Skip to main content

actom

Supplier Forensic Analysis · Scanned: 2026/06/15

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
20
Total Value
R 552M

Recent Awards

20 awards · Total: R 551 553 016,08

Showing 5 of 20
ENG 027 OF 2021
Unknown Department
Ref: 12911
R 0,00
N/A
KZN0131/TS
Unknown Department
Ref: 5662
R 0,00
N/A
DSM 10/23
Unknown Department
Ref: 54781
R 0,00
N/A
REPAIRS OF AN HR97 INTERLOCKING SYSTEM EQUIPMENT (ACTOM) USED IN THE KZN REGION FOR 24 MONTHS ON AN AS AND WHEN REQUIRED BASIS
Passenger Rail Agency of South Africa (PRASA)
R 1 000 000,00
24 Feb 2026
Overhauling of fuel forwarding electrical motors at Ankerlig and Gourikwa Power Station
Eskom
Ref: E1171GXPOU
R 7 351 502,40
03 Nov 2025

15 More Awards

View complete award history with full tender details.
Paid access from R499/mo

or upgrade to Pro Subscription

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →