Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Stand No. 24 - Mthombomuhle - Kwaggafontein - 0458
Organization Type
GOVERNMENT
Published
17 Jun 2026
OCDS Reference
ocds-9t57fa-159315
Thembisile hani local municipality seeks to appoint a panel of cidb-registered electrical contractors (4ep or higher) for the supply, delivery, and installation of high mast lights on an as-needed basis over 36 months. The tender is open to individual contractors or joint ventures meeting strict eligibility, compliance, and technical criteria.
Date & Time
Friday, 10 July 2026 - 12:00
Venue
Municipal Shelter
Request for Bid(Open-Tender)
17 Jun
2026
Tender Published
Tender was published
10 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
3 High Mast Lights _Tender data - PRINT IN PINK.pdf
Thembisile Hani Local Municipality (THLM) invites tenders for the appointment of a panel of electrical contractors to supply, deliver, and install high mast lights as and when required over a 36-month period. The tender is governed by THLM's Supply Chain Management Policy and follows a 90/10 preference point system (80 points for price, 20 for specific goals). The estimated bid value is under R50 million.
Median Estimate
R 2 352 377
Range
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
In 2026, General contractors in the Western Cape must navigate an increasingly stringent compliance landscape to secure public sector contracts. With 175 active General tenders in the region, procurement officers are prioritising adherence to regulatory frameworks like the PFMA and PPPFA. Non-compliance remains the leading cause of bid rejection, making it critical for suppliers to understand verification processes and align their documentation with evolving standards.
In 2026, Western Cape construction contractors face heightened scrutiny as procurement officers crack down on CIDB grade compliance. With 180 active construction tenders in the province and regulatory bodies enforcing stricter verification, a single discrepancy in your grading certificate can mean instant disqualification. The stakes are high—getting this wrong costs time, money, and credibility.
As a General contractor in Gauteng, understanding the requirements for CIPC company registration is crucial in 2026, given the current regulatory environment that emphasizes compliance and transparency in government procurement. With the government's increased focus on supporting local businesses, the opportunity for General contractors to secure government tenders has never been more significant.
Understanding the different PSIRA registration categories is the first step to compliance. Learn about Security Officer, Security Business, and Service Provider registrations.
💡 Want more tendering tips and strategies?
Explore Our BlogStand No. 24 - Mthombomuhle - Kwaggafontein - 0458
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: APSO Membership, Services SETA Accreditation
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: 13.1 Health and Safety Specification.pdfThis is a comprehensive Health and Safety Specification document for construction projects issued by Thembisile Hani Local Municipality.
Evaluation Criteria
Source: 13.1 Health and Safety Specification.pdf (unknown)General
Technical
Legal
Technical Specifications
Source: 13.1 Health and Safety Specification.pdf (unknown)The document is a detailed Health and Safety Specification for construction work. Key requirements for bidders:
Quality Management
Source: 13.1 Health and Safety Specification.pdfThe specification mandates rigorous quality control measures for health and safety:
Pricing Schedule
Source: 13.1 Health and Safety Specification.pdfThe document references injury measurement formulas but does not contain a pricing schedule for the main works.
Financial Requirements
Source: 13.1 Health and Safety Specification.pdf (unknown)Payment for Occupational Health and Safety compliance is structured into three items:
Compliance Requirements
Source: 13.1 Health and Safety Specification.pdf (unknown)The contractor must comply with the following legal requirements:
Health & Safety
Source: 13.1 Health and Safety Specification.pdfThis is the core health and safety specification. Key requirements include:
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve transport, fleet, logistics, public transport, vehicles, or road operations.
Act 5 of 2009
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
13.1 Health and Safety Specification.pdf
The tender is for the appointment of a panel of contractors to supply, deliver, and install high mast lights within Thembisile Hani Local Municipality over a 36-month period. The document emphasizes strict compliance with the Occupational Health and Safety (OHS) Act, Construction Regulations, and COVID-19 safety measures. Contractors must adhere to comprehensive health, safety, and operational protocols, including risk assessments, emergency planning, PPE usage, and regular audits. Payment is structured around OHS compliance obligations, with a minimum allocation of 1% of the tender amount for OHS-related costs.
1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf
Thembisile Hani Local Municipality is seeking to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period.
7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality is seeking to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis over a 36-month period. The tender (THLM/SCM23/2025-2026/E04) requires contractors to submit a formal offer, with acceptance forming a binding contract upon mutual agreement and signing of the Form of Offer and Acceptance.
8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf
Thembisile Hani Local Municipality is appointing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over 36 months. The provided document is a pro forma performance guarantee template that must be completed by the successful contractor's guarantor (typically a bank or insurer).
2 High Masts Contents Notice - PRINT IN WHITE.pdf
Thembisile Hani Local Municipality is appointing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period. The tender uses an 80/20 preferential points system and requires CIDB grading of 5EP or higher.
8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf
This document is a safety agreement clause (C1.4) from a tender for appointing a panel of electrical contractors to supply, deliver, and install high mast lights for Thembisile Hani Local Municipality over 36 months. It outlines the contractor's legal safety obligations under the Occupational Health and Safety Act.
9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period. The tender involves detailed pricing instructions and a bill of quantities, with emphasis on monthly invoicing based on completed activities within allocated budgets.
4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period.
6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality is establishing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-needed basis over a 36-month period.
13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf
Thembisile Hani Local Municipality seeks to establish a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis for a 36-month period. This is a framework agreement approach allowing the municipality to engage pre-qualified contractors for multiple projects without re-tendering.
8 High Masts_Contract Data - PRINT ON YELLOW.pdf
Thembisile Hani Local Municipality is appointing a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis for 36 months. The contract is governed by the General Conditions of Contract for Construction Works (Third Edition, 2015) with specific amendments detailed in the Contract Data. Key aspects include a re-measurement pricing strategy, a 365-day defects liability period, strict subcontracting and local participation targets, and significant penalties for non-compliance with time, labor, and enterprise targets.
10 High Mast _Bill of Quantities.pdf
Thembisile Hani Local Municipality seeks to appoint a panel of contractors for the supply, delivery, and installation of high mast lights (both 30m conventional and 20m solar-powered) on an as-needed basis over a 36-month period. The tender includes comprehensive preliminary costs, detailed technical specifications for two types of mast lighting, and provisions for provisional sums and dayworks.
11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf
Thembisile Hani Local Municipality (THLM) seeks to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an 'as and when required' basis over a 36-month period. The scope includes design, engineering, manufacturing, delivery, installation, testing, commissioning, and maintenance of 30-meter high mast lighting structures, including floodlights, foundations, and electrical connections. The contract is structured as an EPC (Engineering, Procurement, Construction) project with strict compliance to South African National Standards (SANS) and local regulations.
12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf
Thembisile Hani Local Municipality is seeking to appoint a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an 'as and when required' basis over a 36-month period. The scope includes design, engineering, geotechnical studies, foundation work, electrical connections, testing, commissioning, and compliance with SANS standards. The contract is structured as an EPC (Engineering, Procurement, Construction) project with stringent technical, safety, and quality requirements.
5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf
Thembisile Hani Local Municipality invites tenders for the appointment of a panel of electrical contractors to supply, deliver, and install high mast lights on an as-and-when-required basis over 36 months. The tender closes on 10 July 2026 at 12:00 UTC.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Thembisile Hani Local MunicipalityContact Person
Siya Kalipa
Phone
013-986-9101
[email protected]
Address
Stand No. 24 - Mthombomuhle - Kwaggafontein - 0458
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
16
Last checked
17 Jun 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Thembisile Hani Local Municipality governs KwaMhlanga and surrounds in the Nkangala District of Mpumalanga.
Key Personnel
Description
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdfPanel of electrical contractors for supply, delivery and installation of high mast lights within Thembisile Hani Local Municipality for a period of 36 months. Services will be required as and when needed.
Evaluation Criteria
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf (unknown)The document does not explicitly list eligibility criteria beyond being a qualified electrical contractor capable of supplying, delivering, and installing high mast lights. Applicants must comply with all pricing instructions and demonstrate ability to work within the municipality's budget and procedural requirements.
Technical Specifications
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf (unknown)The tender covers the supply, delivery, and installation of high mast lights within Thembisile Hani Local Municipality.
Key scope elements:
Pricing Schedule
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdfPricing Instructions (C.2.1):
Bill of Quantities (C.2.2):
Key terms: Unit, Quantity, Rate, Amount, Sum as defined in specifications
Financial Requirements
Source: 9 High Masts_Pricing Instructions - PRINT IN YELLOW.pdf (unknown)Pricing format requirements:
Payment terms:
Key definitions:
Important: If a tenderer fails to price any item, it will be construed that adequate allowance has been made under other items for all labour, material, and costs required—including any increase in quantum that may be undertaken during the contract.
Description
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdfAppointment of a panel of electrical contractors for the supply, delivery, and installation of high mast lights as and when required for a period of 36 months.
Submission Guidelines
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Submit a signed Form of Offer and Acceptance. Include sub-total and total prices (exclusive and inclusive of VAT) in both words and figures. Ensure all deviations or amendments from tender documents are recorded in the Schedule of Deviations, signed by both parties. Covering letters are not part of the final contract. Return one copy of the signed document to the Employer before the end of the validity period. Failure to provide required bonds, guarantees, or proof of insurance within two weeks of contract acceptance may result in repudiation.
Evaluation Criteria
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)General
Financial
Legal
Technical Specifications
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Scope: Supply, delivery, and installation of high mast lights as and when required. Duration: 36-month panel appointment. Contractors must be electrical specialists capable of fulfilling the scope as per the Conditions of Contract and Tender Data.
Pricing Schedule
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdfPricing structure includes: Part 1 (Agreements and Contract Data), Part 2 (Pricing Data), Part 3 (Scope of Work), Part 4 (Additional Documentation). Prices must be provided in words and figures for sub-total (exclusive of VAT) and total (inclusive of VAT).
Financial Requirements
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Pricing must be structured as follows: Part 1 (Agreements and Contract Data), Part 2 (Pricing Data), Part 3 (Scope of Work), Part 4 (Additional Documentation). Include drawings or referenced documents where applicable. Provide sub-total and total prices (exclusive and inclusive of VAT) in words and figures.
Compliance Requirements
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Compliance with all terms and conditions of the Contract Data and Conditions of Contract is mandatory. Bonds, guarantees, proof of insurance, and other documentation must be submitted within two weeks of contract acceptance. All deviations must be formally recorded in the Schedule of Deviations.
Contractual Terms
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdfContract becomes effective upon receipt of a fully signed copy of the Form of Offer and Acceptance, including the Schedule of Deviations (if any). The Contractor must notify the Employer within five days of receipt if they cannot accept the agreement terms. Bonds, guarantees, proof of insurance, and other required documentation must be delivered within two weeks of contract acceptance. Amendments or deviations are only valid if recorded in the signed Schedule of Deviations. No oral or implied agreements are binding.
Special Conditions
Source: 7 High Masts_Form of Offer and Acceptance - PRINT IN YELLOW.pdf (unknown)Deviations from tender documents are limited to those permitted in the Conditions of Tender. Covering letters are excluded from the final contract. Any deviations, clarifications, or changes agreed during the offer and acceptance process must be recorded in the Schedule of Deviations and incorporated into the final contract draft.
Contact Information
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown){"name":null,"email":null,"phone":null,"department":"Supply Chain Management","address":null}
Submission Guidelines
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Returnable documents required. Ensure all forms are completed and witnessed as per document structure.
Evaluation Criteria
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Open to electrical contractors capable of high mast light projects; must meet technical specifications (SANS 10403), provide required guarantees, and comply with all contractual and safety agreements outlined in the document.
Technical Specifications
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Financial Requirements
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Compliance Requirements
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdf (unknown)Health & Safety
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdfContractual Terms
Source: 6 High Mast Lights _The Contract - PRINT IN YELLOW.pdfDescription
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)FOR A PERIOD OF 36 MONTHS PROJECT No: THLM/SCM23/2025-2026/E04. SCOPE OF WORK C 3.1 DESCRIPTION OF WORKS C 3.2 STANDARDS C 3.3 TECHNICAL SPECIFICATIONS C.3.4 SCHEDULES Scope of Works Part C3 C3.1. DESCRIPTION OF THE WORKS
Contact Information
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown){"name":null,"email":null,"phone":null,"department":"y Liaison and Community Relations","address":"ng been"}
Returnable Documents
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)offered in respect of each item tendered. The information must be submitted with the tender documents, failing which, the offer will be deemed non-responsive. form compatible with the Dailux Lighting computer program. The information shall have been approved by the South African Bureau of Standards (SABS) or the CIE. service. 6. Samples of flood light luminaires offered within 5 working days of being requested to do so. 7. A copy of the manufacturer's Certificate of Listing in terms of SANS 9001. 9. Certificate of the Professional Structural Engineer to be submitted within 3 days of request.
Evaluation Criteria
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)General
Technical
Financial
Local Content
Experience & Qualifications
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Engineer Council of South Africa (ECSA).
Quality Management
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfinspections during manufacture, prior to or after delivery, of
the items
covered by this specification and
acceptance thereof on behalf of the THLM
drawings site during the erection and testing works. The changed or
cancelled items shall not be deleted by
eraser or liquid corrector, but crossed only, to keep
i ibl th ll d tTHLM Thembisile Hani Local Municipality
LV Low Voltage (230V or 400V)
MV Medium Voltage (11kV for this project)
commissioning, testing, and handing over in full working order a high mast lighting structure, including
floodlight luminaires, in Thembisile Hani Local on an “as and when” basis for a period of three (3)
years.
testing, and handing over in full working order a 30meter high mast pole complete
with Luminaries and control panel as specified.
the relevant stakeholders to do inspections.
accepted by the Engineer. The Contractor must comply with the Quality Control Plan.
Not less than ten (10) working days’ notice in writing shall be given to the Engineer detailing when
the poles will be ready for inspection and tests.
which causes the butt-weld (half circumference) to be under tension. The load shall be varied
according to the section and shall not cause permanent set. The load (or the amount of deflection
produced) shall be to the satisfaction of the Engineer and sufficient to ensure that each butt-weld is
of adequate strength. The Engineer shall witness as many of these tests as he may deem necessary,
preferably during the course of manufacture. The manufacturer shall give adequate notice, to permit
the Engineer to attend the inspections. Any joint where cracking occurs shall be ground out to the full
thickness of the material, re-welded and tested again.
The Contractor’s quality assurance system shall be approved in terms of SANS 9001 or an alternative
quality assurance system to the approval of the Engineer. A copy of the registration certificate shall
be submitted with the tender.
photometric data based on measurements undertaken by an internationally certified lighting
laboratory. The photometric report shall contain :
ground level. To be secured by two 5-sided stainless steel hot dip galvanized allen screws and
galvanised mounting / gland plate.
ground level at 90° displacement from the access opening.
2.4. Corrosion protection
o For corrosion protection, all parts of the pole and associated parts shall be hot dip galvanised
according to SANS 121 ISO 1461 specification and. Bidder shall provide inspection
certificates upon on request from the municipality.
o No welding, drilling, punching, bending or removal of burrs shall be carried out after
galvanizing.
THLM/SCM23/2025-2026/E04.
photometric data based on measurements undertaken by an internationally certified lighting
laboratory. The photometric report shall contain:
Pricing Schedule
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfFor a period of 36 months
the Engineer. Where the Contractor is of the opinion that any instruction of the Engineer issued
in terms of this clause will result in the incurring of additional costs which were not provided for
in his tendered rates and/or that a delay in the progress of the works will result, he shall be
entitled to submit a claim in terms of Clause 48 of the conditions of contract, provided always
that the period of twenty-eight (28) days referred to in Clause 48 shall be reduced to three (3)
normal working days in respect of all claims submitted in terms of this clause.
Financial Requirements
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)Bid Bond: performance
guarantee tests with all materials, tools, tackles, handling equipment, testing equipment/kits and putting
into successful commercial operation complete with standard accessories/attachments as per the
relevant technical Specifications, particular equipment specifications, data sheets, relevant codes and
pra
Compliance Requirements
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf (unknown)10. Proof of qualifications of all construction staff to be engaged in contract work.
Health & Safety
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdf9. Occupational health and safety act (act ) .....................................
9.1. Safety Precautions
9.2. Health and Safety Plan
THLM/SCM23/2025-2026/E04.
For a period of 36 months
9.3. Detailed Health and Safety Requirements
conflicts between this Tender package and any of Thembisile Hani Local Municipality
standards and/or the Local Statutory authorities’ regulations and safety codes, the Contractor
shall refer to the Engineer for clarification.
development of a Health & Safety Plan, including all risk registers to be accepted by
the Engineer.
Mean annual rain fall mm 700
Lightning flash density Flashes/km2/annu 2
al
Level of atmospheric pollution Heavy (coastal)
THLM/SCM23/2025-2026/E04.
9. Occupational health and safety act (act )
9.1. Safety Precautions
duly appointed sub-contractors, the Engineer reserves the right for himself, or his nominated
representative, to inspect and monitor working methods and materials handling to ensure that safe
working practices are being adhered to at all times.
9.2. Health and Safety Plan
construction work all in accordance with the Act and Regulations. Such Health and Safety Plan
shall cover inter-alia the following details:
ensure compliance with the Act, Regulations and Safety Specifications.
when drawing up the Health and Safety Plan for the contract.
Each Tenderer shall submit a pro-forma Occupational Health and Safety (OHS) file within 3 days of
request. This file shall sufficiently demonstrate their competence and resources regarding OHS
documentation. Failure to comply with this clause will disqualify the tender. This OHS file shall contain
the following chapters demarcated with suitable dividers:
names
and contact numbers of the engineer, the mandatory, inspectors, and other key personnel
as well as a complete list of emergency telephone numbers for the area.
2. a chapter containing all Non-Compliance Notices and engineer’s Instructions.
3. a chapter containing all Inspection Sheets
4. a chapter containing the outcome of Safety Review Meetings.
5. a chapter containing Mandataries, Appointments, Certificates, and Proofs of Good
6. a chapter containing a List of Employees Allowed on Site, temporary and permanent
personnel that have successfully completed induction training.
7. a chapter describing the Induction Course.
8. a chapter containing a complete Risk Assessment for the project that shall include at
least:
a) the identification of risks and hazards to which persons may be exposed to.
b) the analysis and evaluation of the risks and hazards identified.
c) the list of relevant documented Safe Operating Procedures (SOPs) to mitigate, reduce,
or control the risks identified.
d) a monitoring plans.
e) a review plans.
f) any additional documentation required to ensure compliance with the OHS Act and
For a period of 36 months
9.3. Detailed Health and Safety Requirements
For a period of 36 months
SANS 10160-2 - Basis of structural design and actions for buildings and industrial
structures Part 2: Self-weight and imposed loads
SANS 10160-3 - Basis of structural design and actions for buildings and industrial
structures Part 3: Wind actions
SANS 10162-1 - The structural use of steel Part 1: Limit-state design of hot-rolled
steelwork
SANS 10162-2 - The structural use of steel Part 2: Limit-states design of cold- formed
steelwork
SANS 10162-4 - Structural use of steel Part 4: The design of cold-formed stainless-
steel structural members
SANS 10164-2 - The structural use of masonry Part 2: Structural design and
requirements for reinforced and pre-stressed masonry
SANS 10225 - The design and construction of lighting masts
SANS 10313 - Protection against lightning – Physical damage to structures and life
hazard
SANS 10389-1 - Exterior lighting Part 1: Artificial lighting of exterior areas for work
and safety
SANS 10389-3 - Exterior lighting Part 3: Guide on the limitation of the effects of
obtrusive light from outdoor lighting installations
SANS 14713 - Protection against corrosion of iron and steel in structures – Zinc and
aluminium coatings - Guidelines
SANS 15607 - Specification and qualification of welding procedures for metallic
materials - General rules
SANS 15609-1 - Specification and qualification of welding procedures for metallic
materials - Welding procedure specification Part 1: Arc welding
SANS 15609-2 - Specification and qualification of welding procedures for metallic
materials - Welding procedure specification Part 2: Gas welding
SANS 15609-3 - Specification and qualification of welding procedures for metallic
materials - Welding procedure specification Part 3: Electron beam
welding
SANS 15609-5 - Specification and qualification of welding procedures for metallic
materials - Welding procedure specification Part 5: Resistance
welding procedures
THLM/SCM23/2025-2026/E04.
For a period of 36 months
SANS 15614-1 - Specification and qualification of welding procedures for metallic
materials - Welding procedure test Part 1: Arc and gas welding of
steels and arc welding of nickel and nickel alloys
SANS 17660-1 - Welding - Welding of reinforcing steel Part 1: Load-bearing welded joints
SANS 17660-2 - Welding - Welding of reinforcing steel Part 2: Non-load-bearing
welded joints
SANS 50025 - Hot rolled products of structural steels
SANS 60439-3 - Guidelines for quality management system documentation
AWS D1.1 - Structural Welding Code - Steel
SANS 1091 - National Colour Standard
SANS 1250 - Capacitors
SANS 1266 - Ballasts
SANS 475 - Luminaires: Performance requirements
SANS 60529 - Degrees of Protection provided by Enclosures (IP Code)
SANS 60598-1 - Luminaires: Part 1. General Requirements and Tests SANS
60598-2-5 - Luminaires: Part 2-3. Particular requirements - Floodlights
SANS 60662 - High Pressure Sodium Vapour Lamps
SANS 60923 - Auxiliaries for Lamps (Ballasts)
SANS 60927 - Auxiliaries for Lamps (Starting Devices)
SANS 61048 - Auxiliaries for Lamps (Capacitors)
SANS 61049 - Capacitors (Performance requirements)
SANS 61347 - Lamp Control Gear: Part 1. General and Safety requirements
SANS 215 - Limits and methods of measurement of radio disturbance
characteristics of electrical lighting and similar equipment
SANS VC 8011 - Lamp holders
ARP 035 - Guidelines for the installation and maintenance of street lighting
shall be designed in accordance with SANS specifications and the following requirements:
temperatures, low pollution, low corrosive.
documentary proof or evidence, that is, technical data sheets which demonstrate the statistical
correlation.
documentary proof or evidence showing compliance, shall submit with the tender.
o Measured LED junction temperature for a given test condition and extrapolated for
an ambient temperature of 35°C.
o LED drive current.
THLM/SCM23/2025-2026/E04.
For a period of 36 months
2. SOLAR STEP POLE SPECIFICATION (9m TOTAL LENGTH)
The total pole length shall be 9,2m – the poles shall be 9.2 m long suitable for planting on the
ground, giving a mounting height of 8m. Pole dimensions 127/101/76mm.
2.1. Working loads
specified. Applicable criteria: -
o Terrain category 3
o Design wind speed 40m/s
o Altitude 0m
o Horizontal and vertical deflections shall not exceed the requirements of SANS
10225 code.
2.2. Construction
diameter at the top.
means of a reducing washer. A reducing cone of a minimum thickness of 3mm and a minimum
height of 140 mm shall be welded to the smaller and the bigger tube.
Grade 355WA with minimum yield strength of 355MPa. Tests and analyses certificates must
be provided upon request by the municipality. No steel sections shall be less than 2.5mm –
wall thickness.
shall be provided upon request by the municipality.
THLM/SCM23/2025-2026/E04.
For a period of 36 months
2.3. Dimensions
of 8m.
For a period of 36 months
shall be provided on request.
3.6. Dimensions
mounting height of 17m.
of the mast.
ground level. To be secured by two 5-sided stainless steel hot dip galvanized allen screws and
galvanised mounting / gland plate.
as a safety measure.
3.7. Corrosion protection
All parts of the pole and its associated parts shall be hot dip galvanized to SANS 121 ISO 1461
specifications. Contractor to provide an inspection certificate upon request from Thembisile Hani
Environmental
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdffees due in terms of the Environmental laws and regulations.
Section
Source: 12 Solar Strees and High Masts_Scope of Work - PRINT IN BLUE.pdfb) the analysis and evaluation of the risks and hazards identified.
5. Quality system .................................................................................................................
Description
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdfSupply, delivery, and installation of high mast lights as and when required for a period of 36 months.
Evaluation Criteria
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf (unknown)While specific pre-qualification criteria are not in this excerpt, the ability to obtain a substantial performance guarantee from a reputable financial institution is a de facto eligibility requirement. The contractor must be a legally registered entity capable of entering into a formal contract.
Financial Requirements
Source: 8. 1 High Masts_Performance Guarantee - PRINT ON YELLOW.pdf (unknown)Performance Guarantee required, aligned with the General Conditions of Contract for Construction Works, 3rd Edition, 2015. Two types of guarantees are applicable:
Payment Terms:
Description
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfImportant Dates
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Contact Information
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Submission Guidelines
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Returnable Documents
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Evaluation Criteria
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)General
Bbbee
B-BBEE status level verification required (certificate or affidavit for EMEs/QSEs).
Local Content
Preference for local production/content (if applicable to designated sectors).
Foreign Bidders
Must declare RSA residency/permanent establishment or tax liability.
Technical Specifications
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Pricing Schedule
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfFinancial Requirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Compliance Requirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)B-BBEE Requirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Contractual Terms
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfRequirements
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdf (TENDER)Section
Source: 5 High Masts_List of Returnable Documents - PRINT IN YELLOW.pdfReturnable Documents
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Name of tenderer: ................................................................... CIDB registration number: ..................................................... Csd registration number: ...................................................... Tenderer amount: .................................................................
Evaluation Criteria
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)Valid CIDB registration, Valid CSD registration, Compliance with tender document requirements, Submission of required company and registration details.
Section
Source: 1 High Masts_COVER PAGE - PRINT IN COLOUR.pdf (TENDER)ISSUED BY: Thembisile Hani Local Municipality Private bag x 4041 Mpumalanga 0458 CONTACT: THLM Project Manager: 013 986 9201 THLM SCM Practitioner: 013 986 9187/9141 Consulting Engineer: 016 932 0089
Description
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdfThembisile Hani Local Municipality is seeking to establish a panel of electrical contractors for the supply, delivery, and installation of high mast lights on an as-and-when-required basis for a period of 36 months. The panel arrangement allows the municipality to call upon pre-qualified contractors as needs arise rather than conducting individual tenders for each project. Project reference: THLM/SCM23/2025-2026/E04.
Submission Guidelines
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Returnable Documents: This appears to be the T2 Returnable Documents cover page. Specific submission requirements, forms, and returnable document checklist are not visible in this extracted section. Bidders should obtain the complete T2 document package to identify all required submissions and potential disqualification criteria.
Evaluation Criteria
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Must be a registered electrical contractor. Must comply with all municipal supply chain management policies and relevant South African regulations. Must submit complete tender documentation including witness-signed returnable documents.
Technical Specifications
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)Scope: Appointment of a panel of electrical contractors for the supply, delivery, and installation of high mast lights.
Duration: 36 months (as and when required basis).
Client: Thembisile Hani Local Municipality.
Project Number: THLM/SCM23/2025-2026/E04.
Note: Detailed technical specifications, deliverables, standards, and service level requirements are not included in this document section. Bidders should request the full technical specifications document.
Compliance Requirements
Source: 4 High Masts_Returnable Documents Cover page - PRINT IN YELLOW.pdf (unknown)No specific compliance requirements found in this document section. Bidders should consult the complete tender documentation for CSD registration, tax clearance, B-BBEE certification, CIDB grading, and any local content requirements that may apply.
Description
Source: 10 High Mast _Bill of Quantities.pdfThe tender is for the appointment of a panel of contractors for the supply, delivery, and installation of high mast lights within Thembisile Hani Local Municipality over 36 months.
Evaluation Criteria
Source: 10 High Mast _Bill of Quantities.pdf (unknown)While explicit pre-qualification criteria are not detailed in the provided extract, contractors must demonstrate capability to meet stringent technical specifications, provide all required certifications (structural, galvanizing, SANS, concrete), and have capacity for a 36-month panel appointment. Experience with high mast lighting installation, solar PV systems, and compliance with South African National Standards (SANS) is essential. Financial capacity to handle provisional sums and dayworks is also implied.
Technical Specifications
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Scope: Supply, delivery, and installation of high mast lighting systems within Thembisile Hani Local Municipality.
Quality Management
Source: 10 High Mast _Bill of Quantities.pdfExtensive quality assurance and certification requirements are specified.
Pricing Schedule
Source: 10 High Mast _Bill of Quantities.pdf (unknown)The tenderer must complete the detailed Bill of Quantities pricing schedule.
Financial Requirements
Source: 10 High Mast _Bill of Quantities.pdf (unknown)Pricing must be submitted via the provided Bill of Quantities (BoQ) schedule.
Compliance Requirements
Source: 10 High Mast _Bill of Quantities.pdf (unknown)The document lists general contractual and safety compliance items but does not specify standard tender compliance certificates (e.g., CSD, B-BBEE, tax).
Health & Safety
Source: 10 High Mast _Bill of Quantities.pdfSafety compliance is listed as a required line item in the Bill of Quantities.
Contractual Terms
Source: 10 High Mast _Bill of Quantities.pdfThe document references standard contractual compliance as a line item but does not detail specific terms, duration, or conditions.
Important Dates
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Contact Information
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Technical Enquiries:
SCM Enquiries:
Municipal Manager: Mr D.J.D. Mahlangu
Physical Submission Address: Municipality's Offices, Stand Number 24, Mthombomuhle (Kwaggafontein C)
Submission Guidelines
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Evaluation Criteria
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Must have CIDB grading 5EP or higher; cannot be in service of the state or have directors/managers in state service; cannot be municipal advisors/consultants; must comply with preferential procurement regulations; facsimile or emailed bids not accepted.
Technical Specifications
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Financial Requirements
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Compliance Requirements
Source: 2 High Masts Contents Notice - PRINT IN WHITE.pdf (TENDER)Evaluation Criteria
Source: 8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf (unknown)While this specific clause does not list general tender eligibility criteria, it establishes a mandatory contractual condition: any appointed contractor must be willing and legally able to assume full, sole liability for all Occupational Health and Safety Act compliance as detailed in the agreement. Failure to agree to these terms would disqualify a bidder.
Compliance Requirements
Source: 8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf (unknown)Contractor must comply with all duties, obligations, and prohibitions under the Occupational Health and Safety Amendment Act, 1993 (the ACT) and its regulations. Contractor must acquaint all officials and employees with relevant ACT provisions. Contractor must adhere to any employer-prescribed arrangements and procedures for the work. Contractor bears sole liability for compliance and absolves the employer and consulting engineers from these obligations.
Contractual Terms
Source: 8. 2 High Masts_Safety Agreement -PRINT ON YELLOW.pdf (unknown)Agreement is concluded under Section 37(2) of the Occupational Health and Safety Amendment Act, 1993. Contractor and employer enter into a mandatory agreement for a specific contract number, with contractor accepting sole liability for compliance with ACT duties, obligations, and prohibitions.
Contact Information
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Department: Supply Chain Management. No specific contact person, email, phone, or address provided.
Submission Guidelines
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Returnable documents must be submitted as specified. Ensure all required forms are completed and signed. Disqualification may occur if submission guidelines are not followed.
Returnable Documents
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Additional relevant documents are required as per Part C4.
Evaluation Criteria
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Must be a registered electrical contractor; compliance with Thembisile Hani Local Municipality SCM Policy; ability to meet Health and Safety specifications; capability to perform supply, delivery, and installation of high mast lights; good standing with regulatory bodies
Technical Specifications
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Scope: Appointment of a panel of electrical contractors for the supply, delivery, and installation of high mast lights as and when required. Duration: 36 months. Project number: THLM/SCM23/2025-2026/E04.
Compliance Requirements
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdf (unknown)Required documents include: Thembisile Hani Local Municipality Supply Chain Management Policy, Health and Safety Specification, and Kwaggafontein B and C Geotechnical Report.
Health & Safety
Source: 13 High Masts_Add Relevant Information - PRINT IN WHITE.pdfHealth and Safety Specification is a required document. Also includes Thembisile Hani Local Municipality Supply Chain Management Policy and Kwaggafontein B and C Geotechnical Report.
Contact Information
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Submission Guidelines
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Returnable Documents
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Evaluation Criteria
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)While explicit pre-qualification criteria (like CIDB grading) are not detailed in this excerpt, the document implies eligibility through compliance mandates: Subcontractors must be CIDB registered in the appropriate work class; all entities must be registered on the Central Supplier Database (CSD); and subcontractors must be in good standing with COIDA and the relevant Bargaining Council. The tender is likely aimed at contractors capable of handling electrical and civil works for high mast lighting installations.
Technical Specifications
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Quality Management
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfPricing Schedule
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfFinancial Requirements
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Compliance Requirements
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)B-BBEE Requirements
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdf (unknown)Health & Safety
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfContractual Terms
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfSection
Source: 8 High Masts_Contract Data - PRINT ON YELLOW.pdfDescription
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfSubmission Guidelines
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Evaluation Criteria
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)General
Technical
Financial
Legal
Technical Specifications
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Methodology
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfQuality Management
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfPricing Schedule
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfFinancial Requirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Compliance Requirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)B-BBEE Requirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Health & Safety
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfEnvironmental
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfContractual Terms
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfRequirements
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdf (unknown)Section
Source: 11 StreetLights_Scope of Work - PRINT IN BLUE Revised.pdfDescription
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfImportant Dates
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Briefing Session
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Contact Information
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Submission Guidelines
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Returnable Documents
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Evaluation Criteria
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)CIDB
Contractors must be registered with CIDB at **4EP or higher** (or capable of registration before evaluation). Joint ventures must have all members CIDB-registered, with the lead partner at 4EP or higher.
Legal
Financial
B-BBEE
Preference points (20%) awarded for B-BBEE compliance (specific goals).
Past Performance
Minimum **75/100 points** in functionality (organizing/staffing, plant, experience) to qualify for price evaluation.
Technical Specifications
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Experience & Qualifications
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfQuality Management
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfPricing Schedule
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfFinancial Requirements
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Compliance Requirements
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Health & Safety
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfContractual Terms
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfSpecial Conditions
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Requirements
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdf (TENDER)Section
Source: 3 High Mast Lights _Tender data - PRINT IN PINK.pdfRelevant to public transport, fleet, logistics and subsidised transport service contracts.
Relevant because this tender appears to involve transport, fleet, logistics, public transport, vehicles, or road operations.
Act 93 of 1996
Relevant to roadworthiness, vehicle compliance and operator requirements in transport contracts.
Relevant because this tender appears to involve transport, fleet, logistics, public transport, vehicles, or road operations.
Data conflicts
None detected
Get deep intelligence on Office administrative, office support and other business support activities. Unlock full pricing strategies, bid frequency, and historical win rates.