Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
Hely Hutchinson road - Quigney - East London - 5201
Organization Type
GOVERNMENT
Published
24 Jul 2026
OCDS Reference
ocds-9t57fa-163478
This tender is for the supply, delivery, removal of existing units, installation, and testing of 21 air conditioning units at the port of east london over a four-month period. IT is a request for quotation issued by TRANSNET soc ltd, targeting contractors experienced in HVAC systems and construction projects. The contract will be governed by the nec3 engineering and construction contract.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 10 August 2026 - 16:00
Venue
A Non-Compulsory Tender Clarification Meeting will be conducted via MS Teams please click here to ac
This tender may be downloaded directly from the national treasury etender publication portal at www.etenders.gov.za And the TRANSNET website: the TRANSNET digital procurement system (tdps) supplier submission portal can be accessed as follows:a) log on to the TRANSNET esupplier website/portal (https://esupplierportal.transnet.net/portal/)FOR Free of charge. To view the CIDB tender notice please refer to: https://www.cidb.org.za/cidb-tenders/currenttenders/
Request for Quotation
Hely Hutchinson road - Quigney - East London - 5201
Recommended Certifications
Having these can improve your winning chances: NERSA Registration, PV GreenCard (Solar Installation)
AI Document Analysis Stages
Description
Source: 4. Part C3 Works Information and Drawingsx.pdf24 Jul
2026
Tender Published
Tender was published
10 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
5. NEC Contract.pdf
Transnet SOC Ltd invites tenders for the supply, delivery, removal of existing units, installation, and testing of 21 air conditioning units at the Port of East London over a 4-month period, using the NEC3 Engineering and Construction Contract.
4. Part C3 Works Information and Drawingsx.pdf
The Transnet SOC Ltd tender is for the supply, delivery, removal of existing air conditioning units, installation, and testing of twenty-one (21) air conditioning units at the Port of East London for a period of four (4) months.
1. Request for Quotation x.pdf
Transnet SOC Ltd invites bids for the supply, delivery, removal of existing units, installation, and testing of 21 air conditioning units at the Port of East London over a 4-month period. The tender follows a multi-stage electronic submission and evaluation process.
2. Technical Evaluation.pdf
Transnet SOC Ltd invites bids for the supply, delivery, removal of existing units, installation, and testing of 21 air conditioning units at the Port of East London over a 4-month period. The evaluation is based on a technical functionality assessment with a minimum threshold score of 60 out of 100.
3. Form of Offer and Acceptance.pdf
Transnet SOC Ltd seeks a contractor to supply, deliver, install, test, and remove existing air conditioning units at the Port of East London. The contract involves 21 units of various types (split, cassette, console) over a 4-month period. The document includes a Form of Offer and Acceptance, pricing instructions based on NEC3 ECC Option A, and a detailed Activity Schedule for cost breakdown.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure Transnet tenders using AI Matching & Recommendations, logistics infrastructure intelligence, compliance analysis, and application support for rail, ports, and pipelines.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 972 578
Range
Based on 13 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)Evaluation Criteria
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)The contractor must have the necessary expertise and experience in air conditioning installation and maintenance, and must comply with all relevant laws and regulations, including those related to safety and environmental protection.
Technical Specifications
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)Scope of Works:
New Unit Types and Locations:
Technical Requirements:
Completion and Testing:
Methodology
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)Quality Management
Source: 4. Part C3 Works Information and Drawingsx.pdfCompliance Requirements
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)Standards and Regulations:
Safety and Environmental:
Health & Safety
Source: 4. Part C3 Works Information and Drawingsx.pdfEnvironmental
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)Contractual Terms
Source: 4. Part C3 Works Information and Drawingsx.pdfRequirements
Source: 4. Part C3 Works Information and Drawingsx.pdf (unknown)Section
Source: 4. Part C3 Works Information and Drawingsx.pdfImportant Dates
Source: 1. Request for Quotation x.pdf (RFQ)Contact Information
Source: 1. Request for Quotation x.pdf (RFQ)Submission Guidelines
Source: 1. Request for Quotation x.pdf (RFQ)Evaluation Criteria
Source: 1. Request for Quotation x.pdf (RFQ)Mandatory CIDB registration as a contractor in a grading designation of 2ME or higher. For Joint Ventures, each member must be CIDB registered, the lead partner must be no lower than one level below the required class, and a certified joint venture agreement is required. Bidders must pass administrative checks (timely submission, signed documents, etc.) and substantive checks (priced offer, CIDB compliance). A minimum functionality score of 60 points is required to proceed to price evaluation.
Technical Specifications
Source: 1. Request for Quotation x.pdf (RFQ)Financial Requirements
Source: 1. Request for Quotation x.pdf (RFQ)Compliance Requirements
Source: 1. Request for Quotation x.pdf (RFQ)Description
Source: 3. Form of Offer and Acceptance.pdfThe description of the goods and services includes the supply, delivery, installation, and testing of twenty-one (21) air conditioning units at the Port of East London for a period of four (4) months.
Contact Information
Source: 3. Form of Offer and Acceptance.pdf (RFQ){"name":null,"email":null,"phone":null,"department":"S, INSTALLATION","address":"n the conditionsofcontract identified"}
Submission Guidelines
Source: 3. Form of Offer and Acceptance.pdf (RFQ)The tenderer must complete the Form of Offer manually, and the amounts must correspond with the prices submitted electronically. The tenderer must also submit a Schedule of Deviations, if any, which outlines any deviations from the tender documents. The Employer will accept the tenderer's Offer by signing the Acceptance part of the Form of Offer and Acceptance, and returning one copy of the document to the tenderer before the end of the period of validity stated in the Tender Data.
Evaluation Criteria
Source: 3. Form of Offer and Acceptance.pdf (RFQ)Tenderers must have a valid CIDB registration number (to be provided in the Form of Offer). They must examine all tender documents, including any addenda, and accept the Conditions of Tender. The contractor must be able to provide required securities, bonds, guarantees, and proof of insurance within two weeks of contract acceptance. No eligibility criteria beyond CIDB registration and agreement to contract terms are explicitly stated in the provided excerpt.
Technical Specifications
Source: 3. Form of Offer and Acceptance.pdf (RFQ)The technical specifications include the supply, delivery, installation, and testing of twenty-one (21) air conditioning units at the Port of East London for a period of four (4) months. The specifications also include the removal of existing air conditioning units and the supply of all necessary cabling, circuit breakers, plugs, and other materials required for the complete installation.
Quality Management
Source: 3. Form of Offer and Acceptance.pdfThe quality management requirements include the supply of all necessary cabling, circuit breakers, plugs, and other materials required for the complete installation. The tenderer must also ensure that all work is carried out in accordance with the specifications and the contract.
Pricing Schedule
Source: 3. Form of Offer and Acceptance.pdfThe pricing schedule includes the priced Activity Schedule, which outlines the costs of all direct and indirect costs, overheads, profits, risks, liabilities, and obligations relative to the contract. The tenderer must also submit a total price, which includes all costs and a 15% VAT.
Financial Requirements
Source: 3. Form of Offer and Acceptance.pdf (RFQ)The financial requirements include the pricing data, which is outlined in Part C2 of the contract. The tenderer must submit a priced Activity Schedule, which includes the costs of all direct and indirect costs, overheads, profits, risks, liabilities, and obligations relative to the contract. The tenderer must also submit a total price, which includes all costs and a 15% VAT.
Compliance Requirements
Source: 3. Form of Offer and Acceptance.pdf (RFQ)The compliance requirements include the Certificate of Compliance, which must be submitted by the tenderer. The tenderer must also comply with all health and safety requirements, as outlined in the contract.
Contractual Terms
Source: 3. Form of Offer and Acceptance.pdfThe contractual terms include the Form of Offer and Acceptance, which outlines the terms and conditions of the contract. The tenderer must accept the Conditions of Tender and submit a priced Activity Schedule.
Special Conditions
Source: 3. Form of Offer and Acceptance.pdf (RFQ)Schedule of Deviations Note: To be completed by the Employer prior to award of contract. This part of the Offer & Acceptance would not be required if the contract has been developed by negotiation between the Parties and is not the result of a process of competitive tendering.
Description
Source: 2. Technical Evaluation.pdfThe description of the project includes the supply and installation of an Air Conditioning Unit or similar work.
Contact Information
Source: 2. Technical Evaluation.pdf (unknown){"name":null,"email":null,"phone":null,"department":"s at the Port of East London","address":"Air Conditioning Unit or similar work."}
Submission Guidelines
Source: 2. Technical Evaluation.pdf (unknown)The bidder must submit a returnable document. The document should include a Comprehensive method statement detailing how the supply and installation of the air conditioning Units will be executed.
Evaluation Criteria
Source: 2. Technical Evaluation.pdf (unknown)Bidders must meet all mandatory proof requirements for each evaluation category. Failure to submit the specified documents (e.g., reference letters, qualifications, CVs, method statement, SHE plans) will result in low scores or disqualification. The minimum threshold of 60 points must be achieved overall.
Technical Specifications
Source: 2. Technical Evaluation.pdf (unknown)The technical specifications include the supply and installation of an Air Conditioning Unit or similar work. The bidder must submit a Comprehensive method statement detailing how the supply and installation of the air conditioning Units will be executed. The method statement shall include a minimum of three (3) of the following Five aspects: 1. Procure/Supply the air conditioners, 2. Installation of new air conditioners, 3. Testing of air conditioners, 4. Disposal of waste, making good on site, 5. Provide project schedule indicating all the project milestones with project activities.
Experience & Qualifications
Source: 2. Technical Evaluation.pdfThe experience and qualifications requirements include the submission of a minimum of three (3) signed reference letters, a signed Practical Completion Certificate of previous projects, and a valid letter of good standing with the Workmen’s Compensation Fund.
Quality Management
Source: 2. Technical Evaluation.pdfThe quality management requirements include the submission of a Comprehensive method statement detailing how the supply and installation of the air conditioning Units will be executed.
Compliance Requirements
Source: 2. Technical Evaluation.pdf (unknown)The compliance requirements include the submission of a signed Practical Completion Certificate of previous projects, a minimum of three (3) signed reference letters, and a valid letter of good standing with the Workmen’s Compensation Fund. The bidder must also demonstrate previous company experience in the supply and installation of an Air Conditioning Unit or similar work.
Health & Safety
Source: 2. Technical Evaluation.pdfThe health and safety requirements include the submission of a SHE Management Plan that addresses the project scope and SHE requirements.
Section
Source: 2. Technical Evaluation.pdfThe evaluation criteria include the Technical Functionality Evaluation Criteria for the Supply, Delivery, and Installation of Air Conditioning Units at the Port of East London.
Important Dates
Source: 5. NEC Contract.pdf (RFQ)Contact Information
Source: 5. NEC Contract.pdf (RFQ)Submission Guidelines
Source: 5. NEC Contract.pdf (RFQ)Returnable Documents: The tenderer must complete the Contract Data in Part C1.2 Part Two. An example is provided on pages 156-158 of the NEC3 ECC3 Guidance Notes. The tenderer is advised to read the NEC3 Engineering and Construction Contract and its Guidance Notes to understand the implications of the data.
Returnable Documents
Source: 5. NEC Contract.pdf (RFQ)Evaluation Criteria
Source: 5. NEC Contract.pdf (RFQ)Contractor must be legally registered entity capable of entering into contract under South African law. Must have capacity to obtain required insurances from approved insurers. If a joint venture, must provide detailed joint venture agreement meeting specified requirements. Subject to vetting by State Security Agency (SSA) for security clearances due to access to National Key Points. Must not be involved in tender rigging/collusion.
Technical Specifications
Source: 5. NEC Contract.pdf (RFQ)Methodology
Source: 5. NEC Contract.pdf (RFQ)Quality Management
Source: 5. NEC Contract.pdfFinancial Requirements
Source: 5. NEC Contract.pdf (RFQ)Compliance Requirements
Source: 5. NEC Contract.pdf (RFQ)Health & Safety
Source: 5. NEC Contract.pdfContractual Terms
Source: 5. NEC Contract.pdfSection
Source: 5. NEC Contract.pdf (RFQ)10.1 The Employeris: Transnet SOC Ltd (Registration No. 1990/000900/30)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 4 of 2006
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 28 of 2002
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Act 40 of 2004
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
Address
Level 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
5
Last checked
24 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
subsidiary of Transnet
Contact
031-361-8589[email protected]www.transnet.netLevel 200, Carlton Centre, 150 Commissioner St, Cbd, Johannesburg, 2001, South Africa
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Electricity, gas, steam and air conditioning. Unlock full pricing strategies, bid frequency, and historical win rates.