This tender is a request for quotation for the supply and installation of new split air conditioning units at the national museum's oliewenhuis and artbank facilities in bloemfontein. IT is aimed at qualified HVAC contractors who can remove existing units and install new samsung ar4500 or similar models. The bidder must meet strict compulsory requirements and will be evaluated on an 80/20 price-to-preference points basis.
Key Requirements
Compulsory Requirements: Must be an established South African company with an office/workshop in Mangaung, have minimum 3 years' HVAC installation experience with references, be registered with SARACCA and the Department of Labour (Electrical Regulation 6(4)), and hold CIDB Grading 1EP & 1EB or higher.
Key Personnel: Must provide CVs and qualifications for a Pr Mechanical Engineer (ECSA), a Trade Test Electrician, and an HVAC Trade Test professional, each with at least 5 years' experience.
Documentation: Must submit completed SBD Form 4, CSD supplier report, CIPC registration, proof of Mangaung premises, 3 reference letters, and SARS tax compliance PIN.
Technical Scope: Remove 3 existing 9000BTU units and supply/install 2 new 24000BTU and 2 new 9000BTU Samsung AR4500 (or similar) units with 10-year compressor warranties at specified locations.
Submission: Quotes and all documents must be emailed to [email protected] by 31 July 2026 at 15h00; hand-delivered quotes are not accepted.
Evaluation: Two-stage process: pre-screening for compulsory compliance, then 80/20 scoring (80 for price, 20 for B-BBEE, Free State location, and youth/women/PWD ownership).
Validity & Compliance: Quotes must be valid for 90 days; non-compliance with compulsory requirements leads to disqualification (tax non-compliance has a 7-day grace period for the preferred bidder only).
Review in progress · 0 of 2 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
The National Museum Bloemfontein is requesting bids for the supply and installation of three split unit air conditioners at Oliewenhuis and Artbank. The tender requires bidders to complete a detailed disclosure form (SBD4) regarding conflicts of interest, state employment, ownership structure, and compliance with anti-collusion regulations.
RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
The National Museum Bloemfontein is requesting quotations for the supply and installation of 5 air conditioning split units (3 for removal and 5 new installations) across two sites. The tender involves removing existing 9000BTU units and installing new Samsung AR4500 or equivalent units with specific capacity requirements and a 10-year compressor warranty.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Appointment of a Panel of Legal Firms to Provide Legal Services and Legal Support to Free State Development Corporation for a Period of Three (3) Years.
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Returnable Documents
Source: SBD 4_ NASMUS_final2.pdf (TENDER)
Complete and submit the SBD 4 Bidder’s Disclosure form.
The form requires declarations regarding:
State employment of bidder's directors, trustees, shareholders, members, partners, or persons with controlling interest.
Relationships with employees of the National Museum, Bloemfontein.
Interests in other related enterprises.
Designation of such persons as youth, women, or people with disabilities.
The bidder must certify the truth and completeness of the disclosure.
Failure to provide a true and complete disclosure will result in disqualification.
Evaluation Criteria
Source: SBD 4_ NASMUS_final2.pdf (TENDER)
Not listed on Register for Tender Defaulters or List of Restricted Suppliers, 2) Must provide full disclosure of all required information in SBD4 form, 3) Must declare any state employment connections, 4) Must declare any relationships with National Museum employees, 5) Must certify bid independence and no collusion with competitors, 6) Must not have been involved in drafting tender specifications.
Compliance Requirements
Source: SBD 4_ NASMUS_final2.pdf (TENDER)
Bidders must complete a detailed disclosure form (SBD 4).
Any person listed in the Register for Tender Defaulters or List of Restricted Suppliers is automatically disqualified.
The bidder must declare:
Whether any director, trustee, shareholder, member, partner, or person with controlling interest is employed by the state.
Any relationship with employees of the National Museum, Bloemfontein.
Any interest in other related enterprises bidding for this contract.
Whether any such persons are designated as youth, women, or people with disabilities.
The bidder must certify that:
The bid is prepared independently without collusion with competitors.
No bid terms have been disclosed to competitors before the official opening.
No improper consultations occurred with officials of the National Museum.
False declarations may lead to bid rejection, reporting to the Competition Commission or NPA, and restriction from public sector business for up to ten years.
RFQRFQ for supply installation of aircons 21 07 2026 with CEO edits.pdfReview complete
Description
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
Supply and installation of split air conditioning units at:
ArtBank Offices: 2 units.
The National Museum: 2 units.
Detailed scope includes removal of existing units and installation of new Samsung AR4500 (or similar) units with specific capacities and warranties.
Important Dates
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Closing Date: 31 July 2026.
Closing Time: 15h00.
No briefing session, site visit, or clarification deadlines are mentioned.
Contact Information
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Submit your quote and all compulsory documents via email to [email protected] by the closing date and time.
Hand-delivered quotes will not be considered.
Your quotation must be valid for a minimum period of 90 days.
Non-compliance with compulsory requirements will lead to disqualification, except for tax compliance which has a 7-day grace period for the preferred bidder.
Failure to rectify tax non-compliance within the 7-day grace period leads to automatic disqualification.
You must attach the following compulsory returnable documents:
Completed, signed, and witnessed SBD Form 4.
CSD supplier report.
CIPC registration documents.
Proof of established office/workshop in Mangaung (lease agreement or municipal rates account).
At least 3 written, contactable reference letters for HVAC installation experience.
Proof of registration with SARACCA.
Department of Labour registration for Electrical Installation Regulation 6(4).
CVs and qualifications of key personnel (Pr Mechanical Engineer, Trade Test Electrician, HVAC Trade Test).
Valid BBBEE certificate or signed affidavit/declaration.
SARS tax compliance PIN.
Returnable Documents
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
You must submit valid proof of claim for any specific goal (B-BBEE, ownership, etc.) to be awarded points. Failure to submit proof will not disqualify you but will result in zero points for that criterion.
Evaluation Criteria
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
The bidder must be an active company registered in South Africa with established premises in Mangaung. They must meet all compulsory technical, professional, and regulatory registrations. The company and its key personnel must have the specified experience. Compliance with all listed documents is mandatory for pre-screening eligibility.
Technical Specifications
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Scope: Supply and installation of split air conditioning units at ArtBank offices and the National Museum.
Deliverables:
Carefully remove 3 existing 9000BTU split units (2 at ArtBank, 1 at National Museum). Disconnect power from isolator for reuse. Do not remove the existing isolators.
Supply and install 2 units of 24000 BTU Samsung AR4500 (or similar approved) complete aircon systems with heating and cooling function for up to 48m², including a 10-year compressor warranty (1 at ArtBank, 1 at National Museum).
Supply and install 2 units of 9000BTU Samsung AR4500 (or similar approved) complete aircon systems with heating and cooling function for up to 18m², including a 10-year compressor warranty (1 at ArtBank, 1 at National Museum).
Experience & Qualifications
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
You must have a minimum of 3 years' experience in HVAC installation, proven by 3 written, contactable reference letters.
You must provide CVs and copies of qualifications for key personnel with at least 5 years' experience in the following roles:
Professional Mechanical Engineer registered with ECSA.
Trade Test Electrician (Red Seal).
HVAC Trade Test (Air Conditioning) accredited by Merseta or SAQCC/SARACCA.
Pricing Schedule
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
You must complete the all-inclusive pricing table provided in the document.
The table includes line items for:
Removal of 3 existing 9000BTU split units.
Supply and installation of 2 units of 24000 BTU Samsung AR4500 (or similar).
Supply and installation of 2 units of 9000BTU Samsung AR4500 (or similar).
Submit your quote and all compulsory documents via email to [email protected]. Hand-delivered quotes are not accepted.
Financial Requirements
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Provide a cost-inclusive quotation including VAT.
Complete the all-inclusive pricing table provided in the document.
Submit your quote and all compulsory documents via email to [email protected].
Hand-delivered quotes will not be considered.
Compliance Requirements
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Compulsory Requirements (non-compliance leads to disqualification, except tax as noted):
Company must be established in South Africa with an office/workshop in Mangaung. Provide proof (lease agreement or municipal rates account).
Minimum 3 years' experience in HVAC installation, supported by 3 written, contactable reference letters on letterhead.
Compulsory registration with SARACCA (South Africa Registration and Air Conditioning Contractors Association).
Company registration with the Department of Labour for Occupational Health and Safety Act, 1993, Electrical Installation Regulation Registration 6(4).
CVs and qualifications of key personnel with at least 5 years' experience: Pr Mechanical Engineer (ECSA), Trade Test Electrician, HVAC Trade Test accredited by Merseta or SAQCC/SARACCA.
Completed, signed, and witnessed SBD Form 4.
Registered on the Central Supplier Database (CSD). Attach CSD supplier report.
Active company registered in South Africa. Attach CIPC registration documents.
CIDB Grading: 1EP & 1EB or higher.
Tax Compliance: You must be tax compliant and attach a tax PIN issued by SARS. Non-compliance is subject to a 7-day grace period for the preferred bidder only.
B-BBEE: Submit a valid B-BBEE certificate or completed and signed affidavit/declaration to score preference points.
B-BBEE Requirements
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Submit a valid B-BBEE certificate or completed and signed affidavit/declaration to score preference points.
Preference points are awarded for B-BBEE status and for ownership by Youth, Women, and People with Disabilities (each with specific ownership thresholds).
Points are allocated as per the Preferential Procurement Regulations 2022, with specific goals for local business empowerment (Free State based), youth empowerment, women empowerment, and empowerment of people with disabilities.
Health & Safety
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
You must be registered with the Department of Labour under the Occupational Health and Safety Act, 1993, specifically for Electrical Installation Regulation Registration 6(4).
Contractual Terms
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
The formal written price quotation must be valid for a minimum period of 90 days.
If you are the preferred service provider and are non-compliant with tax matters, you will be given a grace period of at least 7 days to rectify.
Failure to rectify tax non-compliance within the 7-day grace period leads to automatic disqualification.
Special Conditions
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
Non-compliance with compulsory requirements leads to disqualification, except for tax compliance which has a 7-day grace period for the preferred bidder.
Failure to rectify tax non-compliance within the 7-day grace period leads to automatic disqualification.
Quotations are valid for 90 days minimum, regardless of any shorter expiry date indicated on the quote.
Requirements
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf (RFQ)
The existing electrical isolators must not be removed by the supplier.
You must be tax compliant and attach a SARS tax PIN.
Section
Source: RFQ for supply installation of aircons 21 07 2026 with CEO edits.pdf
Two-stage evaluation: pre-screening for compliance, then preferential procurement scoring (80/20).
Specific goals for preference points: B-BBEE status, Free State based business, youth ownership, women ownership, ownership by people with disabilities.
Points awarded per criterion as per the detailed scoring tables.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
36 Aliwal St, Bloemfontein Central, Bloemfontein, 9301, South Africa
Document-Backed
Recently Synced
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
2
Last checked
21 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.