrectly
used machinery or using unsafe machinery can cause serious harm and/or damage, it is important
to ensure that all mechanical equipment is safeguarded in order to protect the health and safety of
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
persons who may be exposed to such mechanical equipment, and also to ensure that competent
persons operate the machinery.
3.20 Explosive-powered tools
An explosive-powered tool means a tool that is activated by an explosive cartridge and/or air or
gas charge, and that is used for driving bolts, nails and similar objects for the purpose of providing
fixing.
Because such a tool fastening system operates on an explosive force, it is considered a lethal
operating tool, especially when the manufacturer’s and legal requirements are not adhered to, in
particular when being operated. These types of tools operate like a loaded gun, so they must be
treated with extreme caution and be operated by specially trained employees.
The legal operating requirements for explosive-powered tools are set out in the Construction
Regulations.
3.21 Lifting equipment
Owing to its versatility, lifting equipment is often abused and/or misused. This nearly always results
in damage to and/or the failure of equipment, leading to incidents and serious injuries.
All types of lifting equipment are governed by regulation 18 of the OHS Act: Driven Machinery
Regulations, as follows:
includes all the lifting machine codes as listed in the regulations and the national code of
practice for the training providers of lifting machine operators).
When working in close proximity (with tower cranes) to power lines, the contractor shall apply for a
permit. See the Eskom Plant Safety Regulations and/or Operating Regulations for High-Voltage
Systems and Electrical Machinery Regulations 19(4) and 19(5) of the OHS Act.
3.22 Boilers, pressurised systems and vessels under pressure
The Pressure Equipment Regulations cover various types of equipment, from boilers, fixed-plant
compressors, mobile compressors and pressure vessels, to fire extinguishers and all piping
associated with such equipment.
There are strict requirements in terms of the Pressure Equipment Regulations. A poorly maintained
and/or operated piece of equipment can have catastrophic consequences.
3.23 Working at heights
Where there is a risk that a fall may cause personal injury, measures should be taken to prevent a
fall and injury. Falls occur at any level. The duty is to prevent falls. It is worth noting that there are
almost as many low-fall injuries as high-fall injuries. Where it is reasonably practicable to take
precautions to prevent falls, such precautions should be taken.
In an effort to prevent falls, including falling objects and/or materials, fall protection plans and
rescue plans must be compiled and implemented. The Occupational Health and Safety Act places
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
duties on employers, employees and anyone who controls the way that work at height is
undertaken.
Where possible, efforts should be made to provide a safe working platform for employees before
resorting to the use of a fall arrest system. Where this is not practicable, suitable fall arrest
equipment shall be provided.
All equipment used for working at height must conform to the OHS Act and the relevant SANS
standards.
A working platform can be virtually any surface from which work is carried out, such as a roof, floor,
a platform on a scaffold, a mobile elevated work platform, the treads of a stepladder, climbing
irons, suspended platforms or a boatswain’s chair.
3.23.1 Eskom’s life-saving rule “Hook up at Height”
When working at height, you must take suitable and sufficient measures to prevent, as far as is
reasonably practicable, any person from falling a distance liable to cause personal injury. Where a
fall from any height could result in harm, an effective means of fall prevention has to be put in
place. You are required to take practicable steps to ensure your safety and the safety of others, as
well as not knowingly exposing yourself or others to harm.
3.23.2 Floor and wall openings
Falls through openings in walls, floors, roadways, etc. account for a number of fatalities and
serious injuries where such openings are not protected. Floor and wall openings must be included
in the fall protection plan.
When including fall arrest equipment, note must be taken of the amount of pedestrian and
vehicular traffic and that the nature of equipment specified can prevent its dislodgement or
unauthorised removal, in other words, barricading must be adequate.
3.24 Excavations and tunnelling
3.24.1 Excavations
Almost all construction work involves some form of excavation, for foundations, drains, sewers, etc.
These can vary greatly in depth and may be only a few centimetres deep or very deep and very
dangerous.
A relatively small collapse might involve about a cubic metre of soil, but a cubic metre of soil
weighs over a tonne. A person at the bottom of a trench who is buried under this volume of
material would be unable to breathe, due to the pressure on the chest, and could quickly suffocate
and die.
An excavation may also be a “confined space” in the meaning of the Work in Confined Spaces
Regulations, and additional precautions will have to be taken.
The legislative requirements for making excavations are contained in Construction Regulation 13
of the OHS Act.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.24.2 Tunnelling
Owing to environmental and seismic factors, no ground material can be regarded as stable when
excavating or tunnelling is taking place or work is being done in them. Ground collapse is
extremely hazardous, especially where people are working inside a tunnel, and usually results in
serious injuries and fatalities.
Any contractor performing tunnelling activities shall comply with Construction Regulation 15, which
then refers to the Tunnelling Regulations published under the Mine Health and Safety Act, 1996
(Act No. ), as amended, and regulation 15 of the Construction Regulations.
3.25 Confined spaces
The belief that any confined space is a safe place as far as asphyxiation is concerned, because of
ignorance about the air quality inside such space and the risk factors, is dangerous. Most
asphyxiates are colourless and odourless. Sometimes the odour asphyxiate is considered a
nuisance and temporary. This makes entering into a confined space an extremely high risk. If
testing is not performed, irrespective of the size of the space or the duration of entry, then
employees’ health (in the short or long term) will be at risk.
The requirements listed in General Safety Regulation 5 shall be adhered to.
3.26 Danger of engulfment
No person shall be permitted to work in any situation where there is a danger of material, etc.
being discharged, unless that person is issued with an appropriate safety belt/harness fitted with a
rope, where at least one other person who has been trained in rescue is available and observing.
If there is a possibility of gas or other fumes being emitted from the material in question, adequate
precautions shall be taken regarding air quality.
3.27 Barricading
Falls through openings in walls, floors or excavations, or approaching dangerous equipment and
operations, continue to pose a threat to persons.
Stringent precautions have to be taken to protect persons against any form of injury through
entering unauthorised entrances and/or areas and/or to prevent such persons from approaching
dangerous and/or operating equipment. These precautions are taken by erecting substantial
barriers, fencing or covers to a degree that prevents unauthorised removal.
3.28 Explosives
The handling and use of explosives for any form of construction work are controlled by the
requirements of the Explosives Regulations of the OHS Act, the Mine, Health and Safety Act, 1996
(Act No. ) and the Explosives Act, 1956 (Act No. ).
Requirements for the transporting and storage of explosives must be in accordance with
Explosives Regulation 13(4) of the OHS Act and SANS 100228 Code of Practice for the
Identification and Classification of Dangerous Substances and Goods for Transport (published by
the South African Bureau of Standards).
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Explosives in the wrong hands and used for the wrong purpose can have devastating
consequences.
3.29 Demolition work
The demolition of structures is an extremely hazardous task and can only be performed by
competent persons.
All demolition work must be planned, and all role players must be involved in the planning; this
includes making thorough risk assessments.
If explosives have to be used, the requirements in terms of the Explosives Regulations shall be
adhered to.
Where structures (power lines, poles, lattice towers, etc.) have to be demolished, this shall be done
in terms of Eskom requirements (task manuals).
All demolition work shall be carried out in accordance with Construction Regulation 14 Demolition
Work.
3.30 Permit to work
A permit-to-work system is a formal written system used to control certain types of work which are
potentially hazardous.
A permit-to-work is a document which specifies the work to be done and the precautions to be
taken.
Permits-to-work are an essential part of safe systems of work for many maintenance activities.
They allow work to start only after safe procedures have been defined, and provide a clear record
that all foreseeable hazards have been considered.
A permit is needed when maintenance work can only be carried out if normal safeguards are
dropped or when the work introduces new hazards. Examples are entry into vessels, hot work and
pipeline breaking.
If the type of work requires working with Eskom power systems/networks (low voltage, medium
voltage or high voltage), then the appropriate permits will be required.
3.31 Radiography, ultrasonic or non-destructive testing (NDT)
During the construction phase and maintenance phase, certain equipment and/or materials require
some form of examination to ascertain that the material used is free of any kind of defect or that
welded joints in piping do not leak. Where testing is performed, all actions for that specific type of
testing must be taken in accordance with the relevant requirements.
3.32 Work in close proximity to/on public roads
Working next to or in close proximity to any public road has inherent dangers, not only to the
persons carrying out the work but also to the motorists, where the persons working do not take
care of their own safety and ignore any rules and regulations. It is imperative to comply with all the
requirements of the National Road Traffic Act when work is performed. For additional worker
safety, organisations should enhance the national requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.33 Work stoppage
Section 8(2)(f) and Construction Regulation 5(q) of the OHS Act have clear requirements for not
permitting an employee to work unless adequate precautionary measures are taken and for
stopping any work which is not in accordance with health and safety plans.
Any person may stop any activity where there is an unsafe act or unsafe condition that poses or
may pose an imminent threat to the health and safety of an individual or of creating a risk of
degrading the environment. This includes any unauthorised work or service performed by, or
legally or contractually non-compliant acts or omissions by, any contractor contracted to work at
that site.
Work stoppages which are initiated because of SHE concerns will be handled in terms of the
Eskom standard SHE Requirements for the Eskom Commercial Process (32-726).
Where stoppages are carried out, the required non-conformance report shall be raised.
3.34 Substance abuse
Alcohol and substance abuse poses a significant threat to any business, more so in industrial
incidents and when driving vehicles. Eskom is therefore entitled to take reasonable steps to ensure
that intoxicated persons are identified and prevented from entering Eskom’s premises, or working
on any of Eskom’s equipment.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
Persons are not permitted to enter or remain on or at a workplace while under the influence of
either or both substances and are not permitted to be under the influence of or consume
intoxicating substances while at/in the workplace. There is a provision regarding the taking of
medication.
The permissible blood level of alcohol and/or drugs is 0%.
3.35 Statistical reporting
There is a legal requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) (General Administrative Regulations) that certain serious incidents shall be reported to the
Department of Labour within a specified time.
Measuring performance also allows us to entrench a positive safety culture and benchmark against
world-class systems.
The primary purpose of measuring health and safety performance is to provide information about
the progress and current status of the strategies, processes and activities used by Eskom to
control risks to health and safety.
Suppliers are required to report to the Eskom contract custodians and Eskom SHE staff, the
monthly OHS statistics which shall include the following as a minimum:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Measurement information sustains the operation and development of the health and safety
management system, and the control of risk, by –
This report will also enable the organisation to reflect on the impact of the implemented
improvement strategies, namely a decrease or an increase in the number of incidents.
3.35.1 From a contractor point of view
There are regulatory requirements in the Construction Regulations which place a strong emphasis
on the relationship between and accountability from the client’s and contractor’s point of view. The
contractor, which is an employer in its own right, does not release Eskom from fundamental
responsibilities; therefore Eskom will have an interest in the contractor’s activities.
“We can't manage what we can't measure.”
“What is measured can be monitored and improved.”
3.36 Housekeeping
Good housekeeping has important functions, which benefit not only the worker but also the
employer:
superfluous material.
of refuse bins, store areas comply with good storage practices and stacking is done in
accordance with accepted stacking practices.
Access to emergency and/or safety equipment will be unimpeded.
Housekeeping means “A Place for Everything and Everything in Its Place”.
A clean and tidy workplace produces a clean and safe worker.
Prompt disposal of waste materials, scrap and rubbish is essential to prevent unnecessary storage.
3.37 Workplace signage and colour coding
The purpose of symbolic safety signs is to convey a message without the use of a specific
language. In this way, instant recognition takes place or the employee can receive a message,
order or warning.
Caution and care have to be taken when positioning mandatory signage. Where these signs
“indicate” a requirement, this means that it shall be done, irrespective of whether the activity is
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
present or the equipment is a requirement. For example, if the sign indicates that hearing
protection is required, which is now no longer needed although the sign is still in place, hearing
protection shall be worn.
All signs and notices shall conform to the requirements of SANS 1186 in terms of standard signs,
safety colours, geometric forms and dimensions.
In terms of identification regarding colour marking, ensure that the colours used match the
appropriate colours of SANS 10140 and 1091.
3.38 Personal protective equipment (PPE)
Personal protective equipment may be described as clothing and/or equipment used in the
workplace to protect the worker from risks and hazards, and includes but is not limited to
equipment and clothing worn on the body as well as equipment used to determine, measure or
indicate danger. The objective of protective clothing is to prevent exposure or injury to any body
parts exposed to operations.
In the interests of the effective protection of the worker, it is essential for the quality and
effectiveness of the items to be of a high standard.
It is imperative to realise that PPE, like any other form of protection, does not eliminate danger. It
simply serves as a screen between the person and the danger lurking in the machine or process.
In most instances, the PPE can only limit to a greater or lesser extent the negative effect of danger
to the human body. Employees must be trained on the limitations of PPE and on how to fit PEE
correctly.
General Safety Regulation 2 of the OHS Act provides for employers to make the workplace safe
and where required to provide appropriate PPE.
3.39 Safety, Health and Environment (SHE) Specification
NOTE: this paragraph is included for information sharing only. The guideline for the compilation of
SHE specifications is contained in the Eskom document 32-524 “Developing a Construction Safety,
Health, and Environmental Specification”.
As a norm, Eskom provides SHE project/service specifications for all types of contracts awarded.
Minimum requirements for SHE specifications must be specific to the task, project and site. The
various project tasks have to be defined, the associated hazards identified, and the associated
risks listed.
SHE specifications provide a basis of requirements for contractors to compile their project-specific
SHE plans.
By drawing up SHE specifications, the client has endeavoured to address the identified critical
factors relating to health and safety issues in order to assist the contractor to provide adequately
for the health and safety of employees on site. Should additional risks be identified later by Eskom
or its agents/clients, these will be included in the contract works information and/or relayed at the
clarification or negotiation meeting.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.40 Safety, Health and Environment (SHE) Plan
A health and safety plan is a documented plan that addresses the hazards identified, and includes
safe work procedures to mitigate, reduce or control the hazards identified. It is specific to each
project undertaken and site where work is done, is compiled by the contractor and appointed
contractor, and must be approved by the client/agent prior to the commencement of any activities
on a project. The contractor and the client/agent must both be signatories to the health and safety
plan once it has been negotiated, agreed upon and accepted. This plan has to be regularly
updated to take account of any changes in project scope and unanticipated conditions.
The health and safety plan must cover all aspects of the health and safety procedures to be
applied by all contractors for the duration of the contract
Where any H&S issues have been omitted in the specification, and the contractor is aware of
these, the omitted issues must be documented in the plan, and the client/agent must be advised of
the omission.
Eskom will evaluate each contractor for its health and safety plan. A health and safety plan will be
accepted and signed by an Eskom SHE functionary, and approved and signed by the contract
custodian. The main contractor is required to evaluate its appointed contractors and proof of
compliance shall be included in the main contractor’s safety file. The contractor shall not be
allowed to commence work on site until the health and safety file has been accepted and
approved.
3.41 Safety, Health and Environment (SHE) File
An SHE file means a file or other record in permanent form, containing the information about the
health and safety management system for the project and the site during the project, and all
information relating to the post-project phase after handover to the client.
All Eskom contractors and their appointed contractors are required to keep a SHE file on every
project worksite. If there is more than one worksite per specific project and scope of work, a file for
a particular site and scope of work shall be kept at that site. Contractors may keep additional files
at their head office as additional records. The SHE file shall be maintained by all the contractors
on their construction sites and shall be available on request for audit and inspection purposes.
The main contractor is responsible for ensuring that its contractor(s) maintain a SHE file and
adhere to the SHE plans at all times during the duration of their appointment. However, this does
not take away the authority from Eskom staff members to regularly inspect and audit their
contractor’s SHE file.
3.42 Hours of work
The Basic Conditions of Employment Act, 1997 (Act No. ), stipulates the permissible
working hours for individuals to perform their duties optimally.
Staff consistently working excessive hours of overtime risk their health and safety and that of their
colleagues due to fatigue.
Fatigue can have deadly consequences, especially in environments where a loss of alertness can
threaten the health and safety of the employee or others.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Compliance Requirements
Source: Contractor Health and Safety Requirements.pdf (unknown)Alternative Reference N/A Number: Area of Applicability: Eskom Holdings SOC Ltd Functional Area: Sustainability Systems Revision: 4 Total Pages: 33 Next Review Date: March 2023 Disclosure Controlled Disclosure Classification: SM/EDC/Formatted 08.09.2016 Document Template 32-4 Rev 9 Contractor Health and Safety Requirements Unique Identifier: 32-136 Revision: 4 Page: Contents . Introduction ............................................................................................................................... 4
Supporting Clauses .................................................................................................................. 4 2.1 Scope ............................................................................................................................... 4 2.1.1 Purpose ................................................................................................................. 4 2.1.2 Applicability ........................................................................................................... 5 2.1.3 Effective date ......................................................................................................... 5 2.2 Normative/Informative References ................................................................................... 5 2.2.1 Normative .............................................................................................................. 5 2.2.2 Informative............................................................................................................. 6 2.3 Definitions ........................................................................................................................ 6 2.4 Abbreviations ................................................................................................................. 11 2.5 Roles and Responsibilities ............................................................................................. 12 2.6 Process for Monitoring .................................................................................................... 14 2.7 Related/Supporting Documents ...................................................................................... 15 2.8 Statutory/Non-statutory Appointment .............................................................................. 15
Document Content .................................................................................................................. 15 3.1 Material and Equipment .................................................................................................. 15 3.2 Risk Assessments .......................................................................................................... 15 3.3 Record Keeping .............................................................................................................. 16 3.4 Disciplinary Process ....................................................................................................... 16 3.5 Life-Saving Rules ........................................................................................................... 16 3.6 Health and Safety Behaviour Observations .................................................................... 17 3.7 Incident Investigation ...................................................................................................... 17 3.8 Training .......................................................................................................................... 17 3.9 Health and Safety Representative .................................................................................. 17 3.10 Health and Safety Communication ................................................................................. 18 3.11 Contractor’s Site Facilities .............................................................................................. 19 3.12 Public Safety .................................................................................................................. 19 3.13 Emergency Preparedness .............................................................................................. 19 3.14 Occupational Health and Hygiene .................................................................................. 20 3.15 Auditing .......................................................................................................................... 21 3.16 Inspections ..................................................................................................................... 21 3.17 Transport/Mobile Plant Equipment.................................................................................. 22 3.18 Hazardous Materials/Chemicals Management................................................................ 22 3.19 Machinery, Tools and Equipment ................................................................................... 22 3.20 Explosive-Powered Tools ............................................................................................... 23 3.21 Lifting Equipment ............................................................................................................ 23 3.22 Boilers, Pressurised Systems and Vessels under Pressure ............................................ 23 3.23 Working at Heights ......................................................................................................... 23 CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. Contractor Health and Safety Requirements Unique Identifier: 32-136 Revision: 4 Page: 3.24 Excavations and Tunnelling ............................................................................................ 24 3.25 Confined Spaces ............................................................................................................ 25 3.26 Danger of Engulfment..................................................................................................... 25 3.27 Barricading ..................................................................................................................... 25 3.28 Explosives ...................................................................................................................... 25 3.29 Demolition Work ............................................................................................................. 26 3.30 Permit to Work................................................................................................................ 26 3.31 Radiography, Ultrasonic or Non-destructive Testing (NDT) ............................................ 26 3.32 Work in Close Proximity to/on Public Roads ................................................................... 26 3.33 Work Stoppage............................................................................................................... 27 3.34 Substance Abuse ........................................................................................................... 27 3.35 Statistical Reporting ....................................................................................................... 27 3.36 Housekeeping ................................................................................................................ 28 3.37 Workplace Signage and Colour Coding .......................................................................... 28 3.38 Personal Protective Equipment (PPE) ............................................................................ 29 3.39 Safety, Health and Environment (SHE) Specification ..................................................... 29 3.40 Safety, Health and Environment (SHE) Plan .................................................................. 30 3.41 Safety, Health and Environment (SHE) File .................................................................... 30 3.42 Hours of Work ................................................................................................................ 30 3.43 SHE Recognition and Reward System ........................................................................... 31 3.44 Environmental Care ........................................................................................................ 31 3.45 Unlawful Orders .............................................................................................................. 31 3.46 Section 37(2) Agreement ................................................................................................ 31 3.47 Security .......................................................................................................................... 32
Acceptance ............................................................................................................................. 32
Revisions ................................................................................................................................ 32
Development Team ................................................................................................................ 33
Acknowledgements ................................................................................................................ 33 CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30. Contractor Health and Safety Requirements Unique Identifier: 32-136 Revision: 4 Page
B-BBEE Details: ll reasonably practicable steps to prevent constructionrelated incidents and harm to any person, including members of the public, and damage to
property and the environment.
The contractor, being an employer in his/her own right, is still required to abide by Eskom’s SHE
requirements, as well as the relevant safety, health and environmental legislation.
The appointed managers are responsible for health, safety and the environment on sites under
their control.
2.5.1 Project management
Project management is the discipline of planning, organising, motivating and controlling resources
to achieve specific goals. A project is a temporary endeavour with a defined beginning and end
(usually time-constrained, and often constrained by funding or deliverables), undertaken to achieve
unique goals and objectives, typically to bring about beneficial change or added value. The
temporary nature of projects contrasts with business as usual (or operations), which are repetitive,
permanent or semi-permanent functional activities to produce products or services. In practice, the
management of these two systems is often quite different, and as such requires the development
of distinct technical skills and management strategies.
The primary challenge of project management is to achieve all of the project goals and objectives
while honouring the preconceived constraints. The primary constraints are scope, time, quality and
budget. The secondary and more ambitious challenge is to optimise the allocation of the necessary
inputs and integrate them to meet pre-defined objectives.
2.5.2 Project managers
Project managers manage the activities and resources allocated to projects in a cohesive, efficient
manner and also administer and execute engineering and technology projects (including control
p
Health & Safety
Source: Contractor Health and Safety Requirements.pdfTitle: Contractor Health and Safety Document Identifier: 32-136
Requirements
SM/EDC/Formatted 08.09.2016 Document Template 32-4 Rev 9
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
. Introduction ............................................................................................................................... 4
2.1 Scope ............................................................................................................................... 4
2.1.1 Purpose ................................................................................................................. 4
2.1.2 Applicability ........................................................................................................... 5
2.1.3 Effective date ......................................................................................................... 5
2.2 Normative/Informative References ................................................................................... 5
2.2.1 Normative .............................................................................................................. 5
2.2.2 Informative............................................................................................................. 6
2.3 Definitions ........................................................................................................................ 6
2.4 Abbreviations ................................................................................................................. 11
2.5 Roles and Responsibilities ............................................................................................. 12
2.6 Process for Monitoring .................................................................................................... 14
2.7 Related/Supporting Documents ...................................................................................... 15
2.8 Statutory/Non-statutory Appointment .............................................................................. 15
3.1 Material and Equipment .................................................................................................. 15
3.2 Risk Assessments .......................................................................................................... 15
3.3 Record Keeping .............................................................................................................. 16
3.4 Disciplinary Process ....................................................................................................... 16
3.5 Life-Saving Rules ........................................................................................................... 16
3.6 Health and Safety Behaviour Observations .................................................................... 17
3.7 Incident Investigation ...................................................................................................... 17
3.8 Training .......................................................................................................................... 17
3.9 Health and Safety Representative .................................................................................. 17
3.10 Health and Safety Communication ................................................................................. 18
3.11 Contractor’s Site Facilities .............................................................................................. 19
3.12 Public Safety .................................................................................................................. 19
3.13 Emergency Preparedness .............................................................................................. 19
3.14 Occupational Health and Hygiene .................................................................................. 20
3.15 Auditing .......................................................................................................................... 21
3.16 Inspections ..................................................................................................................... 21
3.17 Transport/Mobile Plant Equipment.................................................................................. 22
3.18 Hazardous Materials/Chemicals Management................................................................ 22
3.19 Machinery, Tools and Equipment ................................................................................... 22
3.20 Explosive-Powered Tools ............................................................................................... 23
3.21 Lifting Equipment ............................................................................................................ 23
3.22 Boilers, Pressurised Systems and Vessels under Pressure ............................................ 23
3.23 Working at Heights ......................................................................................................... 23
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.24 Excavations and Tunnelling ............................................................................................ 24
3.25 Confined Spaces ............................................................................................................ 25
3.26 Danger of Engulfment..................................................................................................... 25
3.27 Barricading ..................................................................................................................... 25
3.28 Explosives ...................................................................................................................... 25
3.29 Demolition Work ............................................................................................................. 26
3.30 Permit to Work................................................................................................................ 26
3.31 Radiography, Ultrasonic or Non-destructive Testing (NDT) ............................................ 26
3.32 Work in Close Proximity to/on Public Roads ................................................................... 26
3.33 Work Stoppage............................................................................................................... 27
3.34 Substance Abuse ........................................................................................................... 27
3.35 Statistical Reporting ....................................................................................................... 27
3.36 Housekeeping ................................................................................................................ 28
3.37 Workplace Signage and Colour Coding .......................................................................... 28
3.38 Personal Protective Equipment (PPE) ............................................................................ 29
3.39 Safety, Health and Environment (SHE) Specification ..................................................... 29
3.40 Safety, Health and Environment (SHE) Plan .................................................................. 30
3.41 Safety, Health and Environment (SHE) File .................................................................... 30
3.42 Hours of Work ................................................................................................................ 30
3.43 SHE Recognition and Reward System ........................................................................... 31
3.44 Environmental Care ........................................................................................................ 31
3.45 Unlawful Orders .............................................................................................................. 31
3.46 Section 37(2) Agreement ................................................................................................ 31
3.47 Security .......................................................................................................................... 32
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Eskom is committed to safeguarding its contractors (principal contractors, appointed contractors,
suppliers, vendors, service providers and consultants) and the environment against undesired
exposure to its operations, which is in line with its Safety, Health, Environmental and Quality
practical occupational health and safety risks to which contractors are exposed and to take the
appropriate measures that are necessary to prevent any incidents, injuries or environmental
damage resulting from accidental exposure.
The term “contractor requirements” means a comprehensive documented prerequisite of the
imperative safety, health and environmental requirements for a contract or project.
taking measures to ensure contractor health, safety and environment during their activities/services
to prevent any injury to employees and/or other people and members of the public, or damage to
the environment. Each contractor is responsible for ensuring that its employees and the
employees of any appointed contractors comply with all the applicable occupational health and
safety legislative requirements and the policies and procedures of Eskom.
specialised activity or operation. In such a situation, contractors shall be responsible for
developing their safety, health and environmental plans/procedures/manuals/work instructions to
adequately address these specialised activities and scope of operation.
2.1.1 Purpose
aspects for the purposes of contractor health and safety conformity and standardisation.
Eskom’s contractors have the fundamental accountability and responsibility for the on-site safety
and health of people, and environmental protection in their activities, services, products and work.
contractors comply with all the occupational safety, health, and environmental (SHE) statutory
requirements and the policies and procedures of Eskom Holdings SOC Limited.
The contractor’s SHE management system must demonstrate compliance with the level
appropriate to the service provided and with the applicable legal requirements. The contractor and
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
its employees must be able to carry out their work safely, using the correct procedures for the
safety of plant, equipment and substances, by employing safe systems of work, and providing
adequate instruction, training and supervision for all employees.
[3] 32-727: Safety, Health, Environment, and Quality Policy
[4] 32-726: SHE Requirements for the Eskom Commercial Process
[5] 240-62196227: Life-Saving Rules Standard
[6] 32-245: Waste Management Procedure
[7] 32-477: Safety, Health, and Environment Training and Development
[8] 32-524 Developing Health & Safety Specifications
[9] 32-529: Occupational Health and Safety Risk Management Process
[10] 32-407: Behavioural Safety Observations
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
[11] 32-123: Emergency Planning
[12] 32-124: Eskom Fire Risk Management
[13] 32-108: Firefighting Organisation
[14] 32-37: Substance Abuse Procedure
[15] 32-95: Environmental, Occupational Health and Safety Incident Management Procedure
[16] 32-418: Working at Heights Standard
[17] 32-520: Occupational Health & Safety Risk Assessment Procedure
[18] 32-345: Eskom Vehicle Safety Specification
[19] 32-1112: Eskom Disciplinary Code (Standard)
[20] 32-1113: Eskom Disciplinary Procedure
[21] 32-1034: Eskom Procurement and Supply Chain Management Procedure
[22] 240-62946386: Vehicle and Driver Safety Management Procedure
[23] 240-44175038: Control of Non-Conforming Product or Service Procedure
[24] 240-46569633: Professional and Statutory Registration for Construction Project Managers and
[25] Project and Construction Management Professions Act, 2000 (Act No. )
[26] National Environmental Management Act, 1998 (Act No. )
[27] National Environmental Management: Waste Act, 2008 (Act No. )
[28] All relevant South African legislation (at national, provincial and municipal level)
[29] Occupational Health and Safety Act, 1993 (Act No. ), and regulations.
2.2.2 Informative
NOTE: the following is a list of documents that can be used as a guide in order to meet legal and Eskom requirements.
[1] 240-84520108: Public Safety Standard
[2] 32-726: SHE Requirements for the Eskom Commercial Process
[3] 32-303: Requirements for the Safe Processing, Storage, Removing and Handling of Asbestoscontaining Materials, Equipment and Articles Procedure
[4] 240-46569633 Professional and Statutory Registration for Construction Project Managers and
2.3 Definitions
NOTE: where there are no listed Eskom definitions, the definitions listed in the Occupational
Health and Safety Act, 1993 (Act No. ) (OHS Act), or its regulations should be referred
to.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.1 Agent: (OHS Act) means any person who acts as a representative for a client.
2.3.2 Baseline risk assessment: means the OHS hazards and risks that are identified and
assessed before the inception of a new project and the commencement of operations. The
baseline risk assessment shall include both routine and non-routine tasks.
2.3.3 Client: means the Eskom representative (Internal – Asset Owner), also referred to as the
contract administrator/custodian or agent or project manager (as defined in the contract).
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
ii. checks and approves a design;
iii arranges for a person at work under his or her control to prepare a design, including an
employee of that person where she or he is the employer; or
iv designs temporary work, including its components;
b) an architect or engineer contributing to, or having overall responsibility for a design;
c) a building services engineer designing details for fixed plant;
d) a surveyor specifying articles or drawing up specifications;
e) a contractor carrying out design work as part of a design and building project; or
f) an interior designer, shop-fitter or landscape architect.
2.3.13 Duty of care to the environment: anyone who causes or has caused or may cause
significant pollution or degradation of the environment must take reasonable measures to
prevent such pollution or degradation from occurring, continuing or recurring. If such harm
to the environment is authorised by law or cannot reasonably be avoided or stopped, such
person must minimise and rectify such pollution or degradation of the environment.
2.3.14 Employee: means, subject to the provisions of subsection (2), any person who is employed
by or works for an employer and who receives or is entitled to receive any remuneration or
who works under the direction or supervision of an employer or any other person.
2.3.15 Employer: means, subject to the provisions of subsection (2), any person who employs or
provides work for any person and remunerates that person or expressly or tacitly
undertakes to remunerate him/her, but excludes a TES (ex labour broker) as defined in
section 1(1) of the Labour Relations Act 1956 (Act No. ).
2.3.16 Environment: means –
a) the land, water, and atmosphere of the earth;
b) micro-organisms and plant and animal life; and
c) any part or combination of (a) and (b) and the interrelationships among and between them,
and the physical, chemical, aesthetic and cultural properties and conditions of the foregoing
that influence human health and well-being.
2.3.17 Eskom requirements: mean the Eskom requirements flowing from directives, policies,
standards, procedures, specifications, work instructions, guidelines or manuals.
2.3.18 Fall protection plan: means a documented plan of all the risks relating to working from an
elevated position, considering the nature of the work undertaken, and setting out the
procedures and methods to be applied in order to eliminate the risk.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.19 Hazard: means a source of, or exposure to, danger.
2.3.20 Hazard identification: means the identification and documenting of existing or expected
hazards to the health and safety of persons, which are normally associated with the type of
construction work being executed or to be executed.
2.3.21 Health and safety file: means a file or other record in permanent form, containing the
information required as contemplated in these regulations (the Construction Regulations).
2.3.22 Health and safety specification: means a document specification of all health and safety
requirements pertaining to associated works on a construction site, so as to ensure the
health and safety of persons.
2.3.23 Health and safety requirements: mean the comprehensive health and safety
requirements for a contract, project, site and scope of work. This specification is intended
to ensure the health and safety of persons, both workers and the public, and the duty of
care to the environment. The health and safety requirements must be specific to each
contract, project, site and scope of work.
2.3.24 Internal: means an Eskom department that performs work for another Eskom department.
2.3.25 Joint venture: means a strategic alliance between two or more parties to undertake
economic activity together. The parties agree to create a new entity (incorporated or
unincorporated) by each party’s contribution of equity, and they then share in the profits,
losses and control of the enterprise. The venture may be for one specific project only or a
continuing business relationship.
2.3.26 Life-Saving Rules: mean the set of Eskom safety rules that, if not adhered to, have the
potential to cause serious harm to people.
2.3.27 Maintenance: (maintenance management) means the schemes that can be based on a
number of techniques to focus on those parts which deteriorate and need to be maintained,
such as the following:
a) Preventive – planned maintenance which involves replacing parts and consumables or
making necessary adjustments at pre-set intervals, so that no hazards are created by
component deterioration or failure.
b) Condition-based –involves monitoring the condition of critical parts and carrying out
maintenance whenever necessary to prevent hazards which could otherwise occur.
c) Breakdown-based –the maintenance carried out when faults or failures have occurred. This
is acceptable if the failure does not present an immediate hazard and can be corrected
before the risk is increased.
2.3.28 Mandatary: includes an agent, a contractor, or an appointed contractor for work, but
without derogating from his/her status in his/her own right as an employer or user.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.29 Medical Certificate of Fitness: (OHS Act) means a certificate valid for one year, issued in
terms of the regulations by an occupational health practitioner who shall be registered with
the Health Professions Council of South Africa.
2.3.30 Medical surveillance: (OHS Act) means a planned programme of periodic examination
(which may include clinical examinations, biological monitoring or medical tests) of
employees by an occupational health practitioner or, in prescribed cases, by an
occupational medicine practitioner.
2.3.31 Method statement: (OHS Act) means a written document detailing the key activities to be
performed in order to reduce, as reasonably as practicable, the hazards identified in any
risk assessment.
2.3.32 Mine
a) when used as a noun, means –
i. any borehole or excavation, in any tailings on or in the earth, including the portion of the
earth that is under the sea or other water, made for the purpose of searching for or winning
a mineral, whether it is being worked or not; or
ii. any other place where a mineral deposit is being exploited, including the mining area and
all buildings, structures, machinery, mine dumps, access roads or objects situated on or in
that area that are used or intended to be used in connection with searching, winning,
exploiting or processing of a mineral, or for health and safety purposes. But, if two or more
excavations, boreholes or places are being worked in conjunction with one another, they
are deemed to comprise one mine, unless the Chief Inspector of Mines notifies their
employer in writing that those excavations, boreholes or places comprise two or more
mines; or
iii. a works; and
(b) when used as a verb, the making of any excavation or borehole referred to in paragraph (a)(i),
or the exploitation of any mineral deposit in any other manner, for the purpose of winning a
mineral, including prospecting in connection with the winning of a mineral.
2.3.33 Organisation: may be defined as a group of individuals (large of small) which is co-
operating under the direction of executive leadership in the accomplishment of certain
common objects.
2.3.34 Project: means an activity or a group of activities which has a defined start and end date, a
defined scope and a defined sum of money allocated to complete the activities.
2.3.35 Project manager/leader: means the person who has the responsibility for the successful
planning and execution of a project. The project manager must satisfy the certification
requirements set by the South African Council for the Project and Construction
Management Professions. Note: the project manager is the duly authorised Eskom
representative who acts on Eskom’s behalf as the administrating officer for the purposes of
the contract. (The term “project manager” in the context of this procedure should be used in
its broader sense and should not be restricted to the designation of project manager in any
specific work environment.)
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.3.36 Risk assessment: (OHS Act) means a programme to determine any risk associated with
any hazard at a construction site in order to identify the steps that have to be taken to
remove, reduce or control such hazard.
2.3.37 Service provider: means any private person or legal entity that provides any service(s) to
2.3.38 Subsidiary: means an enterprise controlled by another (called the parent) through the
ownership of greater than 50% of its voting stock.
2.3.39 Task: means a segment of work that requires a set of specific and distinct actions for its
completion.
2.3.40 Toolbox talks: where the team leader, after conducting pre-task planning, shares all the
tasks at hand and discusses task allocation, the identified risks and the control measures
with all his/her team members on site before commencing a specific task and documenting
the agreed strategy. (This shall be done to ensure a common understanding of the tasks,
risks and control measures required.)
2.3.41 The Act: (OHS Act) means the Occupational Health and Safety Act, 1993 (Act No. ), as amended, and the regulations made under it.
2.3.42 Visitor: means any person visiting a workplace with the knowledge of, or under the
supervision of, an employer or who is not providing a specific service to Eskom.
2.4 Abbreviations
MHS Act Mine Health and Safety Act, 1996 (Act No. )
NEMA National Environmental Management Act, 1998 (Act No. )
OHS Act Occupational Health and Safety Act, 1993 (Act No. )
property and the environment.
The contractor, being an employer in his/her own right, is still required to abide by Eskom’s SHE
requirements, as well as the relevant safety, health and environmental legislation.
manner and also administer and execute engineering and technology projects (including control
plant) within cost, quality and time.
Eskom: Project health and safety manager/practitioner
to advise, assist and support the project manager, supervisor and project engineer with managing
the health and safety issues on the project, which include ensuring proper co-ordination among the
various contractors. The health and safety manager/practitioner shall also be responsible for
assisting with the development of site- and project-specific health and safety specifications and for
ensuring that health and safety specifications are issued with the enquiry documents and that the
contractor’s health and safety plans are submitted, evaluated and approved. He/she shall be
responsible for auditing these plans and ensuring they comply with legal requirements.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.5.3 Contractor health and safety officer
Where appointed, a contractor’s health and safety officer shall be competent to perform the
required duties contemplated in the OHS Act and contained in the project requirements.
2.5.4 MHS Act
of the contracted work. The contractor’s health and safety officer shall assist and support the
contractor’s construction manager to ensure that the organisation’s health and safety
responsibilities are fulfilled and that there is compliance with the health and safety specifications
and the health and safety plan.
of work being performed shall be taken into consideration.
All contractor health and safety officers must liaise closely with Eskom’s OHS departments for the
2.5.5 OHS Act
In terms of Construction Regulation 8(5) a contractor must, after consultation with the client and
having considered the size of the project, the degree of danger likely to be encountered or the
accumulation of hazards or risks on the site, appoint in writing a full-time construction health and
safety officer to assist with controlling the health and safety-related matters on the site: provided
that, where the question arises as to whether a construction health and safety officer is necessary,
the inspector makes thedecision.
him/her to carry out his/her tasks efficiently, and must be registered with a statutory body approved
by the Chief Inspector.
The contractor’s health and safety officer shall assist with the control of all safety-related matters at
the sites, and give inputs at the design stage.
of the work being performed shall be taken into consideration.
All contractor health and safety officers must maintain constant liaison with Eskom’s divisional
health and safety departments and co-operate with the health and safety managers/practitioners
responsible for providing a health and safety service.
2.5.6 Contractors
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
and/or responsibilities.
2.5.7 Employees
Section 14 of the OHS Act has reference; contractor employees are responsible for their own
health and safety, as well as the health and safety of their colleagues while at work. The
client/employer/contract manager cannot be expected to be totally responsible if any of their
employees do not comply with legislative and Eskom health and safety requirements. Employees
will be held jointly responsible where situations so require. In their own interests, contractor
employees must be aware of the responsibilities of their contractor management.
2.5.8 Construction professional registration
The legislation and the SACPCMP’s publications direct that all persons assuming responsibility for
construction project management, construction management and construction health and safety
should be registered as professionals in the appropriate category with the SACPCMP in order to
comply with the legal and statutory requirements in South Africa.
2.5.9 Joint ventures
the contractors shall also apply to the joint venture partner, therefore each contractor shall be
responsible and accountable for its own organisation’s health and safety. All organisations shall be
signatories to the required section 37(2) agreement of the OHS Act.
agreement, the single business entity must fulfil all the SHE requirements.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
2.7 Related/Supporting documents
appointments must be made using Eskom Standard 32-296: Integrated SHE Organisation, Roles
and Responsibilities, and Statutory Appointments.
(in terms of the BU’s Legal Appointments Manual, where compiled). All appointments/copies made
by the contractor shall be included in the health and safety file, and be available to the client/agent.
the manufacturer and legislative requirements. Where reclaimed material is authorised to be used,
it shall meet the manufacturer’s safety requirements, as if it were new.
Cognisance of the health and safety factor during work: the health and safety of such
material/equipment shall be factored in, to ensure that it remains safe for use by others at a time
after the completion of the contract. Eskom and/or the designer/agent/client shall determine the
acceptability of workmanship.
3.2 Risk assessments
In terms of section 8(2)(d) of the OHS Act and section 9 of the CR for an employer, it is a legal
requirement to carry out risk assessments to establish what hazards to the health and safety of
persons are attached to any work which is performed, any article or substance which is produced,
processed, used, handled, stored or transported, and any plant or machinery which is used in
his/her business and he/she shall, as far as is reasonably practicable, further establish what
precautionary measures should be taken with respect to such work, article, substance, plant or
machinery in order to protect the health and safety of persons and shall provide the necessary
means to take such precautionary measures.
estimate of the extent of the risks involved, taking into account whatever precautions are already
being taken.
Risk assessment is essentially a three-stage process to –
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
activity, or any new process, activity or operation, should be subjected to a risk assessment and, if
new hazards come to light during the work process, these should also be subjected to risk
assessments.
supervisors and employees to assess any inherent risks which might have been overlooked during
the initial risk assessment or any changes which might have occurred in a period of absence, in
particular if a job or task is extended over a day or halted owing to inclement weather.
3.3 Record keeping
by any party who is entitled to audit or inspect the project. SHE files should be handed over by the
contractor to the client or asset owners for archiving on completion of the project.
3.4 Disciplinary process
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.6 Health and safety behaviour observations
courses. Such training shall be conducted by contractor management, construction safety officers
or construction supervisors.
Induction training is an opportunity to inform persons of the organisation’s health and safety
requirements, not only in the organisation’s offices but also at the workplaces.
3.8.2 Site-specific awareness training
commences work on the project, that the supervisor in control with responsibility for the employee
has informed the employee of his/her scope of authority for that site/workplace.
3.9 Health and safety representative
The requirements of sections 17 and 18 of the OHS Act shall be complied with. Where contractors
perform operational work, they shall appoint health and safety representatives for each workplace.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
of the nature and risk level of work in terms of sections 17 and 18 of the OHS Act.
3.10 Health and safety communication
changing behaviour or influencing decision-making. Communication is a process which allows
information to be shared and exchanged, using different methods that sometimes require
feedback.
3.10.1 SHE Committees
Statutory SHE Committees shall be established in terms of sections 19 and 20 and General
Administrative Regulation 5 of the OHS Act and Eskom’s requirements.
as making recommendations to an employer on health and safety matters, incident investigations
and any other health and safety-related matters as such committees may prescribe.
meetings, and the minutes of these meetings must be available on site at all times.
NOTE: this project meeting does not replace or act as a substitute for the required SHE Committee
meeting.
3.10.2 Toolbox talks
employees about the hazards and risks they will be exposed to when they perform work. Use
toolbox talks to create awareness among the employees to recognise and avoid unsafe conditions.
management and other employees can take actions to correct them. Employees will learn to avoid
the potentially hazardous situations discussed during toolbox talks as well as become able to
identify hazards and correct those hazards prior to starting a task/job if there are hazards present.
Toolbox talks are an effective way of fulfilling one’s legal requirements.
3.10.3 General SHE communication
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
use their facilities, must ensure that adequate facilities are provided for their employees on the
site/project.
When such facilities are provided, they must comply with the Facilities Regulations, SANS 10400
standard A to XA and CR 30.
3.12 Public safety
members of the public against their activities during the project, without damaging Eskom’s name
and reputation.
3.13 Emergency preparedness
of the organisation so as to achieve a quick response and recovery and return the situation to
normal in the shortest possible time and the most cost-effective way.
3.13.1 Fire safety
Regulations, SANS 10400 (T regulations).
3.13.2 First-aid planning and emergency care
meet the first-aid requirements of General Safety Regulation 3:
“An employer shall take all reasonable steps that are necessary under the circumstances, to
ensure that persons at work receive prompt first aid treatment in the case of injury or emergency.”
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
Eskom has established a contract with Netcare 911 for all its employees, contractors and their
employees for emergency medical assistance while on duty anywhere in South Africa. The
telephone number is 086 1237 566 (0861 2ESKOM).
3.13.3 Emergency escape routes
The SANS 10400 T regulations provide that escape routes have to be incorporated in buildings.
were unable to evacuate the burning building. This is attributed to there being no escape routes
and/or, if there were such routes in the building, egress was restricted because the routes were
being used as storage areas.
3.14 Occupational health and hygiene
3.14.1 Medicals
requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) and is
an essential component of an Occupational Health and Safety programme.
Where there is a possibility of occupational hygiene stressors (for example noise, dust,
illumination, heat and cold stressors, ergonomics, vibration (hand, arm and whole body, etc.),
health risk assessments must be carried out to determine whether there is any possible worker
exposure. Records of all these assessments should be documented and kept up to date.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
less than 6 oC for cold. Any exposure beyond these limits can lead to organ damage/failure and
death.
3.14.4 Asbestos control management
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.17 Transport/Mobile plant equipment
OHS Act Construction Regulation 23, NRTA, the Mine Health and Safety Act and the National
3.18 Management of hazardous materials/chemicals
all persons and the environment. Various requirements for the handling and storage of hazardous
materials and chemicals are listed in the OHS Act.
used machinery or using unsafe machinery can cause serious harm and/or damage, it is important
to ensure that all mechanical equipment is safeguarded in order to protect the health and safety of
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
persons who may be exposed to such mechanical equipment, and also to ensure that competent
persons operate the machinery.
3.20 Explosive-powered tools
includes all the lifting machine codes as listed in the regulations and the national code of
practice for the training providers of lifting machine operators).
When working in close proximity (with tower cranes) to power lines, the contractor shall apply for a
permit. See the Eskom Plant Safety Regulations and/or Operating Regulations for High-Voltage
Systems and Electrical Machinery Regulations 19(4) and 19(5) of the OHS Act.
3.22 Boilers, pressurised systems and vessels under pressure
compressors, mobile compressors and pressure vessels, to fire extinguishers and all piping
associated with such equipment.
rescue plans must be compiled and implemented. The Occupational Health and Safety Act places
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
duties on employers, employees and anyone who controls the way that work at height is
undertaken.
reasonably practicable, any person from falling a distance liable to cause personal injury. Where a
fall from any height could result in harm, an effective means of fall prevention has to be put in
place. You are required to take practicable steps to ensure your safety and the safety of others, as
well as not knowingly exposing yourself or others to harm.
3.23.2 Floor and wall openings
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.24.2 Tunnelling
excavating or tunnelling is taking place or work is being done in them. Ground collapse is
extremely hazardous, especially where people are working inside a tunnel, and usually results in
serious injuries and fatalities.
Any contractor performing tunnelling activities shall comply with Construction Regulation 15, which
then refers to the Tunnelling Regulations published under the Mine Health and Safety Act, 1996
(Act No. ), as amended, and regulation 15 of the Construction Regulations.
3.25 Confined spaces
being discharged, unless that person is issued with an appropriate safety belt/harness fitted with a
rope, where at least one other person who has been trained in rescue is available and observing.
requirements of the Explosives Regulations of the OHS Act, the Mine, Health and Safety Act, 1996
(Act No. ) and the Explosives Act, 1956 (Act No. ).
Explosives Regulation 13(4) of the OHS Act and SANS 100228 Code of Practice for the
Identification and Classification of Dangerous Substances and Goods for Transport (published by
the South African Bureau of Standards).
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
competent persons.
All demolition work must be planned, and all role players must be involved in the planning; this
includes making thorough risk assessments.
adhered to.
Where structures (power lines, poles, lattice towers, etc.) have to be demolished, this shall be done
in terms of Eskom requirements (task manuals).
All demolition work shall be carried out in accordance with Construction Regulation 14 Demolition
potentially hazardous.
that all foreseeable hazards have been considered.
dropped or when the work introduces new hazards. Examples are entry into vessels, hot work and
pipeline breaking.
If the type of work requires working with Eskom power systems/networks (low voltage, medium
voltage or high voltage), then the appropriate permits will be required.
3.31 Radiography, ultrasonic or non-destructive testing (NDT)
persons carrying out the work but also to the motorists, where the persons working do not take
care of their own safety and ignore any rules and regulations. It is imperative to comply with all the
requirements of the National Road Traffic Act when work is performed. For additional worker
safety, organisations should enhance the national requirements.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.33 Work stoppage
Section 8(2)(f) and Construction Regulation 5(q) of the OHS Act have clear requirements for not
permitting an employee to work unless adequate precautionary measures are taken and for
stopping any work which is not in accordance with health and safety plans.
may pose an imminent threat to the health and safety of an individual or of creating a risk of
degrading the environment. This includes any unauthorised work or service performed by, or
legally or contractually non-compliant acts or omissions by, any contractor contracted to work at
that site.
Eskom standard SHE Requirements for the Eskom Commercial Process (32-726).
incidents and when driving vehicles. Eskom is therefore entitled to take reasonable steps to ensure
that intoxicated persons are identified and prevented from entering Eskom’s premises, or working
on any of Eskom’s equipment.
General Safety Regulation 2A is clear on the legal stance regarding intoxication.
either or both substances and are not permitted to be under the influence of or consume
intoxicating substances while at/in the workplace. There is a provision regarding the taking of
medication.
The permissible blood level of alcohol and/or drugs is 0%.
3.35 Statistical reporting
There is a legal requirement in terms of the Occupational Health and Safety Act, 1993 (Act No. ) (General Administrative Regulations) that certain serious incidents shall be reported to the
the progress and current status of the strategies, processes and activities used by Eskom to
control risks to health and safety.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
employer:
superfluous material.
of refuse bins, store areas comply with good storage practices and stacking is done in
accordance with accepted stacking practices.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
present or the equipment is a requirement. For example, if the sign indicates that hearing
protection is required, which is now no longer needed although the sign is still in place, hearing
protection shall be worn.
All signs and notices shall conform to the requirements of SANS 1186 in terms of standard signs,
safety colours, geometric forms and dimensions.
appropriate colours of SANS 10140 and 1091.
3.38 Personal protective equipment (PPE)
workplace to protect the worker from risks and hazards, and includes but is not limited to
equipment and clothing worn on the body as well as equipment used to determine, measure or
indicate danger. The objective of protective clothing is to prevent exposure or injury to any body
parts exposed to operations.
to the human body. Employees must be trained on the limitations of PPE and on how to fit PEE
correctly.
General Safety Regulation 2 of the OHS Act provides for employers to make the workplace safe
and where required to provide appropriate PPE.
3.39 Safety, Health and Environment (SHE) Specification
NOTE: this paragraph is included for information sharing only. The guideline for the compilation of
SHE specifications is contained in the Eskom document 32-524 “Developing a Construction Safety,
Health, and Environmental Specification”.
various project tasks have to be defined, the associated hazards identified, and the associated
risks listed.
factors relating to health and safety issues in order to assist the contractor to provide adequately
for the health and safety of employees on site. Should additional risks be identified later by Eskom
or its agents/clients, these will be included in the contract works information and/or relayed at the
clarification or negotiation meeting.
Reg No 2002/015527/30.
Contractor Health and Safety Requirements Unique Identifier: 32-136
Revision: 4
Page:
3.40 Safety, Health and Environment (SHE) Plan
safe work procedures to mitigate, reduce or control the hazards identified. It is specific to each
project undertaken and site where work is done, is compiled by the contractor and appointed
contractor, and must be approved by the client/agent prior to the commencement of any activities
on a project. The contractor and the client/agent must both be signatories to the health and safety
plan once it has been negotiated, agreed upon and accepted. This plan has to be regularly
updated to take account of any changes in project scope and unanticipated conditions.
accepted and signed by an Eskom SHE functionary, and approved and signed by the contract
custodian. The main contractor is required to evaluate its appointed contractors and proof of
compliance shall be included in the main contractor’s safety file. The contractor shall not be
allowed to commence work on site until the health and safety file has been accepted and
approved.
3.41 Safety, Health and Environment (SHE) File
health and safety management system for the project and the site during the project, and all
information relating to the post-project phase after handover to the client.
threaten the health and safety of the employee or others.
Section
Source: Contractor Health and Safety Requirements.pdfOccupational hygiene is the identification, evaluation and control of those environmental factors,
exposure to its operations, which is in line with its Safety, Health, Environmental and Quality
to achieve specific goals. A project is a temporary endeavour with a defined beginning and end
while honouring the preconceived constraints. The primary constraints are scope, time, quality and
plant) within cost, quality and time.
Description
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)the purpose of combining their expertise, property, capital, efforts, skill and knowledge in an activity for the execution of a contract.
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)General
Open to natural or juristic persons, excluding those listed in the Register for Tender Defaulters or List of Restricted Suppliers.
Conflict Of Interest
Bidder, directors, shareholders, or controlling persons must not be state employees unless disclosed. No undisclosed relationships with ESKOM officials.
Ethical Standing
No history of restrictive practices, corruption, or fraudulent bidding behavior.
Compliance
Must certify that all information provided is true and complete.
Technical Specifications
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Supply chain management system should
This declaration prove to be false.
.................................... .....................................................
Signature Date
.................................... ......................................................
Position Name of bidder
Requirements
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)3.3 The bidder has arrived at the accompanying bid independently from, and without consultation, communication, agreement or arrangement with any competitor. However, communication between partners in a joint venture or consortium will not be construed as collusive bidding.
Submission Guidelines
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)Submit a signed Annexure B: Acknowledgement Form for Eskom OHS legal and other requirements. Required details: Company/Supplier Name, Name of Authorised Person (CEO/Director/Managing Director), Signature, Date, Witness 1, Witness 2. Non-compliance with submission of this form may disqualify the bid.
Evaluation Criteria
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)General
Open to all suppliers/contractors who can meet the technical and OHS requirements.
OHSAlignment
Must align company processes with Eskom’s OHS policies, procedures, and standards post-contract award.
Past Experience
May be required to provide testimonials/references and contact details for similar past work (including prior work with Eskom).
Legal Compliance
Must comply with all applicable statutory OHS requirements.
Compliance Requirements
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdf (unknown)Health & Safety
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdfContractual Terms
Source: ANNEXURE B ACKNOWLEDGEMENT OF ESKOM RULES.pdfDescription
Source: SECTION 37.2 AGREEMENT.pdfScope: Purchase, collect, and removal of a 5 MVA vandalized transformer (serial number 73151) located at Nantes Substation. Work must comply with the Occupational Health and Safety Act, 1993, and Eskom’s SHE specifications.
Important Dates
Source: SECTION 37.2 AGREEMENT.pdf (unknown)Closing date: 31 May 2023
Evaluation Criteria
Source: SECTION 37.2 AGREEMENT.pdf (unknown)Legal Status
Contractor/supplier must be a legally registered entity with authority to enter into binding agreements.
Safety Compliance
Must demonstrate compliance with the OHS Act and Eskom's SHE requirements.
Technical Capacity
Must have the technical and logistical capability to handle the purchase, collection, and removal of the transformer.
Authorization
Signatories must have the requisite authority to represent their organizations.
Technical Specifications
Source: SECTION 37.2 AGREEMENT.pdf (unknown)Scope: Purchase, collect, and removal of a 5 MVA vandalized transformer (serial number 73151) located at Nantes Substation. Compliance with Occupational Health and Safety Act, 1993, is mandatory for all work and machinery/plant used.
Compliance Requirements
Source: SECTION 37.2 AGREEMENT.pdf (unknown)Mandatory compliance with the Occupational Health and Safety Act, 1993 (Act No. 85 of 1993). Contractor must sign a Section 37(2) Agreement, acknowledging their role as an employer and commitment to adhere to the Act. SHE (Safety, Health, and Environment) specifications for the project must be followed as provided by Eskom.
Health & Safety
Source: SECTION 37.2 AGREEMENT.pdfContractor must: Acknowledge in writing (via Section 37(2) Agreement) that they are an employer under the Occupational Health and Safety Act, 1993. Ensure all work, machinery, and plant used comply with the Act. Adhere to Eskom’s provided SHE (Safety, Health, and Environment) specifications for the project. Ensure all employees follow the Act’s provisions.
Contractual Terms
Source: SECTION 37.2 AGREEMENT.pdf (unknown)Contract is governed by a Section 37(2) Agreement under the Occupational Health and Safety Act. Key terms: Any variation, modification, or waiver must be in writing and signed by both parties. Changes apply only to the specific instance and purpose stated. Both parties must sign the agreement, warranting they have the authority to do so. Witnesses are required for signatures.
Description
Source: eAuction User Guide for Prospective Bidders.pdfThe tender involves the purchase, collection, and removal of a 5 MVA vandalized transformer (serial number 73151) from Nantes Substation. The process is conducted via Eskom’s eAuction platform, which facilitates competitive bidding between buyers and sellers across different locations. Auctions can be Open (public), Standard (Eskom selling), or Reverse (Eskom buying). Bidding is dynamic, with fixed increments and automatic time extensions to ensure fairness.
Submission Guidelines
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)Submit bids via the Eskom eAuction portal: https://eauction.eskom.co.za. Registration required: each bidder must have a unique company code (emails to primary user only) and individual login credentials. Passwords must be >8 characters, with mixed case, numbers, and special characters. Bids are financially binding. Auction end times may extend if bids are placed near closing to allow fair competition. Winning bidders are notified via email and contacted by the procurement officer for contract finalization. Monitor bids in real-time; refresh screens regularly to track competition.
Evaluation Criteria
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)To be eligible to participate in this tender, applicants must have a valid company security code, register on the Eskom eAuction site, and maintain a valid BBBEE score rating. Companies must also have the necessary technical and financial capabilities to purchase, collect, and remove the 5 MVA vandalized transformer.
Technical Specifications
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)Scope: Purchase, collect, and remove a 5 MVA vandalized transformer (serial number 73151) from Nantes Substation. Process: Conducted via Eskom eAuction system, supporting Open, Standard, or Reverse Auctions. Bidding dynamics: Standard auctions (Eskom selling) require higher bids; Reverse auctions (Eskom buying) require lower bids. Bid increments are fixed to prevent marginal price differences. Auction duration: 1–10 days, with automatic extensions if bids are placed near the end time.
Pricing Schedule
Source: eAuction User Guide for Prospective Bidders.pdfStarting bids are set at Eskom’s reserve value. Bidding follows fixed increments, with prices increasing (Standard Auction) or decreasing (Reverse Auction) based on auction type. Auction duration ranges from 1 to 10 days, with end times extending if bids are placed near closing.
Financial Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)Starting bids are set at Eskom’s reserve value. Bids must adhere to fixed increments (displayed on the bidding screen). In Reverse Auctions (Eskom buying), each subsequent bid must be lower than the previous. Bids are financially binding commitments to deliver at the offered price.
Compliance Requirements
Source: eAuction User Guide for Prospective Bidders.pdf (RFP)B-BBEE: Companies must maintain a valid B-BBEE score rating. Auction awards are influenced by both price and B-BBEE rating. User Access: Each bidder must register with a unique company code (provided via email to the primary user) and individual login credentials. Company codes must not be shared; Eskom is not liable for unauthorized use.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Nantes Substation - Polokwane - Polokwane - 0699
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
29 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Specific Goals