Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
OR Tambo International Airport - Kempton Park - Johannesburg - 1627
Organization Type
GOVERNMENT
Published
14 Jul 2026
OCDS Reference
ocds-9t57fa-162368
This tender is for the surface rehabilitation of the lima taxilane at or tambo international airport, issued by the airports company south africa (acsa). IT is a civil services contract using the nec3 term service contract framework, aimed at contractors capable of airport pavement works.
The service is Lima Taxilane Surface Rehabilitation at OR Tambo International Airport, with scope in Part C3 (Service Information) and Part C4 (Site Information).
The contract uses NEC3 Term Service Contract Main Option A (Priced contract with price list); pricing must be submitted in Part C2.
The Contractor must provide a performance bond (Option X13) and may need a parent company guarantee (Option X4), with proforma documents in C1.3c.
Insurance requirements are detailed in Annexure A, covering Employer's property, plant/materials, third-party liability, and employee injury.
The Contractor must comply with the Occupational Health and Safety Act and Compensation for Occupational Injuries and Diseases Act.
After acceptance, the Contractor must contact the Employer's agent within two weeks to arrange delivery of securities, bonds, guarantees, and proof of insurance.
Payment terms: assessments occur between the 1st and 15th of each month, with payments made within 30 days.
Date & Time
Friday, 31 July 2026 - 12:00
Venue
null
Please do not send links when submitting - bids will be disqualified.
Categories
Request for Bid(Open-Tender)
OR Tambo International Airport - Kempton Park - Johannesburg - 1627
14 Jul
2026
Tender Published
Tender was published
31 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf
The Airports Company of South Africa (ACSA) is tendering for the surface rehabilitation of the Lima Taxilane at OR Tambo International Airport in Gauteng. The contract is structured as an NEC3 Term Service Contract with a one-month service period, requiring the contractor to perform all rehabilitation works in accordance with specified service information, site details, and pricing data. The closing date for submissions is July 31, 2026.
Median Estimate
R 4 600 000
Range
Based on Industry avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
A comprehensive guide to civil engineering infrastructure tenders in South Africa. Covers CIDB requirements, major buyers, the tender pipeline, and how civil engineering firms win government work in roads, dams, water, and sanitation.
How small office supplies, stationery, and general goods suppliers use Joint Ventures to win government procurement contracts by combining inventory with B-BBEE credentials.
How the Protection of Personal Information Act affects tender submissions, data handling, and supplier contracts with government. A practical POPIA compliance guide for South African tender bidders covering lawful processing, data subject rights, and consequences of non-compliance.
A meticulously organised tender submission can be the difference between a winning bid and one that hits the rejection pile. Learn how to package, structure, and present your tender response for maximum evaluator impact on South African government contracts.
💡 Want more tendering tips and strategies?
Explore Our BlogAI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)Contact Information
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)Submission Guidelines
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)Evaluation Criteria
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)CIDB contractor grading 4CE or higher; valid tax compliance status; must provide company experience in asphalt construction/rehabilitation for national/provincial roads or airport taxiways/runways; key personnel must have relevant experience and professional registration (ECSA/SACPCMP); must score minimum 70/100 on functionality evaluation; joint ventures must provide consolidated B-BBEE certificate.
Technical Specifications
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)Financial Requirements
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)Compliance Requirements
Source: CIDB Bid document RFQ 73107 .pdf (TENDER)These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
CIDB Bid document RFQ 73107 .pdf
Airports Company South Africa invites tenders for surface rehabilitation of Lima Taxiway at OR Tambo International Airport. Tender reference 73107 requires CIDB grading 4CE or higher, with submission deadline 31 July 2026 at 12:00 via email. Evaluation includes functionality scoring (minimum 70/100) and preferential procurement (80/20 system).
Volume 5 ACSA Lima Project.pdf
This document is a detailed procedural manual for the surface rehabilitation of the Lima Taxiway at O.R. Tambo International Airport. It outlines strict airside safety, security, and operational protocols that the contractor must follow to ensure minimal disruption to airport operations. The work is heavily restricted to night-time hours and requires extensive coordination with airport authorities.
RFQ 73107 Lima_No rates.xlsx
Analysis completed but response format was invalid
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Airports Company of South Africa LimitedContact Person
Lerato Phalo
Phone
010-207-2000
[email protected]
Website
www.acsa.co.za/
Address
O. R. Tambo International Airport, Shop R7, First Floor, Domestic Terminal, O.R. Tambo Airport Rd, O.R. Tambo, Kempton Park, 1627, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
14 Jul 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubDescription
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdfThe project is the Lima Taxilane Surface Rehabilitation at OR Tambo International Airport, executed under an NEC3 Term Service Contract. The contract documents include Part C1 (Agreements and Contract Data), Part C2 (Pricing Data), Part C3 (Employer's Service Information), and Part C4 (Site Information).
Contact Information
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf (unknown)The Employer's agent details are given in the Contract Data. The tenderer must contact this agent within two weeks of receiving the accepted agreement to arrange delivery of required documentation. Specific contact names, emails, or phones are not provided in the extracted text.
Submission Guidelines
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf (unknown)Returnable Documents: The tenderer must submit the completed Form of Offer and Acceptance, including any Schedule of Deviations. The offer must be signed by a duly authorised representative. The tenderer must examine the tender documents listed in the Tender Data and addenda. The offer may be accepted by the Employer signing the Acceptance part and returning a copy before the end of the validity period. After acceptance, the tenderer must within two weeks contact the Employer's agent (details in Contract Data) to arrange delivery of securities, bonds, guarantees, proof of insurance, and other required documentation. Failure to fulfil these obligations constitutes a repudiation of the agreement.
Evaluation Criteria
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf (unknown)Contractor must be a legally registered entity (registration number required). Must have accepted financial capacity to provide required performance bond and insurance coverages. Must comply with South African anti-corruption laws (Prevention and Combating of Corrupt Activities Act). Must have capability to work in high-risk airport environment with specific safety protocols. Joint ventures/consortia are permitted but create joint and several liability. Parent company guarantee may be required depending on contractor structure. Bank providing performance bond must be acceptable to Service Manager.
Technical Specifications
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf (unknown)The service is the Lima Taxilane Surface Rehabilitation at OR Tambo International Airport. The scope is detailed in Part C3: Employer's Service Information and Part C4: Site Information, including drawings and documents. The Contractor must provide the service in accordance with the Service Information and warrant that the results are fit for purpose. Key performance indicators are referenced in C1.3f. The Contractor must submit a first plan for acceptance within one week of the Contract Date.
Pricing Schedule
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdfPricing is under Part C2: Pricing Data, Option A. The Contractor must develop a price list linked to operations on their submitted plan, ensuring satisfactory cash flow. The price list should align with the contract's intention, avoiding unintended daily liability for preliminary items. Care is needed when using SANS 1200 as a guide for price lists.
Financial Requirements
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf (unknown)The contract uses NEC3 Term Service Contract Main Option A: Priced contract with price list. Pricing is detailed in Part C2: Pricing Data. The offered total prices inclusive of VAT and staff rates exclusive of VAT must be stated in the Pricing Schedule. Payment terms: assessments occur between the 1st and 15th of each month, with payments made within 30 days. Interest on late payments is based on the Nedbank prime lending rate or LIBOR. The Contractor must provide a performance bond (Option X13) and may require a parent company guarantee (Option X4), with proforma documents provided in C1.3c.
Compliance Requirements
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdf (unknown)The Contractor must comply with all applicable laws, including the Occupational Health and Safety Act and Compensation for Occupational Injuries and Diseases Act. Insurance requirements are detailed in Annexure A, covering loss/damage to Employer's property, plant/materials, third-party liability, and employee injury. The Contractor must provide proof of insurance. Ethical compliance is required under the Prevention and Combating of Corrupt Activities Act. No specific B-BBEE, CIDB, CIPC, or tax clearance requirements are mentioned in the extracted text.
Health & Safety
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdfThe Contractor acknowledges it is an employer under the Occupational Health and Safety Act (OHS Act) and Compensation for Occupational Injuries and Diseases Act. The Contractor must ensure all work, equipment, and materials comply with the OHS Act and follow requirements set by the Service Manager. The Employer, Service Manager, or their representatives may stop any unsafe service, and such instruction is not a compensation event.
Contractual Terms
Source: NEC Contract_ Lima Taxilane Rehabilitation RFQ 73107.pdfThe contract is based on the NEC3 Term Service Contract (April 2013) with Main Option A and secondary Options X1, X2, X3, X4, X12, X13, X17, X18, X19, X20, and Z clauses. Key terms: The starting date is upon signing by ACSA. The service period is one month after the starting date. The law of the contract is South African law. The language is English. The period for reply is one week. The Contractor must submit a first plan within one week of the Contract Date. Termination clauses include business rescue proceedings as grounds. Dispute resolution uses Option W1 (adjudication followed by arbitration). The Contractor must provide a performance bond and may need a parent company guarantee. Additional Z clauses cover ethics, confidentiality, intellectual property, liens, step-in rights, and joint liability.
Description
Source: RFQ 73107 Lima_No rates.xlsxThe tender involves the surface rehabilitation of the Lima Taxiway at OR Tambo International Airport. The document is primarily a pricing schedule (Bill of Quantities) detailing numerous construction items across multiple categories: General requirements and provisions; Contractor's site establishment; Facilities for the Engineer; Clearing and grubbing; Accommodation of traffic; Loading and hauling; Services (general trenching, dry services, wet services, energy); Drains; Culverts. Each item requires unit rates and quantities to be filled by the bidder. Items marked with an 'X' need additional information from the compiler.
Submission Guidelines
Source: RFQ 73107 Lima_No rates.xlsx (unknown)Returnable Documents: The tender document requires the bidder to complete pricing schedules and provide additional information as marked with an 'X' in the 'Note to compiler' column. Ensure all required data is filled in.
Evaluation Criteria
Source: RFQ 73107 Lima_No rates.xlsx (unknown)Unable to extract eligibility criteria
Technical Specifications
Source: RFQ 73107 Lima_No rates.xlsx (unknown)The scope includes surface rehabilitation works at OR Tambo International Airport's Lima Taxiway. Key technical items include: Environmental management and monitoring; Programming and reporting (Scheme 1 and Scheme 2 programmes); Routine road maintenance (grass cutting, drain cleaning, patching, guardrail replacement); Safety plan implementation; Work adjacent to properties; Traffic accommodation for airside and pedestrian traffic; Clearing and grubbing; Trenching and installation of services (dry, wet, energy); Drain and culvert construction; Loading and hauling; Provision of facilities for the Engineer (site accommodation, offices, laboratories, vehicles). All work must comply with specified standards and contract documentation. Items marked with an 'X' require the bidder to provide additional details.
Financial Requirements
Source: RFQ 73107 Lima_No rates.xlsx (unknown)The pricing schedule includes numerous line items with unit rates (e.g., per cubic metre, per metre, per month). Key financial components: Provisional sums for undefined work; Prime cost sums for items like the Dispute Adjudication Board (DAB) and site vehicle; Handling costs and profit percentages on provisional and prime cost items; Dayworks rates for labour, equipment, and vehicles; Penalties for non-compliance with traffic accommodation requirements. Bidders must price all items in the provided schedules.
Compliance Requirements
Source: RFQ 73107 Lima_No rates.xlsx (unknown)No specific compliance requirements (e.g., CSD, B-BBEE, CIDB) are stated in the extracted text. Bidders should refer to the full tender documentation for standard government compliance rules.
Description
Source: Volume 5 ACSA Lima Project.pdfScope: Maintenance, repair and rehabilitation of Lima Taxiway at O.R. Tambo International Airport.
This Volume 5 is a Procedure Manual for working airside, complementary to the Tender Document (Volume 3).
Evaluation Criteria
Source: Volume 5 ACSA Lima Project.pdf (RFQ)While explicit financial or experience criteria are not stated in this volume, eligibility is heavily implied through the ability to comply with stringent operational and safety protocols. The contractor must demonstrate the capability to: work within extreme time constraints, manage complex security and permit processes, coordinate with multiple airport departments (ATC, Fire & Rescue, Airside Management), and provide specialized safety personnel and equipment. Failure to comply with procedures carries penalties.
Technical Specifications
Source: Volume 5 ACSA Lima Project.pdf (RFQ)Scope: Maintenance, repair and rehabilitation of Lima Taxiway at O.R. Tambo International Airport.
Key operational requirements:
Methodology
Source: Volume 5 ACSA Lima Project.pdfMethodology and procedures:
Quality Management
Source: Volume 5 ACSA Lima Project.pdfQuality and inspection requirements:
Compliance Requirements
Source: Volume 5 ACSA Lima Project.pdf (RFQ)General compliance:
Health & Safety
Source: Volume 5 ACSA Lima Project.pdfHealth and safety requirements:
Contractual Terms
Source: Volume 5 ACSA Lima Project.pdfContractual terms:
Data conflicts
None detected
O. R. Tambo International Airport, Shop R7, First Floor, Domestic Terminal, O.R. Tambo Airport Rd, O.R. Tambo, Kempton Park, 1627, South Africa
Get deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.