Submissions closed on 30 January 2026. The information below is archived for reference.
Our AI analyzes thousands of tenders and finds the ones YOUR company can actually win
AI Match Scoring
Get a compatibility score for every new tender
Instant Notifications
Get alerted when 85%+ matches appear
Gap Analysis
See exactly what you need to qualify
B-BBEE Matching
Tenders matched to your certification level
Province Targeting
Only see tenders in your regions
Document Readiness
Know if you have required docs before using AI assistance
Organization
National Lotteries Commission
Province
Gauteng
Closed
30 January 2026
Don't worry! Here are similar opportunities still open for submission
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: Final TOR_NLC2025-021.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
Important Dates
Source: Final TOR_NLC2025-021.pdfClosing date: 30 January 2026 at 11:00 SAST. Compulsory briefing session: 20 January 2026 11:00 (at 333 Grosvenor Street, Block D, Hatfield Gardens, 0028). Validity period of bid: 120 business days from closing date. No other dates were provided.
Contact Information
Source: Final TOR_NLC2025-021.pdfSupply Chain Management – NLC
Telephone: 012 432 1470 (SCM) / 012 432 1309 (technical)
Email: [email protected]
Address for hard‑copy submission: Supply Chain Management, NLC (exact postal address not specified in the extract).
Submission Guidelines
Source: Final TOR_NLC2025-021.pdfEvaluation Criteria
Source: Final TOR_NLC2025-021.pdfPhase 1 – Tender closing/opening: verify submission date/time and PDF format. Phase 2 – Administrative compliance: check that all returnable documents, signed resolution, pricing attachment, tax compliance PIN, and CSD registration are present. Phase 3 – Mandatory compliance: JV agreement (if applicable), Declaration of Interest (SBD 4), OEM certification, attendance certificate for compulsory briefing, completed price schedule. Phase 4 – Technical evaluation: score against a 0‑5 matrix (Excellent 5, Good 4, Acceptable 3, Minor 2, Serious 1, Unacceptable 0) for company experience, lead project manager experience, server, switch and storage configuration experience, project plan, and SLA framework. Minimum qualifying score 70 %. Phase 5 – Pricing (80 % of total) – lowest acceptable price receives full points; other bids scored proportionally. Phase 5 – Specific goals (20 %): B‑BBEE points for black ownership, women ownership, youth ownership and disability ownership as per the table. Total score = technical + price + specific‑goal points; highest total wins.
Technical Specifications
Source: Final TOR_NLC2025-021.pdfScope: supply, install, configure, integrate and support a Supermicro‑based high‑availability computing cluster for three years across two sites (head office and DR site). Deliverables: functional HA cluster, project rollout plan, SLA, configuration documentation, sign‑off and close‑out reports. Minimum hardware: Supermicro SYS‑121H‑TNR server with specified CPUs, memory, NVMe SSDs, 25 GbE networking, NVIDIA Spectrum‑2 switches, enterprise‑grade storage platform (≥200 TB usable, scale‑out architecture, ≥60 GB/s aggregate throughput, NVMe, data reduction, HA, replication, security). Services: racking, cabling, OS (Windows Hyper‑V), storage provisioning, switch configuration, replication between sites, project management, training, documentation, in‑country spares, 36‑month warranty/maintenance, 5‑year software licensing. All components must be rack‑mounted, enterprise‑class, and comply with POPIA, ISO 27001 and NLC cybersecurity policies.
Financial Requirements
Source: Final TOR_NLC2025-021.pdfPricing must be submitted as a separate attachment from the technical response, in the format prescribed in Annexure B. Price evaluation follows an 80 % weighting; the lowest acceptable bid receives full points, other bids scored proportionally. Bidders must provide a performance bond/guarantee as required in the contract (not explicitly stated in the extract). Payment terms, warranty extensions and any additional financial guarantees will be detailed in the contract documents.
Compliance Requirements
Source: Final TOR_NLC2025-021.pdfGovernment tenders in the Telecommunications sector represent significant opportunities for South African businesses. The South African government regularly procures goods and services through the eTender portal, making it essential for businesses to stay informed about new opportunities.
Get weekly tender digests and industry insights delivered to your inbox.
Subscribe for Free