Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Broadcasting Corporation LimitedLocation
Gauteng
Closing Date
26 Jun 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Corner Artillery and Henley Road - Auckland Park - Johannesburg - 2006
Organization Type
GOVERNMENT
Published
02 Jun 2026
OCDS Reference
ocds-9t57fa-157782
The south african broadcasting corporation (SABC) seeks a service provider to complete the building works for motsweding FM studios in mahikeng as a once-off project. The scope includes supply, installation, and finishing of acoustic treatments, doors, windows, ventilation, and site preparation.
Returnable Documents: Not specified in the document. Ensure all required forms and supporting documents are submitted as per standard tender procedures.
Scope: Completion of building works for Motsweding FM Studios in Mahikeng as a once-off project.
Key Technical Requirements:
Submit the following returnable documents: Proof of Central Supplier Database (CSD) registration; Valid TV License Statement for the company and all active Directors/Shareholders (verification will be done internally by SABC); Valid Tax Clearance Certificate or SARS PIN; Original or certified copy of Valid B-BBEE Certificate (from SANAS-accredited Verification Agency); Certified copy of Company Registration Document (showing Company Name, Registration Number, date of registration, and active Directors/Members); Certified copy of Shareholders’ certificates; Certified copy of ID documents of Directors/Members. Disqualification risks: No contract will be awarded to bidders with invalid TV License Statements, unresolved tax matters, or lack of CSD registration.
Evaluation occurs in two phases: 1) Functionality/Technical Evaluation (64 points maximum, 47-point minimum threshold required to proceed). Criteria include: Construction methodology (16 points: Safety=5, Rubble removal=3, Dust management=2, Painting & fumes management=3, Noise management=3); Project Execution Plan (PEP) (15 points: 4 weeks=15, 5.5 weeks=10, >5.5 weeks=0); Project Organogram (5 points); Experience of project team (18 points: Contract/Project Manager >3 years=5, >2 years=3; Construction Foremen >3 years=5, >2 years=3; Safety Officer=8 points with SAIOSH accreditation); Relevant Company Experience (10 points: <2 reference letters=0, 3-4=5, >5=10). 2) Price Evaluation: 80/20 preference point system applies. Price scored out of 80 points using formula: Ps = 80(1 - (Pt-Pmin)/Pmin). Specific Goals (20 points): EME/SME 51% Black-owned=10; 51% Black-owned=5; 51% Black Women-owned=3; Black Youth=2. Highest total points win. Bidders scoring below 47 in technical evaluation are disqualified.
Returnable Documents: Not specified in the provided text. Verify tender document for exact requirements.
Categories
Request for Quotation
Corner Artillery and Henley Road - Auckland Park - Johannesburg - 2006
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
RFQ SABC NORTHWEST.pdf
Date & Time
Friday, 26 June 2026 - 11:00
Venue
SABC NORTHWEST CNR DR ALBERT LUTHULI DRIVE AND JAMES MOROKA, MAHIKENG
02 Jun
2026
Tender Published
Tender was published
26 Jun
2026
Closing Date
Tender closing date
Median Estimate
R 707 251
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
Limpopo is a mining powerhouse in South Africa. Learn how to identify and bid for mining support services tenders, understanding the role of major players like Anglo American, Exxaro, and the provincial government in creating supply chain opportunities.
A logistical guide to winning and managing multi-million rand contracts for laptop supply and ICT maintenance in Gauteng public schools.
Security contractors in Gauteng must now navigate a tightening regulatory landscape that intertwines ICT procurement with stringent safety and compliance standards. In 2026, every tender is scrutinised for PSIRA validity, CSD clearance, BBBEE status, SARS TCS compliance, and COIDA standing. Missing or outdated documentation can instantly disqualify a bid, jeopardising lucrative contracts and exposing firms to legal penalties. Understanding the updated framework is therefore not optional—it is essential for survival and growth in the provincial market.
As we navigate the complex regulatory environment of 2026, Construction contractors in Gauteng must prioritize compliance to access the lucrative government procurement opportunities. With the Construction Industry Development Board (CIDB) playing a crucial role in regulating the industry, understanding the CIDB contractor registration process, required documents, and common mistakes is essential for small and medium-sized enterprises (SMEs) to successfully bid for tenders. In this article, we will break down the regulatory framework, required documentation, and provide a step-by-step compliance approach to help Gauteng SMEs overcome barriers to entry.
💡 Want more tendering tips and strategies?
Explore Our BlogCompliance with National Building Regulations and local council regulations is mandatory. All materials must meet SABS standards. Acoustic and safety standards (e.g., no fibreglass, use of ThermocousTex) must be adhered to.
Contact: Dirk. Phone: 011 477 8738. Email: [email protected].
Construction is in accordance with
Of 4.4.5, If in-slab heating is installed, IT is in accordance
The requirements of 4.4.2, And services
3mm Eco Underlay, on presure schedule B-B refurbish door as C-C A-A sensative glue on existing timber REVISIONS TD-3000 3 per schedule TD-3000 2 TD-3000 4
floor. Existing floor to be clean and DESCRIPTION NO. DATE DRWN
dry prior to application. D2 New Door Stopper D2 New Door Stopper D2 New Door Stopper ISSUED TO CLIENT A 15/12/25 TM
refurbish door
as per schedule Missing Trims Section 4
new dado rail & acoustic panel as per detail new dado rail & acoustic panel as per detail 1280 new dado rail & acoustic panel as per detail per --- - NEWS 2 41904190 panel panel 7.9 m2 &as D1 refurbish door as per schedule D1 refurbish door as per schedule D1 refurbish door as per schedule belgotex carpet (supplied by client) CLASS A absorprtion suspended 41904190 railpanel ceiling panel acoustic acoustic on high performance carpet glue, on SABC NEWS LOGO: 22mm dado & MDF & 600600600 3mm Eco Underlay, on presure carpet supplied by client on 3mm Blank cnc cut letters. 2 coats timber primer, newacousticdetail rail rail sensative glue on existing timber rubber underlay coats enamel spray paint. Colour as acoustic Cover detail 3 detail floor. Existing floor to be clean and
& per client specs. CNC elements fixed dado dado Missing Blank Blank 600 dry prior to application. SABC NEWS LOGO: 22mm MDF cnc cut letters. 2 Missing 600 MOTS. LOGO: 22mm MDF cnc cut per rail on 12mm mdf behind accoustic panel per
detail letters. 2 coats timber primer, 3 coats newas Cover fabric newas coats timber primer, 3 coats enamel spray paint. Colour SABC NEWS LOGO: 22mm MDF cnc cut letters. 2 dado CONTROL ROOM 4 SABCdetail as per client specs. CNC enamel spray paint. Colour as per MissingCover elements fixed on 12mm mdf coats timber primer, 3 coats enamel spray paint. Colour per per 25.1 m2 behind accoustic panel fabric specs. CNC elements fixed on detail 1455 as per client specs. CNC elements fixed on 12mm 600 new as detail 600 client mdf NOTES:
per 12mm mdf behind accoustic panel 1400 per CLASS A absorprtion suspended as behind accoustic panel fabric
fabric ceiling as as GENERAL NOTES: window 3mm by client on 3mm 600 carpet supplied new dado rail & acoustic new dado rail & acoustic panel panel SABC LOGO: 22mm MDF cnc cut 3mm This is an COMPUTER generated drawing. All MOTS. LOGO center line rubber underlay on SABC NEWS LOGO center line panel as per detail panel as per detail letters. 2 coats timber primer, 3 coats dimensions and levels to be checked and 67466746 67466746 67466746 above 59905990 on on suspended 4190 enamel spray paint. Colour as per verified on site, by the contractors, prior to suspended 3mm suspended acoustic acoustic client client specs. CNC elements fixed on commencing any works. client & client & m2 per 600 panel by underlay ONLY use figured dimensions. NO scaling. 12mm mdf behind accoustic panel P4 as CONTROL ROOM 6 MOTS rail rail by by underlay underlay 9.5 ceiling NEWS 2 All discrepencies on drawings or intended P6m2 P5m2 NEWS 1 fabric 25.1 m2 W3 8.4 9.1 ceiling ceiling 7.9 m2 SABC LOGO center line acoustic CONTROL ROOM 5 NEWS variations from drawings are to be cleared with absorprtion 7.9 m2 panel dado dado
& CLASS A absorprtion suspended rubber 25.1 m2 absorprtion absorprtion A 600 ARCHITECT before putting any work in hand. supplied rubber rubber ceiling Stopper FLOOR FINISH LEGEND rail A A new new All structural works are to be reffered to CLASS A absorprtion suspended supplied supplied per 3193 3168 acoustic drawings and specifications. carpet supplied by client on 3mm ceiling &as 600 dado Door TYPE IMAGE ASSEMBLY DESCRIPTION ENGINEERS & CLASS carpet All floors to have minimum 10% of floor area rubber underlay CLASS carpet CLASS carpet carpet supplied by client on 3mm rail rail 600 600 new New glazed, and minimum 5% of floor area panel rubber underlay
dado dado 600 600 New Belgotex Carpet (supplied by client) ventilated.Floor plans are representative and do not form newacousticdetail newdetail New Door Stopper part of the contract.
new base trap to detail All works to be carried out in strict accordance new base trap to detail new base trap to detail new base trap to detail new base trap to detail new base trap to detail 600 600 with the National Building Regulations and the D1 D1 new 0.78m2 acoustic panel local council's regulations. fabric as per detail New Timber floor Panel & Belgotex Carpet new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail (supplied by client) Brickforce to be laid in every fifth (5th) Missing Missing Missing brickcourse, and every course above doors,
All materials to comply with SABS standards. E1 E1 E1 24872487 2487
Existing Belgotex Carpet (supplied by
belgotex carpet (supplied by client) client) new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail on high performance carpet glue, on NEWS 1 D1 Missing Blank D1 Missing Blank D1 Missing Blank Acoustic Walls and Panels 3mm Eco Underlay, on presure 7.9 m2
Cover Cover Cover sensative glue on existing timber CLASS A absorprtion suspended · Take note that NO fibreglass (wool) will be New Door Stopper MOTS. LOGO: 22mm MDF cnc cut SABC NEWS LOGO: 22mm MDF refurbish door as in any of the installations in the walls or in the floor. Existing floor to be clean and Section 3 allowed ceiling 2 coats timber primer, 3 coats refurbish door as letters. door as detail cnc cut letters. 2 coats timber primer, per schedule acoustic panels. The only product that will be allowed dry prior to application. --- - enamel spray paint. Colour as per per schedule per schedule carpet supplied by client on 3mm 3 coats enamel spray paint. Colour for safety (no flame spread), environmental and health per as Stopper refurbish client specs. CNC elements fixed per client specs. CNC elements fixed rubber underlay reasons will be double layered ThermocousTex board on detail 12mm mdf behind accoustic panel Door as Existing Timber Veneer Frame on 12mm mdf behind accoustic panel and fibre matting. fabric per window · Manufacture and fit fabric cladded acoustic as fabric New window to be adjusted or reinstalled STUDIO 6 MOTS wall panels consisting of 50mm arissed MDF frame and 22.8 m2 STUDIO 5 NEWS Section 1 above 600 SABC LOGO: 22mm MDF cnc cut braces. Clad panels with Weaver ’s World Vulcan --- - cross above MOTS. LOGO center line panel 22.7 m2 SABC NEWS LOGO center line SABC LOGO center line 600 CLASS A absorprtion suspended 4157 Frame 4210 letters. 2 coats timber primer, 3 coats fabric (1.35m wide fabric). Staple fabric to rear of timber W1 W1 reinstalled panel ceiling CLASS A absorprtion suspended
ceiling acoustic Veneer panel enamel spray paint. Colour as per frame of panels. or carpet supplied by client on 3mm per
& &as & & STUDIO 4 SABC client specs. CNC elements fixed on rubber underlay carpet supplied by client on 3mm as 12mm mdf behind accoustic panel acoustic rail rail rail rail 22.7 m2 acoustic rubber underlay panel panel & fabric Timberadjusted
& detail CLASS A absorprtion suspended rail dado be dado paneldetail dado detail dado rail ceiling per to detail NEW Room Schedule newacousticper new new newacousticas Existing dado carpet supplied by client on 3mm dado per acoustic newas rubber underlay NOTE:OCCUPANCYSANS 10400-XA:2011,4.2.1(B)CLASS A1,A2,A3,A4,C1,C2,E1,E2,E3,E4,F1,F3,G1,H1,H2,H3,H4 & H5 SHALL
BE DEEMED TO BE SATISFIED IF ORIENTATION AND SHADING ARE IN ACCORDDANCE new Name Area Perimeter Ceiling Finish Floor Finish new base trap to detail new base trap to detail new base trap to detail new base trap to detail WITH THE REQUIREMENTS OF SANS 204, EXTERNAL WALLS ARE IN ACCORDANCE new base trap to detail new base trap to detail WITH THE REQUIREMENTS OF 4.4.3, FENESTRATION IS IN ACCORDANCE WITH THE
Requirements of 4.4.4, Roof assembly construction is in accordance with
Of 4.4.5, If in-slab heating is installed, IT is in accordance
THE REQUIREMENTS OF 4.4.2, AND SERVICES THAT USE ENERGY OR CONTROL new dado rail & acoustic panel as per detail new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel as per detail THEWITHTHE REQUIREMENTSUSE OF ENERGY, INCLUDING HEATING, AIR CONDITIONING AND MECHANICAL
VENTILATION IN ACCORDANCE WITH SANS 204, AND HOT WATER SYSTEMS IN SABC NEWS LOGO: 22mm MDF
ACCORDANCE WITH THE REQUIREMENTS OF 4.1 CONTROL 25.1 m2 20.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber OR2mm MDF cnc cut letters. 2 coats cnc cut letters. 2 coats timber primer, 4.2.1.C A COMPETENT PERSON CERTIFIES THAT THE BUILDING HAS A THEORITICAL
ANNUAL ENERGY CONSUPTION AND THE DEMAND IS LESS THAN OR EQUAL TO Anamel spray paint. Colour as per 3 coats enamel spray paint. Colour as ROOM 2 underlay REFERENCE BUILDING THAT COMPLIES WITH THE REQUIREMENTS OF 4.2.1(B). 54755475ments fixed on 12mm mdf behind W2 per client specs. CNC elements fixed 53905390 MOTS
accoustic panel fabric 54155415 on 12mm mdf behind accoustic panel
fabric CONTROL 25.1 m2 20.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber
new dado rail & new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel ROOM 3 underlay CLIENT:
as per detail acoustic panel as detail MOTS new base trap to detail new base trap to detail new base trap to detail per detail
per line CONTROL 25.1 m2 20.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber D-D detail as per as detail
as per ROOM 4 underlay ARCHITECT: TD-3000 5 per center
as window as window Existing Timber Veneer Frame SABC line STUDIO 1 NEWS LOGO above window STUDIO 2 MOTS 22.7 m2 to be adjusted or reinstalled m2 CONTROL 25.1 m2 20.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber window above above window center CLASS A absorprtion suspended suspended panel W1 above CLASS A absorprtion22.8 ROOM 5 underlay MOTS. ceiling panel W1 ceiling above panel W1 above LOGO NEWS panel carpet supplied 4210 4210 ENGINEER: acoustic W1 carpet supplied detail panel rubber underlay & panel rubber underlay Frame by client on 3mm acoustic by client on 3mm acoustic CONTROL 25.1 m2 20.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber NEWS per rail & & acoustic reinstalled STUDIO 3 MOTS Stopper Stopper MOTS. LOGO: 22mm MDF cnc 6 underlay & cut rail rail ROOM or acoustic 23.0 m2 dadoas acoustic Veneer SABC 2 coats timber primer, 3 coats & rail letters. & Door Door MOTS dado rail CLASS A absorprtion suspended newwindow enamel spray paint. Colour as per dadodetail rail ceiling New dado client specs. CNC elements fixed Timberadjusted on newper New new CONTROL 25.1 m2 20.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber
12mm mdf behind accoustic panel dado missing door trims be dado carpet supplied by client on 3mm newdetail ROOM 1 underlay new base trap to detail fabric to new rubber underlay new Existing Missing Blank New Door Stopper NEWS
Cover D1 new dado rail & acoustic panel above window as per detail D1 new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail D1 NEWS 1 7.9 m2 11.3 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber MissingTrims MissingTrims
underlay
refurbish door as refurbish E1 door E1 refurbish E1 panel per schedule door as NEWS 2 7.9 m2 11.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber as per schedule per schedule
panel underlay new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail new dado rail & acoustic panel above window as per detail acoustic
& new base trap to detail new base trap to detail panel new base trap to detail new base trap to detail rail new base trap to detail new base trap to detail acoustic P1 8.4 m2 17.3 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber & underlay REV Date detail MOTS. LOGO: 22mm MDF cnc cut acoustic dado
& letters. 2 coats timber primer, 3 coats per detail P2 9.4 m2 18.2 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber Frame rail rail new enamel spray paint. Colour as per as CONTROL ROOM 1 NEWS dado PROJECT: per underlay reinstalled detail client specs. CNC elements fixed on detail 25.1 m2 newas dado PHASE 2 REFURBISHMENT CLASS A absorprtion Veneer 12mm mdf behind accoustic panel or per per suspended detail 3mm 3mm 3mm P3 9.4 m2 18.0 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber ceiling fabric as new as OF EXISTING per on on on detail underlay Timberadjusted STUDIOS carpet supplied by client on 3mm as suspended suspended per suspended be window rubber underlay to client as client client P4 9.5 m2 18.2 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber
m2 panel m2 Existing MOTS. LOGO center line detail m2 byunderlay byunderlay byunderlay P3 W3 above 9.4 ceiling panel P29.4 ceiling P18.4 ceiling underlay per acoustic as absorprtion absorprtion absorprtion SITE panel
& A rubber A rubber A rubber P5 9.1 m2 18.1 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber supplied supplied MOTS. LOGO center line acoustic supplied SABC NEWS LOGO center line rail 59905990 panel & 67276727 underlay SABC NORTH-WEST E-E acoustic rail dado P6 8.4 m2 17.2 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber TD-3001 5 & CLASS carpet CLASS carpet CONTROL ROOM 2 MOTS CLASS carpet detail acoustic new underlay rail & 25.1 m2 dado per
DRAWING dado rail detail CLASS A absorprtion suspended new as STUDIO 1 22.7 m2 19.2 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber ceiling
new dado per panel NEWS underlay TENDER FLOOR PLAN & as carpet supplied by client on 3mm
new rubber underlay STUDIO 2 22.8 m2 19.3 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber SCHEDULES CONTROL ROOM 3 MOTS Missing door trims panel acoustic 25.1 m2 Missing Blank Cover Missing Blank Cover Missing & Missing Blank Cover MOTS underlay
CLASS A absorprtion suspended per Trims rail acoustic STUDIO 3 23.0 m2 19.4 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber ceiling as
& DRAWN BY: DRAWING DATE: dado carpet supplied refurbish door as per schedule MOTS underlay by client on 3mm door rail DAC rubber underlay door new schedule dado D1 D1 D1 STUDIO 4 22.7 m2 19.2 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber CHECKED BY: PLOT DATE:
per refurbishschedule new JMS 2026/01/14 14:08:45 new dado rail & acoustic panel as per detail new dado rail & acoustic panel as per detail refurbishas new dado rail & acoustic panel as per detail SABC underlay
STUDIO 5 22.7 m2 19.2 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber
NEWS underlay SCALE:1 : 50
New Door Stopper New Door Stopper New Door Stopper missing door trims STUDIO 6 22.8 m2 19.3 m CLASS A absorprtion suspended ceiling carpet supplied by client on 3mm rubber PROJECT NO.
MOTS. LOGO: 22mm MDF cnc cut letters. 2 coats D2 D2 SABC NEWS LOGO: 22mm MDF cnc cut letters. 2 D2 MOTS underlay SABC NW timber primer, 3 coats enamel spray paint. Colour as per coats timber primer, 3 coats enamel spray paint. Colour
client specs. CNC elements fixed on 12mm mdf behind as per client specs. CNC elements fixed on 12mm mdf Grand total: 20 357.3 m2 367.3 m 01
accoustic panel fabric behind accoustic panel fabric
refurbish door as per schedule refurbish door as per schedule refurbish door as per schedule DRAWING NO. REVISION
41904240 1450 41904215 14551455 41904215 12851285
TD-1000 a
Ffl
1 : 50
TEL: 011 477 8738 EMAIL: [email protected]
be connected to existing duct by 600 supply 600 per 600 600 supply 600 600 existing duct by specialist. New return air grill to be allowed in any of the installations in the walls or in the as acoustic panels. The only product that will be allowed
specialist. New return air grill to be installed into ceiling grid, no connection to existing for safety (no flame spread), environmental and health installed into ceiling grid, no 600 600 600 600 ThermocousTexseal return air grill reasons will be double layered ThermocousTex board
connection to existing return air grill 600 600 and supply 600 STUDIO 5 NEWS 600 600 600 and fibre matting. 22.7 m2 New 600mm X 600mm · Manufacture and fit fabric cladded acoustic angle 600 600 600 600 wall panels consisting of 50mm arissed MDF frame and
mdf Suspended ceiling cross braces. Clad panels with Weaver ’s World Vulcan 600 600 600 600 14 x 5w 240V GU10 LED bulb (50mm) min 600 16m 400lumens in EMPTY BODY DOWNLIGHT fabric (1.35m wide fabric). Staple fabric to rear of timber
STUDIO 6 MOTS 50W - ALUMINUM TILT - C/O 75MM frame of panels. STUDIO 4 SABC (WHITE) 1. Existing "Push" & "Pull" signage to be re-used 1. Existing acoustic panel to be removed.And replaced 600 22.8 m2 600 600 22.7 m2 by 12mm MDF with matt black Formica finish
2. Existing handles to be removed and replaced with Existing 600mm X 600mm New HVAC supply grill & extension to be connected to GEZE Pull handle D type (c/c 300, D 65) 2. Existing "Push" & "Pull" signage to be re-used 600 600 600 600 600 return 600
600 600 existing duct by specialist. New return air grill to be Suspended ceiling 3. Existing door closer's to be removed and replaced by 3. Existing handles to be removed and replaced with NOTE: SANS 10400-XA:2011,4.2.1(B) installed into ceiling grid, no connection to existing
New HVAC supply grill & extension to 600 600 return air grill GEZE TS 2000 V or similar (by specialist GEZE Pull handle D type (c/c 300, D 65) OCCUPANCYBE DEEMED TOCLASSBE SATISFIEDA1,A2,A3,A4,C1,C2,E1,E2,E3,E4,F1,F3,G1,H1,H2,H3,H4IF ORIENTATION AND SHADING ARE IN ACCORDDANCE& H5 SHALL
be connected to existing duct by return 600 return recommendation) WITHWITH THETHE REQUIREMENTSREQUIREMENTS OFOF SANS4.4.3, FENESTRATION204, EXTERNAL ISWALLSIN ACCORDANCEARE IN ACCORDANCEWITH THE
specialist. New return air grill to be 4. Existing door closer's to be removed and replaced by REQUIREMENTSTHE REQUIREMENTSOF 4.4.4,OF 4.4.5,ROOFIF ASSEMBLYIN-SLAB HEATINGCONSTRUCTIONIS INSTALLED,IS IN ACCORDANCEIT IS IN ACCORDANCEWITH
installed into ceiling grid, no 4. All door seals to be replaced and serviced by GEZE TS 2000 V or similar (by specialist WITHTHE USETHEOFREQUIREMENTSENERGY, INCLUDINGOF 4.4.2,HEATING,AND SERVICESAIR CONDITIONINGTHAT USE ENERGYAND MECHANICALOR CONTROL
WITH THE REQUIREMENTS OF 4.1 connection to existing return air grill VENTILATION IN ACCORDANCE WITH SANS 204, AND HOT WATER SYSTEMS IN Alluglass recommendation) ACCORDANCEOR New HVAC supply grill & extension to be connected to New HVAC supply grill & extension to be connected to 4.2.1.C A COMPETENT PERSON CERTIFIES THAT
ANNUAL ENERGY CONSUPTION AND THE DEMAND IS LESS THAN OR EQUAL TO A existing duct by specialist. New return air grill to be existing duct by specialist. New return air grill to be ceiling grid to align New HVAC supply grill & extension to be connected to HVAC NOTE THE BUILDING HAS A THEORITICAL REFERENCE BUILDING THAT COMPLIES WITH THE REQUIREMENTS OF 4.2.1(B).
installed into ceiling grid, no connection to existing installed into ceiling grid, no connection to existing with new supply grill existing duct by specialist. New return air grill to be 5.All door hinges to be serviced and oiled (q20) 5. All door seals to be replaced and serviced by
return air grill return air grill installed into ceiling grid, no connection to existing New HVAC supply grill & extension to be connected to Alluglass
return air grill existing duct by specialist. New return air grill to be 6. Existing steel door finish to be washed
installed into ceiling grid, no connection to existing 6. 16mm Architrave added to fit accoustic panel
ceiling grid to align CLIENT: return air grill
with new supply grill 595 7. 5.All door hinges to be serviced and oiled (q20) New HVAC supply grill & extension to 600 600 535
be connected to existing duct by 600 600 600 600 600 600 600 600 600
specialist. New return air grill to be 600 supply supply 600 600 supply 600 600 LIGHTING NOTE installed into ceiling grid, no detail 14 x 5w 240V GU10 LED bulb (50mm) min ARCHITECT: connection to existing return air grill 600 600 600 600 600 400lumens in EMPTY BODY DOWNLIGHT 3 MOTS per 600 600 STUDIO 50W - ALUMINUM TILT - C/O 75MM 600 STUDIO 1 NEWS ceiling grid to align 23.0 m2 as STUDIO 2 MOTS 600 with new supply grill seal 22.8 m2 22.7 m2 14 x 5w 240V GU10 LED bulb (50mm) min (WHITE) DOOR SCHEDULE
400lumens in EMPTY BODY DOWNLIGHT 1 : 50 600 600 600 600 Passages: existing light to 600 600 600 50W - ALUMINUM TILT - C/O 75MM 600 be removed, stored and ENGINEER: (WHITE)
600 600 reinstalled on new ceiling
600 600 600 600 600 ThermocousTex 600 600
600 and
New HVAC supply grill & extension to be connected to supply and return position to WINDOW SCHEDULE WINDOW NO. E1 WINDOW SCHEDULE WINDOW NO. W1 New HVAC supply grill & extension to confirmed once ceiling angle existing duct by specialist. New return air grill to be be 600 return 600 600 600 470 be connected to existing duct by slats are removed. return installed into ceiling grid, no connection to existing 600 600 600 QTY: 6 3034 QTY: 1 3034 mdf 600 600 600 600 600 600 600 600 600 600 specialist. New return air grill to be return air grill installed into ceiling grid, no 16m
connection to existing return air grill 600 return 600 600
Ceiling note 1236 1236
16m mdf angle and ThermocousTex seal as per detail absorbable mineral wool ceiling tiles, NRC - 0.70, size
600 x 600 x 15mm with reveal-edge and white painted Existing window frame to be demolished. Existing 600 finish, laid on fire rated OWAconstruct S3a exposed
ceiling grid to align ceiling grid to align ceiling grid to align ceiling grid to align demountable T24 suspension system, comprising glass to be removed and stored.
with new supply grill with new supply grill with new supply grill with new supply grill galvanised main tees and cross tees with main tees Window to be cleaned and new New frame as per detail. Existing glass to be re-used
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 suspended by means of galvanised hangers at centres MDF architrave to be fitted to only if the existing glass is 8mm & 10mm respectively.
not exceeding 1200mm, and all installed to hold acoustic panels If not then new glazing needs to be installed. REV Date 600 supply 600 600 600 New HVAC supply grill & extension to be connected to manufacturer's instructions.
600 existing duct by specialist. New return air grill to be
600 600 600 installed into ceiling grid, no connection to existing OWAconstruct L-trim, plugged and screwed at centres WINDOW SCHEDULE WINDOW NO. W2 WINDOW SCHEDULE WINDOW NO. W3 PROJECT:
600 600 600 600 supply return air grill not exceeding 200mm. 600 PHASE 2 REFURBISHMENT
New HVAC supply grill & extension to 3034 QTY: 2 2534 OF EXISTING STUDIOS 600 600 wall 600 QTY: 1 be connected to existing duct by to wall
specialist. New return air grill to be supply 600 600 to
installed into ceiling grid, no m2 aligned m2 600 m2 600 1236 600 P2 P1 connection to existing return air grill P3 9.4 8.4 aligned OWAcoustic Constellation Premium biologically 1536 grid 9.4 600 CONTROL ROOM 2 MOTS600 grid absorbable mineral wool ceiling tiles, NRC - 0.70, size CONTROL ROOM 1 NEWS 25.1 m2 600 x 600 x 15mm with reveal-edge and white painted SITE Existing window frame to be demolished. Existing ceiling 25.1 m2 600 window frame to be demolished. Existing laid on fire rated OWAconstruct S3a exposed Existing 600 600 ceiling finish, glass to be removed and stored. SABC NORTH-WEST glass to be removed and stored. demountable T24 suspension system, comprising CONTROL ROOM 3 MOTS 600 600
25.1 m2 galvanised main tees and cross tees with main tees New frame as per detail. Existing glass to be re-used New frame as per detail. Existing glass to be re-used suspended by means of galvanised hangers at centres only if the existing glass is 8mm & 10mm respectively. only if the existing glass is 8mm & 10mm respectively. OWAcoustic Constellation Premium 600 not exceeding 1200mm, and all installed to If not then new glazing needs to be installed. biologically absorbable mineral wool If not then new glazing needs to be installed. DRAWING 600 600 600 600 600 manufacturer's instructions. ceiling tiles, NRC - 0.70, size 600 x
600 x 15mm with reveal-edge and 600 OWAconstruct L-trim, plugged and screwed at centres TENDER CEILING PLAN
white painted finish, laid on fire rated
OWAconstruct S3a exposed 600 return 600 wall 600 return 600 600 495 600 140not exceeding 200mm.
demountable T24 suspension to 600 435 600 322 system, comprising galvanised main 600 aligned tees and cross tees with main 600 600 tees 600 600 600
suspended by means of galvanised grid 600 600 DRAWN BY: DRAWING DATE: HVAC supply grill & extension to be connected to 600 New DAC hangers at centres not exceeding 600 600 600 600 existing duct by specialist. New return air grill to be 1200mm, and all installed to ceiling 600 return 600 600 600 installed into ceiling grid, no connection to existing CHECKED BY: PLOT DATE: manufacturer's instructions.
return air grill JMS 2026/01/14 14:08:51
OWAconstruct L-trim, plugged and 600 600
screwed at centres not exceeding SCALE:
200mm. 453 600 297 As indicated
New HVAC supply grill & extension to 16m mdf angle and ThermocousTex 16m mdf angle and New HVAC supply grill & extension to be connected to 16m mdf angle and 16m mdf angle and · Provide double glazed “Noise Lock” sound control windows, including stops, glazing, frame and sound-absorbing PROJECT NO. be connected to existing duct by seal as per detail seal material essential for sound control as an assembly and by a firm specializing in producing this type of work. seal ThermocousTex duct by specialist. New return air grill to be ThermocousTex ThermocousTex seal existing SABC NW specialist. New return air grill to be as per detail · Glass to be 10.38mm and 8.38mm respectively and “floated” in frames with sound absorbing foam in between as per detail installed into ceiling grid, no connection to existing as per detailCEILING AND LIGHTING LAYOUT installed into ceiling grid, no return air grill and foam laminated with same acoustic fabric as used on all acoustic panels. Glass to be slanted as per detail. 01 MAY CHANGE AFTER SUPPLY connection to existing return air grill · Install windows in accordance with reviewed shop drawings and specifications using only factory-trained
absorbable mineral wool ceiling tiles, NRC - 0.70, size
600 x 600 x 15mm with reveal-edge and white painted
finish, laid on fire rated OWAconstruct S3a exposed REVISIONS rubber ceiling hangers as per detail demountable T24 suspension system, comprising DESCRIPTION NO. DATE DRWN rubber ceiling hangers as per detail rubber ceiling hangers as per detail galvanised main tees and cross tees with main tees existing hvac duct existing hvac duct existing hvac duct existing hvac duct suspended by means of galvanised hangers at centres ISSUED TO CLIENT A 15/12/25 TM existing hvac duct existing hvac duct existing hvac duct
not exceeding 1200mm, and all installed to
manufacturer's instructions.
new base trap to detail new base trap to detail OWAconstruct L-trim, plugged and screwed at centres
50mm accoustic pannel as per detail not exceeding 200mm.
new base trap to detail 50mm accoustic new base trap to detail pannel as per detail
refurbished door as E1 W1 per schedule 26002600 26002600 26002600 26002600
D1 new MDF dado fixed to existing as new MDF dado fixed to existing as
per detail per detail
CONTROL ROOM 6 MOTS 935935 935935 25.1 m2 existing carpet below dado STUDIO 6 MOTS existing carpet below dado STUDIO 3 MOTS existing carpet below dado CONTROL ROOM 3 MOTS existing carpet below dado
Existing timber skrting to be sanded, 22.8 m2 23.0 m2 25.1 m2 NOTES:
1 coat pink timber primer, 2 coats
black matt enamel GENERAL NOTES:
belgotex carpet (supplied by client) on high performance
line belgotex carpet (supplied by client) on high performance line line line carpet glue, on 3mm Eco Underlay, on presure This is an COMPUTER generated drawing. All
out carpet glue, on 3mm Eco Underlay, on presure out out out sensative glue on existing timber floor. Existing floor to dimensions and levels to be checked and
sensative glue on existing timber floor. Existing floor to be clean and dry prior to application. verified on site, by the contractors, prior to setting be clean and dry prior to application. setting setting setting commencing any works.
· Take note that NO fibreglass (wool) will be
new base trap to detail 2095 STUDIO LINTOL column column column allowed in any of the installations in the walls or in the
new mdf architrave around all doors acoustic panels. The only product that will be allowed
50mm accoustic pannel as per detail for safety (no flame spread), environmental and health shutter W1 D1 shutter shutter reasons will be double layered ThermocousTex board off off off D2 and fibre matting.
· Manufacture and fit fabric cladded acoustic new MDF dado fixed to existing as existing existing existing wall panels consisting of 50mm arissed MDF frame and per detail Existing timber skrting to be sanded, cross braces. Clad panels with Weaver ’s World Vulcan 1 coat pink timber primer, 2 coats
CONTROL ROOM 5 NEWS existing carpet below dado STUDIO 5 NEWS existing carpet below dado STUDIO 2 MOTS existing carpet below dado P2 existing carpet below dado black matt enamel fabric (1.35m wide fabric). Staple fabric to rear of timber
Existing timber skrting to be sanded, 25.1 m2 22.7 m2 22.8 m2 9.4 m2 frame of panels. 0 FFL 1 coat pink timber primer, 2 coats
black matt enamel
line belgotex carpet (supplied by client) belgotex carpet (supplied by client) Existing timber skrting to be sanded, line line New Door Stopper line line line SABC NEWS LOGO: 22mm MDF on high performance carpet glue, on out on high performance carpet glue, on 1 coat pink timber primer, 2 coats SABC NEWS LOGO: 22mm MDF out out Existing timber skrting to be sanded, 1 coat pink timber cnc cut letters. 2 coats timber primer, out out out 3mm Eco Underlay, on presure NOTE: SANS 10400-XA:2011,4.2.1(B) 3mm Eco Underlay, on presure black matt enamel cnc cut letters. 2 coats timber primer, primer, 2 coats black matt enamel 3 coats enamel spray paint. Colour as sensative glue on existing timber OCCUPANCY CLASS A1,A2,A3,A4,C1,C2,E1,E2,E3,E4,F1,F3,G1,H1,H2,H3,H4 & H5 SHALL sensative glue on existing timber setting 3 coats enamel spray paint. Colour as BE DEEMED TO BE SATISFIED IF ORIENTATION AND SHADING ARE IN ACCORDDANCE setting setting per client specs. CNC elements fixed WITH THE REQUIREMENTS OF SANS 204, EXTERNAL WALLS ARE IN ACCORDANCE floor. Existing floor to be clean and setting setting setting floor. Existing floor to be clean and WITH THE REQUIREMENTS OF 4.4.3, FENESTRATION IS IN ACCORDANCE WITH THE per client specs. CNC elements fixed
OF 4.4.4, ROOF ASSEMBLY CONSTRUCTION IS IN ACCORDANCE WITH dry prior to application. REQUIREMENTS panel on
THE REQUIREMENTS OF 4.4.5, IF IN-SLAB HEATING IS INSTALLED, IT IS IN ACCORDANCE 12mm mdf behind accoustic panel panel dry prior to application. panel on 12mm mdf behind accoustic panel WITH THE REQUIREMENTS OF 4.4.2, AND SERVICES THAT USE ENERGY OR CONTROL fabric panel panel panel
USE OF ENERGY, INCLUDING HEATING, AIR CONDITIONING AND MECHANICAL fabric THEVENTILATION IN ACCORDANCE WITH SANS 204, AND HOT WATER SYSTEMS IN
ACCORDANCE WITH THE REQUIREMENTS OF 4.1 acoustic OR acoustic acoustic 4.2.1.C A COMPETENT PERSON CERTIFIES THAT THE BUILDING HAS A THEORITICAL acoustic acoustic acoustic ANNUAL ENERGY CONSUPTION AND THE DEMAND IS LESS THAN OR EQUAL TO A
5940 41604160 41604160 reference building that complies with the requirements of 4.2.1(B).
CLIENT: B-B SABC LOGO: 22mm MDF cnc cut OWAcoustic Constellation Premium biologically
letters. 2 coats timber primer, 3 coats absorbable mineral wool ceiling tiles, NRC - 0.70, size 1 : 50 enamel spray paint. Colour as per 600 x 600 x 15mm with reveal-edge and white painted
client specs. CNC elements fixed on finish, laid on fire rated OWAconstruct S3a exposed
16m mdf angle and ThermocousTex 12mm mdf behind accoustic panel demountable T24 suspension system, comprising
OWAcoustic Constellation Premium biologically seal as per detail fabric galvanised main tees and cross tees with main tees ARCHITECT: new base trap to detail absorbable mineral wool ceiling tiles, NRC - 0.70, size suspended by means of galvanised hangers at centres
rubber ceiling hangers as per detail rubber ceiling hangers as per detail rubber ceiling hangers as per detail 600 x 600 x 15mm with reveal-edge and white painted new base trap to detail rubber ceiling hangers as per detail not exceeding 1200mm, and all installed to · Provide double glazed “Noise Lock” sound control windows, including stops, glazing, frame and sound-absorbing
finish, laid on fire rated OWAconstruct S3a exposed manufacturer's instructions. material essential for sound control as an assembly and by a firm specializing in producing this type of work.
existing hvac duct existing hvac duct · Glass to be 10.38mm and 8.38mm respectively and “floated” in frames with sound absorbing foam in between and foam demountable T24 suspension system, comprising existing hvac duct existing hvac duct existing hvac duct existing hvac duct existing hvac duct OWAconstruct L-trim, plugged and screwed at centres laminated with same acoustic fabric as used on all acoustic panels. Glass to be slanted as per detail. galvanised main tees and cross tees with main tees
suspended by means of galvanised hangers at centres not exceeding 200mm. · Install windows in accordance with reviewed shop drawings and specifications using only factory-trained personnel as ENGINEER:
not exceeding 1200mm, and all installed to required by the Manufacturer and approved by the Architect.
manufacturer's instructions. · Upon completion of this portion of work, and prior to its acceptance by the Owner, secure a visit to the job site by a
qualified representative of the manufacturer of the acoustical window system to confirm that installation is in conformance with the
50mm accoustic pannel as per detail manufacturer’s recommendations. OWAconstruct L-trim, plugged and screwed at centres
not exceeding 200mm. · Manufacturer’s recommended installation procedures , when approved by the Architect, will become the basis for
accepting or rejecting actual installation procedures used on the project. 16m mdf angle and ThermocousTex -Min 38 DB rating as tested by architect seal as per detail
50mm accoustic pannel as per detail
refurbished door as per schedule all gaps to be filled with PU foam 16m mdf angle and ThermocousTex
seal as per detail 3mm clear silicone bead new MDF dado fixed to existing as D1 new MDF dado fixed to existing as
per detail per detail 16mm mdf internal frame
Control room 1 news studio 1 news studio 4 SABC control room 4 SABC 225225 5050
Existing timber skrting to be sanded, 25.1 m2 existing carpet below dado 22.7 m2 existing carpet below dado 22.7 m2 existing carpet below dado 25.1 m2 existing carpet below dado Existing timber skrting to be sanded, 16mm mdf (2 coats primer, 3 coats black matt enamel) architrave
1 coat pink timber primer, 2 coats 1 coat pink timber primer, 2 coats
black matt enamel black matt enamel 5050 REV Date
REVISIONS M10 nut & washer STUDIO DESCRIPTION NO. DATE DRWN
16mm x 100mm x 100mm mdf washer ISSUED TO CLIENT A 15/12/25 TM EXISTING STUDIO A BOX EXISTING EXISTING STUDIO B BOX silicone sealant between galv. steel and mdf washer EXISTING GLAV. STEEL CEILING 50mm ThermocousTex fibre (50kg/m3)
M10 threaded rod
SELF TAPPING DRYWALLS SCREWS 25MM @ 600mm c/c silicone sealant between galv. steel and mdf washer
16mm x 100mm x 100mm mdf washer 3M X 50mm x 25mm x 16mm MDF angles EXISTING CONTROL ROOM A BOX EXISTING CONTROL ROOM A BOX
M10 nut & washer
RH1 – Super soft rubber ceiling hanger
Sound seals between boxes notes: ceiling hanger assembly a 1 : 10 general notes:
16mm mdf box with the National Building Regulations and the
local council's regulations.
Brickforce to be laid in every fifth (5th)
50mm ThermocousTex fibre (50kg/m3) brickcourse, and every course above doors,
windows and openings. 22mm mdf horizontal 12mm MDF box All materials to comply with SABS standards. 50mm x 56mm mdf spacers screwed to existing wall supports (to nail fins to)
404 20
50x50x3mm steel angle on rubber pads 200mm x 22mm mdf cornice 1 coat pink primer, 2 coats black matt 12
enamel 32mm mdf chamfered. 2 coats Acoustic Walls and Panels
M10 nut and washer timber primer (pink) and · Take note that NO fibreglass (wool) will be 12 32100MM X 100MM X 10MM neoprene rubber pads 35 sanded. 3 coats final matt allowed in any of the installations in the walls or in the
OWAcoustic Constellation Premium biologically 32mm mdf chamfered. 2 coats timber for safety (no flame spread), environmental and health
M10 nut and washer absorbable mineral wool ceiling tiles, NRC - 0.70, size 404 Weaver’s World Vulcan fabric primer (pink) and sanded. 3 coats final reasons will be double layered ThermocousTex board
600 x 600 x 15mm with reveal-edge and white painted to match acoustic panels. matt PVA. colour to architect spec. and fibre matting.
16mm mdf washer M10 threaded rod finish, laid on fire rated OWAconstruct S3a exposed Staple fabric to rear of timber · Manufacture and fit fabric cladded acoustic
demountable T24 suspension system, comprising 566 frame of panels. wall panels consisting of 50mm arissed MDF frame and
M10 threaded rod silicone sealant M10 nut and washer galvanised main tees and cross tees with main tees cross braces. Clad panels with Weaver ’s World Vulcan
suspended by means of galvanised hangers at centres RH1 – Super soft rubber Weaver’s World Vulcan fabric to fabric (1.35m wide fabric). Staple fabric to rear of timber
frame of panels. 16mm mdf washer ceiling hanger 5050 not exceeding 1200mm, and all installed to line of fabric match acoustic panels. Staple manufacturer's instructions.
fabric to rear of timber frame of M10 nut and washer additional 35mm thermocuastex on ceiling 152152
RH1 – Super soft rubber 5050 200200 190190 OWAconstruct L-trim, plugged and screwed at centres panels.
ceiling hanger not exceeding 200mm. meranti skirting painted 1 coat
timber primer & 2 coats black
ceiling L trim edge ceiling T trim ceiling L trim edge enamel NOTE: SANS 10400-XA:2011,4.2.1(B)
chamfered edge OCCUPANCYBE DEEMED TOCLASSBE SATISFIEDA1,A2,A3,A4,C1,C2,E1,E2,E3,E4,F1,F3,G1,H1,H2,H3,H4IF ORIENTATION AND SHADING ARE IN ACCORDDANCE& H5 SHALL
THE REQUIREMENTS OF 4.4.3, FENESTRATION IS IN ACCORDANCE WITH THE (45degree routered) WITHWITHREQUIREMENTSTHE REQUIREMENTS OF SANS 204, EXTERNAL WALLS ARE IN ACCORDANCE OF 4.4.4, ROOF ASSEMBLY CONSTRUCTION IS IN ACCORDANCE WITH
The requirements of 4.4.5, If in-slab heating is installed, IT is in accordance
With the requirements of 4.4.2, And services that use energy or control
Ventilation in accordance with SANS 204, and hot water systems in
OR ACOUSTIC PANEL: 16mm MDF ACCORDANCE WITH THE REQUIREMENTS OF 4.1 4.2.1.C A COMPETENT PERSON CERTIFIES THAT THE BUILDING HAS A THEORITICAL BASE TRAP BASE TRAP AXO ANNUAL ENERGY CONSUPTION AND THE DEMAND IS LESS THAN OR EQUAL TO A ACOUSTIC PANEL ACOUSTIC PANEL ACOUSTIC PANEL outerframe as per detail. Nailed and REFERENCE BUILDING THAT COMPLIES WITH THE REQUIREMENTS OF 4.2.1(B). glued together. All edges to be sanded 1 : 10
and made good.
ACOUSTIC PANEL: 12mm MDF strut
nailed and glued to 16mm MDF outer CLIENT:
frame
16mm mdf (2 coats primer, 3 coats black matt enamel) architrave
7070 ACOUSTIC PANEL: 12mm MDF strut
nailed and glued to 16mm MDF outer ARCHITECT:
frame
Weavers world Vulcan fabric wrapped SABC NEWS LOGO: 22mm MDF cnc cut letters. 2 and nailed to backside of frame coats timber primer, 3 coats enamel spray paint. Colour
as per client specs. CNC elements fixed on 12mm mdf
behind accoustic panel fabric 17001700 ENGINEER:
35mm ThermocousTex boards (50kg/m3) architrave architrave installed in frame cavity
enamel) enamel) 16mm mdf behind fabric to fix
ACOUSTIC PANEL: 12mm MDF strut ACOUSTIC PANEL: 16mm MDF logo to matt matt
nailed and glued to 16mm MDF outer outerframe as per detail. Nailed and
black black frame glued together. All edges to be
sanded and made good.
coats coats ACOUSTIC PANEL: 12mm MDF strut
3 3 nailed and glued to 16mm MDF outer
ACOUSTIC PANEL: 12mm MDF strut
nailed and glued to 16mm MDF outer primer, primer, frameACOUSTIC PANEL: 16mm MDF frame
coats coats outerframe as per detail. Nailed and glued together. All edges to be sanded
(2 (2 and made good.
mdf mdf
16mm 16mm 235mm x 22mm mdf dado REV Date 1. Existing acoustic panel to be removed, fabric fixed to existing: 1 coat pink routered) discarded. Existing frame and foam to be re-used with primer, 2 coats black matt new Weavers World Vulcan fabric to match acoustic enamel PROJECT: panels. (45degree PHASE 2 REFURBISHMENT
2. Existing "Push" & "Pull" signage to be re-used
chamfered edge 2020 edge OF EXISTING STUDIOS
3. Existing handles to be removed and replaced with (45degree routered)
4. Existing door closer's to be removed and replaced by 235235 35mm ThermocousTex boards (50kg/m3) chamfered
GEZE TS 2000 V or similar (by specialist chamfered edge installed in frame cavity
recommendation) (45degree routered)
5. Existing push and pull handles to be removed and 5353 2222 Vulcan fabric and nailed to backside of SABC NORTH-WEST
replaced by Remove all existing nail / frame. fabric to be wrapped consistently
screw caps from existing
dado dado 6. All door seals to be replaced and serviced by dado dado dado rail (ensure surface is
Alluglass flat for new installation) DRAWING
below below below below
existing carpet below dado existing carpet below dado existing carpet below dado TENDER DETAILS carpet carpet carpet carpet
Existing timber skrting to be sanded, 1 coat pink timber existing existing existing existing primer, 2 coats black matt enamel
Drawn by: drawing date:
Dac
belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure CHECKED BY: PLOT DATE:
JMS 2026/01/14 14:09:14 sensative glue on existing timber floor. Existing floor to ACCOUSTIC WINDOW ASSEMBLY ACCOUSTIC PANEL ASSEMBLY
be clean and dry prior to application.
to client spec. STUDIO 1 NEWS
22.7 m2
d
belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance
Studio clock to client carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure TV mounting Bracket spec. Studio speakers to sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to to client spec. client spec. be clean and dry prior to application. be clean and dry prior to application. NOTES: Studio on/off air light Studio clock to client
to client spec. spec. GENERAL NOTES:
Studio 1 News - a Studio 1 News - b This is an COMPUTER generated drawing. All
dimensions and levels to be checked and 1 : 50 1 : 50 verified on site, by the contractors, prior to
refurbished door as commencing any works.
per schedule ONLY use figured dimensions. NO scaling.
CONTROL ROOM 1 NEWS P1 local council's regulations.
25.1 m2 8.4 m2 New 0.5m2 Weavers world Brickforce to be laid in every fifth (5th) Studio speakers to brickcourse, and every course above doors, Vulcan fabric wrapped and
New 1m2 Weavers world nailed to backside of frame client spec. windows and openings.
b nailed to backside of frame
STUDIOSTUDIO 11 NEWSNEWS a c 22.722.7 m2m2 STUDIO 1 NEWS Acoustic Walls and Panels
22.7 m2 · Take note that NO fibreglass (wool) will be
50mm accoustic allowed in any of the installations in the walls or in the
d pannel as per detail acoustic panels. The only product that will be allowed
for safety (no flame spread), environmental and health
reasons will be double layered ThermocousTex board
and fibre matting.
0 FFL · Manufacture and fit fabric cladded acoustic
wall panels consisting of 50mm arissed MDF frame and
cross braces. Clad panels with Weaver ’s World Vulcan
belgotex carpet (supplied by client) on high performance fabric (1.35m wide fabric). Staple fabric to rear of timber
belgotex carpet (supplied by client) on high performance
New Door Stopper carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure frame of panels. sensative glue on existing timber floor. Existing floor to
sensative glue on existing timber floor. Existing floor to be clean and dry prior to application.
be clean and dry prior to application.
Studio 1 News - c Studio 1 News - d
Note: SANS 10400-xa:2011,4.2.1(B) 1 : 50 1 : 50 occupancy class a1,a2,a3,a4,c1,c2,e1,e2,e3,e4,f1,f3,g1,h1,h2,h3,h4 & h5 shall
ACOUSTIC PANEL: 12mm MDF strut Studio speakers to Studio speakers to 50mm accoustic
nailed and glued to 16mm MDF outer client spec. client spec. pannel as per detail
frame
Control room 1 news engineer:
routered) 25.1 m2
(45degree CONTROL ROOM 1 NEWS
edge 0 FFL 0 FFL 25.1 m2
belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance 35mm ThermocousTex boards (50kg/m3) chamfered carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure installed in frame cavity sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
be clean and dry prior to application. be clean and dry prior to application. Panels wrapped with Weavers world
frame. fabric to be wrapped consistently Control Room 1- b Control Room 1- a
REV Date 1 : 50 1 : 50
Studio 1 accoustic panel assembly project:
Phase 2 refurbishment
client spec. client spec. to client spec. local council's regulations. d
New 0.5m2 Weavers world Brickforce to be laid in every fifth (5th)
50mm accoustic Vulcan fabric wrapped and Studio speakers to brickcourse, and every course above doors,
pannel as per detail nailed to backside of frame client spec. windows and openings.
CONTROL ROOM 2 MOTS New 1m2 Weavers world
fabric wrapped 25.1 m2 STUDIO 2 MOTS Vulcan and STUDIO 2 MOTS nailed to backside of frame Acoustic Walls and Panels 22.8 m2 22.8 m2 · Take note that NO fibreglass (wool) will be
allowed in any of the installations in the walls or in the
acoustic panels. The only product that will be allowed
for safety (no flame spread), environmental and health
reasons will be double layered ThermocousTex board
and fibre matting.
0 FFL 0 FFL · Manufacture and fit fabric cladded acoustic wall panels consisting of 50mm arissed MDF frame and
cross braces. Clad panels with Weaver ’s World Vulcan
fabric (1.35m wide fabric). Staple fabric to rear of timber belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure belgotex carpet (supplied by client) on high performance frame of panels.
sensative glue on existing timber floor. Existing floor to carpet glue, on 3mm Eco Underlay, on presure
be clean and dry prior to application. sensative glue on existing timber floor. Existing floor to
Studio 2 MOTS - c Studio 2 MOTS - d be clean and dry prior to application.
Note: SANS 10400-xa:2011,4.2.1(B) 1 : 50 1 : 50 occupancy class a1,a2,a3,a4,c1,c2,e1,e2,e3,e4,f1,f3,g1,h1,h2,h3,h4 & h5 shall
Deemed to be satisfied if orientation and shading are in accorddance studio 2 bewith the requirements of SANS 204, external walls are in accordance
With the requirements of 4.4.3, Fenestration is in accordance with the
Requirements of 4.4.4, Roof assembly construction is in accordance with 1 : 50 the requirements of 4.4.5, If in-slab heating is installed, IT is in accordance
With the requirements of 4.4.2, And services that use energy or control
frame. fabric to be wrapped consistently belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
be clean and dry prior to application. be clean and dry prior to application. Control Room 2 - a STUDIO 2 ACCOUSTIC PANEL ASSEMBLY 1 : 50 Control Room 2 - b
1 : 50 REV Date
client spec. SITE
Studio clock to SABC NORTH-WEST client spec. 50mm accoustic
Studio speakers to client pannel as per detail 50mm accoustic New 1.7m2 Weavers world 50mm accoustic pannel as per detail pannel as per detail spec. Vulcan fabric wrapped and
nailed to backside of frame DRAWING
client spec.
Studio clock to client STUDIO 3 MOTS spec. REVISIONS Studio clock to client 23.0 m2 Studio speakers to TV mounting Bracket Studio on/off air light spec. client spec. to client spec. to client spec. DESCRIPTION NO. DATE DRWN
New 0.5m2 Weavers world Studio speakers to ISSUED TO CLIENT A 15/12/25 TM b Vulcan fabric wrapped and client spec. 50mm accoustic 50mm accoustic
nailed to backside of frame pannel as per detail pannel as per detail
TV mounting Bracket a c 50mm accoustic to client spec.
pannel as per detail
d STUDIO 3 MOTS STUDIO 3 MOTS
23.0 m2 23.0 m2
local council's regulations.
d 50mm accoustic Studio speakers to Studio speakers to Brickforce to be laid in every fifth (5th)
pannel as per detail 50mm accoustic client spec. client spec. brickcourse, and every course above doors,
windows and openings. pannel as per detail All materials to comply with SABS standards.
STUDIO 3 MOTS Acoustic Walls and Panels 23.0 m2
· Take note that NO fibreglass (wool) will be
allowed in any of the installations in the walls or in the
acoustic panels. The only product that will be allowed
for safety (no flame spread), environmental and health
STUDIO 3 MOTS reasons will be double layered ThermocousTex board
23.0 m2 and fibre matting.
0 FFL 0 FFL · Manufacture and fit fabric cladded acoustic
wall panels consisting of 50mm arissed MDF frame and
cross braces. Clad panels with Weaver ’s World Vulcan
belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance fabric (1.35m wide fabric). Staple fabric to rear of timber
carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure frame of panels.
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
Studio 3 MOTS - c be clean and dry prior to application. Studio 3 MOTS - d be clean and dry prior to application.
1 : 50 1 : 50 note: SANS 10400-xa:2011,4.2.1(B)
Occupancy class a1,a2,a3,a4,c1,c2,e1,e2,e3,e4,f1,f3,g1,h1,h2,h3,h4 & h5 shall
Ventilation in accordance with SANS 204, and hot water systems in
Accordance with the requirements of 4.1
A COMPETENT PERSON CERTIFIES THAT THE BUILDING HAS A THEORITICAL ACOUSTIC PANEL: 16mm MDF OR4.2.1.CANNUAL ENERGY CONSUPTION AND THE DEMAND IS LESS THAN OR EQUAL
REFERENCE BUILDING THAT COMPLIES WITH THE REQUIREMENTS OF 4.2.1(B). outerframe as per detail. Nailed and TO A
glued together. All edges to be
sanded and made good.
ACOUSTIC PANEL: 12mm MDF strut New 2m2 Weavers world CLIENT:
nailed and glued to 16mm MDF outer Vulcan fabric wrapped and TV mounting Bracket
frame nailed to backside of frame to client spec. Studio clock to client Studio on/off air light
spec. to client spec.
frame. fabric to be wrapped consistently belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
be clean and dry prior to application. be clean and dry prior to application. STUDIO 3 ACCOUSTIC PANEL ASSEMBLY Control Room 3 - a Control Room 3 - b
1 : 50 1 : 50
New 2m2 Weavers world client spec. New 2m2 Weavers world Vulcan fabric wrapped and
to client spec. spec. Brickforce to be laid in every fifth (5th)
brickcourse, and every course above doors, TV mounting Bracket 50mm accoustic 50mm accoustic windows and openings. to client spec. pannel as per detail pannel as per detail STUDIO 4 SABC 50mm accoustic All materials to comply with SABS standards. New 1.7m2 Weavers world
22.7 m2 pannel as per detail b Vulcan fabric wrapped and
nailed to backside of frame
a c · Take note that NO fibreglass (wool) will be
allowed in any of the installations in the walls or in the
new MDF dado fixed new MDF dado fixed acoustic panels. The only product that will be allowed d to existing as per to existing as per for safety (no flame spread), environmental and health
detail detail reasons will be double layered ThermocousTex board
CONTROL ROOM 4 SABC CONTROL ROOM 4 SABC and· fibre matting.Manufacture and fit fabric cladded acoustic
25.1 m2 25.1 m2 wall panels consisting of 50mm arissed MDF frame and
cross braces. Clad panels with Weaver ’s World Vulcan
fabric (1.35m wide fabric). Staple fabric to rear of timber
frame of panels.
belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
be clean and dry prior to application. be clean and dry prior to application. Control Room 4 - c Control Room 4 - d
1 : 50 1 : 50 note: SANS 10400-xa:2011,4.2.1(B)
Occupancy class a1,a2,a3,a4,c1,c2,e1,e2,e3,e4,f1,f3,g1,h1,h2,h3,h4 & h5 shall
nailed to backside of frame nailed to backside of frame
ACOUSTIC PANEL: 12mm MDF strut
nailed and glued to 16mm MDF outer 50mm accoustic 50mm accoustic 50mm accoustic ARCHITECT: frame
pannel as per detail 50mm accoustic pannel as per detail pannel as per detail
pannel as per detail
ENGINEER: routered)
(45degree
edge STUDIO 4 SABC STUDIO 4 SABC
22.7 m2 22.7 m2
35mm ThermocousTex boards (50kg/m3) chamfered
belgotex carpet (supplied by client) on high performance installed in frame cavity belgotex carpet (supplied by client) on high performance carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure sensative glue on existing timber floor. Existing floor to Panels wrapped with Weavers world sensative glue on existing timber floor. Existing floor to be clean and dry prior to application. Vulcan fabric and nailed to backside of be clean and dry prior to application.
frame. fabric to be wrapped consistently Studio 4 SABC - a Studio 4 SABC - b
1 : 50 1 : 50
REV Date STUDIO 4 ACCOUSTIC PANEL ASSEMBLY
spec. SITE
Studio on/off air light to TV mounting Bracket New 1m2 Weavers world
client spec. to client spec. Vulcan fabric wrapped and SABC NORTH-WEST
b 50mm accoustic 50mm accoustic pannel as per detail Acoustic Walls and Panels
pannel as per detail 50mm accoustic 50mm accoustic · Take note that NO fibreglass (wool) will be
a c pannel as per detail pannel as per detail allowed in any of the installations in the walls or in the
New 1.7m2 Weavers world acoustic panels. The only product that will be allowed 50mm accoustic Vulcan fabric wrapped and for safety (no flame spread), environmental and health
pannel as per detail d nailed to backside of frame reasons will be double layered ThermocousTex board
new MDF dado fixed and fibre matting.
to existing as per STUDIO 5 NEWS · Manufacture and fit fabric cladded acoustic
detail 22.7 m2 new MDF dado fixed wall panels consisting of 50mm arissed MDF frame and new MDF dado fixed cross braces. Clad panels with Weaver ’s World Vulcan to existing as per to existing as per fabric (1.35m wide fabric). Staple fabric to rear of timber detail detail frame of panels.
Controlcontrol roomroom 55 newsnews control room 5 news
25.125.1 m2m2 25.1 m2
belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure NOTE: SANS 10400-XA:2011,4.2.1(B)
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to OCCUPANCYBE DEEMED TOCLASSBE SATISFIEDA1,A2,A3,A4,C1,C2,E1,E2,E3,E4,F1,F3,G1,H1,H2,H3,H4IF ORIENTATION AND SHADING ARE IN ACCORDDANCE& H5 SHALL
be clean and dry prior to application. be clean and dry prior to application. WITHWITH THETHE REQUIREMENTSREQUIREMENTS OFOF SANS4.4.3, FENESTRATION204, EXTERNAL ISWALLSIN ACCORDANCEARE IN ACCORDANCEWITH THE
Requirements of 4.4.4, Roof assembly construction is in accordance with
The requirements of 4.4.5, If in-slab heating is installed, IT is in accordance
WITH THE REQUIREMENTS OF 4.4.2, AND SERVICES THAT USE ENERGY OR CONTROL STUDIO 5 Control Room 5 - c Control Room 5 - d THE USE OF ENERGY, INCLUDING HEATING, AIR CONDITIONING AND MECHANICAL
Ventilation in accordance with SANS 204, and hot water systems in
Accordance with the requirements of 4.1 1 : 50 1 : 50 1 : 50 or
4.2.1.C A competent person certifies that the building has a theoritical
belgotex carpet (supplied by client) on high performance Vulcan fabric and nailed to backside of belgotex carpet (supplied by client) on high performance
carpet glue, on 3mm Eco Underlay, on presure frame. fabric to be wrapped consistently carpet glue, on 3mm Eco Underlay, on presure
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
be clean and dry prior to application. be clean and dry prior to application.
REV DateSTUDIO 5 ACCOUSTIC PANEL ASSEMBLY Studio 5 News - a Studio 5 News - b
1 : 50 1 : 50 project:
Phase 2 refurbishment
with the National Building Regulations and the
50mm accoustic local council's regulations.
Studio on/off air light Studio clock to client pannel as per detail 50mm accoustic Brickforce to be laid in every fifth (5th) brickcourse, and every course above doors, to client spec. spec. 50mm accoustic pannel as per detail windows and openings.
New 1.7m2 Weavers world pannel as per detail All materials to comply with SABS standards. Studio speakers to TV mounting Bracket Vulcan fabric wrapped and
client spec. b to client spec. nailed to backside of frame
a c · Take note that NO fibreglass (wool) will be
allowed in any of the installations in the walls or in the
acoustic panels. The only product that will be allowed
d
CONTROL ROOM 6 MOTS CONTROL ROOM 6 MOTS forreasonssafetywill(nobeflamedoublespread),layeredenvironmentalThermocousTexand boardhealth
25.1 m2 25.1 m2 and fibre matting.
· Manufacture and fit fabric cladded acoustic
wall panels consisting of 50mm arissed MDF frame and
STUDIO 6 MOTS cross braces. Clad panels with Weaver ’s World Vulcan belgotex carpet (supplied by client) on high performance belgotex carpet (supplied by client) on high performance fabric (1.35m wide fabric). Staple fabric to rear of timber 22.8 m2
carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure frame of panels.
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to
be clean and dry prior to application. be clean and dry prior to application. Control Room 6 - c Control Room 6 - d
1 : 50 1 : 50
Note: SANS 10400-xa:2011,4.2.1(B)
Occupancy class a1,a2,a3,a4,c1,c2,e1,e2,e3,e4,f1,f3,g1,h1,h2,h3,h4 & h5 shall
Reference building that complies with the requirements of 4.2.1(B). 1 : 50
ACOUSTIC PANEL: 16mm MDF
outerframe as per detail. Nailed and New 1m2 Weavers world glued together. All edges to be New 2m2 Weavers world New 2m2 Weavers world Vulcan fabric wrapped and CLIENT: sanded and made good. Vulcan fabric wrapped and Vulcan fabric wrapped and nailed to backside of frame nailed to backside of frame nailed to backside of frame
ACOUSTIC PANEL: 12mm MDF strut
nailed and glued to 16mm MDF outer 50mm accoustic 50mm accoustic frame pannel as per detail pannel as per detail ARCHITECT:
routered) STUDIO22.8 6m2MOTS ENGINEER:
(45degree
edge STUDIO 6 MOTS
22.8 m2
35mm ThermocousTex boards (50kg/m3) chamfered belgotex carpet (supplied by client) on high performance carpet (supplied by client) on high performance installed in frame cavity belgotex New Door Stopper carpet glue, on 3mm Eco Underlay, on presure carpet glue, on 3mm Eco Underlay, on presure
sensative glue on existing timber floor. Existing floor to sensative glue on existing timber floor. Existing floor to Panels wrapped with Weavers world be clean and dry prior to application. be clean and dry prior to application. Vulcan fabric and nailed to backside of frame. fabric to be wrapped consistently Studio 6 News - a Studio 6 News - b
1 : 50 1 : 50
Studio 6 accoustic panel assembly
New 0.5m2 Weavers world client spec. Studio on/off air light Vulcan fabric wrapped
SITE and nailed to backside of TV mounting Bracket to New 0.5m2 Weavers world to client spec.
frame client spec. Vulcan fabric wrapped and Studio speakers to TV mounting Bracket Studio clock to client SABC NORTH-WEST nailed to backside of frame client spec. to client spec. Studio clock to spec.
client spec.
Studio speakers to client Studio speakers to 50mm accoustic
spec. 50mm accoustic client spec. pannel as per detail DRAWING
pannel as per detail
50mm accoustic TENDER PLAN AND
pannel as per detail ELEVATIONS
Drawn by: drawing date:
REVISIONS 50mm accoustic
pannel as per detail DESCRIPTION NO. DATE DRWN
Issued to client a 15/12/25 tm
2650 EXISTING CEILING 2650 EXISTING CEILING 50mm accoustic
pannel as per detail
TV mounting Bracket 50mm accoustic TV mounting Bracket Studio on/off air light to client spec. 2095 STUDIO LINTOL New 1.1m2 Weavers world 2095 STUDIO LINTOL pannel as per detail to client spec.
to client spec. ACOUSTIC PANEL: 16mm MDF Vulcan fabric wrapped and
nailed to backside of frame outerframe as per detail. Nailed and
frame. fabric to be wrapped consistently 50mm accoustic TV mounting Bracket part of the contract. All works to be carried out in strict accordance pannel as per detail to client spec. with the National Building Regulations and the
local council's regulations. NEWS 1 & 2
1 : 50 2650 EXISTING CEILING 2650 EXISTING CEILING Brickforcebrickcourse,to andbe laideveryin everycoursefifthabove(5th)doors,
windows and openings. NEWS ACCOUSTIC PANEL ASSEMBLY 2095 STUDIO LINTOL 50mm accoustic 2095 STUDIO LINTOL Studio on/off air light All materials to comply with SABS standards. to client spec. pannel as per detail
spec. Acoustic Walls and Panels
50mm accoustic · Take note that NO fibreglass (wool) will be
pannel as per detail allowed in any of the installations in the walls or in the
acoustic panels. The only product that will be allowed
NEWS 1 NEWS 1 forreasonssafetywill(nobeflamedoublespread),layeredenvironmentalThermocousTexand boardhealth
7.9 m2 7.9 m2 and fibre matting.
0 FFL 0 FFL · Manufacture and fit fabric cladded acoustic
wall panels consisting of 50mm arissed MDF frame and
cross braces. Clad panels with Weaver ’s World Vulcan
fabric (1.35m wide fabric). Staple fabric to rear of timber
frame of panels.
50mm accoustic
pannel as per detail
2650 existing ceiling 2650 existing ceiling architect:
2095 STUDIO LINTOL 2095 STUDIO LINTOL New 1.1m2 Weavers world
50mm accoustic Vulcan fabric wrapped and
pannel as per detail 50mm accoustic nailed to backside of frame ENGINEER:
pannel as per detail
News 2 news 1
7.9 m2 7.9 m2
0 FFL 0 FFL NEWS 1 Equipment and acoustic panels
· Take note that NO fibreglass (wool) will be
allowed in any of the installations in the walls or in the
acoustic panels. The only product that will be allowed
for safety (no flame spread), environmental and health
reasons will be double layered ThermocousTex board
and fibre matting.
· Manufacture and fit fabric cladded acoustic
wall panels consisting of 50mm arissed MDF frame and
cross braces. Clad panels with Weaver ’s World Vulcan
fabric (1.35m wide fabric). Staple fabric to rear of timber
frame of panels.
Note: SANS 10400-xa:2011,4.2.1(B)
Occupancy class a1,a2,a3,a4,c1,c2,e1,e2,e3,e4,f1,f3,g1,h1,h2,h3,h4 & h5 shall
Scope: Completion of final 10% of Motsweding FM Studios refurbishment in Mahikeng. Key deliverables: Final fit-out, acoustic detailing, and aesthetic completion of Main Studios, News Studios, and Control Rooms. Tasks include: Preliminaries & Site Management (full-time supervision, Health & Safety compliance, coordination with SABC installers, protection of existing works, rubble removal/cleaning); Acoustic Treatments & Paneling (installation of acoustic wall panels, base traps, sound seals); Ceilings & HVAC Finishes (Class A absorption ceilings, HVAC inlets/grilles, duct extensions); Floor Finishes (carpeting on 3mm rubber underlay, skirtings); Doors/Windows/Carpentry (servicing acoustic doors, window adjustments, dado rails, cornices); Minor Electrical & Lighting (relocating passage lights, installing studio downlights, assisting with broadcast equipment connections); Signage (supply/install studio signage per BOQ). Contractor must take custody of on-site materials, supply outstanding BOQ items, and provide specialized labor. Duration: 2 months. Location: SABC Northwest Office, Mahikeng.
Payment terms: SABC will effect payment 60 days after service delivery and invoice submission. Quotation must include a detailed cost breakdown and all indirect costs per the Scope of Service. Pricing evaluated using 80/20 preference point system (80 points for price, 20 for B-BBEE).
Mandatory: Valid CSD registration; Valid Tax Clearance Certificate or SARS PIN; Valid B-BBEE Certificate (SANAS-accredited); Certified Company Registration Document; Certified Shareholders’ certificates; Certified IDs of Directors/Members; Valid TV License Statements for company and all Directors/Shareholders. CIDB contractor grading designation of 2GB required. Non-submission of mandatory documents results in automatic disqualification. Additional: Bidders must not be blacklisted, have unresolved tax issues, or fraudulent records. SABC former employees/Board members are restricted (12-month cooling-off for resignations/retirements, 5-year ban for dismissals, permanent ban for criminal convictions). Subcontracting requires SABC approval and compliance with B-BBEE thresholds (max 30% to non-equal/higher B-BBEE entities unless subcontracted to capable EMEs).
Point Allocation Breakdown
Closing date: 26 June 2026 at 12:00 PM. Bid validity period: 90 days from closing date. All enquiries must be emailed at least three days before the closing date.
Submission email: [email protected]. Contact person: Dr Albert. Note: Electronic submissions only; physical submissions will invalidate the quote.
The South African Broadcasting Corporation Limited (SABC)NW situated in Mafikeng Cnr Dr Albert Luthuli Drive and
James Moroka seeks to appoint a service provider for upgrade of Motsweding FM Studios.
The South African Broadcasting Corporation (SABC) previously initiated a project for the full interior refurbishment and
acoustic upgrade of the SABC Mahikeng Broadcasting Studios (North-West). A primary contractor was appointed and
successfully completed approximately 90% of the planned refurbishment works.
However, due to unforeseen circumstances, the initial contractor was unable to finalize the remaining scope.
Consequently, this Request for Quotation (RFQ) is issued to appoint a capable and suitably qualified contractor to execute
the "Phase 2 Refurbishment" / Completion Works. The appointed contractor will be responsible for completing the final
10% of the project, ensuring the studios are brought to full operational readiness and meet the required broadcasting and
acoustic standards.
The current project entails the final fit-out, acoustic detailing, and aesthetic completion of various broadcasting spaces,
including the Main Studios , News Studios, Control Rooms.
Because the project is already 90% complete, the incoming contractor will be required to seamlessly interface with the
existing finished elements. Please note: Certain materials required for the completion of the works are already stored on-
site (as indicated in the attached BOQ). The contractor will need to take custody of these materials, supply any outstanding
materials listed in the BOQ, and provide the specialized labor and management required to finalize the installation.
4. Requirements and scope of services
The Scope of Works covers the final finishing trades, acoustic sealing, minor services, and general making-good of the
studio environments. The specific tasks include, but are not limited to:
4.1 Preliminaries & Site Management
4.2 Acoustic Treatments & Paneling
4.3 Ceilings & HVAC Finishes
and duct extensions.
4.4 Floor Finishes
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
4.5 Doors, Windows, and Carpentry
4.6 Minor Electrical & Lighting
lighting layouts.
4.7 Signage
5. RFQ Validity period
This bid will remain valid 90 (ninety) days from the date of closing.
6. Costing
The quotation must reflect a detailed cost breakdown, and any indirect costs associated with the rendering of required
service as per the schedule in the Scope of Service
7. Duration of the Contract
2 months for completion of the project
8. Location
SABC northwest office in mahikeng
9. Second phase: functionality / technical evaluation criteria
➢ The tender submission will be technically evaluated out of 64.
➢ A minimum threshold of 47 out of a maximum of 64 has been set.
➢ Bidders achieving less than the set threshold will be declared non-responsive and therefore will not continue
forward for evaluation of Price.
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Evaluation Evaluation Area Min Max Compliance
Points Points Resp. Page
Page reference
Construction Construction methodology (Due to the premises 16 16
methodology being occupied, bidders should provide detailed
layout as to how work would be carried out with
minimal business disruptions – NB: Bidder to submit
detailed information as per the items listed)
Project Execution Provide a brief step by step project execution plan 10 15
Plan (PEP) including major milestones such an approved proof
of concept with durations and timelines.
4 weeks (30 working days) = 15 points
5.5 weeks (45 working days) = 10 points
> 5.5 weeks (45 plus working days) = 0 points
Project Organogram The company must demonstrate the allocation of 5 5
resources to achieve activities within timeframes
based on the project execution plan. = 5 points
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Experience of building Bidder to submit project team CVs illustrating their 11 18
project team experience and professional /academic certificates
for the following categories.
Submit CVs with at least 2 contactable
references illustrating experience as follows:
>2 years working experience as project manager in
construction environment on projects of a similar
nature =3 points
>3 years working experience as project manager in
construction environment on projects of a similar
nature =5 points
>2 years working experience as Foreman in
construction environment = 3 points
>3 years working experience as Foreman in
construction environment = 5 points
Provide proof of qualification obtained from an
accredited SAIOSH South African Institute of
Occupational Safety and Health) Provider.
Relevant Company Bidders to submit portfolio of evidence indicating
Experience experience in interior building works. Provide
reference letters of previous experience (reference
letter to have letterhead, email address & the
signature of the referee) 5 10
<2 reference letters = 0 points
3 -4 reference letters= 5points
> 5 reference letters = 10 points
Total 47 64
Price and specific goals
a. The 80/20 preference point system will apply to evaluate responses
b. The award of the tender / RFQ to will be based on functionality evaluation.
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
c. The Price and BEE (Specific goals) will be applicable to award the highest scoring bidder
10. Price and (specific goals) application during contract implementation
a. PRICE
The 80/20 preference point system
A maximum of 80 points is allocated for price on the following basis:
Pt-Pmin
Ps= 80 ( 1- Pmin )
Where:
Ps = Points scored for comparative price of bid under
Consideration
Pt = Comparative price of bid under consideration
Pmin = Comparative price of lowest acceptable bid
b. BEE (SPECIFIC GOALS)
Specific goals 80/20
EME/SME 51% owned by Black people 10
51% owned by Black people; 5
51% owned by Black people who are women 3
Black Youth 2
accordance with the evidence as submitted by the bidder. The bidder who does not meet the specific
goals will not be disqualified but score zero.
c. ADJUDICATION USING A POINT SYSTEM
➢ The bidder obtaining the highest number of total points will be awarded the contract.
➢ Preference points shall be calculated after process has been brought to a comparative basis taking into account
all factors of non-firm prices.
➢ Should two or more bids be equal in all respects, the award shall be decided by the drawing of lots.
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
d. Objective Criteria
➢ The Corporation does not bind itself to accept the lowest or any tender, nor shall it be responsible for or pay
The SABC reserves the right not to award this tender to any bidder based on the proven poor record of
accomplishment of the bidder in previous projects within the SABC.
➢ The SABC will not award contract/s to the bidders who are blacklisted or have committed other acts of fraud
and misrepresentation of facts e.g., tax compliance, company financials, etc. will be eliminated from the bid
process.
➢ The SABC reserve the right not to award this tender to any bidder who fails the financial stability assessment.
➢ No SABC former employees shall be awarded contracts with the SABC within 12 months after termination of
employment with the SABC.
➢ Should employees resign or retire from the employment of the SABC and become directors of other
businesses tendering with the SABC, such tender shall not be considered until the cooling off period of 12
(Twelve) months has expired.
➢ Should the employee be dismissed from the SABC employment, such employee shall be prohibited from
conducting business with SABC for a period of 5 (Five) years from the date of dismissal.
➢ Should the employee be found guilty in a court of law due to criminal conduct/act, such employee will not be
considered to do/conduct business with SABC, until the criminal record has been legally expunged.
➢ The SABC shall not procure any goods, services, works or Content from any Board member or Board member
owned business, to ensure that suppliers competing for the SABC’s business have confidence in the integrity
of SABC’s selection process.
➢ Should the SABC’s Board members no longer serve on the SABC Board but become directors of other
companies, the SABC shall not conduct business with those companies until the cooling off period of 12
(Twelve) months has expired.
➢ Should the Board member be found guilty in a court of law due to criminal conduct/act, such Board member
will not be considered to do/conduct business with SABC, until the criminal record has been legally expunged.
11. Communication
Respondents are warned that a response will be disqualified should any attempt be made by a tenderer either directly
or indirectly to canvass any officer(s) or employees of SABC in respect of a tender, between the closing date and the
date of the award of the business.
All enquiries relating to this RFQ should be emailed three days before the closing date.
12. Conditions to be observed when tendering
or losses which may be incurred by the Tenderer in the preparation and delivery of his tender. The Corporation reserves
the right to accept a separate tender or separate tenders for any one or more of the sections of a specification. The
corporation also reserves the right to withdraw the tender at any stage.
parties.
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
➢ Make a selection solely on the information received in the submissions
➢ Enter into negotiations with any one or more of preferred bidder(s) based on the criteria specified in the
evaluation of this tender.
➢ Contact any bidder during the evaluation process, in order to clarify any information, without informing any other
bidders. During the evaluation process, no change in the content of the RFQ shall be sought, offered or
permitted.
➢ Cancel this RFQ or any part thereof at any time.
Corporation and not necessarily on the basis of the lowest costs, aligned to the BEE & Price.
13. Cost of Bidding
The Tenderer shall bear all costs and expenses associated with preparation and submission of its tender or RFQ, and
the Corporation shall under any circumstances be responsible or liable for any such costs, regardless of, without
limitation, the outcome of the bidding, evaluation, and selection process.
14. Payment terms
SABC will effect payment sixty (60) days after the service provider has rendered the service and submitted an invoice /
statement.
End of RFQ document
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Annexed to this document for completion and return with the document:
Annexure A - Declaration of Interest
Annexure B - SBD 6.1 Form
Annexure C - Consortiums, Joint Ventures and Sub-Contracting Regulations
Annexure D - Previous completed projects/Current Projects
Annexure E - SBD 4 Form
Annexure F - Attached BOQ, Spreadsheet highlighting items and Drawings
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Annexure a
Declaration of interest
1. Any legal or natural person, excluding any permanent employee of SABC, may make an offer or offers in terms of this tender
invitation. In view of possible allegations of favoritism, should the resulting tender, or part thereof be awarded to-
(a) any person employed by the SABC in the capacity of Tenderer, consultant or service provider; or
(b) any person who acts on behalf of SABC; or
(c) any person having kinship, including a blood relationship, with a person employed by, or who acts on behalf of SABC; or
(d) any legal person which is in any way connected to any person contemplated in paragraph (a), (b) or (c),
it is required that:
The Tenderer or his/her authorised representative shall declare his/her position vis-à-vis SABC and/or take an oath
declaring his/her interest, where it is known that any such relationship exists between the Tenderer and a person employed
by SABC in any capacity.
Does such a relationship exist? [YES/NO]
If YES, state particulars of all such relationships (if necessary, please add additional pages containing the required
information):
[1] [2]
Name :..........................................................................
Position :.............................................................................
Office where employed :.............................................................................
Telephone number :..........................................................................
Relationship :..........................................................................
2. Failure on the part of a Tenderer to fill in and/or sign this certificate may be interpreted to mean that an association as
stipulated in paragraph 1, supra, exists.
3. In the event of a contract being awarded to a Tenderer with an association as stipulated in paragraph 1, supra, and it
subsequently becomes known that false information was provided in response to the above question, SABC may, in addition to
any other remedy it may have:
contract; and/or
arrangements after such cancellation.
_________________________ _________________ _________________
Signature of declarant tender number date
__________________________ _________________________________________
Position of declarant name of company or tenderer
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Annexure b
Sbd 6.1
Preference points claim form in terms of the preferential procurement regulations 2022
This preference form must form part of all tenders invited. It contains general information and serves as a claim form for
preference points for specific goals.
Nb: before completing this form, tenderers must study the general conditions, definitions
And directives applicable in respect of the tender and preferential procurement
Regulations, 2022
1. General conditions
1.1 The following preference point systems are applicable to invitations to tender:
1.2 To be completed by the organ of state
a) The applicable preference point system for this tender is the 80/20 preference point system.
1.3 Points for this tender (even in the case of a tender for income-generating contracts) shall be awarded for:
(a) Price; and
(b) Specific Goals.
1.4 To be completed by the organ of state:
The maximum points for this tender are allocated as follows:
Specific goals 80/20
EME/SME 51% owned by Black people 10
51% owned by Black people; 5
51% owned by Black people who are women 3
Black Youth 2
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
1.5 Failure on the part of a tenderer to submit proof or documentation required in terms of this tender to claim points for
specific goals with the tender, will be interpreted to mean that preference points for specific goals are not claimed.
1.6 The organ of state reserves the right to require of a tenderer, either before a tender is adjudicated or at any time
subsequently, to substantiate any claim in regard to preferences, in any manner required by the organ of state.
2. Definitions
(a) “tender” means a written offer in the form determined by an organ of state in response to an invitation to provide
goods or services through price quotations, competitive tendering process or any other method envisaged in legislation.
(b) “price” means an amount of money tendered for goods or services, and includes all applicable taxes less all
unconditional discounts;
(c) “rand value” means the total estimated value of a contract in Rand, calculated at the time of bid invitation, and includes
all applicable taxes;
(d) “tender for income-generating contracts” means a written offer in the form determined by an organ of state in
response to an invitation for the origination of income-generating contracts through any method envisaged in legislation
that will result in a legal agreement between the organ of state and a third party that produces revenue for the organ of
state, and includes, but is not limited to, leasing and disposal of assets and concession contracts, excluding direct sales
and disposal of assets through public auctions; and
(e) “the Act” means the Preferential Procurement Policy Framework Act, 2000 (Act No. ).
3. Formulae for procurement of goods and services
3.1. Points awarded for price
3.1.1 The 80/20 or 90/10 preference point systems
A maximum of 80 or 90 points is allocated for price on the following basis:
80/20 or 90/10
Pt−Pmin
Ps= 80(1− ) or Ps= 90(1− Pt−Pmin )
Pmin Pmin
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
3.2. Formulae for disposal or leasing of state assets and income generating procurement
3.2.1. Points awarded for price
A maximum of 80 or 90 points is allocated for price on the following basis:
80/20 or 90/10
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Pt−Pmax
Ps= 80(1+ ) or Ps= 90(1+ Pt−Pmax )
Pmax Pmax
Where
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmax = Price of highest acceptable tender
4. Points awarded for specific goals
4.1. In terms of Regulation 4(2); 5(2); 6(2) and 7(2) of the Preferential Procurement Regulations, preference points must be
awarded for specific goals stated in the tender. For the purposes of this tender the tenderer will be allocated points
based on the goals stated in table 1 below as may be supported by proof/ documentation stated in the conditions of
this tender:
4.2. In cases where organs of state intend to use Regulation 3(2) of the Regulations, which states that, if it is unclear whether
the 80/20 or 90/10 preference point system applies, an organ of state must, in the tender documents, stipulate in the
case of—
(a) an invitation for tender for income-generating contracts, that either the 80/20 or 90/10 preference point
system will apply and that the highest acceptable tender will be used to determine the applicable preference
point system: or
(b) any other invitation for tender, that either the 80/20 or 90/10 preference point system will apply and that the
lowest acceptable tender will be used to determine the applicable preference point system,
then the organ of state must indicate the points allocated for specific goals for both the 90/10 and 80/20 preference
point system.
Table 1: Specific goals for the tender and points claimed are indicated per the table below.
Note to tenderers: The tenderer must indicate how they claim points for each preference point system.
Number of points Number of points
claimed. allocated
The specific goals allocated points in terms of this (80/20 system) (80/20 system)
tender (To be completed by the (To be completed
tenderer) by the organ of
state)
SMMEs (inclusive or QSEs and EMEs) 51% owned by
Black people 10
51% owned by Black people; 5
51% owned by Black people who are women 3
Black Youth 2
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
NB: All tenders will be issued to the market with all specific goals, and these will be scored in accordance with the evidence as
submitted by the bidder. The bidder who does not meet the specific goals will not be disqualified but score zero
Source Documents to be submitted with the tender or RFQ
Specific Goals Acceptable Evidence
B-BBEE Valid BEE Certificate / Affidavit (in case of JV, a consolidated scorecard will be accepted)
Black Women Owned Certified ID Documents of the Owners/shareholder
Black Youth owned Certified ID Documents of the Owners
EME or QSE 51% Black Owned Annual Financial/ Management Accounts/ B-BBEE Certificate / Affidavit/ Certified ID
Documents of the Owners/shareholder
51% Black Owned CIPC Documents / B-BBEE Certificate/Affidavit/ Certified ID Documents of the
Owners/shareholder
South African Enterprises CIPC Documents
Declaration with regard to company/firm
4.3. Name of company/firm...............................................................................
4.4. Company registration number: .....................................................................
4.5. Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that the points claimed,
based on the specific goals as advised in the tender, qualifies the company/ firm for the preference(s) shown and I
acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated in paragraph 1 of this
form;
iii) In the event of a contract being awarded as a result of points claimed as shown in paragraphs 1.4 and 4.2, the
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
contractor may be required to furnish documentary proof to the satisfaction of the organ of state that the claims
are correct;
iv) If the specific goals have been claimed or obtained on a fraudulent basis or any of the conditions of contract
have not been fulfilled, the organ of state may, in addition to any other remedy it may have –
(a) disqualify the person from the tendering process;
(b) recover costs, losses, or damages it has incurred or suffered as a result of that person’s
conduct;
(c) cancel the contract and claim any damages which it has suffered as a result of having to make
less favourable arrangements due to such cancellation.
(d) recommend that the tenderer or contractor, its shareholders, and directors, or only the
shareholders and directors who acted on a fraudulent basis, be restricted from obtaining
business from any organ of state for a period not exceeding 10 years, after the audi alteram
partem (hear the other side) rule has been applied; and
(e) forward the matter for criminal prosecution, if deemed necessary.
..............................................
Signature(s) of tenderer(s)
Surname and name: ................................................................
Date: ...............................................................
Address: ...............................................................
...............................................................
...............................................................
...............................................................
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Annexure c
Consortiums, joint ventures and sub-contracting regulations
1. Consortiums and joint ventures
1.1 A trust, consortium or joint venture will qualify for points for their B-BBEE status level as a legal entity, provided that
the entity submits their B-BBEE status level certificate.
1.2 A trust, consortium or joint venture will qualify for points for their B-BBEE status level as an unincorporated entity,
provided that the entity submits their consolidated B-BBEE scorecard as if they were a group structure and that such
a consolidated B-BBEE scorecard is prepared for every separate tender.
2 sub-contracting
2.1 A person awarded a contract may only enter into a subcontracting arrangement with the approval of the organ of state.
2.2 A person awarded a contract in relation to a designated sector, may not subcontract in such a manner that the local
production and content of the overall value of the contract is reduced to below the stipulated minimum threshold.
2.3 A person awarded a contract may not subcontract more than 30% of the value of the contract to any other enterprise that
does not have an equal or higher B-BBEE status level of contributor than the person concerned, unless the contract is
subcontracted to an EME that has the capability and ability to execute the subcontract.
3 declaration of sub-contracting
3.1 Will any portion of the contract be sub-contracted? YES / NO
3.2 If yes, indicate:
3.2.1 The percentage of the contract will be sub-contracted ...................................%
3.2.2 The name of the sub-contractor ..........................................................................
3.2.3 The B-BBEE status level of the sub-contractor......................................................
3.2.4 whether the sub-contractor is an EME YES / NO
___________________________ _________________ _________________
Signature of declarant tender number date
__________________________ _________________________________________
Position of declarant name of company or tenderer
RFQ/MASTER/2024-1
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Annexure “d”
Previous completed Host-to-Host projects (preferably provide a detailed company profile, detailed the below mentioned information)
Project Descriptions Client Contact Contact person Email address Period of projects Value of projects Project Commence Completed date
no date
Current Host-to-Host projects (preferably provide a detailed company profile, detailed the below mentioned information)
Project Descriptions Client Contact Contact person Email address Period of projects Value of projects Project Commence Completion date
no date
RFQ/ENG//2026/10252037/22 of 22
Strictly Confidential
Annexure “e”
Bidder’s disclosure
1. Purpose of the form
Any person (natural or juristic) may make an offer or offers in terms of this invitation to bid. In line with the principles of
transparency, accountability, impartiality, and ethics as enshrined in the Constitution of the Republic of South Africa and
further expressed in various pieces of legislation, it is required for the bidder to make this declaration in respect of the details
required hereunder.
Where a person/s are listed in the Register for Tender Defaulters and / or the List of Restricted Suppliers, that person will
automatically be disqualified from the bid process.
2. Bidder’s declaration
2.1 Is the bidder, or any of its directors / trustees / shareholders / members / partners or any person having a controlling interest1
in the enterprise,
employed by the state? YES/NO
2.1.1 If so, furnish particulars of the names, individual identity numbers, and, if applicable, state employee numbers of sole
proprietor/ directors / trustees / shareholders / members/ partners or any person having a controlling interest in the enterprise,
in table below.
Full Name Identity Number Name of State institution
2.2 Do you, or any person connected with the bidder, have a relationship with any person who is employed by the procuring
institution? YES/NO
1 the power, by one person or a group of persons holding the majority of the equity of an enterprise, alternatively, the
person/s having the deciding vote or power to influence or to direct the course and decisions of the enterprise.
RFQ/LOG/2026/10251300/14 of 22
Strictly Confidential
2.2.1 If so, furnish particulars:
................................................................................................
................................................................................................
2.3 Does the bidder or any of its directors / trustees / shareholders / members / partners or any person having a controlling
interest in the enterprise have any interest in any other related enterprise whether or not they are bidding for this contract?
Yes/no
2.3.1 If so, furnish particulars:
........................................................................................
........................................................................................
further evaluation.
9. Second phase: functionality / technical evaluation criteria
forward for evaluation of Price.
Evaluation Evaluation Area Min Max Compliance
Points Points Resp. Page
4 weeks (30 working days) = 15 points
5.5 weeks (45 working days) = 10 points
> 5.5 weeks (45 plus working days) = 0 points
based on the project execution plan. = 5 points
nature =3 points
nature =5 points
construction environment = 3 points
construction environment = 5 points
<2 reference letters = 0 points
3 -4 reference letters= 5points
> 5 reference letters = 10 points
Price and specific goals
a. The 80/20 preference point system will apply to evaluate responses
b. The award of the tender / RFQ to will be based on functionality evaluation.
accomplishment of the bidder in previous projects within the SABC.
➢ The SABC will not award contract/s to the bidders who are blacklisted or have committed other acts of fraud
and misrepresentation of facts e.g., tax compliance, company financials, etc. will be eliminated from the bid
process.
➢ The SABC reserve the right not to award this tender to any bidder who fails the financial stability assessment.
➢ No SABC former employees shall be awarded contracts with the SABC within 12 months after termination of
employment with the SABC.
➢ Should employees resign or retire from the employment of the SABC and become directors of other
businesses tendering with the SABC, such tender shall not be considered until the cooling off period of 12
(Twelve) months has expired.
➢ Should the employee be dismissed from the SABC employment, such employee shall be prohibited from
conducting business with SABC for a period of 5 (Five) years from the date of dismissal.
➢ Should the employee be found guilty in a court of law due to criminal conduct/act, such employee will not be
considered to do/conduct business with SABC, until the criminal record has been legally expunged.
➢ The SABC shall not procure any goods, services, works or Content from any Board member or Board member
owned business, to ensure that suppliers competing for the SABC’s business have confidence in the integrity
of SABC’s selection process.
➢ Should the SABC’s Board members no longer serve on the SABC Board but become directors of other
companies, the SABC shall not conduct business with those companies until the cooling off period of 12
(Twelve) months has expired.
➢ Should the Board member be found guilty in a court of law due to criminal conduct/act, such Board member
will not be considered to do/conduct business with SABC, until the criminal record has been legally expunged.
4.3. Name of company/firm...............................................................................
4.4. Company registration number: .....................................................................
4.5. Type of company/ firm
Partnership/Joint Venture / Consortium
One-person business/sole propriety
Close corporation
Public Company
Personal Liability Company
(Pty) Limited
Non-Profit Company
State Owned Company
[Tick applicable box]
4.6. I, the undersigned, who is duly authorised to do so on behalf of the company/firm, certify that the points claimed,
based on the specific goals as advised in the tender, qualifies the company/ firm for the preference(s) shown and I
acknowledge that:
i) The information furnished is true and correct;
ii) The preference points claimed are in accordance with the General Conditions as indicated in paragraph 1 of this
form;
iii) In the event of a contract being awarded as a result of points claimed as shown in paragraphs 1.4 and 4.2, the
RFQ/ENG//2026/10252037/22 of 22
including the Main Studios , News Studios, Control Rooms.
Because the project is already 90% complete, the incoming contractor will be required to seamlessly interface with the
existing finished elements. Please note: Certain materials required for the completion of the works are already stored on-
site (as indicated in the attached BOQ). The contractor will need to take custody of these materials, supply any outstanding
materials listed in the BOQ, and provide the specialized labor and management required to finalize the installation.
studio environments. The specific tasks include, but are not limited to:
4.1 Preliminaries & Site Management
4.2 Acoustic Treatments & Paneling
4.3 Ceilings & HVAC Finishes
and duct extensions.
4.4 Floor Finishes
RFQ/ENG//2026/10252037/22 of 22
Experience of building Bidder to submit project team CVs illustrating their 11 18
project team experience and professional /academic certificates
for the following categories.
Submit CVs with at least 2 contactable
references illustrating experience as follows:
>2 years working experience as project manager in
construction environment on projects of a similar
nature =3 points
>3 years working experience as project manager in
construction environment on projects of a similar
nature =5 points
>2 years working experience as Foreman in
construction environment = 3 points
>3 years working experience as Foreman in
construction environment = 5 points
accredited SAIOSH South African Institute of
Occupational Safety and Health) Provider.
I CERTIFY THAT THE INFORMATION FURNISHED IN PARAGRAPHS 1, 2 and 3 ABOVE IS CORRECT.
I accept that the state may reject the bid or act against me in terms of paragraph 6 of PFMA
SCM instruction /22 on preventing and combating abuse in the supply chain
Construction Construction methodology (Due to the premises 16 16
methodology being occupied, bidders should provide detailed
layout as to how work would be carried out with
minimal business disruptions – NB: Bidder to submit
detailed information as per the items listed)
Project Execution Provide a brief step by step project execution plan 10 15
Plan (PEP) including major milestones such an approved proof
of concept with durations and timelines.
4 weeks (30 working days) = 15 points
5.5 weeks (45 working days) = 10 points
> 5.5 weeks (45 plus working days) = 0 points
Project Organogram The company must demonstrate the allocation of 5 5
resources to achieve activities within timeframes
based on the project execution plan. = 5 points
RFQ/ENG//2026/10252037/22 of 22
reference letters of previous experience (reference
letter to have letterhead, email address & the
signature of the referee) 5 10
<2 reference letters = 0 points
3 -4 reference letters= 5points
> 5 reference letters = 10 points
Total 47 64
Annexure “d”
Previous completed Host-to-Host projects (preferably provide a detailed company profile, detailed the below mentioned information)
no date
Current Host-to-Host projects (preferably provide a detailed company profile, detailed the below mentioned information)
supply of complete unit 24 qty
2,9 Delivery 24 qty
3 door service
1,1 Works insurance as per client specification 1 qty
1,2 Health and safety (including safety officer) to comply with Act No. 1 qty
1,3 Project administration (transport & meetings.) 1 qty
1,4 Rubble removal & hoarding around bin location (parking) 1 m2
1,5 Contractual Expenses (JBCC) 1 qty
1,6 Fulltime site supervision and management 1 qty
1,7 Clean and make site good prior to occupation 1 qty
1,8 ASSIST EQUIPMENT AND FURNITURE INSTALLER WHERE NEEDED 1 qty
2 24 x 400mm x 400mm x 1800mm BASE TRAPS QTY UNIT
Works discription, quantities and specifications revision b 14/01/2026
Windows to have min 38DB STL as per architects testing
9,1 All passage windows W1 & W3 frames require veneer frame fixng 4 qty
2,1 MDF box as per detail (nailed and glued together. Boxes to be sanded and sealed until smooth) 24 qty
2,2 Weavers world Vulcan fabric wrapped around front of box after installing insulation 28,8 m2
32mm MDF fins installed in front of fabric face. Fins to be fixed (nail gun) to horizontal beams behind the
2,3 fabric. Nail hole to be filled and painted 216 qty
2,4 2 coats pink mdf primer (sanded max 60 grit), 3 coats final matt PVA (fins) 56 m2
2,5 35mm ThermocousTex boards (50kg/m3) to fill box cavity 180 m2
2,6 Meranti skirting fixed to the bottom of the base trap 0 lm
2,8 Skirting to be painted: 1 coat pink timber primer (sanded max 60 grit), 2 coats matt black enamel 0 m2
2,8 Manufacture and supply of complete unit 24 qty
2,9 Delivery 24 qty
all hinges to be serviced. Existing acoustic panels to be removed. Accoustic panel to be replaced by 12mm mdf
with matt black formica. All visible black paintwork to be touched up. Existing door signage to be removed,
stored and reinstalled. All door handles to be removed and new handles installed.
3,1 Removal and rerplacement of accoustic panel with 12mm mdf with matt black formaica. 38 qty
3,2 Removal, storage and re fitting of existing signage 38 qty
3,3 Removal of existing handles 38 qty
3,4 Supply and fit GEZE TS 2000 V or similar door closer 20 m2
3,5 Supply and fit GEZE Pull handle D type (c/c 300, D 65) 80 qty
3,6 Supply and fit door seal replacement and servicing by Alluglass 120 lm
3,7 All door hinges to be serviced and oiled (q20) 40 qty
3,8 Black matt enamel paint for touch ups 20 qty
3,9 New Door stoppers 14 qty
7,1 New Weavers world Vulcan fabric wrapped and nailed to backside of frame 37 m2
7,2 Installation 1 qty
the ceiling and equipped with the relevant trims. Grills to be white powder coated
10,1 Supply and fit air grille (white) 600mm x 600mm 14 qty
10,2 Supply and fit Return air grille (white) 600mm x 600mm 14 qty
10,3 Supply and fit Duct extension supply air (by specialist detail) 14 qty
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: APSO Membership, Services SETA Accreditation
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SABC 14012026 (003).pdf
SABC NW BOQ REV-B 14012025 (003).pdf
To download these documents and access AI-powered analysis, visit the main tender page.
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Organization
South African Broadcasting Corporation LimitedContact Person
Porcia
Phone
011-714-4644
[email protected]
Website
www.sabc.co.za/
Address
Uitsaaisentrum, Johannesburg, 2092, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
3
Last checked
02 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
The SABC is South Africa's national public broadcaster, operating television and radio services.
Data conflicts
None detected
Uitsaaisentrum, Johannesburg, 2092, South Africa
Get deep intelligence on Administrative and support activities. Unlock full pricing strategies, bid frequency, and historical win rates.